1) Sri K.Ranganadham, Ex. CMD, Technical Advisor for Electrical, TTD. 2) Sri C. Chandra Sekhar Reddy, Chief Engineer, T.T.D, Tirupati 3) Sri A.Venkateswarlu, Superintending Engineer (Elec),T.T.D, Tirupati 4) Sri C.Jagadeeswar Reddy, District Manager, NREDCAP, A.P Name of work : Design, Engineering, Supply, Installation, Testing & Commissioning of 10 MWp grid based solar PV power plant with single axis tracking on Build, Own, Operate and Transfer (BOOT) basis at TTD Land in Kosuvaripalli Village near Thamballapalli in Chittoor District. 5) Sri S. Prasad, Dy.Chief Engineer (Admn.,), T.T.D, Tirupati 6) Sri S. Somasekhar, Energy Manager, T.T.D, Tirupati 7) Smt. G.Lakhmi Devi, PA (T5) to CE, TTD OFFICIALS: 8) M/s. Hild Energy Pvt Ltd., Chennai 9) M/s. Kripatelecom, Bangalore 10) M/s. Sterling & Wilson, Chennai 11) M/s.Enrich Energy, Hyderabad 12) M/s. L&T, Chennai 3) M/s.Greenko, Hyderabad 4) M/s.First Solar, New Delhi 5) M/s.Agriya Green Power Pvt Ltd., Bangalore 6) M/s. Petawatts Solar Solutions Pvt Ltd., Hydearabad 7) M/s. Smart Trak Solar Systems Pvt Ltd., Hyderabad FIRMS Representatives: 1) M/s. Welspun Renewables Energy Pvt Ltd, Chennai 2) M/s.Sun Edison, Chennai MINUTES OF THE PRE-BID MEETING Pre-Bid meeting for the above work was conducted at 03.00 PM on 13-05-2015 in the chamber of the Chief Engineer, TTD, Tirupati. The following representative of the firms and officials were attended. The details of the queries raised by the firms (i) M/s Welspun Renewables Energy Pvt. Ltd., Chennai, (ii) M/s SunEdison Solar Power India Pvt. Ltd., Chennai, (iii) M/s First Solar Power India Pvt. Ltd., Hyderabad and (iv) M/s.Greenko, Hyderabad are discussed during the meeting and the clarifications proposed for queries are hereunder furnished. Important Note : 1) Copy of Pre-Bid minutes (pages 2 to 16) and Corrigendum (page 17 to 22) are enclosed seperately. The tenderers are requested to quote their rates duly considering the tender document read with approved pre bid minutes and corrigendum. 2) The tenderers are requested to ensure to enclose signed copy of minutes of pre bid meeting & corrigendum along with technical bid. Failure to enclose, will result in the rejection of tenders. NIT No. : 08/SE(Elec)/TTD/TPT/2015-16 3) Revised Financial Bid format herewith enclosed (vide page No.22). The tenderers are requested to quote Financial Bid using revised Financial Bid format. Page 1 of 22

MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

  • Upload
    vutram

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

1)    Sri K.Ranganadham, Ex. CMD, Technical Advisor for Electrical, TTD.

2)    Sri C. Chandra Sekhar Reddy, Chief Engineer, T.T.D, Tirupati

3)    Sri A.Venkateswarlu, Superintending Engineer (Elec),T.T.D, Tirupati

4)    Sri C.Jagadeeswar Reddy, District Manager, NREDCAP, A.P

Name of work : Design, Engineering, Supply, Installation, Testing & Commissioning of 10 MWp grid based solar

PV power plant with single axis tracking on Build, Own, Operate and Transfer (BOOT) basis at TTD Land in

Kosuvaripalli Village near Thamballapalli in Chittoor District.

5)    Sri S. Prasad, Dy.Chief Engineer (Admn.,), T.T.D, Tirupati

6)    Sri S. Somasekhar, Energy Manager, T.T.D, Tirupati

7)    Smt. G.Lakhmi Devi, PA (T5) to CE, TTD

OFFICIALS:

8)    M/s. Hild Energy Pvt Ltd., Chennai

9)    M/s. Kripatelecom, Bangalore

10) M/s. Sterling & Wilson, Chennai

11) M/s.Enrich Energy, Hyderabad

12) M/s. L&T, Chennai

3)    M/s.Greenko, Hyderabad

4)    M/s.First Solar, New Delhi

5)    M/s.Agriya Green Power Pvt Ltd., Bangalore

6)    M/s. Petawatts Solar Solutions Pvt Ltd., Hydearabad

7)    M/s. Smart Trak Solar Systems Pvt Ltd., Hyderabad

FIRMS Representatives:

1)    M/s. Welspun Renewables Energy Pvt Ltd, Chennai

2)    M/s.Sun Edison, Chennai

MINUTES OF THE PRE-BID MEETING

Pre-Bid meeting for the above work was conducted at 03.00 PM on 13-05-2015 in the chamber of the

Chief Engineer, TTD, Tirupati. The following representative of the firms and officials were attended.

The details of the queries raised by the firms (i) M/s Welspun Renewables Energy Pvt. Ltd., Chennai, (ii)

M/s SunEdison Solar Power India Pvt. Ltd., Chennai, (iii) M/s First Solar Power India Pvt. Ltd., Hyderabad and (iv)

M/s.Greenko, Hyderabad are discussed during the meeting and the clarifications proposed for queries are

hereunder furnished.

Important Note : 1) Copy of Pre-Bid minutes (pages 2 to 16) and Corrigendum (page 17 to 22) are enclosed seperately. The

tenderers are requested to quote their rates duly considering the tender document read with approved pre bid minutes and

corrigendum.

2) The tenderers are requested to ensure to enclose signed copy of minutes of pre bid meeting & corrigendum along with

technical bid. Failure to enclose, will result in the rejection of tenders.

NIT No. : 08/SE(Elec)/TTD/TPT/2015-16

3) Revised Financial Bid format herewith enclosed (vide page No.22). The tenderers are requested to quote Financial Bid

using revised Financial Bid format.Page 1 of 22

Page 2: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

PRE - BID MINUTES

Sl.

No.

Chapter

No

Clause

NoTender condition Query Raised by Remarks of Department

The operation & maintenance of

plant under BOOT basis is revised

to 15 years. As such the solar

power project developer shall

build the plant, own, operate &

maintain the project for 15 years

from the date of commissioning

on BOOT basis and transfer the

plant.

The tender conditions holds good

to take up the solar power project

on BOOT basis for 15 years of

O&M after build & commissioning

of the plant.

However any other action by the

developer, other than establishing

solar power project and related

works, is strictly prohibited.

Accordingly the same will be

included in the agreement.

3 2 TTD will permit the agency to set up a

solar Power Project in its land at

Kosuvaripalli, Near Thamballapalli,

Chitoor District, Andhra Pradesh,

without any transfer of right on the

land. TTD will permit the agency to

setup the Solar Power plants in the

proposed land without involving any

transfer of right to the property.

1)     The land owned by TTD can

be leased to project developer on

long term basis for the entire

useful life of the project.

2) Land allotted shall have

deemed approval of mortagaging /

creation of charge in favour of

project lender/lenders.

3) Under the A.P. solar policy,

2015, there shall be 100%

exemption on the registration fee,

stamp duty for execution of lease

deed of allotted land in favour of

the project developer.

Reply furnished at Sl.No.(1) holds

good.

3 4 The agency shall carry out the

construction of the project on Build,

Own, Operate, and Transfer (BOOT)

basis. The operating agency shall

design and construct the facility,

arrange finance, operate and maintain

the facility for 10 years period from

the date of commissioning of the

project and hand over to TTD in good

operating condition at the end of 10th

year. The agency shall transfer the

entire assets to TTD after completion

of operating lease period in good

working condition.

1 1 1.1.1 Introduction : TTD invites competitive

Bids under Single Stage Bidding

Process to Build, Own, Operate &

Transfer a 10 MWp land based Grid

connected single trackers system

Solar Photo Voltaic Plant at TTD Land

in Kosuvaripalli, near Thamballapalli,

Chitoor District, Andhra Pradesh

under BOOT systemin the land

owned by TTD and is proposed to be

leased to the successful bidder for the

tenure of 10 years under the BOOT.

1) This solar project developer

shall own the project for 10 years

which is in fact a long term.

