18
REMACO GE Oil & Gas/MLNG LONG TERM SERVICE AGREEMENT (LTSA) FY2007 Ahmad Fauzi Bin Rasdi Engineer Maintenance Services

MLNG Presentation

Embed Size (px)

DESCRIPTION

Brief background about Remaco working experience in MLNG with GE

Citation preview

Page 1: MLNG Presentation

REMACO – GE Oil & Gas/MLNG LONG TERM SERVICE AGREEMENT

(LTSA)

FY2007

Ahmad Fauzi Bin Rasdi

Engineer

Maintenance Services

Page 2: MLNG Presentation

Content • Introduction of MLNG & Plant Area

• Inspection Schedule FY2007

• Explanation of Activities

• Introduction of Machine Type

• New Experience

• Summary

Page 3: MLNG Presentation

MLNG

• Malaysian Liquefied Natural Gas

• Tg, Kidurong, Bintulu, Sarawak

• Consist of 3 major processing area i.e MLNG SATU, MLNG DUA & MLNG

TIGA.

• Gas Turbine – Driven Compressors which convert gas to liquid at cryogenic

temperature ( - 162 degree C)

• http://en.wikipedia.org/wiki/Malaysia_LNG

Page 4: MLNG Presentation

MLNG PLANT AREA MAP N

Scrap Metal Yard

LEGEND

Non Manufacturing Area

Manufacturing Plant

Guard House

RD 34

RD 32

RD

21

RD

1

RD

3

RD 5

RD

11

RD 7

RD

13

RD 15

RD 17

RD

9

RD 2B RD 2C RD 2A

RD 2

RD 4

RD 6

RD 8

RD 12

RD 10

RD 14

RD 16

RD 18

RD 19

RD 28

TO TERMINAL

RD

11

RD

13

RD 17

RD

21

RD 21

SLUGCATCHER

VENT

V-104

BEACH VALVE

FLARE

GAS

METERING

STN

ETHANE

PROPANE

STORAGE

T 3201

CONTRACTOR

YARD

LIQUID DISPOSAL

BURNER

FIRE

WATER TANK

RD 20

RD 22

INCENARATOR

RD 13

FLARE

RD 71

RD 70

RD 68

RD 66

RD

61

MO

D. 7

PR

OC

ES

S

RD

67

RD

65

RD

1A

RD 64

RD 62

RD 60

SLUGCATER 3

MOD. 1

PROCESS

MOD. 2

PROCESS

MOD. 3

PROCESS

MOD. 4

PROCESS

MOD. 5

PROCESS

MOD. 6

PROCESS

MO

D. 8

PR

OC

ES

S

MOD. 3

UTY

MOD.2

UTY

MOD. 1

UTY

RD 75

SHUTDOWN

GATE &

GUARD

HOUSE

LP STEAM

TURBO

GENERATOR

OFFICE

AREA

MAIN

GUARD

HOUSE

PLANT

GUARD

HOUSE

LS

TA

/NP

Wa

reh

ou

se

Main Burner

MFS

DRINKING

WATER

TANK

FU

TU

RE

TR

AIN

9

RD

73

RD 72

RD

69

Ex D

ota

na

h

Wa

reh

ou

se

Module 7 - CI

GTG4020 - HGPI

GTG94050 - HGPI

Module 4 - CI

GTG94010 - CI

GTG94020 - CI

Module 6 - MI

Module 8 - CI

GTG94030 - CI

Page 5: MLNG Presentation

Inspection Schedule FY2007

Page 6: MLNG Presentation

MLNG TIGA – Train/Module 7

• Machine Type: i) GE GT Frame 7001 DLN1 (2 units) – Mech. Drive

ii) Axial Compressor AN200

• Inspection Type: i) Combustion Inspection

ii) Bearing Inspection

MLNG SATU – GTG4020

• Machine Type: i) GE/Hitachi GT Frame MS5001 – Generator Drive

• Inspection Type: i) Hot Gas Path Inspection – CI parts, 1st, 2nd

Stage Buckets and 1st , 2nd Stage Nozzle replacement

Page 7: MLNG Presentation

MLNG TIGA - GTG94050

• Machine Type: i) GE GT Frame MS5001 DLN1 – Generator Drive

• Inspection Type: i) Hot Gas Path Inspection – Transition Pieces

replacement and 2nd Stage Bucket replacement due to unacceptable

cracks

MLNG DUA – Module 4

• Machine Type: i) GE GT Frame MS7001 – Mechanical Drive

ii) GE GT Frame MS6001B – Mechanical Drive

• Inspection Type: i) Combustion Inspection

ii) Mini Combustion Inspection • Mini CI Scope

– Only selected CI parts removes as determine by GE Engineering. 6 out of 10 removed except TP which was not removed

– Removed parts was inspected thoroughly (visual, NDT, measured, etc)

Page 8: MLNG Presentation

MLNG TIGA – GTG94010

• Machine Type: i) GE GT Frame MS5001 DLN1 – Generator Drive

• Inspection Type: i) Combustion Inspection (+) - Turbine Casing Removal for 1st and 2nd Stage Buckets NDT Inspection + Exhaust Plenum Repair

