7
Module Description SAP Remarks Status MM SOURCE LIST DETERMINATION Design KIIT MM Design MM Design 26/7/14 SAP MM Design KIIT 15/7/14 SAP MM Design SAP 30/7/14 SAP MM Design KIIT MM SAP DM-MM INITIAL STOCK DATA NOT COMPLETE SAP DM-MM SAP DM-MM KIIT DM-MM SAP MM Tax should be maintained. MM Release procedure dor both PR & PO . MM MM MM MM Issue Type Pending with date raised target completi on date Pending with Issues are expected when Mr. Manas Das resumes his work in SAP (KIMS, KIDS, KINS) All process are already tested for KIM KIDS KINS not an issue SAP & KIIT 1)After good issue automatic closure of PURCHASE REQUISITION New requirement came on 26th July New requirement 8)For KIMS (reservation requirement as in process : they reserve certain stock for medical consumer unit) Note : KIMS will be tested later though New requirement.Still they have not provided detail requirement to us New requirement Apart from price comparision other terms and conditions need to be compared based on which desired vendor needs to be selected for procurement Not possible and already communicated to core team. not an issue Process to be defined for Gate Entry sheet Purchase group needs to be uploaded as per material group OPEN PO/ OPEN PR UPLOADING TOOL MISSING & DATA NOT FOUND PURCHASE INFO RECORD DATA NOT AVAILABLE AGREEMENT MASTER/ MESSAGE MASTER/ SERVICE MASTER MISSING BOTH TEMPLATE AND DATA MISSING IF WE FETCH MULTIPLE PR FORT THE SAME MATERIAL THEN IN PRINT OUT OF PO WE SHOULD HAVE ONLY ONE LINE ITEM DISPLAY. GOVT PROJECT SCRIPTS NEEDS TO BE VERIFIED AGAIN. Pricing procedure needs to be changed. Seggregation of materials as per their common codes.

MM-FI normal day to day issue document

Embed Size (px)

DESCRIPTION

MM-FI Integration issue

Citation preview

MASTERModuleDescriptionIssue TypeSAP RemarksStatusPending withdate raisedtarget completion datePending withRemaks (Ratna)FICAPayment Receipt created and printed by is not displayingDesignNot an issueCompleteSAP2/8/145/8/14SAPTo be testedFICARoll no is generated after payment of counseling and registration fee and other feeDesignOffered for testingCompleteKIIT FICA Core teamSAPTo be testedFICASingle Manual RTGS EntryDesignCompleteKIIT FICA Core teamSAPTo be testedFICAStudent StipendDesignofferd for testingSAP2/8/146/8/14SAPpendingFICAWhile giving program as a selection criteria the report is showing errorDesignSAPFICAProcessing of fee in USDDesignCompleteSAP2/8/146/8/14SAPoffered but not satisfactorySLCMAcademic Structure (Subject code mapping)DesignSAP & KIITALL SCHOOL COMPLETE,LAW SCHOOL PENDINGSLCMAcademic Structure finalization for school will take some more time It is a master data which is not an issue for integration testing.Required Academic structure for IT is already finalised and also uploaded in Quality. It is go-live issueInprocessKIIT28/7/14KIITCompleted for 11 schools;to be Completed 12/8 for 13 schoolsSLCM78 ISSUE IN SLCM (EXAMINATION, ADDMISSION, MBA COUNSELLING)[6 TH SEPTEMBER FILE]DesignSAPentire list with Mr. Jaivardhan sahFICODistribution of expense profit centre wiseDesignproposed alternate solution.InprocessKIIT24/7/145/8/14SAPIn processFICOAsset purchase process finalisationDesignAlready implemented in SAP signed off by core team long backCompleteSAPMaterial purchase mapped; not asset purchase; requirement to be frozen and mappedFICOTds