2) As the asset will remain with

developer for a long term and

considering the fact that TTD has

no experience operating and

implementing solar projects, thus

the project can be implemented in

BOO basis, where the Developer

shall own and maintain the project

for the entire useful life of the

project i.e. for 25 years.

M/s Welspun

Renewables

Energy Pvt. Ltd.,

Chennai

3) The land owned by TTD can be

leased for 25 years in favour of the

project Developer.

TTD will lease the land to the

developer at a lease rent of

Rs.1116/- per annum per Acre for

establishing solar power project

for a BOOT period of 15 years

and 1 year construction period

(Total 16 years) from the date of

handing over of site or Date of

entering into agreement

whichever is later.

2 M/s Welspun

Renewables

Energy Pvt. Ltd.,

Chennai

Page 2 of 22

Page 3: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

PRE - BID MINUTES

Sl.

No.

Chapter

No

Clause

NoTender condition Query Raised by Remarks of Department

3 1 1.1.1 TTD invites competitive Bids under

Single Stage Bidding Process to

Build, Own, Operate & Transfer a 10

MWp land based Grid connected

single trackers system Solar Photo

Voltaic Plant at TTD Land in

Kosuvaripalli, near Thamballapalli,

Chitoor District, Andhra Pradesh

under BOOT systemin the land

owned by TTD and is proposed to be

leased to the successful bidder for the

tenure of 10 years under the BOOT.

Requested to implement the

project in BOO basis, where the

developer shall own and maintain

the project for 25 years. / Request

to extend the BOOT period to 20

years.

M/s. Welspun

Renewables

Energy Pvt Ltd,

Chennai /

M/s.Sun Edison,

Chennai

The tender conditions holds good

to take up the solar power project

on BOOT basis for 15 years of

O&M after build & commissioning

of the plant.

4 3 4 BOOT period of 10 years Is it possible to extend the BOOT

period to 20 years so that the tariff

will be very attractive and thereby

ensuring more power cost savings

to TTD from year 1 itself.

M/s SunEdison

Solar Power

India Pvt. Ltd.,

Chennai

Reply furnished in Sl.No. (1) holds

good.

5 1 1.1.1 Regd. leasing of land for 25 years./

Leasing of site.

M/s. Welspun

Renewables

Energy Pvt Ltd,

Chennai /

M/s.First Solar,

New Delhi

Reply furnished in Sl.No.1 holds

good.

6 1 1.1.1 TTD invites competitive Bids under

Single Stage Bidding Process to

Build, Own, Operate & Transfer a 10

MWp land based Grid connected

single trackers system Solar Photo

Voltaic Plant at TTD Land in

Kosuvaripalli, near Thamballapalli,

Chitoor District, Andhra Pradesh

under BOOT system in the land

owned by TTD and is proposed to be

leased to the successful bidder for the

tenure of 10 years under the BOOT.

Do we have an estimate of the

lease rental charges?

M/s SunEdison

Solar Power

India Pvt. Ltd.,

Chennai

Reply furnished in Sl.No. (1) holds

good.

7 General Lease of the Land What will be the lease charges for

the Land.

M/s First Solar

Power India Pvt.

Ltd., Hyderabad

Reply furnished in Sl.No.1 holds

good.

8 General Title documents on the land owned Request to share title documents

over the land owned. This will be

required by our lenders for review.

M/s SunEdison

Solar Power

India Pvt. Ltd.,

Chennai

Reply furnished in Sl.No.(1) holds

good.

Page 3 of 22

Page 4: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

PRE - BID MINUTES

Sl.

No.

Chapter

No

Clause

NoTender condition Query Raised by Remarks of Department

1) Andhra Pradesh enjoy almost

300+ sunny days in an year with

long sun shine hours.

2) Implementation of single axis

tracking system will incorporate

moving parts into the system,

which has its own advantages and

dis-advantages.

3) We request that project should

be independent of tracking system

installation as the same will add on

to project cost and at the same

time will also increase O&M

expenses.

4) The implementation of tracking

system can be left to the sole

discretion of project Developer.

10 General We would like to again stress the

importance of installing 10 MW

solar plant with single axis trackers

as mentioned in the TTD tender

documents. The Solar plant with

single axis trackers can

significantly reduce the cost of

power generated vis a vis of the

power generated from fixed tilt

solar plants. Hence it will be

beneficial for TTD in the long run

especially after the completion of

the BOOT period. Hence TTD

should insist on the construction of

a solar plant with single axis

trackers only as specificed on the

original tender documents.

M/s SunEdison

Solar Power

India Pvt. Ltd.,

Chennai

-do-

11 1 1.1.3 The Solar power plant to be selected

will be for aggregate capacity of 10

MWp. However, the selection of solar

power plant would be technology

agnostic within the technology

mentioned above. Crystalline silicon

or thin film or CPV, with single

trackers can be installed. Only

commercially established and

operational technologies can be used,

to minimize the technology risk and to

achieve the timely commissioning of

the Projects.

Implementation of tracking system

can be left to the sole discretion of

developer /Requested TTD to

consider fixed mounting structure

along with tracking system

M/s. Welspun

Renewables

Energy Pvt Ltd,

Chennai

-do-

Adoption of fixed / tracking system

is left to the sole discretion of

project Developer. However they

shall adopt mono crystalline PV

Modules technology only. The

minimum solar power plant

capacity to be established shall be

10 MWp in case of fixed system

(or) 8.5 MWp in case of tracking

system and in any case, the total

annual assured power generation

shall not be less than 150 Lakh

units.

9 1 1.1.3 The Solar power plant to be selected

will be for aggregate capacity of 10

MWp. However, the selection of solar

power plant would be technology

agnostic within the technology

mentioned above. Crystalline silicon

or thin film or CPV, with single

trackers can be installed. Only

commercially established and

operational technologies can be used,

to minimize the technology risk and to

achieve the timely commissioning of

the Projects.

M/s Welspun

Renewables

Energy Pvt. Ltd.,

Chennai

Page 4 of 22

Page 5: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

PRE - BID MINUTESSl.

No.

Chapter

No

Clause

NoTender condition Query Raised by Remarks of Department

12 1 1.1.1 TTD invites competitive Bids under

Single Stage Bidding Process to

Build, Own, Operate & Transfer a 10

MWp land based Grid connected

single trackers system Solar Photo

Voltaic Plant at TTD Land in

Kosuvaripalli, near Thamballapalli,

Chitoor District, Andhra Pradesh

under BOOT system in the land

owned by TTD and is proposed to be

leased to the successful bidder for the

tenure of 10 years under the BOOT.

We request TTD to consider fixed

mounting structures along with

tracing system.

M/s First Solar

Power India Pvt.

Ltd., Hyderabad

Reply furnished in Sl.No.(1) holds

good.

There are 2 Nos. of 33/11 KV sub-

stations nearer to the proposed

solar power project site at

Kosuvaripalli. One is at

Kosuvaripalli about 4.5 KM away

from the site and the other is at

Mudivedu about 5.5 KM away

from the site.

Necessary inter-connection lines

at 33 KV level to any one or both

of the sub-stations or to any other

sub-stations of APSPDCL as per

feasibility and necessity to be

provided by the developer

including procuring of land for

right of way, at his own cost for

evacuation of power. These lines

shall also be maintained by the

developer till the end of the BOOT

period.

Necessary approvals shall be

obtained by developer only. TTD

will extend necessary co-

operation in this regard.14 1 1.8 33/11 kV Substation Kosuvaripalli is

about 4km from the site. The agency

has to provide necessary connection

line from the site to this point (or) to

any other point as decided by the

APSPDCL.

As per the current norms of APSPDCL

10MW capacity is not permitted at

33/11KV sub-station and would be

required to be connected at 33KV level

of 132/33KV sub-station. We request

TTD to confirm if the evacuation permit

is obtained and if not will TTD facilitate

in getting the concerned evacuation

feasibility permit from APSPDCL.

M/s First Solar

Power India Pvt.

Ltd., Hyderabad

Reply furnished at Sl.No.13 holds

good.

15 2 2.2.1

Page

No.13

Can we create a SPV to execute

the project ? There is no explicit

clause allowing us to do that.

M/s SunEdison

Solar Power

India Pvt. Ltd.,

Chennai

SPV not allowed

16 2 2.2.1

(vi)

The company shall have a Liquid

assets and / or credit facilities of not

less than Rs. 60 crores (Credit facility

/ letter of credits / Solvency

certificates from Banks etc).

