PORTFOLIOCERTIFICATE OF COMPLETION
Modular Construction and Construction Efficiency
PORTFOLIOCERTIFICATE OF COMPLETION
Traditional Building Construction Methods
Highlights of obstacles•Building site conditions•Adverse weather conditions•Multiple trade scheduling•Special Inspections•Material availability issues•Critical Path and “domino” effect
• Window and GWB example
PORTFOLIOCERTIFICATE OF COMPLETION
Manufactured Product Assembly Process
Highlights of efficiencies•Controlled environment•Detailed engineering and modeling•Prototype development •Internal coordination•Extensive Quality Control•Material planning•Precision details and assembly
PORTFOLIOCERTIFICATE OF COMPLETION
Integration of construction and manufacturing
Obstacles overcome•Project control through schedule•Extensive shop drawing and engineering •Model and prototype development•MRP system integration•In-house quality control systems
• Window flashing example•Compressed time-frame for completion•Increased off-site fabrication trend
• Wall panels• Precast concrete• Trusses• Structural Systems
PORTFOLIOCERTIFICATE OF COMPLETION
Project Planning and Detailing ProcessModular Construction Design Process•Modular fabricator involved early to optimize advantages•Integrated systems and details•Design for Manufacturability•Detailed shop drawing and submittals•Extensive planning:
• Parametric Programming• Materials Resource Planning
•Coordinated details in-plant carryover to field
PORTFOLIOCERTIFICATE OF COMPLETION
Project Planning and Detailing ProcessStandardization and Performance•Standard details increase performance•Streamlined design process•Variables and coordination limited•Detailed specification review early in design •Optimization of selected finishes•Virtual real-time pricing updates•Compressed submittal process•Single source for potential conflicts
PORTFOLIOCERTIFICATE OF COMPLETION
Project Efficiencies - SchedulingSchedule Performance Enhanced•Coincident on-site and off-site tasks
• On-site construction tasks • Modular fabrication off-site
•Coordinated start dates and work•Modular schedule precision•Erection•Completion of building at site
PORTFOLIOCERTIFICATE OF COMPLETION
Project Efficiencies – Quality AssuranceQuality Control Systems and Procedures•Detailed systems for inspections
• Structural Steel• Welding• Concrete• MEP Systems• Fire rated assemblies• Finishes and casework
•Documentation• QC Travelers• Engineering change documentation• Database of deficiencies and corrective action• Post-Occupancy response
PORTFOLIOCERTIFICATE OF COMPLETION
Energy Efficiency – Reduced WasteMaterial Optimization•Optimized usage planning
• Steel Framing• Gypsum Wallboard• Cast Iron, Copper and Steel Pipe• Electrical wiring
•Reduction of refuse• Gypsum recycling• Cardboard recycling• Steel waste virtually eliminated• Results in 70% reduced refuse per SF
PORTFOLIOCERTIFICATE OF COMPLETION
Energy Efficiency – Energy AnalysisEarly stage energy modeling•In-house energy analysis
• eQuest schematic modeling• Advanced life-cycle performance• Optimized equipment
•Trade-off cost analysis• Baseline cost projections• Marginal cost analysis• Historical cost data• Optimized envelope performance
• How much is too much?Standard Practice Energy Savings• Reduced waste• Optimized envelope• Infiltration performance• Energy Star
PORTFOLIOCERTIFICATE OF COMPLETION
Overall Efficiency – Various BenefitsVarious benefits•Local neighborhood impact
• Reduced on-site noise• Shortened Construction time• Reduced deliveries
•Worker health benefits• 40-60% indoor work• Managed particulate program• Vision safety controls
•Increased worker safety• Cleaner work environment• All work at one-story• Safety training program and supporting
environment
PORTFOLIOCERTIFICATE OF COMPLETION
Modular Construction and Construction Efficiency