110
SCHEDULE OF FINAL DOCUMENTATION COMPILATION # Description First Start Date Actual Start Date First Completion Date 1 Data Collection 2 File, Index & Box Proposal 2.1 Quotation Submission 2.2 Selection of Supplier 3 File, Index & Box Arrival 4 Data Compilation 5 Generate Copy 6 Handover Document to CARIGALI 6.1 Proposed By Reviewed By Leonard Juan Document Control

MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

Embed Size (px)

Citation preview

Page 1: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

SCHEDULE OF FINAL DOCUMENTATION COMPILATION

# Description First Start Date Actual Start Date First Completion Date Actual End Date

1 Data Collection

2 File, Index & Box Proposal

2.1 Quotation Submission

2.2 Selection of Supplier

3 File, Index & Box Arrival

4 Data Compilation

5 Generate Copy

6 Handover Document to CARIGALI

6.1

Proposed By Reviewed By

Leonard JuanDocument Control

Page 2: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

CONTRACT NO. : CH2/CO/2008/DKB/166

CLIENT : PETRONAS CARIGALI SDN BHD

PROJECT: PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BIF ONSHORE UPGRADING AND MODIFICATIONS

OVERALL STATUS - FINAL DOCUMENTATION

MLNG-2 Status As of: Saturday, 08 Apr 23y

DESCRIPTION Wt

DOCUMENT DOCUMENT Hard Copy

REMARKS

Estimated Black Binders

TOTAL RCVD O/S

Total Balance

(nos) Subtotal SIZE

20% 70 33 0 0 37

33.00% 0.00% 0.00% 6.60%

A4

- PCSB Supplied 70 33 0 0 37 0

- PRSB Supplied 0 0 0 0 0 0

20% 349 27 27 0 322 5.42% 1.55% 0.00% 1.39% 0 A4

20% 284 0 0 0 284 0.00% 0.00% 0.00% 0.00% 0 A4

10% 691 1 1 0 690 0.00% 0.00% 0.00% 0.01% TBA 0 A4

10% 12 0 0 0 12 0.00% 0.00% 0.00% 0.00% TBA 0 A4

10% 51 0 0 0 51 0.00% 0.00% 0.00% 0.00% TBA 0 A4

10% 44 33 33 0 11 52.50% 15.00% 0.00% 6.75% 0 A4

TOTAL % ### 1501 94 61 0 1407 12.99% 2.36% 0.00% 14.76% TOTAL 0

WT. Progress ()Receiving

(70%)Compilation

(20%)Soft Copy

(10%)Receiving

(70%)Compilation

(20%)Soft Copy

(10%)(Sub-Sub index & Content)

Per/Set (Est')

Total Set req'd

Volume 1 - Equipment Dossier

Volume 2 - QA/QC Documentation

Volume 3 - Material Documentation

Volume 4 - Testing, Precommissioning & Commissioning Doc.

Volume 5 - Design Data

Volume 6 - As Built Drawing

Volume 7 - Project Specific Procedure

Page 3: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

VOLUME 1 - EQUIPMENT DOSSIER

Legend - A : Accepted, R : Rejected, F : Final

DOC. DESCRIPTION AS PER TOC DOC I.D.

70% 20% 10%

No. of Sheet Status RemarksRECEIVED COMPILED

1.0 MECHANICAL EQUIPMENT (BOOK __OF __)

PCSB Supplied

1.1 NEW PIG TRAP SYSTEM (PIG RECEIVER A-201C)

1.1.1 Equipment Information Sheets YES YES1.1.2 Engineering Data Sheets YES YES1.1.3 Warranty Certification YES YES1.1.4 As Built Vendor Drawings YES YES1.1.5 Operating & maintenance Manual

- Recommended Spare Part Lists YES YES

- Recommended Maintenance Schedule YES YES

1.1.6 Factory Acceptance Procedure & Report YES YES

1.1.7 Design Calculation YES YES

1.1.8 Test Certification YES YES

1.1.9 Material Inspection Report YES YES

1.1.10 Others YES YES

1.2

1.2.1 Equipment Information Sheets YES YES1.2.2 Engineering Data Sheets YES YES1.2.3 Warranty Certification YES YES1.2.4 As Built Vendor Drawings YES YES1.2.5 Operating & maintenance Manual

- Recommended Spare Part Lists YES YES

- Recommended Maintenance Schedule YES YES

1.2.6 Factory Acceptance Procedure & Report YES YES

1.2.7 Design Calculation YES YES

1.2.8 Test Certificates YES YES

1.2.9 Material Inspection Report YES YES

1.2.10 Others YES YES

CONTRACTOR SUPPLIED EQUIPMENT

1.3 N/A

1.30.1 Equipment Information Sheets NA NA1.30.2 Engineering Data Sheets NA NA1.30.3 Warranty Certification NA NA1.30.4 As Built Vendor Drawings NA NA1.30.5 Operating & maintenance Manual

- Recommended Spare Part Lists NA NA- Recommended Maintenance Schedule NA NA

1.30.6 Factory Acceptance Procedure & Report NA NA1.30.7 Design Calculation NA NA1.30.8 Test Certificates NA NA1.30.9 Material Inspection Report NA NA

1.30.10 Others NA NA

2.0 PIPING (BOOK __OF __)

PCSB Supplied

2.1

2.1.1 Equipment Information Sheets YES YES2.1.2 Engineering Data Sheets YES YES2.1.3 Warranty Certification YES YES2.1.4 As Built Vendor Drawings YES YES2.1.5 Operating & maintenance Manual

- Recommended Spare Part Lists YES YES

- Recommended Maintenance Schedule Summary YES YES

2.1.6 Factory Acceptance Procedure / Report YES YES

2.1.7 NA NA

2.1.8 Test Certification YES YES

2.1.9 Material & Inspection Report YES YES

2.1.10 Other YES YES

2.2

2.2.1 Equipment Information Sheets YES YES2.2.2 Engineering Data Sheets YES YES2.2.3 Warranty Certification YES YES2.2.4 As Built Vendor Drawings YES YES

PROJECT: PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BIF ONSHORE UPGRADING AND MODIFICATIONS

Scanning Doc.(PDF 4.0+300s) / Final

Compilation

PNEUMATIC ACTUATED BALL VALVE (02-SDV-217, 02-SDV-219, 02-ROV-201, 02-ROV-202, 02-ROV-203, 02-ROV-206, 02-ROV-207, 02-ROV-208, 02-ROV-210, 02-ROV-211, 02-ROV-212, 02-ROV-213, 02-ROV-214, 02-ROV-215, 02-ROV-230)

TRUNNION BALL VALVES - (30" x 900# RB LOW TEMP(K510) TAG NO: VX-23029, VX-23030, VX-23035, VX-23036), (20" x 900# FB LOW TEMP(K-520) TAG NO: VX-63007) & (20" x 150# FB LOW TEMP(K-530) TAG NO: VX-63016)

Design Calculation : N/A

DUAL PLATE CHECK VALVE (TAG NO: VX-23032, VX-23038, VX-23017, VX-23016)

Page 4: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

2.2.5 Operating & Maintenance Manual

NA NA

NA NA2.2.6 Factory Acceptance Procedure / Report YES YES2.2.7 NA NA2.2.8 Test Certification YES YES2.2.9 Material & Inspection Report YES YES

2.2.10 Other YES YES

Contractor Supplied

2.3

2.3.1 Equipment Information Sheets

2.3.2 Engineering Data Sheets

2.3.3 Warranty Certification

2.3.4 As Built Vendor Drawings

2.3.5 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

2.3.6 Factory Acceptance Procedure / Report

2.3.7 Design Calculation

2.3.8 Test Certificates

2.3.9 Material & Inspection Report

2.3.10 Other

2.4 Manual Valve - Ball Valve (31 unit) - (Size-DN20, 25, 50& 100)

2.4.1 Equipment Information Sheets

2.4.2 Engineering Data Sheets

2.4.3 Warranty Certification

2.4.4 As Built Vendor Drawings

2.4.5 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

2.4.6 Factory Acceptance Procedure / Report

2.4.7 Design Calculation

2.4.8 Test Certificates

2.4.9 Material & Inspection Report

2.4.10 Other

2.5 Manual Valve - Check Valve (2 unit)

2.5.1 Equipment Information Sheets

2.5.2 Engineering Data Sheets

2.5.3 Warranty Certification

2.5.4 As Built Vendor Drawings

2.5.5 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

2.5.6 Factory Acceptance Procedure / Report

2.5.7 Design Calculation

2.5.8 Test Certification

2.5.9 Material & Inspection Report

2.5.10 Other

2.6 Manual Valve - Double Block Bleed Valve (10 unit)

2.6.1 Equipment Information Sheets

2.6.2 Engineering Data Sheets

2.6.3 Warranty Certification

2.6.4 As Built Vendor Drawings

2.6.5 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

2.6.6 Factory Acceptance Procedure / Report

2.6.7 Design Calculation

2.6.8 Test Certification

2.6.9 Material & Inspection Report

2.6.10 Other

2.7 Manual Valve - Gate Valve (10 unit)

2.7.1 Equipment Information Sheets

2.7.2 Engineering Data Sheets

2.7.3 Warranty Certification

2.7.4 As Built Vendor Drawings

2.7.5 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

2.7.6 Factory Acceptance Procedure / Report

2.7.7 Design Calculation

2.7.8 Test Certification

2.7.9 Material & Inspection Report

2.7.10 Other

- Recommended Spare Part Lists : N/A

- Recommended Maintenance Schedule Summary : N/A

Design Calculation : N/A

Ball Valve Interlock Device - (VX63008, VX63010, VX63012, VX63018, VX63019, VX63021, VX63022, VX63024 & VX63025)

Page 5: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

2.8 Manual Valve - Globe Valve (7 unit)

2.8.1 Equipment Information Sheets2.8.2 Engineering Data Sheets2.8.3 Warranty Certification2.8.4 As Built Vendor Drawings2.8.5 Operating & maintenance Manual

- Recommended Spare Part Lists- Recommended Maintenance Schedule Summary

2.8.6 Factory Acceptance Procedure / Report2.8.7 Design Calculation2.8.8 Test Certification2.8.9 Material & Inspection Report

2.8.10 Other

2.9 Specialty Item - Bar Tee (5units)

2.9.1 Equipment Information Sheets2.9.2 Engineering Data Sheets2.9.3 Warranty Certification2.9.4 As Built Vendor Drawings2.9.5 Operating & maintenance Manual

- Recommended Spare Part Lists- Recommended Maintenance Schedule Summary

2.9.6 Factory Acceptance Procedure / Report2.9.7 Design Calculation2.9.8 Test Certification2.9.9 Material & Inspection Report

2.9.10 Other

2.10 Specialty Item - Corrossion Coupon / Corrossion Probe - 2unit

2.10.1 Equipment Information Sheets2.10.2 Engineering Data Sheets2.10.3 Warranty Certification2.10.4 As Built Vendor Drawings2.10.5 Operating & maintenance Manual

- Recommended Spare Part Lists- Recommended Maintenance Schedule Summary

2.10.6 Factory Acceptance Procedure / Report2.10.7 Design Calculation2.10.8 Test Certification2.10.9 Material & Inspection Report

2.10.10 Other

2.11 Specialty Item - Flexible Hose / Quick Release coupling

2.11.1 Equipment Information Sheets2.11.2 Engineering Data Sheets2.11.3 Warranty Certification2.11.4 As Built Vendor Drawings2.11.5 Operating & maintenance Manual

- Recommended Spare Part Lists- Recommended Maintenance Schedule Summary

2.11.6 Factory Acceptance Procedure / Report2.11.7 Design Calculation2.11.8 Test Certification2.11.9 Material & Inspection Report

