22
888-320-8050 www.MBSI.com

Modular building systems international (mbsi) modular buildings and construction

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Modular building systems international (mbsi) modular buildings and construction

888-320-8050

www.MBSI.com

Page 2: Modular building systems international (mbsi) modular buildings and construction

Key Contact

Patricia Berk - President & Owner of MBSI• Patricia Berk incorporated MBSI in April of 2000.

• MBSI has become the leading environmentally consciousmodular company in the State of Florida.

• Prior to MBSI, Ms. Berk held positions as Executive VicePresident and was a shareholder of ASAP Office Buildings

in Orlando, Florida, 1996-1999.• Branch Manager for the Central Florida branch of Space

Master International, 1993-1996.• Account Executive for Diamond Engineered Space, 1989-

1993.

• Phone 888-320-8050GUATEMALA HOUSING REVITALIZATION

Page 3: Modular building systems international (mbsi) modular buildings and construction

About MBSI

• MBSI is a solely owned corporation based in theState of Florida, United States.

• MBSI is a certified general contracting firm,specializing in modular construction with Turn KeyServices.

• The Company was established April 10, 2000 withit’s primary business in the South East, USA.

• MBSI has established themselves in the alternativebuilding marketplace as a leader with energy

efficient and environmentally friendly buildings.

GUATEMALA HOUSING REVITALIZATION

Page 4: Modular building systems international (mbsi) modular buildings and construction

MBSI’s Mission

• To exceed client expectations throughhonest communication, quality construction

and sensitivity for the environment, whilefostering a safe, creative and ethicalworkplace that provides unlimitedopportunities.

• To be major contributor to the developmentand quality of modular construction whileproviding impeccable customer service and

communication.GUATEMALA HOUSING REVITALIZATION

Page 5: Modular building systems international (mbsi) modular buildings and construction

MBSI Business Philosophy

• To attain successful long-term relationshipsthrough truthful and honest business

procedures.

- Utilize proven manufacturers, qualitymaterials, and provide cost effective

construction.

- Committed to meeting all clientrequirements, for total customer satisfaction.

GUATEMALA HOUSING REVITALIZATION

Page 6: Modular building systems international (mbsi) modular buildings and construction

Environmental Focus• Provider of the first platinum-levelLeadership, Energy and Environmental

Design (LEED) Certified modular school inthe State of Florida

• Introduced green building practices in allaspects of MBSI as standard practices.

• We use use certified green products in ourmodular buildings in order to minimize offgassing and conserve energy

GUATEMALA HOUSING REVITALIZATION

Page 7: Modular building systems international (mbsi) modular buildings and construction

Market Sectors• Commercial Housing

- Group treatment homes, Dormitories, Military Housing,Worker Camps

• Schools- Charter, Public and Private, Gymnasiums, Classrooms,

Auditoriums• Medical

- CT/MRI Buildings, X-Ray Storage, AdministrativeBuildings, Doctors Offices, Hospitals, Laboratories

• Churches/Places of Worship - Daycare & Child Care, Offices, Fellowship Halls,Sanctuary's, Business Offices

• Government- Administrative Offices, dormitories, field

stations,Grelocatable medical centers

Page 8: Modular building systems international (mbsi) modular buildings and construction

Types of Products Provided

• Factory Built Modular Structures

• Pre-engineered Steel Buildings

• Turn Key Site Services

• Building Accessories

GUATEMALA HOUSING REVITALIZATION

Page 9: Modular building systems international (mbsi) modular buildings and construction

Recent Completed Projects

• Shands Hospital MRI/CT Scan ModularFacility

• Learning Gate Community School, PlatinumLevel LEED Certified Hillsboro CountyPublic Charter School.

www.learninggate.org• Terrace Community Charter Middle School-Hillsboro County Public Charter School

• 50,000 sq. ft. classroom space EmbryRiddle Aeronautical University

GUATEMALA HOUSING REVITALIZATION

Page 10: Modular building systems international (mbsi) modular buildings and construction

Jacksonville Medical Center• MRI/CT can, type II non

combustible modularmedical facility.