deduction in Fbcj(Vendor cash advance)DesignSAP doesn't recommend to do it. KIIT need to change process.not an issueSAP7/8/148/12/14SAPOpen IssueFICOIssues are expected when Mr. Ashok Dalbehera resumes his work in SAP (KIMS, KIDS, KINS)DesignRequirement still not provided by KIITNew requirementSAP & KIITFICOWorkflow for payment to vendor -Approval from registrar/Hk nayakDesignNot possible and already communicated to core team. not an issueSAPOpen IssueFICOAPPROPRIATE GL NOT ASSIGNED FOR FOREIGN CURRENCY VALUATION & FOR EXCHANGE RATE DIFFERENCE SAPFICOADVANCE RECEIPT FROM CUSTOMER (FBCJ)SAPFICODEPRECIATION RUN (AFAB)SAPFICOBANK RECONCILLIATION (ZFF67)SAPFICOCUSTOMER RECEIPTS NEED TO BE DEVELOPEDSAPFICOFICOFICOFICOHCMID cardDEVSign off is not given. Best solution provided but KIIT is not accepting it,offerd for testingKIIT1/4/148/8/14SAPOpen IsueHCMAppointment letterDEVTesting penidng at KIIT.It is pending since Aprilofferd for testingKIIT1/4/1414/8/14SAP & KIITThere are some adjustment problems in KIMS formatHCMRetirement letter, Service anniversaryDEVSign off is not givenofferd for testingKIIT15/7/1414/8/14SAP & KIITCorrection required; mail integration issue for Service anniversaryHCMOrganization structure could not be prepared and will take more time DEVOrganization structure is already captured in Master data given by usersCompleteKIIT has doubt on itKIITPending taskHCMTraining pending( PMS, travel)2 times training given for whole HCM and no sign off givenCompleteKIITSAPHCMThere should be the displaying facilities for PAN Card and registration Number in ESS portal for employee displayNew requirementSAPPendingMMSOURCE LIST DETERMINATIONDesignKIITPENDINGMMIssues are expected when Mr. Manas Das resumes his work in SAP (KIMS, KIDS, KINS)DesignAll process are already tested for KIM KIDS KINSnot an issueSAP & KIITMM1)After good issue automatic closure of PURCHASE REQUISITIONDesignNew requirement came on 26th JulyNew requirement26/7/14SAPOpen IssueMM8)For KIMS (reservation requirement as in process : they reserve certain stock for medical consumer unit) Note : KIMS will be tested later thoughDesignNew requirement.Still they have not provided detail requirement to usNew requirementKIIT15/7/14SAPRequirement given; Process to be mappedMMApart from price comparision other terms and conditions need to be compared based on which desired vendor needs to be selected for procurementDesignNot possible and already communicated to core team. not an issueSAP30/7/14SAPOpen IssueMMProcess to be defined for Gate Entry sheetDesignKIITIssue found; requirement to be sent to SAPMMPurchase group needs to be uploaded as per material groupSAPPendingpmEnd user identificationInprocessKIITKIITpmEnd user training PlanProj mgtInprocessKIITKIITpmEnd user training manualProj mgtInprocessKIITKIITpmTest Case Sign offProj mgtInprocessKIITKIITpmUploading required Master data for IT data in Quality systemProj mgtInprocessKIITKIITpmUploading required transaction data for IT data in Quality systemProj mgtInprocessKIITKIITpmPrinter configuration planProj mgtInprocessKIITKIITpmChange management planProj mgtInprocesskiitKIITtechnicalDesign document does not have details on application HA clusterDevAs agreed HA cluster is part of OS design. Clearly updated in design document.not an issueKIIT21/07/14SAPApplication HA will be tested and then doc needs to be