Credit facility of at least Rs.60 Cr.

need to be reviewed.

M/s.Greenco,

Hyderabad

The credit facility / solvency

certificate proposed under

eligibility criteria is revised to

Rs.25.00 Crores.

M/s Welspun

Renewables

Energy Pvt. Ltd.,

Chennai

13 1 1.8 33/11 kV Substation Kosuvaripalli is

about 4km from the site. The agency

has to provide necessary connection

line from the site to this point (or) to

any other point as decided by the

APSPDCL.

1) As the project is getting

implemented in a specific location,

thus permission for interconnection

at the specific sub-station and at

specific voltage level is crucial.

2) Any deviation / change of

interconnection point shall add to

time and cost over run for the

project.

3) We request the tender

document should specify the

interconnection point and specific

voltage level for evacuation of

power.

Page 5 of 22

Page 6: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

PRE - BID MINUTESSl.

No.

Chapter

No

Clause

NoTender condition Query Raised by Remarks of Department

17 2 2.2.1

(vi)

The company shall have a Liquid

assets and / or credit facilities of not

less than Rs. 60 crores (Credit facility

/ letter of credits / Solvency

certificates from Banks etc).

The additional requirement of

liquid assets can be dispensed

with.

M/s. Welspun

Renewables

Energy Pvt Ltd,

Chennai

-do-

2.2.1

(vi)

The company shall have a Liquid

assets and / or credit facilities of not

less than Rs. 60 crores (Credit facility

/ letter of credits / Solvency

certificates from Banks etc).

1) The figure of liquid assets and /

or credit facilities (Rs.60Crs. /

Rs.50Crs.) are not in conformity

with each other.

2) The developer will already

provide the performance BG and

EMD as per the Bidding document.

3) This additional requirement of

liquid assets is not required, the

same can be dispensed with

19 2 2.9 The performance gaurantee will be

retained as security deposit and will

be refunded after the completion of

lease agreement period (installation &

commissioning period + 10 years

BOOT period) and after fulfilling all

contractual obligations.

PBG should be refunded after

COD / PBG validity period to be

reduced to 1 (or) 2 years.

M/s.Greenco,

Hyderabad /

M/s.Sun Edison,

Chennai

The PBG will be returned after 2

years from the date of

comissioning of power plant duly

evaluating the generation

performance. From 3rd year

onwards penalties due to shortfall

in the guaranteed generation will

be recovered in the succeding

year. For the 15th year the

shortfall will be recovered for

assessed shortfall of 15th year in

addition to the actual shortfall of

14th year.

20 2 2.2.1 (i) The Bidder should be a Public limited

company or private limited company

or Consortium. The company

/companies should be registered in

India. The term ‘Bidder’ used herein

after would therefore apply to both a

single Bidder and/ or the Consortium.

The Bid submitted by a Consortium

should comply with the following

additional requirements failing which

shall result in disqualification.

Can a foreign Bidder participate in

the Tender.

M/s.Sun Edison,

Chennai

Tender conditions holds good.

18 2 M/s Welspun

Renewables

Energy Pvt. Ltd.,

Chennai

-do-

Checklis

t

Copy of proof of liquid assests and /

or credit facility of not lessthan

Rs.50.00 Crores ( Credit facility /

letter of credits/solvency certificates

from banks etc.,)

Page 6 of 22

Page 7: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

PRE - BID MINUTES

Sl.

No.

Chapter

No

Clause

NoTender condition Query Raised by Remarks of Department

(iv) The company should have

designed, supplied, erected,

commissioned of SPV-based grid

connected/ interactive power plants

cumulative installed capacity of 10

MWp or above (at one or more

projects), during last 5 years (i.e.,

2010-11 to 2014-15). In the case of

consortium, the lead member shall

fulfill this criterion.

(v) The company shall be an

EPC/BOLT/BOOT Contractor with

capability of executing turnkey

solution for engineering, procurement,

supply, installation, testing and

commissioning of large scale grid

connected solar PV-based power

plants having executed at least one

project (under one contract) rated

minimum 5.0 MWp which has been

running successfully for a period of

minimum one year during the last five

(5) years as on the date of opening of

bids.In the case of consortium, the

lead member shall fulfil this criterion.

22 3 16 The interconnection line from Project

switchyard to the Location has to be

constructed and maintained by the

agency at his cost. The entire cost of

transmission, construction of lines,

metering equipment, losses,

supervision charges etc., from the

Project up to the Interconnection

Point shall be borne by the agency

and shall not be reimbursed by TTD.

It is the responsibility of agency to

identify suitable interconnection point

for evacuation of power generation

After construction of the power line

the same shall be under the

concerned Discom / Clarification

required regarding interconnection

point at plant end (or) sub-station

end.

M/s. Welspun

Renewables

Energy Pvt Ltd,

Chennai,

M/s.Sun Edison,

Chennai

Reply furnished in Sl.No.13 holds

good.

Tender conditions holds good21 2 2.2.1

(iv), (v)

Can the eligibility criteria be

fulfilled by considering the

Technical capability of

Parent/Ultimate Parent for

qualification purpose?

M/s First Solar

Power India Pvt.

Ltd., Hyderabad

Page 7 of 22

Page 8: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

PRE - BID MINUTES

Sl.

No.

Chapter

No

Clause

NoTender condition Query Raised by Remarks of Department

(a) From the date of commissioning,

the Agency shall guarantee to deliver

16.00 lakh units of power (kWh)

annually for each one mega watt

capacity installed under the project,

excepting incidents of Acts of GOD or

force majeure.

(b) In case of failure to deliver the

power guaranteed on annual basis

except for reasons contributory to Act

of GOD and / or Force majeure, the

rate of compensation would be the

cost of power per unit purchased by

TTD from AP Transco/SPDCL less

the rate fixed with the operating

agency.

(c) In the event of Solar P.V. Power

Plant become non-functional within 10

years, the Agency shall compensate

for the loss of the generation based

on the guaranteed generation of

16.00 lakh kWh of power annually for

each one MW capacity installed under

this project. The rate of compensation

will be the max. cost of power per

kWh chargeable by the AP Transco/

APSPDCL less the rate fixed with the

operating agency.

1) We understand this clause as

16Lakh units per MW (AC) of

installed capacity for first year from

the date of commissioning.

2) As the clause is not complete

we would like to propose the

following.

3) Bidder to propose the first year

generation assuming the weather

data for the plant and buyer to buy

the entire energy generated from

the solar project.

4) Further the quantum of energy

generated to be reduced at a rate

of 1% year on year from second

year and the same may be

considered for minimum assured

weather corrected generation.

-do-24 3 57.(11).

(a)

From the date of commissioning, the

Agency shall guarantee to deliver

16.00 lakh units of power (kWh)

annually for each one mega watt

capacity installed under the project,

excepting incidents of Acts of GOD or

force majeure

M/s First Solar

Power India Pvt.

Ltd., Hyderabad

23 3 57.(ii) There has to be a range of energy

generation availability of the

project end based on realistic CUF

/ Insulation level. / Regarding

guaranteed generation degration is

considered or not.

M/s. Welspun

Renewables

Energy Pvt Ltd,

Chennai /

M/s.First Solar,

New Delhi

Reply furnished in Sl.No.9 holds

good.

Page 8 of 22

Page 9: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

PRE - BID MINUTES

Sl.

No.

Chapter

No

Clause

NoTender condition Query Raised by Remarks of Department

(a) From the date of commissioning,

the Agency shall guarantee to deliver

16.00 lakh units of power (kWh)

annually for each one mega watt

capacity installed under the project,

excepting incidents of Acts of GOD or

force majeure.

1) Solar energy generation entirely

depends on the irradiation/intensity

of the sun light.

(b) In case of failure to deliver the

power guaranteed on annual basis

except for reasons contributory to Act

of GOD and / or Force majeure, the

rate of compensation would be the

cost of power per unit purchased by

TTD from AP Transco/SPDCL less

the rate fixed with the operating

agency.

2) Based on the realistic solar

insolation data available with us,

conservatively at 17.5% CUF and

0.25% auxiliary consumption, the

plant will be able to generate

15.30Lakh units per year (+/-

5.00%).

