34
Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

Embed Size (px)

Citation preview

Page 1: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

Modeling Tres-Amigas Update

Modeling Work Group Meeting

February 10, 2011

WECC Staff

Page 2: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

Adjustments to the Modeling of the Tres-Amigas Project

Page 3: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

Background

Page 4: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

Background

● Modeling the Tres-Amigas Project This model was developed by Z-Global. This model consists of a set of energy cost curves

that describes the price at which the SPP and ERCOT markets are willing to buy or sell power with WECC.

The cost curves do not represent the entire supply curves for the ERCOT and SPP markets. Rather the cost curves represent the subset of the generation fleet in SPP and ERCOT that is expected to participate in the WECC energy market.

4

Page 5: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

Background

● At the last Modeling Work Group meeting it was suggested that this approach may be overly optimistic. The subset of generation that was assumed to be

available to participate in the WECC market may not always be available due to high loads, forced outages, lack of transmission, etc…

Potential over-generation problems during off peak hours in ERCOT and SPP are not accounted for in the current modeling.

5

Page 6: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

Background

● During the last MWG meeting it was proposed to address the concerns stated above as follows: The unavailability of SPP and ERCOT generation to

participate in the WECC market could be modeled with an 8760 load shape.

Potential over-generation problems during off peak hours in ERCOT and SPP could be modeled with an 8760 generator shape.

These load and generator shapes would then be netted against the output of the current Tres-Amigas model.

6

Page 7: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

Implementation of the Model Adjustments

Page 8: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

Terminology

● Unavailable Generation Adjustment Accounts for the occasional unavailability of SPP and

ERCOT generation to participate in the WECC market.

Modeled with an 8760 Load Shape.

● Over-Generation Adjustment Accounts for potential over-generation problems in

SPP and ERCOT in the off peak hours. Modeled with an 8760 Generator Shape.

8

Page 9: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

Unavailable Generation Adjustment

● The Unavailable Generation Adjustment hourly shapes were created as follows:1. All hours were selected in the 2006 ERCOT and SPP

historical load shapes that were within a given ‘percentage’ of the shapes monthly peaks. ERCOT -> 28% SPP -> 20%

2. The monthly peak was multiplied by one minus this ‘percentage’ and then subtracted from the selected values.

3. The values were then normalized by multiplying each value by the ratio of the monthly peak divided by the annual peak.

9

Page 10: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

0

10000

20000

30000

40000

50000

60000

70000

1 2190 4379 6568 8757

MW

Hour of Year

ERCOT 2006 Load Step 1 - Select values above the black line

Page 11: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

1 2190 4379 6568 8757

MW

Hour of Year

ERCOT 2006 Load Step 2 - ('selected values' - 'black line')

Page 12: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

1 2190 4379 6568 8757

MW

Hour of Year

ERCOT 2006 Load Step 3 - Normalized selected values

Page 13: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

Unavailable Generation Adjustment

● Reasoning behind assumptions Since generation supply shortages and transmission

congestion problems tend to occur at times of high load it seems reasonable to use ERCOT and SPP historical load shapes as a starting point.

Since many utilities tend to schedule units out for maintenance during the winter and shoulder months it seems reasonable to allow the adjustment to be non zero during these months. Although there is a non zero adjustment during the winter and

shoulder months the magnitude of the adjustment during these months is significantly less than the adjustment during the summer months.

13

Page 14: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

0

10

20

30

40

50

60

70

80

90

100

0 2193 4386 6579 8772

pu

Hour of Year

ERCOT (Unavailable Gen Adjustment)

Page 15: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

0

10

20

30

40

50

60

1 3 5 7 9 11 13 15 17 19 21 23

pu

Hour of Day

ERCOT (Unavailable Gen Adjustment)

winter

fall

summer

spring

annual

Page 16: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

0

10

20

30

40

50

60

70

80

90

100

0 2193 4386 6579 8772

pu

Hour of Year

SPP (Unavailable Gen Adjustment)

Page 17: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

0

5

10

15

20

25

30

35

40

45

1 3 5 7 9 11 13 15 17 19 21 23

pu

Hour of Day

SPP (Unavailable Gen Adjustment)

winter

fall

summer

spring

annual

Page 18: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

Over-Generation Adjustment

● The Over-Generation Adjustment hourly shapes were created as follows:1. All hours were selected in an ERCOT and SPP wind

profile that were within a given ‘percentage’ of the profiles maximum value. ERCOT -> 40% SPP -> 60%

2. The profiles maximum value was multiplied by one minus this ‘percentage’ and then subtracted from the selected values.