updatedtechnicalDiscussion required for Sybase backup storage requirementProj MgtWe are waiting for Shanti's availabilitynot an issue21/07/14SAPDiscussion pendingtechnicalSOLMAN upgrade to SP 10 is pendingProj MgtCurrently we have SP8.0 .We have confirmed them that It will be done after IT is complete.InprocessSAP21/07/14SAPWe have SP 4.0 not 8.0. Needs to be upgraded.technicalIncident management, EWA will need to be setup after SOLMAN upgradeProj Mgtnot an issueKIIT6/8/14SAPPendingtechnicalQuality file system to be made same as the production file systemProj MgtKIIT ICT team need to perform itInprocessKIIT21/07/14SAPGo ahead to be given by SAP. ICT is ready to do it anytime.technicalPayment gatewayProj MgtPending contract to sign of since 6 monthsKIITtechnicalKIMS BiometricNew requirement came last monthNew requirementKIIT10/7/14KIIT mgttechnicalSMS GatewayPayment not done to the vendorKIITPendingtechnicaltest case are not completeAll test cases are already delivered. Review comments need to be implementsInprocessKIIT/SAP10.07.14KIITReview comments given on 16 Aug to be incorporatedtechnicalIssue in LIBSYS fine inbound interfaceSAPIssue found during testingtechnicalHMS testing pendingSAP/KIITtechnicalUser id creation for power userTechnicalInprocessKIITKIITtechnicalEP,PI,BIBO team members from KIIT need Development display access.Proj mgtSAPPendingtechnicalKiit basis team dont have access to ECC Dev 100,110 and Bi dev .Proj mgtSAPPendingtechnicalKIIT Biometrics - mapping to production tables pendingTechnicalKIITPendingBASIS1. SMTP Mail Server ConfigurationKIIT+SAPBASIS2. Storage Space for SAP Database BackupKIIT+SAPBASIS3. SAP & Portal Access other than VPNKIIT+SAPBASIS4. Cluster HA set upKIIT+SAPBASIS5. DR discussionKIIT+SAPDM-SLCMACADEMIC HISTORY DATA TYPE 1 EXTRACTION REQUIREDKIITDM-SLCMACADEMIC STRUCTURE WIPKIITDM-MMINITIAL STOCK DATA NOT COMPLETESAPDM-MMOPEN PO/ OPEN PR UPLOADING TOOL MISSING & DATA NOT FOUNDSAPDM-MMPURCHASE INFO RECORD DATA NOT AVAILABLEKIITDM-MMAGREEMENT MASTER/ MESSAGE MASTER/ SERVICE MASTER MISSING BOTH TEMPLATE AND DATA MISSINGSAPDM-HCMPAYROLL / MIDYEAR GO-LIVE DATA NOT COMPLETEKIITDM-HCMRECRUITMENT / TRAVEL/ ROLES AND RESPONSIBILITY MASTER BOTH TEMPLATE AND DATA NOT AVAILABLESAPDM-FICOASSET MASTER DATA NOT COMPLETEKIITDM-FICOGL OPEN MASTER & VENDOR OPEN ITEM DATA NOT AVAILABLE KIITDM-FICOTAXATION MASTER TEMPLATE AND DATA NOT AVAILABLESAPDM-FICOINTERNAL ORDER TEMPLATE PRESENT WITHOUT UPLOADING TOOLSAPPI Integration of Biometrics at KIMS with SAP not done. After many combined meetings and discussion with SAP and KIIT/ KIMS technical and functional team like Mr. Surya Mohanty Sir, Mr. Amulya Vindhani, Mr. Kalpataru (ICT Dept.) etc, SAP says out of scope.DESIGNSAPPI LIBSYS fine system and student roll number change scenario not yet developed.DESIGNSAPPI Payment gateways and SMS gateways not working, as a new VPS is required.DESIGNKIITPI Payment gateways Functional Specification document incorrect.DESIGNSAPPI LIBSYS Test Script incorrect for fine system.DESIGNSAPMMTax should be maintained.MMRelease procedure dor both PR & PO .MMIF WE FETCH MULTIPLE PR FORT THE SAME MATERIAL THEN IN PRINT OUT OF PO WE SHOULD HAVE ONLY ONE LINE ITEM DISPLAY.MMGOVT PROJECT SCRIPTS NEEDS TO BE VERIFIED AGAIN.MMPricing procedure needs to be changed.MMSeggregation of materials as per their common codes.

