    Examine the above facts critically;Develop the most efficient and economic method.

    Define the new method; Install the new method

    Maintain the new method by regular checking.

    (ii) Two handed process chart & multiple activity chart

    14 (b)

    15. (a) (i) SIMO chart is used to record, simultaneously on a common time scale, the activities of

    two hands or other parts of workers body during the performance of a single cycle of operation

    being investigated.

    (ii) Time study Select the job to be studied.

    Note all the details about the operations and the operator being studied.

    Split the work cycle into suitable elements. An elementis a distinct part of a job, selected

    for convenience of observation, measurement and analysis. Any non-repetitive andoccasional element in the manufacturing cycle should be noted separately.

    (b)Applications : * Design of instruments and controls

    * Design of workplace * Design of working environment