2.11.10 Other

2.12 Specialty Item - High Strength Fittings

2.12.1 Equipment Information Sheets

2.12.2 Engineering Data Sheets

2.12.3 Warranty Certification

2.12.4 As Built Vendor Drawings

2.12.5 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

2.12.6 Factory Acceptance Procedure / Report

2.12.7 Design Calculation

2.12.8 Test Certification

2.12.9 Material & Inspection Report

2.12.10 Other

3.0 ELECTRICAL (BOOK __OF __)

PCSB Supplied Equipment

3.1 N/A

3.1.1 Equipment Information Sheets NA NA3.1.2 Engineering Data Sheets NA NA3.1.3 Warranty Certification NA NA3.1.4 As Built Vendor Drawings NA NA3.1.5 Operating & maintenance Manual

- Recommended Spare Part Lists NA NA- Recommended Maintenance Schedule NA NA

3.1.6 Factory Acceptance Procedure & Report NA NA3.1.7 Design Calculation NA NA3.1.8 Test Certificates NA NA

Page 6: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

3.1.9 Material Inspection Report NA NA3.1.10 Others NA NA

Contractor Supplied Equipment

3.2 415v Distribution Boards (22-D-6)

3.2.1 Engineering Information Sheet

3.2.2 Engineering Data Sheets

3.2.3 Warranty Certification

3.2.4 As Built Vendor Drawings

3.2.5 Operating & Maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule

3.2.6 Factory Acceptance Procedure / Report

3.2.7 Design Calculation

3.2.8 Test Certification

3.2.9 Material & Inspection Report

3.2.10 Other

3.3 Miscellaneous - Junction Box

3.3.1 Engineering Information Sheet3.3.2 Engineering Data Sheets3.3.3 Warranty Certification3.3.4 As Built Vendor Drawings3.3.5 Operating & Maintenance Manual

- Recommended Spare Part Lists- Recommended Maintenance Schedule

3.3.6 Factory Acceptance Procedure / Report3.3.7 Design Calculation3.3.8 Test Certification3.3.9 Material & Inspection Report

3.3.10 Other

3.4 Miscellaneous - Cables

3.4.1 Engineering Information Sheet3.4.2 Engineering Data Sheets3.4.3 Warranty Certification3.4.4 As Built Vendor Drawings3.4.5 Operating & Maintenance Manual

- Recommended Spare Part Lists- Recommended Maintenance Schedule

3.4.6 Factory Acceptance Procedure / Report3.4.7 Design Calculation3.4.8 Test Certification3.4.9 Material & Inspection Report

3.4.10 Other

3.5 Lighting System - Emergency Lighting

3.5.1 Engineering Information Sheet3.5.2 Engineering Data Sheets3.5.3 Warranty Certification3.5.4 As Built Vendor Drawings3.5.5 Operating & Maintenance Manual

- Recommended Spare Part Lists- Recommended Maintenance Schedule

3.5.6 Factory Acceptance Procedure / Report3.5.7 Design Calculation3.5.8 Test Certification3.5.9 Material & Inspection Report

3.5.10 Other

3.6 Ligthing System - Outdoor Lighting

3.6.1 Engineering Information Sheet3.6.2 Engineering Data Sheets3.6.3 Warranty Certification3.6.4 As Built Vendor Drawings3.6.5 Operating & Maintenance Manual

- Recommended Spare Part Lists- Recommended Maintenance Schedule

3.6.6 Factory Acceptance Procedure / Report3.6.7 Design Calculation3.6.8 Test Certification3.6.9 Material & Inspection Report

3.6.10 Other

4.0 INSTRUMENTATION (BOOK __OF __)

PCSB Supplied

4.1 Distribution Control System (DCS)

4.1.1 Equipment Information Sheets

4.1.2 Instrument Index

Page 7: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

4.1.3 Instrument Calibration certificates

4.1.4 Engineering Data Sheets

4.1.5 Warranty Certification

4.1.6 As-Built Vendor Drawing

4.1.7 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

4.1.8 Factory Acceptance Procedure & Report

4.1.9 Design Calculation

4.1.10 Test Certification

4.1.11 Material Inspection Report

4.1.12 Others

4.2 Safeguarding System (ASD) and Fire & Gas System (FGS)

4.2.1 Equipment Information Sheet

4.2.2 Instrument Index

4.2.3 Instrument Calibration Certificate

4.2.4 engineering Data Sheet

4.2.5 Warranty Certification

4.2.6 As Built Vendor Drawings

4.2.7 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

4.2.8 Factory Acceptance Procedure & Report

4.2.9 Design Calculation

4.2.10 Test Certification

4.2.11 Material & Inspection Report

4.2.12 Other

PRSB Supplied

4.3 Field Instruments - Flow Instruments-Restriction Orifice Plate- (02-RO-201 & 02-RO-217)

4.3.1 Equipment Information Sheet

4.3.2 Instrument Index

4.3.3 Instrument Calibration Certificate

4.3.4 engineering Data Sheet

4.3.5 Warranty Certification

4.3.6 As Built Vendor Drawings

4.3.7 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

4.3.8 Factory Acceptance Procedure & Report

4.3.9 Design Calculation

4.3.10 Test Certification

4.3.11 Material & Inspection Report

4.3.12 Other

4.4 Field Instruments - Pressure Instruments-Pressure Gauges - (02-PG-201, 02-PG-202, 02-PG-203 & 02-PG-204)

4.4.1 Equipment Information Sheet

4.4.2 Instrument Index

4.4.3 Instrument Calibration Certificate

4.4.4 engineering Data Sheet

4.4.5 Warranty Certification

4.4.6 As Built Vendor Drawings

4.4.7 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

4.4.8 Factory Acceptance Procedure & Report

4.4.9 Design Calculation

4.4.10 Test Certification

4.4.11 Material & Inspection Report

4.4.12 Other

4.5 Field Instruments - Pressure Instruments-Pressure Transmitters - (02-PT-201, 02-PZT-202A/B/C, 02-PDT-204)

4.5.1 Equipment Information Sheet

4.5.2 Instrument Index

4.5.3 Instrument Calibration Certificate

4.5.4 engineering Data Sheet

4.5.5 Warranty Certification

4.5.6 As Built Vendor Drawings

4.5.7 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

4.5.8 Factory Acceptance Procedure & Report

4.5.9 Design Calculation

4.5.10 Test Certification

4.5.11 Material & Inspection Report

4.5.12 Other

4.6 Field Instruments - Pressure Instruments-Pressure Safety Relief Valve - (02-PSV-201, 02-PSV-202, 02-PSV-203)

4.6.1 Equipment Information Sheet

4.6.2 Instrument Index

4.6.3 Instrument Calibration Certificate

4.6.4 engineering Data Sheet

Page 8: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

4.6.5 Warranty Certification

4.6.6 As Built Vendor Drawings

4.6.7 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

4.6.8 Factory Acceptance Procedure & Report

4.6.9 Design Calculation

4.6.10 Test Certification

4.6.11 Material & Inspection Report

4.6.12 Other

4.7 Field Instrument - Control Valves - (02-LIC-066-3 & 02-HIC-204)

4.7.1 Equipment Information Sheet

4.7.2 Instrument Index

4.7.3 Instrument Calibration Certificate

4.7.4 engineering Data Sheet

4.7.5 Warranty Certification

4.7.6 As Built Vendor Drawings

4.7.7 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

4.7.8 Factory Acceptance Procedure & Report

4.7.9 Design Calculation

4.7.10 Test Certification

4.7.11 Material & Inspection Report

4.7.12 Other

4.8 Field Instrument - Pig Signallers (Intrusive Type-02-ZI-201, 02-ZI-202)

4.8.1 Equipment Information Sheet

4.8.2 Instrument Index

4.8.3 Instrument Calibration Certificate

4.8.4 engineering Data Sheet

4.8.5 Warranty Certification

4.8.6 As Built Vendor Drawings

4.8.7 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

4.8.8 Factory Acceptance Procedure & Report

4.8.9 Design Calculation

4.8.10 Test Certification

4.8.11 Material & Inspection Report

4.8.12 Other

4.9 Fire & Gas Devices - IR Gas Detector (Point Type) - 60-XA-1865, 60-XA-1866, 60-XA-1874, 60-XA-1875, 60-XA-1876, 60-XA-1877)

4.9.1 Equipment Information Sheet

4.9.2 Instrument Index

4.9.3 Instrument Calibration Certificate

4.9.4 engineering Data Sheet

4.9.5 Warranty Certification

4.9.6 As Built Vendor Drawings

4.9.7 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

4.9.8 Factory Acceptance Procedure & Report

4.9.9 Design Calculation

4.9.10 Test Certification

4.9.11 Material & Inspection Report

4.9.12 Other

4.10 Fire & Gas Devices - IR Flame Detector (Open Path) - (60-XA(R)-1879 & 60-XA(T)-1879)

4.10.1 Equipment Information Sheet

4.10.2 Instrument Index

4.10.3 Instrument Calibration Certificate

4.10.4 engineering Data Sheet

4.10.5 Warranty Certification

4.10.6 As Built Vendor Drawings

4.10.7 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

4.10.8 Factory Acceptance Procedure & Report

4.10.9 Design Calculation

4.10.10 Test Certification

4.10.11 Material & Inspection Report

4.10.12 Other

4.11 Fire & Gas Devices - IR Flame Detector (60-XZA-1976, 60-XZA-1977, 60-XZA-1978, 60-XZA-1979, 60-XZA-1985, 60-XZA-1986)

4.11.1 Equipment Information Sheet

4.11.2 Instrument Index

4.11.3 Instrument Calibration Certificate

4.11.4 engineering Data Sheet

4.11.5 Warranty Certification

4.11.6 As Built Vendor Drawings

Page 9: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

4.11.7 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

4.11.8 Factory Acceptance Procedure & Report

4.11.9 Design Calculation

4.11.10 Test Certification

4.11.11 Material & Inspection Report

4.11.12 Other

4.12 Fire & Gas Devices - ESD Break Glass Station (60-H-97)

4.12.1 Equipment Information Sheet

4.12.2 Instrument Index

4.12.3 Instrument Calibration Certificate

4.12.4 engineering Data Sheet

4.12.5 Warranty Certification

4.12.6 As Built Vendor Drawings

4.12.7 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

4.12.8 Factory Acceptance Procedure & Report

4.12.9 Design Calculation

4.12.10 Test Certification

4.12.11 Material & Inspection Report

4.12.12 Other

4.13 Fire & Gas Devices - Gas Horn (60-X4-A-1880)

4.13.1 Equipment Information Sheet

4.13.2 Instrument Index

4.13.3 Instrument Calibration Certificate

4.13.4 engineering Data Sheet

4.13.5 Warranty Certification

4.13.6 As Built Vendor Drawings

4.13.7 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

4.13.8 Factory Acceptance Procedure & Report

4.13.9 Design Calculation

4.13.10 Test Certification

4.13.11 Material & Inspection Report

4.13.12 Other

4.14 Fire & Gas Devices - Gas Beacon (60-XB-1880)

4.14.1 Equipment Information Sheet

4.14.2 Instrument Index

4.14.3 Instrument Calibration Certificate

4.14.4 engineering Data Sheet

4.14.5 Warranty Certification

4.14.6 As Built Vendor Drawings

4.14.7 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

4.14.8 Factory Acceptance Procedure & Report

4.14.9 Design Calculation

4.14.10 Test Certification

4.14.11 Material & Inspection Report

4.14.12 Other

4.15 Fire & Gas Devices - Gas Horn Silence Push Button (60-HS-1880)

4.15.1 Equipment Information Sheet

4.15.2 Instrument Index

4.15.3 Instrument Calibration Certificate

4.15.4 engineering Data Sheet

4.15.5 Warranty Certification

4.15.6 As Built Vendor Drawings

4.15.7 Operating & maintenance Manual

- Recommended Spare Part Lists

- Recommended Maintenance Schedule Summary

4.15.8 Factory Acceptance Procedure & Report

4.15.9 Design Calculation

4.15.10 Test Certification

4.15.11 Material & Inspection Report

4.15.12 Other

5.0 FIRE AND SAFETY SYSTEM / EQUIPMENT (BOOK __OF __)

5.1 Four Way Fire Hydrant with Mounted Firewater monitor

5.1.1 Equipment Information Sheets

5.1.2 Engineering Data Sheets

5.1.3 Warranty Certification

5.1.4 As Built Vendor Drawings

5.1.5 Operating & maintenance Manual

5.1.6 - Recommended Spare Part Lists

Page 10: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

5.1.7 - Recommended Maintenance Schedule Summary

Factory Acceptance Procedure / Report

Design Calculation

5.1.8 Test Certification

5.1.9 Material & Inspection Report

5.1.10 Other

Page 11: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

11/104

VOLUME 1 - EQUIPMENT DOSSIER

Saturday, 08 Apr 23y

DESCRIPTION

Soft

Cop

y Receiving (70%)