18

Page 19: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

0

10

20

30

40

50

60

70

80

90

1 2190 4379 6568 8757

MW

Hour of Year

ERCOT Wind Shape Step 1 - Select values above the black line

Page 20: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

0

5

10

15

20

25

30

35

1 2190 4379 6568 8757

MW

Hour of Year

ERCOT Wind Shape Step 2 - ('selected values' - 'black line')

Page 21: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

Over-Generation Adjustment

● Reasoning behind assumptions Since over-generation problems in off peak hours can

be aggravated by wind generation it seems reasonable to use wind shapes as a starting point for this adjustment.

Only the hours of high wind generation were selected since these are the hours when wind will tend to aggravate over generation problems.

21

Page 22: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

0

20

40

60

80

100

120

0 2193 4386 6579 8772

pu

Hour of Year

ERCOT (Over-Gen Adjustment)

Page 23: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

0

10

20

30

40

50

60

1 3 5 7 9 11 13 15 17 19 21 23

pu

Hour of Day

ERCOT (Over-Gen Adjustment)

winter

fall

summer

spring

annual

Page 24: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

0

20

40

60

80

100

120

0 2193 4386 6579 8772

pu

Hour of Year

SPP (Over-Gen Adjustment)

Page 25: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

0

5

10

15

20

25

30

35

40

45

50

1 3 5 7 9 11 13 15 17 19 21 23

pu

Hour of Day

SPP (Over-Gen Adjustment)

winter

fall

summer

spring

annual

Page 26: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

Composite Shape

● The adjustment shapes for ERCOT and SPP were scaled and then combined into a Composite Shape. The adjustment shapes were scaled so that the Over-

Gen shapes and the Unavailable Gen shapes had about the same energy.

The shapes were then combined by subtracting the Unavailable Gen shapes from the Over-Gen shapes.

The Composite shape can be thought of as an adder to the generation in SPP and ERCOT that will be exported to the WECC energy market.

26

Page 27: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

0

5

10

15

20

25

30

35

40

45

50

1 3 5 7 9 11 13 15 17 19 21 23

pu

Hour of Day

ERCOT (Shapes)

Unavailable-Gen

Over-Gen

Page 28: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

0

5

10

15

20

25

30

1 3 5 7 9 11 13 15 17 19 21 23

pu

Hour of Day

ERCOT (Scaled Shapes)

Unavailable-Gen

Over-Gen

Page 29: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

-25

-20

-15

-10

-5

0

5

10

15

20

25

1 3 5 7 9 11 13 15 17 19 21 23

pu

Hour of Day

ERCOT (Composite Shape)

Page 30: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

-100

-80

-60

-40

-20

0

20

40

60

0 2193 4386 6579 8772

pu

Hour of Year

ERCOT (Composite Shape)

Page 31: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

-60

-50

-40

-30

-20

-10

0

10

20

30

1 3 5 7 9 11 13 15 17 19 21 23

pu

Hour of Day

ERCOT (Composite Shape)

winter

fall

summer

spring

annual

Page 32: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

-100

-80

-60

-40

-20

0

20

40

60

0 2193 4386 6579 8772

pu

Hour of Year

SPP (Composite Shape)

Page 33: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

-50

-40

-30

-20

-10

0

10

20

30

1 3 5 7 9 11 13 15 17 19 21 23

pu

Hour of Day

SPP (Composite Shape)

winter

fall

summer

spring

annual

Page 34: Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff

Major Assumptions Summary What percentage of the monthly load peaks should be

used when deriving the Unavailable Gen shape? Current Assumption (ERCOT -> 28% SPP -> 20%).

What percentage of the wind profiles maximum value should be used when deriving the Over-Gen shape?

Current Assumption (ERCOT -> 40% SPP -> 60%).

How should the Over-Gen and Unavailable Gen shapes be scaled before they are combined?

Current Assumption (The shapes were scaled to contain the same energy).

How should the ERCOT and SPP Composite Shapes be scaled relative to each other?

Current Assumption (Both shapes were scaled with a multiplier of one).

34