26
Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

  • Upload
    agrata

  • View
    27

  • Download
    0

Embed Size (px)

DESCRIPTION

Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS. Background. BASIC is a 24/7 clinical, academic and research enterprise Over 30 FTE – faculty, staff and post-doc trainees 5 basic science laboratories with over $8 million in annual research funding - PowerPoint PPT Presentation

Citation preview

Page 1: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

Mission Continuity Management Team (MCMT) Meeting

November 22, 2013Mary Vassar, RN, MS

Page 2: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

Background• BASIC is a 24/7 clinical, academic and research enterprise• Over 30 FTE – faculty, staff and post-doc trainees• 5 basic science laboratories with over $8 million in annual

research funding• Housed on first and second floors of Building 1

Page 3: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

How we started on Continuity Planning

• Needed to be a dynamic process, not a document that is thrown together because approval is needed by the University

• Needed to involve people throughout our organization working as a team -- rather than “Me” sitting at my computer working in a vacuum and writing a text book plan that would read perfectly to any outside reviewer

Page 4: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

Action Items PrioritizedConducted Vulnerability Assessment for Research Labs:

Action Item #1: Preserve Animal Colonies: coordinate plan with LARC to identify care needs and prioritize most irreplaceable animals in the event of loss of boarding capacity.

Page 5: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

Action Items Prioritized

Conducted Vulnerability Assessment for Research Labs:Action Item #2: Preserve Irreplaceable Specimens: 1) coordinate identification of high priority frozen specimens and cubic feet of space needed for off-site storage; 2) pre-event identification of on-site irreplaceable specimens for emergency relocation in the event of back-up power failure. Can’t prioritize at the time of the event.

Page 6: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

Planning Elements for Preservation of Irreplaceable Frozen Specimens

• Likely hazards to mitigate• Essential response capabilities and dependencies• Communications• Continuity of operations • Development of job action sheets• Process for addressing gaps• Exercise to test the plans and training

procedures

Page 7: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

Objectives for Day of the Exercise1. Test emergency specimen relocation procedures to determine if:

• Appropriate actions are identified in the plan & procedures• Necessary resources (BASIC & external/upstream) identified• Appropriate staff (BASIC & external/upstream) identified• Likely scenarios and logistical considerations addressed?• What type of training will other staff (new hires, lab, clinical and admin)

need – i.e., beyond reading the procedures to implement?• How much time will it take to train other employees?• How frequently will staff need to practice to maintain familiarity with the

procedures?• We are confident that we have done everything feasible to assure samples

can be salvaged in non-catastrophic emergencies?2. Hotwash to evaluate what worked and what didn’t and update and improve

the Continuity Plan to integrate exercise outcomes.

Page 8: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

Goal: Save high priority frozen specimens!

Baseline - Prior to Planning and Exercise• What back-up procedures do we have for -80

freezers?– Bldg 1 back-up generator plugs– Dry ice from hospital supply or call Air Gas

Page 9: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

The Exercise Scenario• Two years of drought in California• Water reservoir volumes are critically low,

and statewide communities are rationing water use.

Page 10: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

Saturday July 21, 2012 Statewide Power Reserves @ <1%

Page 11: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

16 Million Residential and Commercial Customers without Power. National Weather Service issued Excessive Heat Warning through Tuesday.

San Francisco

Los Angeles

Saturday July 21st @ 8 PM: CA ISO Declared First Ever Stage 3 Emergency and Rolling Blackouts Initiated

Page 12: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

• Nearly all BASIC lab faculty and staff are out-of-town at the Annual Meeting of the National Neurotrauma Society in Phoenix through Wednesday.

Sunday July 22, 2012

Page 13: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

• Amity, Ellen, Xioakui and Tim are also going to Phoenix on a 6 PM flight as they all have poster sessions on Monday or Tuesday.

• They all planned to meet at the lab to ride BART to the airport together and check the freezers due to concerns from news reports about rolling blackouts.

• Lab temp is over 90 degrees & all freezers alarming

Sunday July 22, 2012 – 2 PM

Page 14: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

• 2:15 pm - Participants relocate to Freezer Bay• Participants have 45 minutes to work through the

response plan. Creative problem solving is encouraged during play, however, decisions must be based on reality of the scenario and expected resources.

• Facilitator will be providing scenario injects as you work through the response plan.

• Remember to document times, problems, actions and decisions etc. We expect gaps to be identified, we aren’t expecting perfection.

Sunday July 22, 2012Exercise Begins

Page 15: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS
Page 16: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

Goal: Save high priority frozen specimens!

Post Planning and Exercise• What back-up procedures do we have for -80 freezers?

– Bldg 1 back-up generator plugs (power diverted to patient care bldgs)– Dry Ice from hospital Supply (allocated to patient care services)– Air Gas Delivery (overwhelmed & allocated to patient care services)– CO2 back-up system in the freezers (requires batteries and liquid CO2).– Dry ice chest with weekly delivery—(research requests will be low priority

for allocating dry ice in a disaster)– Spare -80 Freezer is staged at Oyster Point (result of planning research and

exercise)– For future action – send duplicate samples to remote biorepository

Page 17: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

Responding kit

Page 18: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

Specimen Preservation Decision Tree

Generators on?

Check Periodically

Notify PI

CO2 Backup Keep Door Closed

“Save Me Box” Strategy

No

No

Yes

Yes

Put in Dry Ice Chest

Page 19: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

Freezer Disaster Logs

Page 20: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

“SAVE ME” Freezer Boxes

• Tissue specimen from current Projects

• 1 set of cut tissues per project

• Inventory updated periodically

Page 21: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

• Implement only when Generators and CO2 do not activate. – Place in dry ice box (assure weekly delivery has arrived)– Place in Cooler with dry ice and relocate to Oyster Point

• Located in the lower left hand corner of each freezer.

“Save Me” Box Strategy

Page 22: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

Importance of Details!

Page 23: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

How do I access the freezer at Oyster Point’s Biorepository?

• In an emergency, contact UCSF Police at 476-1414 • Request to go down the Oyster Point call out list

– (Otherwise call Anthony Meno at (415) 476-5907, https://clsdsb2b.ucsf.edu)• Directions to OP

– 101 South.– Take the Oyster Point Blvd East exit, and go east to Gull Drive.– At Gull Drive, turn right.– At Forbes, turn left, then an immediate right into the parking lot.– Park in a visitor spot in the lot at 612 Forbes in South San Francisco.– Come to the 612 Forbes door. Ring the "Air Phone" button and someone will

answer- six desks here have access to the air phone. Someone will buzz you in. Please sign in.

• Freezer ID:– Property Number#072000185– Model Number# ULT-25869SIA

Page 24: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

Conclusions• Planning process has been critical to improving our

ability to preserve research specimens• Conducting exercise (not just tabletop) made staff

recognize how the details of the structures and processes need to be tested under a variety of scenarios

• Experiences from Hurricanes Katrina, Irene and Sandy, 2011 Japan Earthquake and Fike Lab fire have increased faculty and staff awareness/buy-in for the importance establishing a culture of preparedness

Page 25: Mission Continuity Management Team (MCMT) Meeting November 22, 2013 Mary Vassar, RN, MS

Conclusions• There is a struggle to prioritize the time

required for department staff and faculty to do effective planning and training on top of existing workloads

• Support from Esther and UC Ready planning application have provided time saving tools and resources to get the work on our Continuity Plan done.