1
Part I: Overview of Business John Deere Ottumwa Works has been in business since 1910 when they bought the Dain Manufacturing Company. They currently make a round baler, large and small square baler, windrower, forage harvester and mower conditioner equipment. Approximately 850 employees make over 10,000 units per year. Part II: Job Specifics The key to building anything at John Deere is identifying a need, defining the problem , breaking down the problem into smaller problems to be solved, like the design process the manufacturing processes , the prototype testing and marketing processes. Each new product at John Deere requires new fixture weld tooling. Weld fixtures are constantly redesigned and retooled for a new part. In much the same way students will design and rebuild a modified trailer in metals classes. Part III: Introduce the Problem The project is to take an existing boat trailer and design, modify, build and test a kayak trailer that will accommodate 8 kayaks Part IV: Background The students in Metals 2 will use the skills learned in Metals 1 to complete the project. These will include sketching, layout, measurement, cutting, grinding,welding preparation, MIG welding, painting, and testing. Some remedial training up of skills taught in Metals 1 may be needed. They will also brainstorm possible solutions. Part V: Business Solution Students will brainstorm and research the question. How do you think John Deere would go about solving this problem? Invite John Deere Engineer to come hear student answers . John Deere Manufacturing engineer explains how it would be done at John Deere. Part VI: Student Solutions I think students will come up with several designs that would complete the project. Students will determine how much different designs cost to build. Can we make it cheaper? Will a cheaper solution compromise strength? Brett Phippen Automotive and Metals Ottumwa High School John Deere Ottumwa Works Modifying A Boat Trailer

Modifying A Boat Trailer Brett...Modifying A Boat Trailer Title Phippen, Brett_PBL storyboard_Deere Ottumwa Created Date 9/4/2018 5:18:26 PM

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Modifying A Boat Trailer Brett...Modifying A Boat Trailer Title Phippen, Brett_PBL storyboard_Deere Ottumwa Created Date 9/4/2018 5:18:26 PM

PartI:OverviewofBusinessJohn DeereOttumwaWorkshasbeeninbusinesssince1910whentheyboughttheDainManufacturingCompany.Theycurrentlymakearoundbaler,largeandsmallsquarebaler,windrower,forageharvesterandmowerconditionerequipment.Approximately850employeesmakeover10,000unitsperyear.

PartII:JobSpecificsThe keytobuildinganythingatJohnDeereisidentifyinganeed,definingtheproblem,breakingdowntheproblemintosmallerproblemstobesolved,likethedesignprocessthemanufacturingprocesses,theprototypetestingandmarketingprocesses.EachnewproductatJohnDeererequiresnewfixtureweldtooling.Weldfixturesareconstantlyredesignedandretooledforanewpart.Inmuchthesamewaystudentswilldesignandrebuildamodifiedtrailerinmetalsclasses.

PartIII:IntroducetheProblemThe projectistotakeanexistingboattraileranddesign,modify,buildandtestakayaktrailerthatwillaccommodate8kayaks

PartIV:BackgroundThe studentsinMetals2willusetheskillslearnedinMetals1tocompletetheproject.Thesewillincludesketching,layout,measurement,cutting,grinding,weldingpreparation,MIGwelding,painting,andtesting.Some remedialtrainingupofskillstaughtinMetals1maybeneeded.Theywillalsobrainstormpossiblesolutions.

PartV:BusinessSolutionStudentswillbrainstormandresearchthequestion.How doyouthinkJohnDeerewouldgoaboutsolvingthisproblem?Invite JohnDeereEngineertocomehearstudentanswers.JohnDeereManufacturingengineerexplainshowitwouldbedoneatJohnDeere.

PartVI:StudentSolutionsI thinkstudentswillcomeupwithseveraldesignsthatwouldcompletetheproject.Studentswilldeterminehowmuchdifferentdesignscosttobuild.Canwemakeitcheaper?Willacheapersolutioncompromisestrength?

BrettPhippenAutomotiveandMetalsOttumwaHighSchoolJohnDeereOttumwaWorks

ModifyingABoatTrailer