MLNG TIGA – GTG94020

• Machine Type: i) GE GT Frame MS5001 DLN1 – Generator Drive

• Inspection Type: i) Combustion Inspection – Standard CI procedure except removal of Transition Pieces + Exhaust Roof Repair

Page 9: MLNG Presentation

MLNG DUA – Module 6

• Major Inspection and Plant Turn Around for Module 6 Process Lines

• Machine Type for C3 (Propane Refrigerant) Line:

– i) GE GT Frame MS6001B – Mechanical Drive

ii) Centrifugal Compressor 3MCL

iii) Small Steam Turbine – Mechanical Drive

iv) Air Filter House

• Inspection Type for PR Line:

– i) Major Inspection

ii) Minor Inspection

iii) Bearing Inspection

iv) Air Filter replacement

Page 10: MLNG Presentation

MLNG DUA – Module 6 (cont.)

• Major Inspection and Plant Turn Around for Module 6 Process Lines

• Machine Type for MR (Mix. Refrigerant) Line:

– i) GE GT Frame MS7001 – Mechanical Drive

ii) Axial Compressor AN200

iii) Small Steam Turbine – Mechanical Drive

iv) Air Filter House

• Inspection Type for PR Line:

– i) Major Inspection

ii) Major Inspection

iii) Major Overhaul

iv) Air Filter replacement

• UCP (Utilities Control Panel) major upgrading work

Page 11: MLNG Presentation

MLNG TIGA – Train/Module 8

• Machine Type: i) GE GT Frame 7001 DLN1 (2 units) – Mech. Drive

ii) Axial Compressor AN200

iii) Centrifugal Compressor 3MCL

• Inspection Type: i) Combustion Inspection

ii) Bearing Inspection and Variable Linkage Insp.

iii) Bearing Inspection

MLNG TIGA – GTG94030

• Machine Type: i) GE GT Frame MS5001 DLN1 – Generator Drive

• Inspection Type: i) Combustion Inspection - Standard CI procedure except removal of Transition Pieces

Page 12: MLNG Presentation

GAS TURBINE FRAME MS5001 – DLN1

• Rated Capacity = 26.8MW (power gen.)

• Shaft (Single/Two) = Single Shaft

• Turbine Stage = 2 Stages

• Compressor Stages = 17 Stages

• Main Burner = Primary and Secondary Fuel

Nozzle

• Manufacturer = Nuovo Pignone

Primary Fuel Nozzle

Secondary Fuel Nozzle

Page 13: MLNG Presentation

GAS TURBINE FRAME MS6001B

• Rated Capacity = 43.5MW (Mech. Drive)

• Shaft (Single/Two) = Single Shaft

• Turbine Stage = 3 Stages

• Compressor Stage = 17 Stages

• Combustion Chamber = 10 chambers

• Burner Type = Single Fuel Nozzle (Gas)

• Manufacturer = Nuovo Pignone

Page 14: MLNG Presentation

GAS TURBINE FRAME MS7001/MS7001 DLN1

• Rated Capacity = 87.3MW (Mech. Drive)

• Shaft (Single/Two) = Two Shaft

• Turbine Stages = 3 Stages

• Compressor Stages = 17 Stages

• Burner Type = Single Fuel Nozzle for MS7001 & Primary/Secondary Fuel Nozzle for MS7001 DLN1

• Manufacturer = Nuovo Pignone

Page 15: MLNG Presentation

3MCL & AN200

Page 16: MLNG Presentation

New Experiences • Safety

– Mandatory requirement –Safety Glass & Coverall (Dark Blue)

– NPSP, MLNG Pass (Specific Safety Induction for working inside MLNG), AE/SP Confined Space, PTW Taker

• Work – Hold point – no work can proceed unless inspected and

approved by QA/QC & TA

– Witness point – QA/QC & TA have to be present to witness the activities

– For GT Frame 5 DLN1, normal CI procedure practiced in MLNG does not include removal of Transition Pieces

Page 17: MLNG Presentation

Summary • 9 jobs – 5 nos of GT Frame 5, 2 nos of GT Frame 6, 6 nos of GT

Frame 7, 2 nos of AN200 Compr., 1 no of 3MCL Compr. and 2 nos of Steam Turbine

• From March till December – Train/Module 7 – March - CI

– GTG4020 & GTG94050 – April~Jun - HGPI

– Module 4 – Jun~July - CI

– GTG94010 – July - CI

– GTG94020 – August - CI

– Module 6 – August~October – MI

– Train/Module 8 – November - CI

– GTG94030 – November~December - CI

• Average 90 REMACO + 200 contractor manpower

• Inspection to different type of Gas Turbine i.e Frame MS5001 DLN1 and Frame MS7001 / MS7001 DLN1

• First time working on compressor (AN200 & 3MCL) • http://www.ge.com/oilandgas

Page 18: MLNG Presentation

THANK YOU