Vendor Remark

1.0 MECHANICALCARIGALI SUPPLIED ITEM

1.1 NEW PIG TRAP SYSTEM (PIG RECEIVER A-201C) 11 11 0

1.2 11 11 0

PRSB SUPPLIED ITEM1.3 N/A 0 0 0

2.0 PIPINGPCSB SUPPLIED

2.1 10 10 0

2.2 8 8 0

PRSB SUPPLIED

2.3 0 0 0

2.4 Manual Valve - Ball Valve (31 unit) - (Size-DN20, 25, 50& 100) 0 0 0

2.5 Manual Valve - Check Valve (2 unit) 0 0 02.6 Manual Valve - Double Block Bleed Valve (10 unit) 0 0 02.7 Manual Valve - Gate Valve (10 unit) 0 0 02.8 Manual Valve - Globe Valve (7 unit) 0 0 02.9 Specialty Item - Bar Tee (5units) 0 0 0

2.10 Specialty Item - Corrossion Coupon / Corrossion Probe - 2unit 0 0 0

2.11 Specialty Item - Flexible Hose / Quick Release coupling 0 0 02.12 Specialty Item - High Strength Fittings 0 0 0

3.0 ELECTRICALPCSB SUPPLIED

3.1 N/A 0 0 0

PRSB SUPPLIED3.2 415v Distribution Boards (22-D-6) 0 0 03.3 Miscellaneous - Junction Box 0 0 03.4 Miscellaneous - Cables 0 0 03.5 Lighting System - Emergency Lighting 0 0 03.6 Ligthing System - Outdoor Lighting 0 0 0

4.0 INSTRUMENTPCSB SUPPLIED

4.1 Distribution Control System (DCS) 0 0 0

4.2 Safeguarding System (ASD) and Fire & Gas System (FGS) 0 0 0

PRSB SUPPLIED

4.3 0 0 0

4.4 0 0 0

4.5 0 0 0

4.6 0 0 0

4.7 Field Instrument - Control Valves - (02-LIC-066-3 & 02-HIC-204) 0 0 0

4.8 0 0 0

PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BINTULU INTEGRATED FACILITIES(BIF) ONSHORE UPGRADING AND MODIFICATIONS

No.

of S

et

recv

'd

C'k

list

avai

labl

e?

Com

pila

tion

(20%

)

Soft

Cop

y (1

0%)

Rec

eive

d by

Pro

c.

Rev

iew

ed

by E

ng

Fina

l R

ecv.

by

QA

QC

PNEUMATIC ACTUATED BALL VALVE (02-SDV-217, 02-SDV-219, 02-ROV-201, 02-ROV-202, 02-ROV-203, 02-ROV-206, 02-ROV-207, 02-ROV-208, 02-ROV-210, 02-ROV-211, 02-ROV-212, 02-ROV-213, 02-ROV-214, 02-ROV-215, 02-ROV-230)

TRUNNION BALL VALVES - (30" x 900# RB LOW TEMP(K510) TAG NO: VX-23029, VX-23030, VX-23035, VX-23036), (20" x 900# FB LOW TEMP(K-520) TAG NO: VX-63007) & (20" x 150# FB LOW TEMP(K-530) TAG NO: VX-63016)

DUAL PLATE CHECK VALVE (TAG NO: VX-23032, VX-23038, VX-23017, VX-23016)

Ball Valve Interlock Device - (VX63008, VX63010, VX63012, VX63018, VX63019, VX63021, VX63022, VX63024 & VX63025)

Field Instruments - Flow Instruments-Restriction Orifice Plate- (02-RO-201 & 02-RO-217)

Field Instruments - Pressure Instruments-Pressure Gauges - (02-PG-201, 02-PG-202, 02-PG-203 & 02-PG-204)

Field Instruments - Pressure Instruments-Pressure Transmitters - (02-PT-201, 02-PZT-202A/B/C, 02-PDT-204)

Field Instruments - Pressure Instruments-Pressure Safety Relief Valve - (02-PSV-201, 02-PSV-202, 02-PSV-203)

Field Instrument - Pig Signallers (Intrusive Type-02-ZI-201, 02-ZI-202)

Page 12: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

12/104

VOLUME 1 - EQUIPMENT DOSSIER

Saturday, 08 Apr 23y

DESCRIPTION

Soft

Cop

y Receiving (70%)

Vendor Remark

PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BINTULU INTEGRATED FACILITIES(BIF) ONSHORE UPGRADING AND MODIFICATIONS

No.

of S

et

recv

'd

C'k

list

avai

labl

e?

Com

pila

tion

(20%

)

Soft

Cop

y (1

0%)

Rec

eive

d by

Pro

c.

Rev

iew

ed

by E

ng

Fina

l R

ecv.

by

QA

QC

4.9 0 0 0

4.10 0 0 0

4.11 0 0 0

4.12 Fire & Gas Devices - ESD Break Glass Station (60-H-97) 0 0 04.13 Fire & Gas Devices - Gas Horn (60-X4-A-1880) 0 0 04.14 Fire & Gas Devices - Gas Beacon (60-XB-1880) 0 0 0

4.15 0 0 0

5.0 FIRE AND SAFETY SYSTEM 5.1 Four Way Fire Hydrant with Mounted Firewater monitor 0 0 0

Fire & Gas Devices - IR Gas Detector (Point Type) - 60-XA-1865, 60-XA-1866, 60-XA-1874, 60-XA-1875, 60-XA-1876, 60-XA-1877)

Fire & Gas Devices - IR Flame Detector (Open Path) - (60-XA(R)-1879 & 60-XA(T)-1879)

Fire & Gas Devices - IR Flame Detector (60-XZA-1976, 60-XZA-1977, 60-XZA-1978, 60-XZA-1979, 60-XZA-1985, 60-XZA-1986)

Fire & Gas Devices - Gas Horn Silence Push Button (60-HS-1880)

Page 13: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

VOLUME 2 - QA/QC DOSSIER

Legend - A : Accepted, R : Rejected, F : Final

DOC. DESCRIPTION AS PER TOC DOC I.D.

70% 20% 10%

No. of Sheet Status RemarksRECEIVED COMPILED

1.0 STRUCTURAL (BOOK __OF __)

1.1 Service Platform No. 01

1.1.1 Material Verification Summary

1.1.2 Material Verification Record

1.1.3 Weld Control Summary (SP1-WM-001,002&003)

1.1.4 Fit-up Report YES YES1.1.5 Visual Inspection Report YES YES1.1.6 Dimensional, Levelling and Straightness Inspection Report

1.1.7 NDT Report: Radiographic Testing (RT)

1.1.8 NDT Report: Ultrasonic Testing (UT)

1.1.9 NDT Report: Magnetic Particle Testing (MPI) YES YES1.1.10 NDT Report: Dye Penetrant Testing (DPI)

1.2 Service Platform No. 02

1.2.1 Material Verification Summary

1.2.2 Material Verification Record

1.2.3 Weld Control Summary (SP2-WM-001 & 002)

1.2.4 Fit-up Report YES YES1.2.5 Visual Inspection Report YES YES1.2.6 Dimensional, Levelling and Straightness Inspection Report

1.2.7 NDT Report: Radiographic Testing (RT)

1.2.8 NDT Report: Ultrasonic Testing (UT)

1.2.9 NDT Report: Magnetic Particle Testing (MPI) YES YES1.2.10 NDT Report: Dye Penetrant Testing (DPI)

1.3 Service Platform No. 03

1.3.1 Material Verification Summary

1.3.2 Material Verification Record

PROJECT: PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BIF ONSHORE UPGRADING AND MODIFICATIONS

Scanning Doc.(PDF 4.0+300s) / Final

Compilation

Page 14: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1.3.3 Weld Control Summary (SP3-WM-001 & 002)

1.3.4 Fit-up Report YES YES1.3.5 Visual Inspection Report YES YES1.3.6 Dimensional, Levelling and Straightness Inspection Report

1.3.7 NDT Report: Radiographic Testing (RT)

1.3.8 NDT Report: Ultrasonic Testing (UT)

1.3.9 NDT Report: Magnetic Particle Testing (MPI) YES YES1.3.10 NDT Report: Dye Penetrant Testing (DPI)

1.4 Service Platform No. 04

1.4.1 Material Verification Summary

1.4.2 Material Verification Record

1.4.3 Weld Control Summary (SP4-WM-001,002,003,004,005,006,007,008,009&010)

1.4.4 Fit-up Report YES YES1.4.5 Visual Inspection Report YES YES1.4.6 Dimensional, Levelling and Straightness Inspection Report

1.4.7 NDT Report: Radiographic Testing (RT)

1.4.8 NDT Report: Ultrasonic Testing (UT)

1.4.9 NDT Report: Magnetic Particle Testing (MPI) YES YES1.4.10 NDT Report: Dye Penetrant Testing (DPI)

1.5 Service Platform No. 05

1.5.1 Material Verification Summary

1.5.2 Material Verification Record

1.5.3 Weld Control Summary (SP5-WM-001&002)

1.5.4 Fit-up Report YES YES1.5.5 Visual Inspection Report YES YES1.5.6 Dimensional, Levelling and Straightness Inspection Report

1.5.7 NDT Report: Radiographic Testing (RT)

1.5.8 NDT Report: Ultrasonic Testing (UT)

1.5.9 NDT Report: Magnetic Particle Testing (MPI) YES YES1.5.10 NDT Report: Dye Penetrant Testing (DPI)

1.6 Service Platform No. 06

1.6.1 Material Verification Summary

1.6.2 Material Verification Record

1.6.3 Weld Control Summary (SP6-WM-001,002,003,004,005,006,007,401,402,403&501)

Page 15: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1.6.4 Fit-up Report YES YES1.6.5 Visual Inspection Report YES YES1.6.6 Dimensional, Levelling and Straightness Inspection Report

1.6.7 NDT Report: Radiographic Testing (RT)

1.6.8 NDT Report: Ultrasonic Testing (UT)

1.6.9 NDT Report: Magnetic Particle Testing (MPI) YES YES1.6.10 NDT Report: Dye Penetrant Testing (DPI)

1.7 Pipe Bridge No. 01

1.7.1 Material Verification Summary

1.7.2 Material Verification Record

1.7.3 Weld Control Summary (PB1-WM-001,002,003,004,005,006,007,007,008,009,010,011,012,013,014,015,016,017,018,019,020,021,022,401,402,501,502&503)

1.7.4 Fit-up Report YES YES1.7.5 Visual Inspection Report YES YES1.7.6 Dimensional, Levelling and Straightness Inspection Report

1.7.7 NDT Report: Radiographic Testing (RT)

1.7.8 NDT Report: Ultrasonic Testing (UT)

1.7.9 NDT Report: Magnetic Particle Testing (MPI) YES YES1.7.10 NDT Report: Dye Penetrant Testing (DPI)

1.8 Pipe Bridge No. 02

1.8.1 Material Verification Summary

1.8.2 Material Verification Record

1.8.3 Weld Control Summary (PB2-WM-001,002,003,004,005,006,007,007,008,009,010,011,012,013,014,015,016,017,018,019,020,021,022,023,024,025,026,027&028)