(c) In the event of Solar P.V. Power

Plant become non-functional within 10

years, the Agency shall compensate

for the loss of the generation based

on the guaranteed generation of

16.00 lakh kWh of power annually for

each one MW capacity installed under

this project. The rate of compensation

will be the max. cost of power per

kWh chargeable by the AP Transco/

APSPDCL less the rate fixed with the

operating agency.

3) Thus there has to be range of

energy generation availability at

project end based on realistic CUF

/ Insolation level.

26 General The land proposed is highly

undulated and needs detailed

contour map for arriving at the

solar capacity that can be installed.

In the absence of a contour map, it

will be difficult to arrive at the

maximum capacity that can be

installed & also on the feasibility of

installing 10 MW solar plant in the

available land.

M/s SunEdison

Solar Power

India Pvt. Ltd.,

Chennai

Reply furnished in Sl.No.9 holds

good.

27 General Bid Capacity We request you to clarify if the

capacity is 10MW AC and if bidder

can propose appropriate DC

capacity to match the generation

requirement.

M/s First Solar

Power India Pvt.

Ltd., Hyderabad

Reply furnished in Sl.No.9 holds

good.

28 3 7 Design & implementation of

integrated micro processor based

SCADA with required software &

hardware for control & monitoring of

solar plant as per best standards.

To consider their own monitory

protocol in place of SCADA.

M/s.Sun Edison,

Chennai

The developer can install

standard SCADA monitoring

system or any other proven

system, provided that it has

similar features / provisions of

standard SCADA system.

25 3 (ii) M/s Welspun

Renewables

Energy Pvt. Ltd.,

Chennai

Reply furnished in Sl.No.9 holds

good.

Page 9 of 22

Page 10: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

PRE - BID MINUTES

Sl.

No.

Chapter

No

Clause

NoTender condition Query Raised by Remarks of Department

29 3 57.(i).

(d)

In case the commissioning of Power

Project is delayed beyond three (3)

months from the Scheduled

Commissioning Date, the Agency

shall pay to TTD, the Liquidated

Damages at rate of Rs 1.00 Lakh per

MW per day of delay for the delay in

such remaining Capacity which is not

commissioned. The amount of

liquidated damages would be

recovered from the Agency from the

payments due on account of sale of

Solar P.V. Power to TTD.

Liquidity damages liability is too

high.

M/s.Sun Edison,

Chennai

Tender conditions holds good.

30 3 51 Right of Way (ROW) for laying of the

inter connection lines shall lie with the

developer. The interconnection line

from Project switchyard to the

Location has to be constructed and

maintained by the agency at his cost.

The entire cost of transmission,

construction of lines metering

equipment, losses, supervision

charges etc., from the Project up to

the Interconnection Point shall be

borne by the agency and shall not be

reimbursed by TTD. The land

required if any for laying of

interconnection line shall be acquired

by the developer only at his cost. It is

the responsibility of agency to identify

suitable interconnection point for

evacuation of power generation.

Clarification regarding ROW

issues.

M/s.Sun Edison,

Chennai

Tender conditions holds good.

31 ROW Who is responsible for ROW

issues?

M/s SunEdison

Solar Power

India Pvt. Ltd.,

Chennai

Tender conditions holds good.

32 3 57.(i) Under normal circumstances the

Project has to be commissioned

within 6 months from the date of

signing of this Agreement. In case of

failing to achieve this milestone, TTD

shall encash the Performance Bank

Guarantee which was submitted by

the agency to the TTD at time of

entering the agreement, in the

following manner:

Time required for commissioning

of the project is 12 months.

M/s.First Solar,

New Delhi

The establishment &

commissioning of solar power

plant to the agreed capacity shall

be completed with in 12 months

and financial closer shall be

completed with in 210 days from

the date of handing over of site

(or) date of concluding of

agreement whichever is later.

33 4 4.9

(Last

para)

SCOD:

The Solar Power Developer shall

commission the Project within six (6)

Months of the date of signing of this

Agreement, and delayed of the same

is subject to the penalties stated in

the Agreement.

As financial closure would require

6 months of time, we request TTD

to consider SCOD of 12months

from the date of handing over of

site or date of concluding of

agreement whichever is later.

M/s First Solar

Power India Pvt.

Ltd., Hyderabad

-do-

Page 10 of 22

Page 11: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

PRE - BID MINUTES

Sl.

No.

Chapter

No

Clause

NoTender condition Query Raised by Remarks of Department

1)     As proposed in the Bid

document, the entire asset

including land and transmission

line shall be transferred to TTD at

a book price of Rs.1.00Lakh per

MW at the end of 10 years.

2) Thus the entire asset has to be

depreciated within 10 years so as

to reach a terminal value of

Rs.1.00Lakh per MW at the end of

10 years.

3) This will result in a huge

increase in tariff a depreciation is

one of the largest component of

tariff (Almost one – third).

4) We strongly believe, extending

the project term by 25 years will

bring a win-win situation to both

TTD and the developer, as TTD

will pay less tariff and the

developer will have depreciation

benefit over the useful life of the

project.

35 3 5 Transfer after Lease period: After

successful completion of specified

BOOT period, the agency shall

transfer the plant in satisfactory

working condition at a book price of

Rs 1.00 lakh per MW. TTD will only

pay Rs. 1.00 lakh per MW at the end

of 10th year as transfer value to the

operating agency. The transfer value

will be on proportionate basis based

on the installed capacity of the Plant

Kindly confirm if the book value will

be paid for installed DC capacity

@1.00Lakh/MW.

M/s First Solar

Power India Pvt.

Ltd., Hyderabad

-do-

36 3 8 On completion of the 10th year from

the date of commissioning of the

project, the operating agency shall

transfer the entire plant and

machinery in good operating condition

to TTD at a price of Rs.1.00 lakh per

MW installed capacity of the project

and after such transfer, the operating

agency could carry on operation and

maintenance of the Solar P.V. Plant

as desired by the TTD at mutually

agreed rates between the TTD and

the operating agency. However, TTD

will have every right to entrust the

operation and maintenance work to

any other agency other than the

operating agency.

Terminal value of the asset is not

in line with the realizable value of

the asset since the life of a solar

plant is considered to be 30 years.

With an assumed cost of Rs.7

Cr./MW, the realizable value of a

solar plant will be around 4.5Cr.

On straight line basis. Hence, we

would incr a significant loss of INR

4.5Cr. on sale of the asset.

M/s SunEdison

Solar Power

India Pvt. Ltd.,

Chennai

Tender conditions holds good.

The Book price will be Rs.1.00

lakh per MWp for fixed system

and for tracking system it will be

Rs.1.20 Lakh per MWp. The

BOOT period is 15 years from the

date of COD. The transfer value

will be on proportionate basis

based on the actual installed

capacity of the plant.

34 3 5 Transfer after Lease period: After

successful completion of specified

BOOT period, the agency shall

transfer the plant in satisfactory

working condition at a book price of

Rs 1.00 lakh per MW. TTD will only

pay Rs. 1.00 lakh per MW at the end

of 10th

year as transfer value to the

operating agency. The transfer value

will be on proportionate basis based

on the installed capacity of the Plant.

M/s Welspun

Renewables

Energy Pvt. Ltd.,

Chennai

Page 11 of 22

Page 12: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

PRE - BID MINUTES

Sl.

No.

Chapter

No

Clause

NoTender condition Query Raised by Remarks of Department

37

(a)

3 16 The interconnection line from Project

switchyard to the Location has to be

constructed and maintained by the

agency at his cost. The entire cost of

transmission, construction of lines,

metering equipment, losses,

supervision charges etc., from the

Project up to the Interconnection

Point shall be borne by the agency

and shall not be reimbursed by TTD.

It is the responsibility of agency to

identify suitable interconnection point

for evacuation of power generation

1) Construction of dedicated

transmission lines for solar

projects by the developers would

only lead to redundancy in the

system. This is because each

project developer would build a

separate transmission line and

occupy a separate bay in the Grid

sub-station. Since solar power is

generated and transmitted only

during the day, the utilization factor

of these transmission lines is also

very less -20% or so equal to the

utilization factor of the solar

project. Thus construction of

dedicated transmission lines would

only increase the stress on land

acquisition, right of way issues

etc., We strongly suggest that the

scope of developing transmission

lines and augmentation of

transmission infrastructure should

be in the scope of procures who

can rationalize the transmission

capacity addition by clubbing

various projects together and also

allowing existing lines for future

projects.