Sheet2

Sheet3ModuleDescriptionIssue TypeSAP RemarksStatusPending withdate raisedtarget completion datePending withRemaks (Ratna)SLCMAcademic Structure (Subject code mapping)DesignSAP & KIITALL SCHOOL COMPLETE,LAW SCHOOL PENDINGSLCMAcademic Structure finalization for school will take some more time It is a master data which is not an issue for integration testing.Required Academic structure for IT is already finalised and also uploaded in Quality. It is go-live issueInprocessKIIT28/7/14KIITCompleted for 11 schools;to be Completed 12/8 for 13 schoolsFICOIssues are expected when Mr. Ashok Dalbehera resumes his work in SAP (KIMS, KIDS, KINS)DesignRequirement still not provided by KIITNew requirementSAP & KIITHCMAppointment letterDEVTesting penidng at KIIT.It is pending since Aprilofferd for testingKIIT1/4/1414/8/14SAP & KIITThere are some adjustment problems in KIMS formatHCMRetirement letter, Service anniversaryDEVSign off is not givenofferd for testingKIIT15/7/1414/8/14SAP & KIITCorrection required; mail integration issue for Service anniversaryHCMOrganization structure could not be prepared and will take more time DEVOrganization structure is already captured in Master data given by usersCompleteKIIT has doubt on itKIITPending taskMMSOURCE LIST DETERMINATIONDesignKIITPENDINGMMIssues are expected when Mr. Manas Das resumes his work in SAP (KIMS, KIDS, KINS)DesignAll process are already tested for KIM KIDS KINSnot an issueSAP & KIITMMProcess to be defined for Gate Entry sheetDesignKIITIssue found; requirement to be sent to SAPpmEnd user identificationInprocessKIITKIITpmEnd user training PlanProj mgtInprocessKIITKIITpmEnd user training manualProj mgtInprocessKIITKIITpmTest Case Sign offProj mgtInprocessKIITKIITpmUploading required Master data for IT data in Quality systemProj mgtInprocessKIITKIITpmUploading required transaction data for IT data in Quality systemProj mgtInprocessKIITKIITpmPrinter configuration planProj mgtInprocessKIITKIITpmChange management planProj mgtInprocesskiitKIITtechnicalPayment gatewayProj MgtPending contract to sign of since 6 monthsKIITtechnicalKIMS BiometricNew requirement came last monthNew requirementKIIT10/7/14KIIT mgttechnicalSMS GatewayPayment not done to the vendorKIITPendingtechnicaltest case are not completeAll test cases are already delivered. Review comments need to be implementsInprocessKIIT/SAP10.07.14KIITReview comments given on 16 Aug to be incorporatedtechnicalHMS testing pendingSAP/KIITtechnicalUser id creation for power userTechnicalInprocessKIITKIITtechnicalKIIT Biometrics - mapping to production tables pendingTechnicalKIITPendingBASIS1. SMTP Mail Server ConfigurationKIIT+SAPBASIS2. Storage Space for SAP Database BackupKIIT+SAPBASIS3. SAP & Portal Access other than VPNKIIT+SAPBASIS4. Cluster HA set upKIIT+SAPBASIS5. DR discussionKIIT+SAPDM-SLCMACADEMIC HISTORY DATA TYPE 1 EXTRACTION REQUIREDKIITDM-SLCMACADEMIC STRUCTURE WIPKIITDM-MMPURCHASE INFO RECORD DATA NOT AVAILABLEKIITDM-HCMPAYROLL / MIDYEAR GO-LIVE DATA NOT COMPLETEKIITDM-FICOASSET MASTER DATA NOT COMPLETEKIITDM-FICOGL OPEN MASTER & VENDOR OPEN ITEM DATA NOT AVAILABLE KIITPI Payment gateways and SMS gateways not working, as a new VPS is required.DESIGNKIITFICAPayment Receipt created and printed by is not displayingDesignNot an issueCompleteSAP2/8/145/8/14SAPTo be testedFICARoll no is generated after payment of counseling and registration fee and other feeDesignOffered for testingCompleteKIIT FICA Core teamSAPTo be testedFICASingle Manual RTGS EntryDesignCompleteKIIT FICA Core teamSAPTo be testedFICAStudent StipendDesignofferd for testingSAP2/8/146/8/14SAPpendingFICAWhile giving program as a selection criteria the report is showing errorDesignSAPFICAProcessing of fee in USDDesignCompleteSAP2/8/146/8/14SAPoffered but not satisfactorySLCM78 ISSUE IN SLCM (EXAMINATION, ADDMISSION, MBA COUNSELLING)[6 TH SEPTEMBER FILE]DesignSAPFICODistribution of expense profit centre wiseDesignproposed alternate solution.InprocessKIIT24/7/145/8/14SAPIn processFICOAsset purchase process