1.8.4 Fit-up Report YES YES1.8.5 Visual Inspection Report YES YES1.8.6 Dimensional, Levelling and Straightness Inspection Report

1.8.7 NDT Report: Radiographic Testing (RT)

1.8.8 NDT Report: Ultrasonic Testing (UT)

1.8.9 NDT Report: Magnetic Particle Testing (MPI) YES YES1.8.10 NDT Report: Dye Penetrant Testing (DPI)

1.9 Structural Pipe Support

1.9.1 Material Verification Summary

1.9.2 Material Verification Record

1.9.3 Weld Control Summary (PS-WM-001&002)

1.9.4 Fit-up Report

Page 16: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1.9.5 Visual Inspection Report

1.9.6 Dimensional, Levelling and Straightness Inspection Report

1.9.7 NDT Report: Radiographic Testing (RT)

1.9.8 NDT Report: Ultrasonic Testing (UT)

1.9.9 NDT Report: Magnetic Particle Testing (MPI)

1.9.10 NDT Report: Dye Penetrant Testing (DPI)

1.10 Handrail for Concrete Staircase & Retaining Wall

1.10.1 Material Verification Summary

1.10.2 Material Verification Record

1.10.3 Weld Control Summary (CS-WM-001&RW-WM-001)

1.10.4 Fit-up Report YES YES1.10.5 Visual Inspection Report YES YES1.10.6 Dimensional, Levelling and Straightness Inspection Report

1.10.7 NDT Report: Radiographic Testing (RT)

1.10.8 NDT Report: Ultrasonic Testing (UT)

1.10.9 NDT Report: Magnetic Particle Testing (MPI) YES YES1.10.10 NDT Report: Dye Penetrant Testing (DPI)

1.2 Welding Procedure Specification (BOOK __OF __)

2.0 PIPING (BOOK __OF __)

2.1 Line: Instrument Air (AI)

2.1.1 Weld Control Summary

2.1.2 Material Verification Report

2.1.3 Fit-up Report

2.1.4 Visual Inspection Report

2.1.5 Dimensional, Levelling and Straightness Inspection Report

2.1.6 NDT Report - Radiographic Testing (RT)

2.1.7 NDT Report - Magnetic Particle Testing Testing (RT)

2.1.8 NDT Report - Ultrasonic Testing (UT)

2.1.9 NDT Report - Hardness Testing (HT)

2.1.10 NDT Report - Dye-Penetration (DPI)

2.1.11 Hydrotest Record

2.1.12 Valve Leak Test Record

2.1.13 Post Weld Heat Treatment (PWHT)Record

Page 17: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

2.1.14 Acid Cleaning Record

2.1.15 Reinstatement Test Record

2.2 Line:Nitrogen Air (NA)

2.2.1 Weld Control Summary

2.2.2 Material Verification Report

2.2.3 Fit-up Report

2.2.4 Visual Inspection Report

2.2.5 Dimensional, Levelling and Straightness Inspection Report

2.2.6 NDT Report - Radiographic Testing (RT)

2.2.7 NDT Report - Magnetic Particle Testing Testing (RT)

2.2.8 NDT Report - Ultrasonic Testing (UT)

2.2.9 NDT Report - Hardness Testing (HT)

2.2.10 NDT Report - Dye-Penetration (DPI)

2.2.11 Hydrotest Record

2.2.12 Valve Leak Test Record

2.2.13 Post Weld Heat Treatment (PWHT)Record

2.2.14 Acid Cleaning Record

2.2.15 Reinstatement Test Record

2.3 Line:Process Gas (PG)

2.3.1 Weld Control Summary

2.3.2 Material Verification Report

2.3.3 Fit-up Report

2.3.4 Visual Inspection Report

2.3.5 Dimensional, Levelling and Straightness Inspection Report

2.3.6 NDT Report - Radiographic Testing (RT)

2.3.7 NDT Report - Magnetic Particle Testing Testing (RT)

2.3.8 NDT Report - Ultrasonic Testing (UT)

2.3.9 NDT Report - Hardness Testing (HT)

2.3.10 NDT Report - Dye-Penetration (DPI)

2.3.11 Hydrotest Record

2.3.12 Valve Leak Test Record

2.3.13 Post Weld Heat Treatment (PWHT)Record

2.3.14 Acid Cleaning Record

2.3.15 Reinstatement Test Record

Page 18: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

2.4 Line:Closed Drains (CD)

2.4.1 Weld Control Summary

2.4.2 Material Verification Report

2.4.3 Fit-up Report

2.4.4 Visual Inspection Report

2.4.5 Dimensional, Levelling and Straightness Inspection Report

2.4.6 NDT Report - Radiographic Testing (RT)

2.4.7 NDT Report - Magnetic Particle Testing Testing (RT)

2.4.8 NDT Report - Ultrasonic Testing (UT)

2.4.9 NDT Report - Hardness Testing (HT)

2.4.10 NDT Report - Dye-Penetration (DPI)

2.4.11 Hydrotest Record

2.4.12 Valve Leak Test Record

2.4.13 Post Weld Heat Treatment (PWHT)Record

2.4.14 Acid Cleaning Record

2.4.15 Reinstatement Test Record

2.5 Line:Relief Vent (RV)

2.5.1 Weld Control Summary

2.5.2 Material Verification Report

2.5.3 Fit-up Report

2.5.4 Visual Inspection Report

2.5.5 Dimensional, Levelling and Straightness Inspection Report

2.5.6 NDT Report - Radiographic Testing (RT)

2.5.7 NDT Report - Magnetic Particle Testing Testing (RT)

2.5.8 NDT Report - Ultrasonic Testing (UT)

2.5.9 NDT Report - Hardness Testing (HT)

2.5.10 NDT Report - Dye-Penetration (DPI)

2.5.11 Hydrotest Record

2.5.12 Valve Leak Test Record

2.5.13 Post Weld Heat Treatment (PWHT)Record

2.5.14 Acid Cleaning Record

2.5.15 Reinstatement Test Record

2.6 Line: LP Steam (LP)

2.6.1 Weld Control Summary

2.6.2 Material Verification Report

Page 19: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

2.6.3 Fit-up Report

2.6.4 Visual Inspection Report

2.6.5 Dimensional, Levelling and Straightness Inspection Report

2.6.6 NDT Report - Radiographic Testing (RT)

2.6.7 NDT Report - Magnetic Particle Testing Testing (RT)

2.6.8 NDT Report - Ultrasonic Testing (UT)

2.6.9 NDT Report - Hardness Testing (HT)

2.6.10 NDT Report - Dye-Penetration (DPI)

2.6.11 Hydrotest Record

2.6.12 Valve Leak Test Record

2.6.13 Post Weld Heat Treatment (PWHT)Record

2.6.14 Acid Cleaning Record

2.6.15 Reinstatement Test Record

2.7 Line: Service Water (SW)

2.7.1 Weld Control Summary

2.7.2 Material Verification Report

2.7.3 Fit-up Report

2.7.4 Visual Inspection Report

2.7.5 Dimensional, Levelling and Straightness Inspection Report

2.7.6 NDT Report - Radiographic Testing (RT)

2.7.7 NDT Report - Magnetic Particle Testing Testing (RT)

2.7.8 NDT Report - Ultrasonic Testing (UT)

2.7.9 NDT Report - Hardness Testing (HT)

2.7.10 NDT Report - Dye-Penetration (DPI)

2.7.11 Hydrotest Record

2.7.12 Valve Leak Test Record

2.7.13 Post Weld Heat Treatment (PWHT)Record

2.7.14 Acid Cleaning Record

2.7.15 Reinstatement Test Record

2.8 Line: Vessel Trim (VT)

2.8.1 Weld Control Summary

2.8.2 Material Verification Report

2.8.3 Fit-up Report

2.8.4 Visual Inspection Report

2.8.5 Dimensional, Levelling and Straightness Inspection Report

2.8.6 NDT Report - Radiographic Testing (RT)

Page 20: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

2.8.7 NDT Report - Magnetic Particle Testing Testing (RT)

2.8.8 NDT Report - Ultrasonic Testing (UT)

2.8.9 NDT Report - Hardness Testing (HT)

2.8.10 NDT Report - Dye-Penetration (DPI)

2.8.11 Hydrotest Record

2.8.12 Valve Leak Test Record

2.8.13 Post Weld Heat Treatment (PWHT)Record

2.8.14 Acid Cleaning Record

2.8.15 Reinstatement Test Record

2.9 Line: Fire Water (FW)

2.9.1 Weld Control Summary

2.9.2 Material Verification Report

2.9.3 Fit-up Report

2.9.4 Visual Inspection Report

2.9.5 Dimensional, Levelling and Straightness Inspection Report

2.9.6 NDT Report - Radiographic Testing (RT)

2.9.7 NDT Report - Magnetic Particle Testing Testing (RT)

2.9.8 NDT Report - Ultrasonic Testing (UT)

2.9.9 NDT Report - Hardness Testing (HT)

2.9.10 NDT Report - Dye-Penetration (DPI)

2.9.11 Hydrotest Record

2.9.12 Valve Leak Test Record

2.9.13 Post Weld Heat Treatment (PWHT)Record

2.9.14 Acid Cleaning Record

2.9.15 Reinstatement Test Record

2.10 Line: Process Liquid (PL)

2.10.1 Weld Control Summary

2.10.2 Material Verification Report

2.10.3 Fit-up Report

2.10.4 Visual Inspection Report

2.10.5 Dimensional, Levelling and Straightness Inspection Report

2.10.6 NDT Report - Radiographic Testing (RT)

2.10.7 NDT Report - Magnetic Particle Testing Testing (RT)

2.10.8 NDT Report - Ultrasonic Testing (UT)

2.10.9 NDT Report - Hardness Testing (HT)

2.10.10 NDT Report - Dye-Penetration (DPI)

Page 21: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

2.10.11 Hydrotest Record

2.10.12 Valve Leak Test Record

2.10.13 Post Weld Heat Treatment (PWHT)Record

2.10.14 Acid Cleaning Record

2.10.15 Reinstatement Test Record

2.11 Line: Utility Water (UW)

2.11.1 Weld Control Summary

2.11.2 Material Verification Report

2.11.3 Fit-up Report

2.11.4 Visual Inspection Report

2.11.5 Dimensional, Levelling and Straightness Inspection Report

2.11.6 NDT Report - Radiographic Testing (RT)

2.11.7 NDT Report - Magnetic Particle Testing Testing (RT)

2.11.8 NDT Report - Ultrasonic Testing (UT)

2.11.9 NDT Report - Hardness Testing (HT)

2.11.10 NDT Report - Dye-Penetration (DPI)

2.11.11 Hydrotest Record

2.11.12 Valve Leak Test Record

2.11.13 Post Weld Heat Treatment (PWHT)Record

2.11.14 Acid Cleaning Record2.11.15 Reinstatement Test Record

2.2 Welding Procedure Specification (BOOK __OF __)

3.0 Mechanical (BOOK __OF __)

3.1 New Pig Trap System (PIG RECEIVER A-201C)

3.1.1 Fit-up Report

3.1.2 Installation and Alignment Record

3.1.3 NDT Record

4.0 Electrical (BOOK __OF __)

4.1 415V Distribution Boards (22-D-6)