• 5000 Square feet.• Contracted November2007• Finished March 2008

To know about MBSI’s other medical buildings and projects, visit http://mbsi.com/building-types/medical.html

Page 11: Modular building systems international (mbsi) modular buildings and construction

Learning Gate School

• 9 Classrooms, 8000Sq. Feet

• First Platinum LEEDCertified ModularSchool in U.S.• Receiving National

Attention• www.learninggate.org

To know about MBSI’s other educational buildings and projects,visit http://mbsi.com/building-types/education.html

Page 12: Modular building systems international (mbsi) modular buildings and construction

Terrace CommunityCharter School

• Built in 2007• Two Buildingstotaling 36,000 sq.feet.• Administrative

Offices• Gymnasium

• 30 Classrooms• Cafeteria

Page 13: Modular building systems international (mbsi) modular buildings and construction

An Overview of thePermanent/Relocatable Modular Construction

Engineering & SubmittalsSite Development

Modular ConstructionStaging & Installation

Interior & Exterior FinishesProject Completion

2000 Modular Building Systems Intl.

Page 14: Modular building systems international (mbsi) modular buildings and construction

Design Engineering• Unlimited Design Assistance

• FL Engineered Blueprints

• PE /Architect Coordination

• Local Permitting Administration

Design Site Development

Modular Construction

Staging and Installation Finishout Completion

2000 Modular Building Systems Intl.

Page 15: Modular building systems international (mbsi) modular buildings and construction

Site Development

• Site preparation

• Foundations

• Logistics and receiving for staging

Design Site Development

Modular Construction

Staging and Installation Finishout Completion

2000 Modular Building Systems Intl.

Page 16: Modular building systems international (mbsi) modular buildings and construction

Modular Construction Process• Begin Manufacturing Modules• Quality control/Documentation• State of FL building approval

• Delivery to Site

Design Site Development

Modular Construction

Staging and Installation

2000 Modular Building Systems Intl.

Finishout Completion

Page 17: Modular building systems international (mbsi) modular buildings and construction

Staging & Installation

• Foundation Development prior toDelivery

• Staging on or near existing site• Set-up and installation• Begin on-site finishes

Design Site Development

Modular Construction

GUATEMALA

Staging and Installation

Begin Finishout

2000 Modular Building Systems Intl.

Finishout Completion

Page 18: Modular building systems international (mbsi) modular buildings and construction

Begin On Site Finishes• As modular building is installed, on site Interior &

Exterior finishes Begin

• Full Time Construction Management

Design Site Development

Modular Construction

Staging and Installation

Begin Finishout

2000 Modular Building Systems Intl.

On Site CompletionFinishes

Page 19: Modular building systems international (mbsi) modular buildings and construction

Interior Finishes• Interior finishes are completed

• Full Time Construction Management and Coordination of Interior Contractors

Design Site Development

Modular Construction

Staging and Installation

Begin Finishout

2000 Modular Building Systems Intl.

Interior CompletionFinishes

Page 20: Modular building systems international (mbsi) modular buildings and construction

Finish Out•Exterior finishes completed:

•Exterior siding, sidewalks, canopies, etc

Design Site Development

Modular Construction

Staging and Installation

Begin Finishout

2000 Modular Building Systems Intl.

Exterior CompletionFinishes

Page 21: Modular building systems international (mbsi) modular buildings and construction

Completion• Final walkthrough of building

• Test HVAC, Electrical & Plumbing

• Substantial Completion Signed Off

Design Site Development

Modular Construction

Staging and Installation

Begin Finishout

2000 Modular Building Systems Intl.

Finishout Completion

Page 22: Modular building systems international (mbsi) modular buildings and construction

Project Completed

Design Site Development

Modular Construction

Staging and Installation

Begin Finishout

2000 Modular Building Systems Intl.

Finishout Completion