M/s Welspun

Renewables

Energy Pvt. Ltd.,

Chennai

Reply furnished in Sl.No.13 holds

good.

37

(b)

3 51 Right of Way (ROW) for laying of the inter

connection lines shall lie with the

developer. The interconnection line from

Project switchyard to the Location has to

be constructed and maintained by the

agency at his cost. The entire cost of

transmission, construction of lines

metering equipment, losses, supervision

charges etc., from the Project up to the

Interconnection Point shall be borne by

the agency and shall not be reimbursed by

TTD. The land required if any for laying of

interconnection line shall be acquired by

the developer only at his cost. It is the

responsibility of agency to identify suitable

interconnection point for evacuation of

power generation.

2) The construction activity for

evacuation / transmission line from the

project sub-station up to the

interconnection / pooling sub-station

may be undertaken by the appropriate

state Discom / Transco.

3) After completion / construction of

the line the same shall be under the

concerned Discom/Transco as the

project developer usually has no

experience / skills of maintaining such

HT/EHT lines.

M/s Welspun

Renewables

Energy Pvt. Ltd.,

Chennai

-do-

38 3 12 The agency shall arrange installation

of solar plants on the land permitted

by TTD at their cost without any

investment from TTD. TTD will

provide adequate land for setting up

of the 10 MWp plants (not

exceeding about 4.5 to 5.0 Acre for

each MW).

The acre requirement can be

confirmed based on the land

shape. Please provide the

proposed land boundary layouts

for cross check the same.

M/s SunEdison

Solar Power

India Pvt. Ltd.,

Chennai

Field Measurement Book (FMB)

sketch enclosed.

39 General Requested to provide proposed

land boundary layout.

M/s.Sun Edison,

Chennai

Field Measurement Book (FMB)

sketch enclosed.

Page 12 of 22

Page 13: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

PRE - BID MINUTES

Sl.

No.

Chapter

No

Clause

NoTender condition Query Raised by Remarks of Department

40 3 57 Penalties in case of Delayed

Commissioning : Under normal

circumstances the Project has to be

commissioned within 6 months from

the date of signing of this Agreement.

In case of failing to achieve this

milestone, TTD shall encash the

Performance Bank Guarantee which

was submitted by the agency to the

TTD at time of entering the

agreement, in the following manner:

Please allow bidder to do part

commissioning.

M/s SunEdison

Solar Power

India Pvt. Ltd.,

Chennai

Part commission is agreeable.

However the total agreed capacity

installation & commissioning shall

be completed within the period of

one year from the date of handing

over of site (or) date of concluding

of agreement whichever is later.

However, the BOOT period will be

from the date of total

commissioning of the plant.

41 5 5.1 Metering and Protection : The

metering will be done at the inter

connection point and the energy

measured at that point only

considered for payment

Please clarify the interconnection point

at plant end or sub-station end.

M/s SunEdison

Solar Power India

Pvt. Ltd., Chennai

Tender condition holds good.

42 3 57.(i).d In case the commissioning of Power

Project is delayed beyond three (3)

months from the Scheduled

Commissioning Date, the Agency

shall pay to TTD, the Liquidated

Damages at rate of Rs 1.00 Lakh per

MW per day of delay for the delay in

such remaining Capacity which is not

commissioned. The amount of

liquidated damages would be

recovered from the Agency from the

payments due on account of sale of

Solar P.V. Power to TTD.

There needs to be a cap on the LD

clause. LD liability exposure to the

value of performance bank guarantee

is too high.

M/s SunEdison

Solar Power India

Pvt. Ltd., Chennai

Tender conditions holds good

43 3 57(iii).c The proceeds of carbon credit from

approved CDM Project shall be

shared between the Agency and TTD

in the following manner, namely

Do we know the process for CDM? Is it

possible for the customer to get the

CDM credit? Is this based on unit

generated/realizable value? How

marketable is this?

M/s SunEdison

Solar Power India

Pvt. Ltd., Chennai

The proceeds of carbon credits

from approved CDM project shall

be shared between the Agency

and TTD in the following manner,

namely (i) 100% of the gross

proceeds on account of CDM

benefit to tbe retained by the

Agency in first year after the date

of commercial operation of the

generating station. (ii) In the

second year, the share of the TTD

shall be 10% which shall be

progressively increased by 10%

every year till it reaches 50%,

where after the proceeds shall be

shared in equal proportion, by the

Agency and the TTD up to BOOT

period. (iii) REC share shall be

shared in equal proportion i.e.,

50:50 by the Agency and the TTD

from the date of commercial

operation of the generating station

upto BOOT period.

Page 13 of 22

Page 14: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

PRE - BID MINUTES

Sl.

No.

Chapter

No

Clause

NoTender condition Query Raised by Remarks of Department

44 3 9 Also the operating agency /

manufacturer have the responsibility

of obligation to make available the

spares, servicing facilities etc., of the

equipments for the entire life span of

the project i.e., for a period of 25

years from the date of commissioning

of the project. The choice of using

the services of operating agency or

otherwise vests with TTD, on

completion of the BOOT period.

As per point.8, TTD has the right

to entrust the O&M to any third

party other than Sun Edison after

the 10th year. However as per

point-9, we are required to make

available the spares and service

facilities till the end of the 25th

year. In that case, can this be

charged to the client?

M/s SunEdison

Solar Power India

Pvt. Ltd., Chennai

After BOOT period, the

manufacturer has to make

available the required spares if

any and the same will be procured

on payment from the developer /

manufacturer after BOOT period.

45 3 11 Is it possible to have two different

off takers from the same plant?

Do we have metering mechanisms

to sell to a party other than TTD?

The other off taker won't be

subject to cross subsidy charges??

M/s SunEdison

Solar Power

India Pvt. Ltd.,

Chennai

In case of higher generation, the

developer can have additional

metering facility to sell the part of

power with the permission from

TTD. Cross subsidy charges if

any will be borne by TTD to the

extent utilised by TTD.

46 6 6.1 For the Delivered Energy purchased,

Agency shall furnish a bill to the TTD

calculated at the Tariff agreed, in

such form as may be mutually agreed

between the TTD and the Agency, for

the billing month on or before the 15th

working day following the Meter

Reading Date.

TTD will pay monthly bill within 20

working days from the date of receipt

of the bill from the Agency subjected

recoveries as per terms & conditions.

Payment for bills raised: Agency shall

submit bills for the energy delivered

duringthe billing period as per the

provision of this agreement and there

upon TTDs shall make payment for

the eligible bill amount by the due

date of payment.

Further in the event, at any time,

TTDs find that amount is due from

Agency either under this agreement

or under any other transaction, the

TTD is entitled to recover the said due

amount by adjusting from the bill

amount payable to the Agency.

1)  As the project will be owned

and funded by the project

developer, the Lender/(s) would

require a payment security

mechanism, so as to build up a

higher credit rating for the project.

2) We request for implementation

of escrow mechanism backed by a

security of letter of credit issued in

favour of the project developer

amounting up to average of 2

months of energy supply bill.

M/s Welspun

Renewables

Energy Pvt. Ltd.,

Chennai

The tender condition on billing &

payment holds good. In addition

to that, TTD agrees to pay penalty

of 1% on monthly basis in all

delayed payments delayed more

than 20 days from the date of

submission of bills if the delay is

on the part of TTD.

47 General Payment Security What is the payment security that

TTD will give?

M/s SunEdison

Solar Power

India Pvt. Ltd.,

Chennai

-do-

Page 14 of 22

Page 15: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

PRE - BID MINUTES

Sl.

No.

Chapter

No

Clause

NoTender condition Query Raised by Remarks of Department

48 General Payment Security Payment security mechanism is

important for financial closure and

we request TTD to issue a letter of

credit towards payment security for

an amount equal to 3 (Three)

times the estimated average

monthly billing for the contract

year, for a term of twelve (12)

months and the sae shall be

renewed annually for the tenure of

PPA.

M/s First Solar

Power India Pvt.

Ltd., Hyderabad

-do-

49 8 9.3 However in respect of power

evacuiatiuon the voltage levels for

interfacing with grid will be as per

voltage of delivery. The cost of

interconnection facilities to be borne

by the agency.