4.1.1 Material Verification Record

4.1.2 Installation and Visual Report

Page 22: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

4.1.3 NDT Reports

4.2 Cables

4.2.1 Material Verification Record

4.2.2 Installation and Visual Report

4.2.3 NDT Reports

4.3 Lighting System - Emergency Lighting

4.3.1 Material Verification Record

4.3.2 Installation and Visual Report

4.3.3 NDT Reports

4.4 Lighting System - Outdoor Lighting

4.4.1 Material Verification Record

4.4.2 Installation and Visual Report

4.4.3 NDT Reports

4.5 Cable Tray and Supports

4.5.1 Material Verification Record

4.5.2 Installation and Visual Report

4.5.3 NDT Reports

5.0 Instrumentation (BOOK __OF __)

5.1 Material Identification Record

5.2 Installation and Visual Record

5.3 Calibration Report

6.0 Blasting and Painting (BOOK __OF __)

6.1 Structural

6.1.1 Material Identification Record

6.1.2 Paint Matrix

6.1.3 Paint Test Panel

6.1.4 Inspection and Testing Record

Page 23: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

6.2 Piping

6.2.1 Material Identification Record

6.2.2 Paint Matrix

6.2.3 Paint Test Panel

6.2.4 Inspection and Testing Record

7.0 Civil & Structural (BOOK __OF __)

7.1 Micropiling Works

7.1.1 Grout Mix Design Report

7.1.2 Survey Data Reports

7.1.3 Micropiling Reinforcement Check Sheet Records

7.1.4 Drilling, Grouting & Installation Records

7.1.5 Comprehensive Strength Cube Test Records for Grout

7.1.6 As-Builts Pilling Point Reports and Sketch

7.1.7 Pile Integrity Test Reports

7.1.8 Maintain Load Test Reports

7.1.9 General Inspection Reports

7.1.10 Procedure Qualification Reports for Rebar

7.2 Foundation and Cast Insitu Works

7.2.1 Concrete Mix Design Report

7.2.2 Survey Data Reports

7.2.3 Excavation Work Reports

7.2.4 Pre Pouring Concrete Reports

7.2.5 Reinforcement Bar Installation Check Sheet Records

7.2.6 Comprehensive Strength Cube Test Records

7.2.7 Pouring Inspection Reports

7.2.8 Anchor Bolt Installation Reports

7.2.9 Backfill Reports

7.2.10 General Inspection Reports

7.2.11 As-Builts Layout Plan and Sketch Reports

7.2.12 Procedure Qualification Reports for Rebar

7.3 Retaining Wall Works

7.3.1 Concrete Mix Design Report

7.3.2 Survey Data Reports

Page 24: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

7.3.3 Excavation Work Reports

7.3.4 Pre Pouring Concrete Reports

7.3.5 Reinforcement Bar Installation Check Sheet Records

7.3.6 Comprehensive Strength Cube Test Records

7.3.7 Pouring Inspection Reports

7.3.8 Anchor Bolt Installation Reports

7.3.9 Backfill Reports

7.3.10 General Inspection Reports

7.3.11 As-Builts Layout Plan and Sketch Reports

7.3.12 Compaction Test Reports for DCR

7.3.12.1 Plate Bearing Test Reports

7.3.12.2 Field Density Test Reports

7.3.13 Procedure Qualification Reports for Rebar

7.3.14 Wet Sand Mix Report

7.3.15 Grain Size Analysis/Aggregate Test Reports

7.4 Road Works

7.4.1 Survey Data Reports

7.4.2 California Bearing Test Reports

7.4.3 Field Density Test Reports

7.4.4 General Inspection Reports

7.4.5 As- Builts Layout Plan and Sketch Reports

7.4.6 Pavement Inspection Checklist

7.4.7 Backfill Reports

7.4.8 Bituminous Road Inspection Reports

7.4.9 Gravel Surfacing Reports

7.4.10 Grain Size Analysis/Aggregate Test Reports

7.0 Others (BOOK __OF __)

7.1 Site Technical Queries (STQ)

7.2 Waivers

7.3 Non-Conformance Report (NCR)

7.4 Welders Qualification Test Record (WQT)

Page 25: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

27 27 0 349 5.42% 1.55% 0.00% 6.96% SUMMARY***

DATA CALCULATION 5% 1% 0% 7%

R'CVD C'PLD SCAN TOTAL NA 70% 20% 10% % TOTAL

1

21% 6% 0% 27%

1

1

1 1 1

1 1 1

1

1

1

1 1 1

1

3 3 0 10 0

1

21% 6% 0% 27%

1

1

1 1 1

1 1 1

1

1

1

1 1 1

1

3 3 0 10 0

1

21% 6% 0% 27%

1

Page 26: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

21% 6% 0% 27%

1 1 1

1 1 1

1

1

1

1 1 1

1

3 3 0 10 0

1

21% 6% 0% 27%

1

1

1 1 1

1 1 1

1

1

1

1 1 1

1

3 3 0 10 0

1

21% 6% 0% 27%

1

1

1 1 1

1 1 1

1

1

1

1 1 1

1

3 3 0 10 0

1

21% 6% 0% 27%

1

1

Page 27: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1 1 1

21% 6% 0% 27%

1 1 1

1

1

1

1 1 1

1

3 3 0 10 0

1

21% 6% 0% 27%

1

1

1 1 1

1 1 1

1

1

1

1 1 1

1

3 3 0 10 0

1

21% 6% 0% 27%

1

1

1 1 1

1 1 1

1

1

1

1 1 1

1

3 3 0 10 0

1

0% 0% 0% 0%

1

1

1

Page 28: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%1

1

1

1

1

0 0 0 10 0

1

21% 6% 0% 27%

1

1

1 1 1

1 1 1

1

1

1

1 1 1

1

3 3 0 10 0

10% 0% 0% 0%

0 0 0 1 0

1

0% 0% 0% 0%

1

1

1

1

1

1

1

1

1

1

1

1

Page 29: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

1

0 0 0 15 0

1

0% 0% 0% 0%

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0 0 0 15 0

1

0% 0% 0% 0%

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0 0 0 15 0

Page 30: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0 0 0 15 0

1

0% 0% 0% 0%

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0 0 0 15 0

1

0% 0% 0% 0%

1

Page 31: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

1

1

1

1

1

1

1

1

1

1

1

1

0 0 0 15 0

1

0% 0% 0% 0%

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0 0 0 15 0

1

0% 0% 0% 0%

1

1

1

1

1

Page 32: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%1

1

1

1

1

1

1

1

0 0 0 15 0

1

0% 0% 0% 0%

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0 0 0 15 0

1

0% 0% 0% 0%

1

1

1

1

1

1

1

1

1

Page 33: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

1

1

1

1

0 0 0 15 0

1

0% 0% 0% 0%

1

1

1

1

1

1

1

1

1

1

1

1

11

0 0 0 15 0

10% 0% 0% 0%

0 0 0 1 0

1

0% 0% 0% 0%1

1

0 0 0 3 0

1

0% 0% 0% 0%1

Page 34: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

10% 0% 0% 0%

0 0 0 3 0

1

0% 0% 0% 0%1

1

0 0 0 3 0

1

0% 0% 0% 0%1

1

0 0 0 3 0

1

0% 0% 0% 0%1

1

0 0 0 3 0

1

0% 0% 0% 0%1

1

0 0 0 3 0

1

0% 0% 0% 0%1

1

0 0 0 3 0

1

0% 0% 0% 0%

1

1

1

0 0 0 4 0

Page 35: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

1

1

1

0 0 0 4 0

1

0% 0% 0% 0%

1

1

1

1

1

1

1

1

1

0 0 0 10 0

1

0% 0% 0% 0%

1

1

1

1

1

1

1

1

1

1

1

0 0 0 12 0

1

0% 0% 0% 0%

1

Page 36: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

1

1

1

1

1

1

1

1

1

1

1

1

1

1

0 0 0 17 0

1

0% 0% 0% 0%

1

1

1

1

1

1

1

1

1

0 0 0 10 0

1

0% 0% 0% 0%

1

1

1

0 0 0 4 0

Page 37: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

VOLUME 3 - MATERIAL DOCUMENTATION

Legend - A : Accepted, R : Rejected, F : Final

DOC. DESCRIPTION AS PER TOC DOC I.D.

70% 20% 10%

No. of Sheet Status RemarksRECEIVED COMPILED

1.0 STRUCTURAL (BOOK __OF __)1.1 Service Platform

1.1.1 Purchase Order1.1.2 Source Inspection Report1.1.3 Material Inspection / Receiving Report1.1.4 Certificates1.1.4.1 Mill Certificates1.1.4.2 Manufacturing Certificates1.1.4.3 Third Party Inspection Certificates1.1.4.4 Test Certificates1.1.5 Material Defiency Reports

1.2 Pipe Bridge1.2.1 Purchase Order1.2.2 Source Inspection Report1.2.3 Material Inspection / Receiving Report1.2.4 Certificates1.2.4.1 Mill Certificates1.2.4.2 Manufacturing Certificates1.2.4.3 Third Party Inspection Certificates1.2.4.4 Test Certificates1.2.5 Material Defiency Reports

1.3 Gratings1.3.1 Purchase Order1.3.2 Source Inspection Report1.3.3 Material Inspection / Receiving Report1.3.4 Certificates1.3.4.1 Mill Certificates1.3.4.2 Manufacturing Certificates1.3.4.3 Third Party Inspection Certificates1.3.4.4 Test Certificates1.3.5 Material Defiency Reports

PROJECT: PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BIF ONSHORE UPGRADING AND MODIFICATIONS

Scanning Doc.(PDF 4.0+300s) / Final

Compilation

Page 38: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1.4 Handrail for Concrete Staircase and Retaining Wall1.4.1 Purchase Order1.4.2 Source Inspection Report1.4.3 Material Inspection / Receiving Report1.4.4 Certificates1.4.4.1 Mill Certificates1.4.4.2 Manufacturing Certificates1.4.4.3 Third Party Inspection Certificates1.4.4.4 Test Certificates1.4.5 Material Defiency Reports

1.5 Pipe Supports1.5.1 Purchase Order1.5.2 Source Inspection Report1.5.3 Material Inspection / Receiving Report1.5.4 Certificates1.5.4.1 Mill Certificates1.5.4.2 Manufacturing Certificates1.5.4.3 Third Party Inspection Certificates1.5.4.4 Test Certificates1.5.5 Material Defiency Reports

1.6 Bolts and Nuts1.6.1 Purchase Order1.6.2 Source Inspection Report1.6.3 Material Inspection / Receiving Report1.6.4 Certificates1.6.4.1 Mill Certificates1.6.4.2 Manufacturing Certificates1.6.4.3 Third Party Inspection Certificates1.6.4.4 Test Certificates1.6.5 Material Defiency Reports

2.0 PIPINGS (BOOK __OF __)2.1 PIPE FITTINGS AND FLANGES

2.1.1 Purchase Order2.1.2 Source Inspection Report2.1.3 Material Inspection / Receiving Report2.1.4 Certificates2.1.4.1 Mill Certificates2.1.4.2 Manufacturing Certificates2.1.4.3 Third Party Inspection Certificates2.1.4.4 Test Certificates2.5.5 Material Defiency Reports

2.2 VALVES2.2.1 Purchase Order

Page 39: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

2.2.2 Source Inspection Report2.2.3 Material Inspection / Receiving Report2.2.4 Certificates2.2.4.1 Mill Certificates2.2.4.2 Manufacturing Certificates2.2.4.3 Third Party Inspection Certificates2.2.4.4 Test Certificates2.4.5 Material Defiency Reports

2.3 Piping Pipe supports2.3.1 Purchase Order2.3.2 Source Inspection Report2.3.3 Material Inspection / Receiving Report2.3.4 Certificates2.3.4.1 Mill Certificates2.3.4.2 Manufacturing Certificates2.3.4.3 Third Party Inspection Certificates2.3.4.4 Test Certificates2.3.5 Material Defiency Reports

2.4 Piping Pipe supports2.4.1 Purchase Order2.4.2 Source Inspection Report2.4.3 Material Inspection / Receiving Report2.4.4 Certificates2.4.4.1 Mill Certificates2.4.4.2 Manufacturing Certificates2.4.4.3 Third Party Inspection Certificates2.4.4.4 Test Certificates2.4.5 Material Defiency Reports