finalisationDesignAlready implemented in SAP signed off by core team long backCompleteSAPMaterial purchase mapped; not asset purchase; requirement to be frozen and mappedFICOTds deduction in Fbcj(Vendor cash advance)DesignSAP doesn't recommend to do it. KIIT need to change process.not an issueSAP7/8/148/12/14SAPOpen IssueFICOWorkflow for payment to vendor -Approval from registrar/Hk nayakDesignNot possible and already communicated to core team. not an issueSAPOpen IssueFICOAPPROPRIATE GL NOT ASSIGNED FOR FOREIGN CURRENCY VALUATION & FOR EXCHANGE RATE DIFFERENCE SAPFICOADVANCE RECEIPT FROM CUSTOMER (FBCJ)SAPFICODEPRECIATION RUN (AFAB)SAPFICOBANK RECONCILLIATION (ZFF67)SAPFICOCUSTOMER RECEIPTS NEED TO BE DEVELOPEDSAPHCMID cardDEVSign off is not given. Best solution provided but KIIT is not accepting it,offerd for testingKIIT1/4/148/8/14SAPOpen IsueHCMTraining pending( PMS, travel)2 times training given for whole HCM and no sign off givenCompleteKIITSAPHCMThere should be the displaying facilities for PAN Card and registration Number in ESS portal for employee displayNew requirementSAPPendingMMNeeds to maintain Avg. Price in material master for goods that is procured externally & also manufactured in houseDesignSAPPendingMM1)After good issue automatic closure of PURCHASE REQUISITIONDesignNew requirement came on 26th JulyNew requirement26/7/14SAPOpen IssueMM8)For KIMS (reservation requirement as in process : they reserve certain stock for medical consumer unit) Note : KIMS will be tested later thoughDesignNew requirement.Still they have not provided detail requirement to usNew requirementKIIT15/7/14SAPRequirement given; Process to be mappedMMApart from price comparision other terms and conditions need to be compared based on which desired vendor needs to be selected for procurementDesignNot possible and already communicated to core team. not an issueSAP30/7/14SAPOpen IssueMMPurchase group needs to be uploaded as per material groupSAPPendingtechnicalDesign document does not have details on application HA clusterDevAs agreed HA cluster is part of OS design. Clearly updated in design document.not an issueKIIT21/07/14SAPApplication HA will be tested and then doc needs to be updatedtechnicalDiscussion required for Sybase backup storage requirementProj MgtWe are waiting for Shanti's availabilitynot an issue21/07/14SAPDiscussion pendingtechnicalSOLMAN upgrade to SP 10 is pendingProj MgtCurrently we have SP8.0 .We have confirmed them that It will be done after IT is complete.InprocessSAP21/07/14SAPWe have SP 4.0 not 8.0. Needs to be upgraded.technicalIncident management, EWA will need to be setup after SOLMAN upgradeProj Mgtnot an issueKIIT6/8/14SAPPendingtechnicalQuality file system to be made same as the production file systemProj MgtKIIT ICT team need to perform itInprocessKIIT21/07/14SAPGo ahead to be given by SAP. ICT is ready to do it anytime.technicalIssue in LIBSYS fine inbound interfaceSAPIssue found during testingtechnicalEP,PI,BIBO team members from KIIT need Development display access.Proj mgtSAPPendingtechnicalKiit basis team dont have access to ECC Dev 100,110 and Bi dev .Proj mgtSAPPendingDM-MMINITIAL STOCK DATA NOT COMPLETESAPDM-MMOPEN PO/ OPEN PR UPLOADING TOOL MISSING & DATA NOT FOUNDSAPDM-MMAGREEMENT MASTER/ MESSAGE MASTER/ SERVICE MASTER MISSING BOTH TEMPLATE AND DATA MISSINGSAPDM-HCMRECRUITMENT / TRAVEL/ ROLES AND RESPONSIBILITY MASTER BOTH TEMPLATE AND DATA NOT AVAILABLESAPDM-FICOTAXATION MASTER TEMPLATE AND DATA NOT AVAILABLESAPDM-FICOINTERNAL ORDER TEMPLATE PRESENT WITHOUT UPLOADING TOOLSAPPI Integration of Biometrics at KIMS with SAP not done. After many combined meetings and discussion with SAP and KIIT/ KIMS technical and functional team like Mr. Surya Mohanty Sir, Mr. Amulya Vindhani, Mr. Kalpataru (ICT Dept.) etc, SAP says out of scope.DESIGNSAPPI LIBSYS fine system and student roll number change scenario not yet developed.DESIGNSAPPI Payment gateways Functional Specification document incorrect.DESIGNSAPPI LIBSYS Test Script incorrect for fine system.DESIGNSAP