Clarification regarding evacuation

feasibility permit from APSPDCL

M/s.First Solar,

New Delhi

TTD will assist in this regard, but it

is the responsibility of the agency

to get permission and to pay

necessary fees.

50 General PPA conditions are to be provided.

/ Request to share a draft PPA. /

Draft PPA is requested.

M/s.Greenco,

Hyderabad /

M/s.Sun Edison,

Chennai /

M/s.First Solar,

New Delhi

The bid document along with pre-

bid minutes will be the draft PPA.

51 General Draft PPA Request to share a draft PPA. M/s SunEdison

Solar Power

India Pvt. Ltd.,

Chennai

-do-

52 General PPA We request TTD to share draft

PPA document before bid

submission.

M/s First Solar

Power India Pvt.

Ltd., Hyderabad

-do-

53 General Draft Land Lease Agreement not

provided. / Regarding change of

location of site.

M/s.Greenco,

Hyderabad /

M/s.First Solar,

New Delhi

Draft land lease agreement will be

provided at the time of agreement.

No change in location of site.

54 General Adequecy / suitability/ ownership

of the land needs to be confirmed.

M/s.Greenco,

Hyderabad

Reply furnished in Sl.No.1 holds

good.

55 General Bidding Entity Can a foreign bidder/entity

participate in the tender or should

be an Indian / entity bidder.

M/s SunEdison

Solar Power

India Pvt. Ltd.,

Chennai

Tender conditions holds good.

56 General Type of Entity What type of entity is TTD? Is it a

registered religious trust or a

society etc.?

M/s SunEdison

Solar Power

India Pvt. Ltd.,

Chennai

TTD is governed by ACT 30 of

1987 of Endowment department,

Govt. of AP.

57 General The identified land has no clear

demarcation or boundary stones to

identify the extent & orientation of

the land available.

M/s SunEdison

Solar Power

India Pvt. Ltd.,

Chennai

Clear demarcation / boundary

stones to identify the extent &

orientation of land available will be

done.

58 General The proposed site is approximately

4 Kms away from the proper TAR

road which is available nearby.

The existing Mud/Cart road

available has to be re-laid and

strengthened for any vehicular

movement that will be required

during the construction stages.

M/s SunEdison

Solar Power

India Pvt. Ltd.,

Chennai

The developer has to condition

the road, wherever necessary for

transportation of materials.

Page 15 of 22

Page 16: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

PRE - BID MINUTES

Sl.

No.

Chapter

No

Clause

NoTender condition Query Raised by Remarks of Department

59 General The leveling of the proposed land and

relaying of the approach road to the

site involves huge cost and this will get

transpired in to the tariff that will be

quoted by all the bidders. Hence

request TTD to consider providing an

alternate land preferably a flat land

with all the approach roads for the

proposed 10 MW solar power project

so as to ensure a comparatively

cheaper unit cost.

M/s SunEdison

Solar Power

India Pvt. Ltd.,

Chennai

Tender conditions holds good.

60 General Change of Location If evacuation feasibility at the

Kosuvaripallu sub-station is not

available, will TTD opt for new location

where evacuation feasibility is

available. And will TTD acquire

required land at new location or should

bidder acquire the required land.

M/s First Solar

Power India Pvt.

Ltd., Hyderabad

Tender conditions holds good.

61 General Open Access permits We request TTD to provide reasonable

support and assistance to the Bidder in

procuring applicable permits required

from any government agencies for

implementation and operation of the

Solar Power Project including without

limitation to opern access permission

from the Discom / SLDC.

M/s First Solar

Power India Pvt.

Ltd., Hyderabad

All the statutory approvals are to

be obtained by the agency only

but necessary assistance / co-

operation will be extended by TTD

in getting approval.

62 General Extension of Bid submission We request bid submission

deadline be extended by at least 6

weeks from date of issue of

revised RFP to give bidders

enough time to study the revised

AFP, PPA document, permits from

Discom and site conditions before

bid submission.

M/s First Solar

Power India Pvt.

Ltd., Hyderabad

Bid submission extended vide

Sl.No.64.

63 Price Bid The tender is not clear, whether

the tariff has to be quoted inclusive

or exclusive of wheeling charges &

losses, banking charges and CSS

if applicable.

M/s.Greenco,

Hyderabad

Tariff quoted shall be exclusive of

wheeling, banking charges &

cross subsidy charges but

inclusive of energy losses up to

the metering point at APSPDCL

Sub-Stations.64 Revised Tender programme

Uploading / attachment of approved

pre-bid minutes & Corrigendum to the

tender document

30-07-2015

Revised Pre-Bid meeting 07-08-2015 at 3.00 PM in the

chamber of Chief Engineer, TTD,

TirupatiUploading of approved revised pre-

bid minutes

10-08-2015.

Bid document down loading end date 27-08-2015 upto 1.00 PM

Last date & Time for receipt of Bids 27-08-2015 upto 3.00 PM

Technical bid opening date 27-08-2015 at 3.30 PM

Commercial Bid opening date 31-08-2015 at 3.30 PM

Encl: FMB Sketch Sd/- C.Chandrasekhar

Chief Engineer, TTDPage 16 of 22

Page 17: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

Sl.

No.

1

2

3

NIT No. : 08/SE(Elec)/TTD/TPT/2015-16

Name of work : Design, Engineering, Supply, Installation, Testing & Commissioning of 10 MWp grid based solar

PV power plant with single axis tracking on Build, Own, Operate and Transfer (BOOT) basis at TTD Land in

Kosuvaripalli Village near Thamballapalli in Chittoor District.

This Bid document is issued by

Tirumala Tirupathi Devasthanams,

Tirupati

Bid security / EMD:

As specified in the Bid document as

per the prescribed Format, proposals

would need to be accompanied by a

Bid security in Indian Rupees for an

amount of Rs. 25.00 lakhs and valid

for 45 days beyond the tender offer

validity.

The bid security shall be kept valid

throughout the Proposal Validity

Period including any extensions in the

Proposal Validity Period and would be

required to be further extended if so

required by TTD.

Any extension of the validity of the Bid

Security as requested by TTD shall be

provided by the agency a minimum of

seven calendar days prior to the expiry

of the validity of the Bid Security, being

extended.

Before signing of agreement with the

Successful Bidder, Authorised

Representative will verify the documents

furnished by the Bidder at the time of Bid

submission and the shareholding of the

Project Company along with a copy of

complete documentary evidence supported

with the original documents. If at this stage

it is found that the documents furn ished by

the Bidders are false / misleading or

misrepresented in any way then the

relevant provisions contained in this Bid

document will be applicable.

Page No.2,

Point No.2

This Bid document is issued by Tirupathi Tirumala

Devasthanam (TTD)

Page No.5,

Point No.8

Bid security / EMD:

As specified in the Bid document as per the prescribed

Format, proposals would need to be accompanied by a

Bid security in Indian Rupees for an amount of Rs.

5.00 lakhs and valid for 45 days beyond the tender

offer validity.

The bid security shall be kept valid throughout the

Proposal Validity Period including any extensions in

the Proposal Validity Period and would be required to

be further extended if so required by TTD.

Any extension of the validity of the Bid Security as

requested by TTD shall be provided by the agency a

minimum of seven calendar days prior to the expiry of

the validity of the Bid Security, being extended.

Page No.19

Chapter-2,

Point No.2.10

para 8

Before signing of agreement with the Successful Bidder,

Authorised Representative will verify the documents

furnished by the Bidder at the time of Bid submission and the

shareholding of the Project Company along with a copy of

complete documentary evidence supported with the original

documents. Authorised Representative at this stage may

also ask the Bidders to furnish the audited balance sheet of

the previous month along with complete Bank Statement

starting from Bid submission date till date along with a copy

of the documents submitted with ROC which became due

during this period. If at this stage it is found that the

documents furn ished by the Bidders are false / misleading

or misrepresented in any way then the relevant provisions

contained in this Bid document will be applicable.

CORRIGENDUM TO THE TENDER DOCUMENT

Clause & Page

No.

Specification as per Tender To be Read As

Page 17 of 22

Page 18: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

CORRIGENDUM

Sl.

No.

4

5

6

7

8

9 The Bidder should be a Public limited

company or private limited company or

Consortium / JV. The company

/companies should be registered in India.