2.5 Hot Tap Tee2.5.1 Purchase Order2.5.2 Source Inspection Report2.5.3 Material Inspection / Receiving Report2.5.4 Certificates2.5.4.1 Mill Certificates2.5.4.2 Manufacturing Certificates2.5.4.3 Third Party Inspection Certificates2.5.4.4 Test Certificates2.5.5 Material Defiency Reports

2.6 Barred Tee2.6.1 Purchase Order2.6.2 Source Inspection Report

Page 40: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

2.6.3 Material Inspection / Receiving Report2.6.4 Certificates2.6.4.1 Mill Certificates2.6.4.2 Manufacturing Certificates2.6.4.3 Third Party Inspection Certificates2.6.4.4 Test Certificates2.6.5 Material Defiency Reports

2.7 Bolts and Nuts for Flanges2.7.1 Purchase Order2.7.2 Source Inspection Report2.7.3 Material Inspection / Receiving Report2.7.4 Certificates2.7.4.1 Mill Certificates2.7.4.2 Manufacturing Certificates2.7.4.3 Third Party Inspection Certificates2.7.4.4 Test Certificates2.7.5 Material Defiency Reports

3.0 MECHANICAL (BOOK __OF __)3.1 A-201C Pig Receiver

3.1.1 Purchase Order3.1.2 Source Inspection Report3.1.3 Material Inspection / Receiving Report3.1.4 Certificates3.1.4.1 Mill Certificates3.1.4.2 Manufacturing Certificates3.1.4.3 Third Party Inspection Certificates3.1.4.4 Test Certificates3.5.5 Material Defiency Reports

4.0 ELECTRICAL (BOOK __OF __)4.1 Cables

4.1.1 Purchase Order4.1.2 Source Inspection Report4.1.3 Material Inspection / Receiving Report4.1.4 Certificates4.1.4.1 Mill Certificates4.1.4.2 Manufacturing Certificates4.1.4.3 Third Party Inspection Certificates4.1.4.4 Test Certificates4.5.5 Material Defiency Reports

4.2 Lighting and Fittings

Page 41: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

4.2.1 Purchase Order4.2.2 Source Inspection Report4.2.3 Material Inspection / Receiving Report4.2.4 Certificates4.2.4.1 Mill Certificates4.2.4.2 Manufacturing Certificates4.2.4.3 Third Party Inspection Certificates4.2.4.4 Test Certificates4.2.5 Material Defiency Reports

4.3 Junction Boxes4.3.1 Purchase Order4.3.2 Source Inspection Report4.3.3 Material Inspection / Receiving Report4.3.4 Certificates4.3.4.1 Mill Certificates4.3.4.2 Manufacturing Certificates4.3.4.3 Third Party Inspection Certificates4.3.4.4 Test Certificates4.3.5 Material Defiency Reports

4.4 Gas Detector and Accessories4.4.1 Purchase Order4.4.2 Source Inspection Report4.4.3 Material Inspection / Receiving Report4.4.4 Certificates4.4.4.1 Mill Certificates4.4.4.2 Manufacturing Certificates4.4.4.3 Third Party Inspection Certificates4.4.4.4 Test Certificates4.4.5 Material Defiency Reports

4.5 Transmitter4.5.1 Purchase Order4.5.2 Source Inspection Report4.5.3 Material Inspection / Receiving Report4.5.4 Certificates4.5.4.1 Mill Certificates4.5.4.2 Manufacturing Certificates4.5.4.3 Third Party Inspection Certificates4.5.4.4 Test Certificates4.5.5 Material Defiency Reports

4.6 SS Tubing4.6.1 Purchase Order

Page 42: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

4.6.2 Source Inspection Report4.6.3 Material Inspection / Receiving Report4.6.4 Certificates4.6.4.1 Mill Certificates4.6.4.2 Manufacturing Certificates4.6.4.3 Third Party Inspection Certificates4.6.4.4 Test Certificates4.6.5 Material Defiency Reports

4.7 Bolts and Nuts4.7.1 Purchase Order4.7.2 Source Inspection Report4.7.3 Material Inspection / Receiving Report4.7.4 Certificates4.7.4.1 Mill Certificates4.7.4.2 Manufacturing Certificates4.7.4.3 Third Party Inspection Certificates4.7.4.4 Test Certificates4.7.5 Material Defiency Reports

5.0 INSTRUMENTATION (BOOK __OF __)5.1 Instrument Materials

5.1.1 Purchase Order5.1.2 Source Inspection Report5.1.3 Material Inspection / Receiving Report5.1.4 Certificates5.1.4.1 Mill Certificates5.1.4.2 Manufacturing Certificates5.1.4.3 Third Party Inspection Certificates5.1.4.4 Test Certificates5.5.5 Material Defiency Reports

5.2 FIBRE OPTIC CABLE & ACCESSORIES5.2.1 Purchase Order5.2.2 Source Inspection Report5.2.3 Material Inspection / Receiving Report5.2.4 Certificates5.2.4.1 Mill Certificates5.2.4.2 Manufacturing Certificates5.2.4.3 Third Party Inspection Certificates5.2.4.4 Test Certificates5.2.5 Material Defiency Reports

5.3 CCTV & ACCESS PASS CARD SYSTEM5.3.1 Purchase Order

Page 43: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

5.3.2 Source Inspection Report5.3.3 Material Inspection / Receiving Report5.3.4 Certificates5.3.4.1 Mill Certificates5.3.4.2 Manufacturing Certificates5.3.4.3 Third Party Inspection Certificates5.3.4.4 Test Certificates5.3.5 Material Defiency Reports

5.4 TANK GAUGING5.4.1 Purchase Order5.4.2 Source Inspection Report5.4.3 Material Inspection / Receiving Report5.4.4 Certificates5.4.4.1 Mill Certificates5.4.4.2 Manufacturing Certificates5.4.4.3 Third Party Inspection Certificates5.4.4.4 Test Certificates5.4.5 Material Defiency Reports

5.5 ELECTRIC OPERATED VALVES5.5.1 Purchase Order5.5.2 Source Inspection Report5.5.3 Material Inspection / Receiving Report5.5.4 Certificates5.5.4.1 Mill Certificates5.5.4.2 Manufacturing Certificates5.5.4.3 Third Party Inspection Certificates5.5.4.4 Test Certificates5.5.5 Material Defiency Reports

5.6 PRESSURE RELIEF VALVES5.6.1 Purchase Order5.6.2 Source Inspection Report5.6.3 Material Inspection / Receiving Report5.6.4 Certificates5.6.4.1 Mill Certificates5.6.4.2 Manufacturing Certificates5.6.4.3 Third Party Inspection Certificates5.6.4.4 Test Certificates5.6.5 Material Defiency Reports

5.7 DISTRIBUTION BOX & JUNCTION BOX5.7.1 Purchase Order5.7.2 Source Inspection Report

Page 44: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

5.7.3 Material Inspection / Receiving Report5.7.4 Certificates5.7.4.1 Mill Certificates5.7.4.2 Manufacturing Certificates5.7.4.3 Third Party Inspection Certificates5.7.4.4 Test Certificates5.7.5 Material Defiency Reports

5.8 ANALYSER 5.8.1 Purchase Order MCOT/PO/0275.8.2 Source Inspection Report5.8.3 Material Inspection / Receiving Report5.8.4 Certificates5.8.4.1 Mill Certificates5.8.4.2 Manufacturing Certificates5.8.4.3 Third Party Inspection Certificates5.8.4.4 Test Certificates5.8.5 Material Defiency Reports

5.9 HOOK UP MATERIAL (TUBING AND ACCESSORIES)5.9.1 Purchase Order MCOT/PO/0495.9.2 Source Inspection Report5.9.3 Material Inspection / Receiving Report5.9.4 Certificates5.9.4.1 Mill Certificates5.9.4.2 Manufacturing Certificates5.9.4.3 Third Party Inspection Certificates5.9.4.4 Test Certificates5.9.5 Material Defiency Reports

5.10 OTHER INSTRUMENT BULK MATERIAL5.10.1 Purchase Order5.10.2 Source Inspection Report5.10.3 Material Inspection / Receiving Report5.10.4 Certificates5.10.4.1 Mill Certificates5.10.4.2 Manufacturing Certificates5.10.4.3 Third Party Inspection Certificates5.10.4.4 Test Certificates5.10.5 Material Defiency Reports

3.0 MISCELLANEOUS (BOOK __OF __)MISCELLANEOUS

3.1 Purchase Order3.2 Source Inspection Report

Page 45: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

3.3 Material Inspection / Receiving Report3.4 Certificates3.5 Material Defiency Reports

Page 46: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

0 0 0 284 0.00% 0.00% 0.00% 0.00% SUMMARY***

DATA CALCULATION 0% 0% 0% 0%

R'CVD C'PLD TOTAL NA 70% 20% 10% % TOTAL

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

Page 47: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

Page 48: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

1111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

1

Page 49: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

Page 50: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

Page 51: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

1111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

Page 52: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

1111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

1

Page 53: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

11111111

0 0 0 9 0

1

0% 0% 0% 0%

1

Page 54: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

10% 0% 0% 0%1

1

0 0 0 5 0

Page 55: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

VOLUME 4 - TESTING AND PRECOMMISIONING DATA

Legend - A : Accepted, R : Rejected, F : Final

DOC. DESCRIPTION AS PER TOC DOC I.D.

70% 20% 10%

No. of Sheet Status RemarksRECEIVED COMPILED

1.0 TESTING PRECOMMISSIONING PROCEDURE YES YES

2.0 CHECK SHEET OVERVIEW2.1 MECHANICAL2.2 ELECTRICAL2.3 INSTRUMENT

3.0 TESTING AND PRE-COMMISSIONING CHECKSHEET3.1 SYSTEM 23-00 - GAS RECEIVING & PROCESS PIPING

Sub System 23-01 - Process GasSub Sub System KAKG-A Pig Receiver (A-201C)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.2 SYSTEM 23-00 - GAS RECEIVING & PROCESS PIPINGSub System 23-02 - Process GasSub Sub System 28" & 24" Piping from Beach Valve to Pig Receiver and TP-05/23System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

PROJECT: PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BIF ONSHORE UPGRADING AND MODIFICATIONS

Scanning Doc.(PDF 4.0+300s) / Final

Compilation

Page 56: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

3.3 SYSTEM 23-00 - GAS RECEIVING & PROCESS PIPINGSub System 23-03 - Process GasSub Sub System 24" & 30" Piping Header from TP05/23 to TP-09/10 (c/w to 10" Vent Line Double Isolation Valve)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.4 SYSTEM 23-00 - GAS RECEIVING & PROCESS PIPINGSub System 23-04 - Process GasSub Sub System 10" Vent Line from double Isolation valve to PSV-201/202/203System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.5 SYSTEM 23-00 - GAS RECEIVING & PROCESS PIPINGSub System 23-05 - Process GasSub Sub System 30" & 36" Piping for Tie-In at TL/3 (from TP-09 to TP-03/04)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.6 SYSTEM 23-00 - GAS RECEIVING & PROCESS PIPINGSub System 23-06 - Process GasSub Sub System 30" & 36" Piping for Tie-In at TL/4 (from TP-10 to TP-01/02)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per System

Page 57: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

Checksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.7 SYSTEM 24-00 - HP FLARE SYSTEMSub System 24-01 - Process Utility/FlareSub Sub System HP Flare Piping System to TP-05 (Hot Tapping)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.8 SYSTEM 45-00 - INSTRUMENT AIRSub System 45-01 - Instrument AirSub Sub System IA Piping Header from TP-20/21 to TL and Pig ReceiverSystem DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.9 SYSTEM 48-00 - NITROGEN SYSTEMSub System 48-01 - NitrogenSub Sub System Nitrogen Supply from TP-11/12 (A-201B) to Pig Receiver A-201CSystem DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

Page 58: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

3.10 SYSTEM 43-00 - SERVICE WATER SYSTEMSub System 43-01 - Service WaterSub Sub System Service Water Supply from TP-13(A-201B) to Pig Receiver A-201CSystem DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.11 SYSTEM 20-00 LP STEAM SYSTEMSub System 20-01 LP SteamSub Sub System LP Steam supply from TP-14 (A-201B) to Pig Receiver A-201CSystem DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.12 SYSTEM 64-00 CLOSED DRAIN SYSTEMSub System 64-01 Process Utility/DrainSub Sub System Closed Drainage System from Pig Receiver (A-201C) to TP-16/17 (at V-6334)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.13 SYSTEM 63-00 OPEN HAZARDOUS DRAIN SYSTEMSub System 63-01 Hydrocarbon DrainageSub Sub System open Drainage system from Pig Receiver (A-201C) to TP-18/19 (CPI)System DescriptionReference Drawing

Page 59: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

Testing and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.14 SYSTEM 60-00 FIREWATER SYSTEMSub System 60-01 FirewaterSub Sub System Firewater Piping, Hydrants and Monitors from TP-22System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.15 SYSTEM 100-00 ELECTRICAL SYSTEMSSub System 100-01 ElectricalSub Sub System Power Supply From Sub-Station No. 22 to New DB-22-D-6System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.16 SYSTEM 100-00 ELECTRICAL SYSTEMSSub System 100-02 ElectricalSub Sub System Outdoor Lighting System (49 Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

Page 60: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

3.17 SYSTEM 100-00 ELECTRICAL SYSTEMSSub System 100-02-1 ElectricalSub Sub System Lighting (at TL 3/4 Tie-In Area - 15 Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.18 SYSTEM 100-00 ELECTRICAL SYSTEMSSub System 100-02-2 ElectricalSub Sub System Lighting (for System 23-03 & Partial Receiver Area - 6 Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.19 SYSTEM 100-00 ELECTRICAL SYSTEMSSub System 100-02-3 ElectricalSub Sub System Lighting (for Pig Receiver Area - 28 Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.20 SYSTEM 100-00 ELECTRICAL SYSTEMSSub System 100-03 - ElectricalSub Sub System Earthing and Lightning Protection SystemSystem Description

Page 61: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

Reference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.21 SYSTEM 100-00 ELECTRICAL SYSTEMSSub System 100-03-01 - ElectricalSub Sub System Earthing and Lightning (at TL 3/4 Tie-In Area - Qty: Grid-1, No & Termination - 28 Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.22 SYSTEM 100-00 ELECTRICAL SYSTEMSSub System 100-03-02 - ElectricalSub Sub System Earthing and Lightning (for System 23-03 & Partial Receiver Area - Qty: GRID-2, Nos & Termination - 24 Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.23 SYSTEM 100-00 ELECTRICAL SYSTEMSSub System 100-03-03 - ElectricalSub Sub System Earthing and Lightning (for Pig Receiver Area - Qty: GRID-2,Nos & Termination - 20 Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet

Page 62: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

Reinstatement Test/set-upPre-Commissioning PunchList

3.24 SYSTEM 100-00 ELECTRICAL SYSTEMSSub System 100-04 - ElectricalSub Sub System Small Power and Socket OutletsSystem DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.25 SYSTEM 100-00 ELECTRICAL SYSTEMS

Sub System 100-05 - ElectricalSub Sub System Cable Trench, Trunking & TraySystem DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.26 SYSTEM 100-00 ELECTRICAL SYSTEMS

Sub System 100-06 - ElectricalSub Sub System Cable LayingSystem DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.27 SYSTEM 100-00 ELECTRICAL SYSTEMS

Page 63: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

Sub System 100-07 - ElectricalSub Sub System Termination at JB and CabinetsSystem DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.28 SYSTEM 200-00 INSTRUMENTATION

Sub System 200-01 InstrumentationSub Sub System DCS system (Marshalling Racks & Control module Panel)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.29 SYSTEM 200-00 INSTRUMENTATION

Sub System 200-02 InstrumentationSub Sub System ASD System (Marshalling Racks & Control Module Panel)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.30 SYSTEM 200-00 INSTRUMENTATION

Sub System 200-03 InstrumentationSub Sub System Fire and Gas System (Marshalling Racks & Control Module Panel) Qty: 17 NosSystem DescriptionReference DrawingTesting and Pre-Commissioning Procedure

Page 64: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

Checksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.31 SYSTEM 200-00 INSTRUMENTATION

Sub System 200-03-1 InstrumentationSub Sub System FGS (at TL 3/4 Tie-In Area - 4 Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.32 SYSTEM 200-00 INSTRUMENTATION

Sub System 200-03-2 InstrumentationSub Sub System FGS (for System 23-03 & Partial Receiver Area - 8 Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.33 SYSTEM 200-00 INSTRUMENTATION

Sub System 200-03-3 InstrumentationSub Sub System FGS (for Pig Receiver Area - 7 Nos & gas Horn Beacon & Reset Switch & Break Glass Station)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

Page 65: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

3.34 SYSTEM 200-00 INSTRUMENTATION

Sub System 200-04 InstrumentationSub Sub System Field Instruments (Installation & Hook-up)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.35 SYSTEM 200-00 INSTRUMENTATION

Sub System 200-04-1 InstrumentationSub Sub System Field Instruments (at TL 3/4 Tie-In Area - 8 Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.36 SYSTEM 200-00 INSTRUMENTATION

Sub System 200-04-2 InstrumentationSub Sub System Field Instruments (for System 23-03 & Partial Receiver Area - 18 Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.37 SYSTEM 200-00 INSTRUMENTATION

Sub System 200-04-3 InstrumentationSub Sub System Field Instruments (for Pig Receiver Area - 23 Nos)

Page 66: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.38 SYSTEM 200-00 INSTRUMENTATION

Sub System 200-05 InstrumentationSub Sub System Tubing, Air Distribution Manifold & Air Line Hook UPSSystem DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.39 SYSTEM 200-00 INSTRUMENTATION

Sub System 200-06 InstrumentationSub Sub System Junction BoxesSystem DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.40 SYSTEM 200-00 INSTRUMENTATION

Sub System 200-07 InstrumentationSub Sub System Cable Trench, Trunking & TraySystem DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet

Page 67: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.41 SYSTEM 200-00 INSTRUMENTATION

Sub System 200-08 InstrumentationSub Sub System Cable LayingSystem DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.42 SYSTEM 200-00 INSTRUMENTATION

Sub System 200-09 InstrumentationSub Sub System Termination At JB and CabinetsSystem DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.43 SYSTEM 300-00 CIVIL AND SURFACE FINISHING

Sub System 300-01 Civil FacilitiesSub Sub System Micro Piles (Qty: 89 Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

Page 68: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

3.44 SYSTEM 300-00 CIVIL AND SURFACE FINISHING

Sub System 300-01-1 Civil FacilitiesSub Sub System Micro Piles (at TL 3/4 Tie0In Area - 20 Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.45 SYSTEM 300-00 CIVIL AND SURFACE FINISHING

Sub System 300-01-2 Civil FacilitiesSub Sub System Micro Piles (for System 23-03 & Partial Receiver Area - 39 Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.46 SYSTEM 300-00 CIVIL AND SURFACE FINISHING

Sub System 300-01-3 Civil FacilitiesSub Sub System Micro Piles (for Pig receiver Area & PB1 - 30 Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.47 SYSTEM 300-00 CIVIL AND SURFACE FINISHING

Sub System 300-02 Civil FacilitiesSub Sub System Foundations & Pipe Supports (Qty: PC-17Nos, TB-3Nos & FT-19Nos)System DescriptionReference Drawing

Page 69: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

Testing and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.48 SYSTEM 300-00 CIVIL AND SURFACE FINISHING

Sub System 300-02-1 Civil FacilitiesSub Sub System Foundations & Pipe Supports (at TL 3/4 Tie-In Area - Qty: PC-8Nos & FT-12Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.49 SYSTEM 300-00 CIVIL AND SURFACE FINISHING

Sub System 300-02-2 Civil FacilitiesSub Sub System Foundations & Pipe Supports (for System 23-03 & Partial Receiver Area - Qty: TB-2Nos & PL-2 Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.50 SYSTEM 300-00 CIVIL AND SURFACE FINISHING

Sub System 300-02-3 Civil FacilitiesSub Sub System Foundations & Pipe Supports (for Pig Receiver Area-Qty: TB-1Nos, PC-9Nos & FT-7Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-up

Page 70: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

Pre-Commissioning PunchList

3.51 SYSTEM 300-00 CIVIL AND SURFACE FINISHING

Sub System 300-03 Civil FacilitiesSub Sub System Retaining Wall - 2 NosSystem DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.52 SYSTEM 300-00 CIVIL AND SURFACE FINISHING

Sub System 300-04 Civil FacilitiesSub Sub System BackFillingSystem DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.53 SYSTEM 300-00 CIVIL AND SURFACE FINISHING

Sub System 300-05 Civil FacilitiesSub Sub System PavingSystem DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.54 SYSTEM 300-00 CIVIL AND SURFACE FINISHING

Sub System 300-06 Civil Facilities

Page 71: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

Sub Sub System Roads and GravelSystem DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.55 SYSTEM 300-00 CIVIL AND SURFACE FINISHING

Sub System 300-07 Civil FacilitiesSub Sub System FencingSystem DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.56 SYSTEM 500-00 STRUCTURAL STEEL

Sub System 500-01 StructuralSub Sub System Pipe Bridge/Racks (Qty: 2Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.57 SYSTEM 500-00 STRUCTURAL STEEL

Sub System 500-01-1 StructuralSub Sub System Pipe Bridge No 2 (for System 23-03 & Partial Receiver Area -1No)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet Overview

Page 72: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

Installation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.58 SYSTEM 500-00 STRUCTURAL STEEL

Sub System 500-01-2 StructuralSub Sub System Pipe Bridge No. 01 /Racks (for Pig receiver Area - 1Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.59 SYSTEM 500-00 STRUCTURAL STEEL

Sub System 500-02 StructuralSub Sub System Service Platforms (Qty: 6Nos)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.60 SYSTEM 500-00 STRUCTURAL STEEL

Sub System 500-02-1 StructuralSub Sub System Service Platforms (at TL 3/4 Tie-In Area - 1Nos/SP-6)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

Page 73: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

3.61 SYSTEM 500-00 STRUCTURAL STEEL

Sub System 500-02-2 StructuralSub Sub System Service Platforms (for System 23-03 & Partial Receiver Area - 2 Nos/SP-4&5)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.62 SYSTEM 500-00 STRUCTURAL STEEL

Sub System 500-02-3 StructuralSub Sub System Service Platforms (for Pig Receiver Area - 3Nos/SP-1,2&3)System DescriptionReference DrawingTesting and Pre-Commissioning ProcedureChecksheet per SystemChecksheet OverviewInstallation Checksheet Calibration Checksheet Reinstatement Test/set-upPre-Commissioning PunchList

3.0 MISCELLANEOUS (BOOK __OF __)MISCELLANEOUS

3.1 Purchase Order3.2 Source Inspection Report3.3 Material Inspection / Receiving Report3.4 Certificates3.5 Material Defiency Reports

Page 74: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1 1 0 691 0 0.10% 0.03% 0.00% 0.13% SUMMARY***

DATA CALCULATION 0% 0% 0% 0%

R'CVD C'PLD TOTAL NA 70% 20% 10% % TOTAL

1 1 10.7 0.2 0 0.9

1 1 0 1 0

1

0% 0% 0% 0%11

0 0 0 3 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

Page 75: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

11111

Page 76: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1 0% 0% 0% 0%

1111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

Page 77: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

111

Page 78: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

Page 79: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

0 0 0 11 0

0% 0% 0% 0%

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

11

Page 80: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

1111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

11111111

Page 81: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

10 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

Page 82: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111

Page 83: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1 0% 0% 0% 0%11111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

Page 84: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

0 0 0 11 0

0% 0% 0% 0%

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1

Page 85: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

11111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111

Page 86: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

11

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

Page 87: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

111

Page 88: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

111111111

Page 89: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

Page 90: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

111111

Page 91: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

Page 92: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111111111

0 0 0 11 0

1

0% 0% 0% 0%

1111

0 0 0 5 0

Page 93: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

VOLUME 5 - DESIGN DATA

Legend - A : Accepted, R : Rejected, F : Final

DOC. DESCRIPTION AS PER TOC DOC I.D.