The term ‘Bidder’ used herein after would

therefore apply to both a single Bidder and/

or the Consortium / JV. The Bid submitted

by a Consortium should comply with the

following additional requirements failing

which shall result in disqualification

To be Read As

Bidders shall submit hard copies of

EMD to the address mentioned in the

respective clause of this Bid document

before Bid dead line.

In case the Authorized Representative

finds multiple versions of the same

Financial Bid in a single zip folder,

such Bids are liable for rejection by

the Authorized Representative at its

discretion.

TTD invites competitive Bids under

Three Stage Bidding Process to Build,

Own, Operate & Transfer a 10 MWp

land based Grid connected single

trackers system Solar Photo Voltaic

Plant at TTD Land in Kosuvaripalli,

near Thamballapalli, Chitoor District,

Andhra Pradesh under BOOT system

in the land owned by TTD and is

proposed to be leased to the

successful bidder for the tenure of 15

years under the BOOT.

The operating agency shall under take

the operation & maintenance with

necessary labour, spares,

consumables etc., during the lease

period of 15 years from the date of

commissioning of the project. The

operating agency shall procure and

use necessary spares, consumable

and maintenance tools for trouble free

operation including spare parts during

the lease period

The operating agency shall operate

the solar plants in consonance with the

Electricity Act 2003, Various other

laws and regulations of Govt of

AP/Govt of India, AP Transco and

TTD.

The Bidder should be a Public limited company or private

limited company or Consortium. The company /companies

should be registered in India. The term ‘Bidder’ used herein

after would therefore apply to both a single Bidder and/ or

the Consortium. The Bid submitted by a Consortium should

comply with the following additional requirements failing

which shall result in disqualification

Page No.10,

Chapter-1,

1.1.1

TTD invites competitive Bids under Single Stage

Bidding Process to Build, Own, Operate & Transfer a

10 MWp land based Grid connected single trackers

system Solar Photo Voltaic Plant at TTD Land in

Kosuvaripalli, near Thamballapalli, Chitoor District,

Andhra Pradesh under BOOT system in the land

owned by TTD and is proposed to be leased to the

successful bidder for the tenure of 10 years under the

BOOT

Page No.11,

Chapter-1,

1.9 (k)

The operating agency shall under take the operation &

maintenance with necessary labour, spares,

consumables etc., during the lease period of 10 years

from the date of commissioning of the project. The

operating agency shall procure and use necessary

spares, consumable and maintenance tools for trouble

free operation including spare parts during the lease

period

Page No.12,

Chapter-1,

1.9 (0)

The operating agency shall operate the solar plants in

consonance with the Indian Electricity Board, Various

Labour laws and regulations of Govt of AP/Govt of

India, AP Transco and TTD

Page No.13,

Chapter-2,

2.2.1 (i)

Clause & Page

No.

Specification as per Tender

Page No.6,

Point No.3

Bidders shall submit hard copies of EMD to the

address mentioned in the respective clause of this Bid

document before tender dead line.

Page No.8,

Point No.27

(3)

In case the Authorized Representative finds multiple

versions of the same Financial Bid in a single zip

folder, such Bids are liable for rejection by the

Authorized Representative.

Page 18 of 22

Page 19: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

CORRIGENDUM

Sl.

No.

10

11

12

13

14

15

EMD of all Bidders who don’t qualify for

opening of Financial Bids i.e. who are non-

responsive as applicable will be returned

within ten (10) days of opening of Financial

Bid.

In the case of submission of BG for

Performance Guarantee, the successful

bidder has to extend the validity BG for the

total construction and BOOT period +

grace period of 4 months, on annual basis

well inadvance.

The company shall be in the field of solar

power systems for at least 3 years. In the

case of consortium of companies,any

member of it shall fulfil this criterion

The company should have designed,

supplied, erected, commissioned of SPV-

based grid connected/ interactive power

plants cumulative installed capacity of 10

MWp or above ( at one or more projects),

during last 5 years ( i.e., 2010-11 to 2014-

15). In the case of consortium of

companies, any member of it shall fulfil

this criterion

All the clarifications/ amendments, issued

and pre bid meeting minutes will be

notified in TTD website www.tirumala.org

and also uploaded in www.e-

procurment.gov.in. The pre bid meeting

minutes and Corrigendum will become part

of the document whether they attend the

pre-bid meeting or not. All the bidders

should invariably sign the copies of all pre-

bid minutes and corrigendum and

invariably enclose(except Revised

Financial Bid format) to the technical bid of

tender document.

Further, in the event that a Successful

Bidder is not able to submit Bank

Guarantee of the requisite value towards

Performance Bank Guarantee within 15

days of issue of LOI by Authorised

Representative or the Successful Bidder is

not able to sign agreement with TTD within

15 days of issue of LOI by Authorised

Representative, then the Authorised

Representative shall have the right to

forfeit amount of EMD submitted by the

Bidder, in addition to other remedies.

To be Read As

Page No.17,

Chapter-2,

2.8 (b)

EMD of all Bidders who don’t qualify for opening of Financial

Bids i.e. who are declared as non-responsive as applicable

will be returned within ten (10) days of opening of Financial

Bid.

Page No.18,

Chapter-2,

para 3

In the case of submission of BG for Performance Guarantee,

the successful tenderer has to extend the validity BG for the

total construction and BOOT period + grace period of 4

months, on annual basis well inadvance.

Page No.14,

Chapter-2,

2.2.1 (iv)

The company should have designed, supplied, erected,

commissioned of SPV-based grid connected/ interactive

power plants cumulative installed capacity of 10 MWp or

above ( at one or more projects), during last 5 years ( i.e.,

2010-11 to 2014-15). In the case of consortium, the lead

member shall fulfil this criterion.

Page No.14,

Chapter-2,

2.2.1 (ii)

The company shall be in the field of solar power systems for

at least 3 years. In the case of consortium of companies, the

lead member shall fulfil this criterion

Clause & Page

No.

Specification as per Tender

Page No.16,

Chapter-2,

2.4 para (2)

All the clarifications/ amendments, issued and pre bid

meeting minutes will be communicated to all the participants

after conducting of pre bid meeting and also published in

TTD website www.tirumala.org and also uploaded in www.e-

procurment.gov.in. These clarifications / amendments/ pre

bid meeting minutes will become part of the document

whether they attend the pre-bid meeting or not. All the

bidders should invariably sign the copies of all clarifications,

amendments/ pre bid meeting minutes and enclose to the

tender document.

Page No.17,

Chapter-2,

2.8

Further, in the event that a Successful Bidder is not able to

submit Bank Guarantee of the requisite value towards

Performance Bank Guarantee within 15 days of issue of LOI

by Authorised Representative or the Successful Bidder is not

able to sign agreement with TTD within 15 days of issue of

LOI by Authorised Representative, then the Authorised

Representative shall have the right to forfeit amount of EMD

submitted by the Bidder.

Page 19 of 22

Page 20: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

CORRIGENDUM

Sl.

No.

16

17

18

19

20

Strict adherence to the formats wherever

specified, is required. Wherever,

information has been sought in specified

formats, the Bidder shall refrain from

referring to brochures/pamphlets. Non-

adherence to formats and/or submission of

incomplete information may be a ground

for treating the Bid as non-responsive.

Each format has to be duly signed and

stamped by the authorised signatory of the

Bidder. The scanned copy of such signed

and stamped format shall be uploaded by

the Bidder on the website specified.

Bids that are incomplete, which do not

substantially meet the requirements

prescribed in this Bid document, will be

liable for rejection at its discretion by

Authorised Representative. Non

submission and/or submission of

incomplete data/ information required

under the provisions of Bid document shall

not be construed as waiver on the part of

Authorised Representative of the obligation

of the Bidder to furnish the said

data/information unless the waiver is in

writing.

Page No.19

Chapter-2,

Point No.2.11

para 6

Strict adherence to the formats wherever specified, is

required. Wherever, information has been sought in

specified formats, the Bidder shall refrain from referring to

brochures/pamphlets. Non-adherence to formats and/or

submission of incomplete information may be a ground for

declaring the Bid as non-responsive. Each format has to be

duly signed and stamped by the authorised signatory of the

Bidder. The scanned copy of such signed and stamped

format shall be uploaded by the Bidder on the website

specified.

Clause & Page

No.

Specification as per Tender To be Read As

Bids, meeting the Technical eligibility

criteria and the Qualification Requirements

specified in this tender shall be treated as

technically responsive and the

corresponding Bidder shall be considered

as the Qualified Bidders.