70% 20% 10%

No. of Sheet Status RemarksRECEIVED COMPILED

1.0 CIVIL & STRUCTURAL

1.1 MLNG-2 Host Tie-In Geotechnical Engineering Report

1.2 Feasibility Study of Constructing New Cable Trench Adjacent to Existing Cable Trench from Receiver Area to Control Building at MLNG-2

1.3 Technical Note on requirement of Drainage Bund at Major Valve in MLNG-2

1.4 MLNG-2 Host Tie-In Pipe Bridges Design Report

1.5 Structure Design Calculation Report for MLNG-2 Host Tie-In Retaining Wall

2.0 PIPING

2.1 Pipe Stress Analysis Report (MLNG-2 Tie In)

2.1 (MLNG Host Tie-In) 90% PDMS Model Review Report

3.0 Mechanical (BOOK __OF __)

3.1 Material Handling Study Report (Onshore MLNG Tie-In Scope)

4.0 Electrical (BOOK __OF __)

4.1 NIL

5.0 Instrumentation (BOOK __OF __)

5.1 Fire & Gas Performance Targets for KAKG-a & MLNG-2 Tie-Ins)

5.2 Fire & Gas Mapping for KAKG-a & MLNG-2 Tie-Ins)

5.3 Instrument Sizing Calculations Report (MLNG-2 Tie-Ins)

PROJECT: PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BIF ONSHORE UPGRADING AND MODIFICATIONS

Scanning Doc.(PDF 4.0+300s) / Final

Compilation

Page 94: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

0 0 0 12 0.00% 0.00% 0.00% 0.00% SUMMARY***

DATA CALCULATION 0% 0% 0% 0%

R'CVD C'PLD SCAN TOTAL NA 70% 20% 10% % TOTAL

1

0% 0% 0% 0%

1

1

1

1

0 0 0 5 0

1

0% 0% 0% 0%1

0 0 0 2 0

10% 0% 0% 0%

0 0 0 1 0

10% 0% 0% 0%

0 0 0 1 0

1

0% 0% 0% 0%1

1

0 0 0 3 0

Page 95: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

VOLUME 6 - AS BUILT DRAWINGS

Legend - A : Accepted, R : Rejected, F : Final

DOC. DESCRIPTION AS PER TOC DOC I.D.

70% 20% 10%

No. of Sheet Status RemarksRECEIVED COMPILED

1.0 STRUCTURAL / ARCHITECTURAL

1.1 Structural Drawings

1.1.1 Drawing Index - Structural & Structural Drawing Index

1.1.2 Structural Drawings

- Service Platform 1

- Service Platform 2

- Service Platform 3

- Service Platform 4

- Service Platform 5

- Service Platform 6

- Pipe Bridge No.01

- Pipe Bridge No.02

- Structural Pipe Support (GP1, GP1A, GP2, TPI, TP2 and TP3)

- Handrail (Handrail for Concrete Staircase & Retaining Wall)

1.2 Structural Drawings - NDE

1.2.1 Drawing Index - Structural NDE Drawings (Weld Map)

1.2.2 - Service Platform 1

- Service Platform 2

- Service Platform 3

- Service Platform 4

- Service Platform 5

- Service Platform 6

- Pipe Bridge No.01

- Pipe Bridge No.02

- Structural Pipe Support (GP1, GP1A, GP2, TPI, TP2 and TP3)

- Handrail (Handrail for Concrete Staircase & Retaining Wall)

PROJECT: PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BIF ONSHORE UPGRADING AND MODIFICATIONS

Scanning Doc.(PDF 4.0+300s) / Final

Compilation

Page 96: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

2.0 PIPING

2.1 Drawing Index

2.2 Line List / Schedule

2.3 Process Engineering & Flow Scheme, Hook up Drawing Details

2.4 Heat and material Balance

2.5 Process Flow Diagrams (PFD)

2.6 Piping and Instrumentation Diagrams Drawings (P&ID)

2.7 Safe Charts

2.8 Process and Cause Effects

2.9 Piping General Arrangement Drawings

2.10 Isometric Drawings

2.11 Piping Pipe Support Drawings and Details

3.0 MECHANICAL (BOOK __OF __)

3.1 NA NA NA3.2

4.0 ELECTRICAL (BOOK __OF __)

4.1 Drawing Index

4.2 Layout Drawings

4.3 Cable and ladder / Tray Routings

4.4 Schematic Wiring and Termination Diagrams

4.5 Single Line Diagrams

4.6 Cable Schedules

5.0 INSTRUMENTATION (BOOK __OF __)

5.1 Drawing Index

5.2 Layout Drawings

5.3 Cable and ladder / Tray Routings

5.4 Tubing and Tray Routings

5.5 Instrument Instalaltion and Hook up Details

5.6 Schematic and Terminatin Diagrams

5.7 Cable schedules

5.8 Loop and Logic Diagrams

6.0 CIVIL (BOOK __OF __)

Page 97: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

6.1 Civil Drawings & Index

5.2 Underground Scanning

Page 98: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

0 0 0 51 1 0.00% 0.00% 0.00% 0.00% SUMMARY***

DATA CALCULATION 0% 0% 0% 0%

R'CVD C'PLD SCAN TOTAL NA 70% 20% 10% % TOTAL

1

0% 0% 0% 0%

1

1

1

1

1

1

1

1

1

1

1

0 0 0 12 0

1

0% 0% 0% 0%

1

1

1

1

1

1

1

1

1

1

0 0 0 11 0

Page 99: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%

1

1

1

1

1

1

1

1

1

1

0 0 0 11 0

1

0% 0% 0% 0%1

0 0 0 1 1

1

0% 0% 0% 0%

1

1

1

1

1

0 0 0 6 0

1

0% 0% 0% 0%

1

1

1

1

1

1

1

0 0 0 8 0

Page 100: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1

0% 0% 0% 0%1

0 0 0 2 0

Page 101: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

VOLUME 7 - PROJECT SPECIFIC PROCEDURE

Legend - A : Accepted, R : Rejected, F : Final

DOC. DESCRIPTION AS PER TOC DOC I.D.

70% 20% 10%

No. of Sheet StatusRECEIVED COMPILED

1.0 QUALITY ASSURANCE1.1 Project Quality Assurance Plan PSP-KOTI-01 YES YES1.2 NDE Procedure - Radiography Testing PSP-KOTI-10 YES YES1.3 NDE Procedure - Ultrasonic Testing PSP-KOTI-11 YES YES1.4 NDE Procedure - Magnetic Particle Inspection PSP-KOTI-12 YES YES1.5 NDE Procedure - Dye Penetrant Inspection PSP-KOTI-13 YES YES1.6 Leveling and Dimensional Control Procedure for Piping Fabrication / Erection PSP-KOTI-14 YES YES1.7 Distortion Control and Welding Sequence Procedure PSP-KOTI-15 YES YES1.8 Hardness Testing Procedure PSP-KOTI-39 YES YES1.9 Air Leak test Procedure PSP-KOTI-48

2.0 SAFETY

2.1 Mobilisation Procedure PSP-KOTI-30 YES YES2.2 HSE Plan PSP-KOTI-36 YES YES

2.3 PSP-KOTI-38

2.4 Emergency Response Plan for Hot Tapping Activity PSP-KOTI-513.0 ADMINISTRATION

3.1 Planning Package (MLNG) PSP-KOTI-02/PSP-MLNG-02 YES YES3.2 Project Execution Plan PSP-KOTI-21 YES YES

4.0 ENGINEERING4.1 NA NA NA NA

5.0 PROCUREMENT/MATERIAL

5.1 NA NA NA NA6.0 FABRICATION/CONSTRUCTION

6.1 Construction Procedure PSP-KOTI-056.2 Lifting Procedure PSP-KOTI-08 YES YES6.3 Grouting Procedure PSP-KOTI-09 YES YES6.4 Electrical Installation Procedure PSP-KOTI-16 YES YES6.5 Hot Tapping Procedure PSP-KOTI-196.6 Isolation Plug Procedure PSP-KOTI-206.7 GRE Pipe Installation Procedure PSP-KOTI-22 YES YES6.8 Micro Piling Works Procedure PSP-KOTI-23 YES YES6.9 Concreting Works Procedure PSP-KOTI-24 YES YES

PROJECT: PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BIF ONSHORE UPGRADING AND MODIFICATIONS

Scanning Doc.(PDF 4.0+300s) / Final

Compilation

Emergency Response Plan for kumang Tie-In Project and BIF Modifications - MLNG

Page 102: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

6.10 Erection of Steel Structure Procedure PSP-KOTI-25 YES YES6.11 Excavation Procedure PSP-KOTI-26 YES YES6.12 Levelling and Earthwork Procedure PSP-KOTI-27 YES YES6.13 Demolition of Bundwall PSP-KOTI-28 YES YES6.14 Roadworks PSP-KOTI-29 YES YES6.15 Foundation and Tie-Beam Procedure PSP-KOTI-31 YES YES6.16 Retaining Wall Construction Procedure PSP-KOTI-32 YES YES6.17 Instrument Installation Procedure PSP-KOTI-33 YES YES

6.18 Pipe Fabrication ProcedurePSP-KOTI-34 YES YES

6.19 Telecommunication Procedure PSP-KOTI-35 YES YES6.20 Thermal Insulation Procedure PSP-KOTI-37 YES YES6.21 Cold Cutting Procedure PSP-KOTI-40 YES YES

6.22 Valve Leak Test for PCSB Supplied ValvePSP-KOTI-41 YES YES

6.23 Degaussing Procedure PSP-KOTI-436.24 Dehydrogenation Procedure PSP-KOTI-446.25 Desulphurization Procedure PSP-KOTI-456.26 Flame Straightening Procedure PSP-KOTI-49

7.0 TESTING AND COMMISSIONING7.1 Testing and Pre-Commissioning Procedure (MLNG) PSP-KOTI-18A YES YES7.2 Commissioning procedure (MLNG) PSP-KOTI-42A7.3 Commissioning Procedure for Outdoor Lighting at Trunkline 3 & 4 PSP-KOTI-50A YES YES

Page 103: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

VOLUME 7 - PROJECT SPECIFIC PROCEDURE

33 33 0 44 2 52.50% 15.00% 0.00% 67.50% SUMMARY***

Legend - A : Accepted, R : Rejected, F : Final DATA CALCULATION 52% 15% 0% 68%

RemarksR'CVD C'PLD SCAN TOTAL NA 70% 20% 10% % TOTAL

52% 15% 0% 68%

1 1 11 1 11 1 11 1 11 1 11 1 11 1 11 1 1

1

1 1 11 1 1

1

1

1 1 11 1 1

1

1

11 1 11 1 11 1 1

11

1 1 11 1 11 1 1

PROJECT: PROVISION OF PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF KUMANG CLUSTER ONSHORE TIE-IN AT MLNG-2 AND BIF ONSHORE UPGRADING AND

Page 104: MLNG-FINAL DOCUMENTATION PROGRESS COMPILATION

1 1 1

52% 15% 0% 68%

1 1 11 1 11 1 11 1 11 1 11 1 11 1 1

1 1 1

1 1 11 1 11 1 1

1 1 1

1111

1 1 11

1 1 133 33 0 44 2