The agency shall carry out the construction

of the project on Build, Own, Operate, and

Transfer (BOOT) basis. The operating

agency shall design and construct the

facility, arrange finance, operate and

maintain the facility for 15 years period

from the date of commissioning of the

project and hand over to TTD in good

operating condition at the end of 15th year

BOOT period. The agency shall transfer

the entire assets to TTD after completion

of operating lease period in good working

condition

TRANSFER after Lease period: After

successful completion of specified BOOT

period, the agency shall transfer the plant

in satisfactory working condition at a book

price of Rs 1.00 lakh per MWp. TTD will

only pay Rs. 1.00 lakh per MWp at the end

of 15th year BOOT period as transfer

value to the operating agency. The

transfer value will be on proportionate

basis based on the installed capacity of the

Plant.

Page No.20

Chapter-2,

Point No.2.12

para 10

Bids that are incomplete, which do not substantially meet the

requirements prescribed in this Bid document, will be liable

for rejection by Authorised Representative. Bids not

submitted in the specified formats will be liable for rejection

by Authorised Representative. Non submission and/or

submission of incomplete data/ information required under

the provisions of Bid document shall not be construed as

waiver on the part of Authorised Representative of the

obligation of the Bidder to furnish the said data/information

unless the waiver is in writing.

Page No.22

Chapter-2,

Point

No.2.13.2

(vii)

Bids meeting the Technical eligibility criteria and the

Qualification Requirements specified in this tender shall be

declared technically responsive and the corresponding

Bidder shall be declared as the Qualified Bidders.

Page No.23

Chapter-3,

Point No.4

The agency shall carry out the construction of the project on

Build, Own, Operate, and Transfer (BOOT) basis. The

operating agency shall design and construct the facility,

arrange finance, operate and maintain the facility for 10

years period from the date of commissioning of the project

and hand over to TTD in good operating condition at the end

of 10th year. The agency shall transfer the entire assets to

TTD after completion of operating lease period in good

working condition

Page No.23

Chapter-3,

Point No.5

TRANSFER after Lease period: After successful completion

of specified BOOT period, the agency shall transfer the plant

in satisfactory working condition at a book price of Rs 1.00

lakh per MW. TTD will only pay Rs. 1.00 lakh per MW at the

end of 10th year as transfer value to the operating agency.

The transfer value will be on proportionate basis based on

the installed capacity of the Plant.

Page 20 of 22

Page 21: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

CORRIGENDUM

Sl.

No.

21

22

23

24

25

26

27

General

Note

Clause & Page

No.

Specification as per Tender To be Read As

1) Copy of Pre-Bid minutes (pages 2 to 16) and Corrigendum (page 17 to 22) are enclosed

seperately. The tenderers are requested to quote their rates duly considering the tender

document read with approved pre bid minutes and corrigendum.

2) The tenderers are requested to ensure to enclose signed copy of minutes of pre bid

meeting & corrigendum along with technical bid. Failure to enclose, will result in the rejection

of tenders.

3) Revised Financial Bid format herewith enclosed (vide page No.22). The tenderers are

requested to quote Financial Bid using revised Financial Bid format.

The short form of "MNRE" wherever

appearing in the tender document

shall be read as "Ministry of New &

Renewable Energy".

The establishment & commissioning of

solar power plant to the agreed

capacity shall be completed with in 12

months and financial closer shall be

completed with in 210 days from the

date of handing over of site (or) date

of concluding of agreement whichever

is later.

The project shall be carried out under

BOOT system for a period of 15 years

from COD (Commercial Operation

Date).

Revised financial bid format is

enclosed to quote accordingly.

The scope of work includes development,

design & engineering, finance, construction

and operation & maintenance of the

Project including evacuation of the power

generated to the 33 kV Kosuvaripalli sub-

station for sale of power generated to TTD

for 15 years.

On completion of the 15th year from the

date of commissioning of the project, the

operating agency shall transfer the entire

plant and machinery in good operating

condition to TTD at a price of Rs.1.00 lakh

per MWp installed capacity of the project

and after such transfer, the operating

agency could carry on operation and

maintenance of the Solar P.V. Plant as

desired by the TTD at mutually agreed

rates between the TTD and the operating

agency. However, TTD will have every

right to entrust the operation and

maintenance work to any other agency

other than the operating agency.

Financil Bid format

General

General

General

Page No.23

Chapter-3,

Point No.6

The scope of work includes development, design &

engineering, finance, construction and operation &

maintenance of the Project including evacuation of the power

generated to the 33 kV Kosuvaripalli sub-station for sale of

power generated to TTD for 10 years.

Page No.23

Chapter-3,

Point No.8

On completion of the 10th year from the date of

commissioning of the project, the operating agency shall

transfer the entire plant and machinery in good operating

condition to TTD at a price of Rs.1.00 lakh per MW installed

capacity of the project and after such transfer, the operating

agency could carry on operation and maintenance of the

Solar P.V. Plant as desired by the TTD at mutually agreed

rates between the TTD and the operating agency. However,

TTD will have every right to entrust the operation and

maintenance work to any other agency other than the

operating agency.

Page 21 of 22

Page 22: MINUTES OF THE PRE-BID MEETING NIT No. : …tirumala.org/Documents/201507311649588357.pdf · PRE - BID MINUTES Sl. No. Chapter No Clause No Tender condition Query Raised by Remarks

In Figures In Words

Authorised Signature:

Name:

Designation:

Sd/- C.Chandrasekhar

Chief Engineer, TTD

9. The losses if any upto metering point is to be borne by the developer and net units accounted at metering point will only be

considered for payment.

Sl.No

1

Revised Financial Bid format

NIT No: 08/SE(Elec)/TTD/TPT/2015-16

Name of Work: Design, Engineering, Supply, Erection, Testing & Commissioning of 10 MWp Grid connected Solar Photo Voltaic Plant in

TTD Land, at Kosuvaripalli, near Thamballapalli, Chittoor District, Andhra Pradesh under BOOT system.

Rate per unit (kWh) of Electrical Power

supplied at interconnection point (in Indian

Rupees)

Description of work

Supply of Electrical Power to TTD by Design, Engineering,

supply, installation, testing, commissioning & operation of

Grid connected Solar Photo Voltaic Plant in TTD land, at

Kosuvaripalli, near Thamballapalli, Chittoor District, Andhra

Pradesh with maintenance of associated interconnection HT

grid for necessary evacuation of power under BOOT system

(Built Own Operate & Transfer) for a period of 15 years from

the date of COD as per terms & conditions mentioned in the

Tender document, approved Pre-Bid meeting minutes &

Corrigendum issued etc.,

8.       TTD shall be authorised to deduct any tax as applicable from the bidders payment. Deduction of all statutory and necessary Tax

from each bill will be made as per Government Orders prevailing at the time of payment. Necessary tax deduction certificate will be issued

on demand by the Company.

Note :

Name & Address of the Company /

Consortium

3.       The tenderers are requested to ensure to enclose signed copy of minutes of pre bid meeting & corrigendum along with technical bid.

Failure to enclose, will result in the rejection of tenders.

4.       Amount shall be quoted for supply of power at Interconnection point in INR / kWh up to two decimal places.

5.       The unit (kWh) rate quoted is inclusive of all taxes, statutories, levies, octroi, duties etc., of Govt. of AP as well as Govt. of India

prevailing from time to time. No extra taxes, duties etc., will be paid apart from the rate quoted.

6.       In the event of any discrepancy between the values entered in figures and in words, the values entered in words shall be considered.

7.       The tariff quoted shall be exclusive of wheeling charges, banking charges & cross subsidy charges, but inclusive of energy losses

upto metering points at APSPDCL substation and CSS (cross subsidy charges) if any, will be borne by TTD.

1.       The bidder has to quote uniform rate for electrical energy generation on unit basis for the entire BOOT period and no escalation of

rate will be permitted under whatsoever reason.

2.       The rate quoted shall be in accordance with specifications and various terms & conditions mentioned in the tender document read

with approved Pre-Bid meeting minutes & Corrigendum issued.

The Bidder has to quote uniform power unit (kWh) rate

including all taxes for the entire BOOT period and no

escalation of rate will be permitted under whatsoever reason.

(NOTE:- The tenderers are requested to quote Financial Bid as per Revised Bid format only)

Page 22 of 22