Minutes of the 113th meeting of State Environment Impact Assessment Authority
held on. 28th May, 2018 under the Chairmanship Sh. Bharat Bhushan IAS (Retd.),
Chairman, SEIAA held in the meeting room of office of SEIAA Haryana, Sector-2
Panchkula, regarding Environmental Clearance under EIA Notification dated
14.9.2006.
All the members are present. The project proposals as recommended by SEAC for
Environmental Clearance or otherwise and listed in the Agenda item circulated vide letter
No. 518 to 520 dated 15.05.2018 were discussed following decisions were taken:-
Item No.[1] Environment Clearance for proposed Sand Minor Mineral at Dadyana
Block/AMB B-8, ML Area-2.85 Ha, Village Dadyana and District-
Ambala by Sh. Devender Sharma, S/o Sh. Gauri Shankar Vashishta,
Lastly the case was taken up in the 112th meeting held on 02.05.2018 and
the case was deferred.
In the today’s meeting the reply dated 08.05.2018 submitted by the project
proponent was considered. It was observed by the Authority that:
[1] As per “Office memorandum” dated 24.12.2013 of MoEF & CC, in case of river
sand mining project since the lease area 2.85 Ha, mining activity shall be done
manually then how the diesel is required?
[2] The project proponent should submit location and layout/ topology of the area
indicating the distance from bridge and embankment.
[3] How the project proponent would ensure that no in-stream mining would take
place?
[4] How the project proponent would ensure that the mining operations will not
intersect groundwater table so that no natural water course/water body would be
obstructed due to any mining operations?.
[5] The project proponent has proposed to use treated water for dust suppression and
sprinkling to conserve water. Has the project proponent identified any source of
treated water?
[6] The project proponent should submit NOC/approved conservation plan from
Forest Department.
[7] How would the project proponent ensure that the depth of mining should be
restricting to 3 meter so that water level is not exposed?
[8] How the project proponent would reclaim the area concerned and reclamation plan
of the mining site should be submitted.
[9] The project proponent should submit the topography of the mine area to ensure
that leasing of mine does not result into a cluster situation.
In view of the above, the Authority decided to agree with the
recommendations of SEAC and EC would be accorded to project proponent provided
they submits the satisfactory clarification to the above raised observations within 15 days.
2
It was also decided that the project proponent shall supply the copies of information to all
the members of SEIAA and after their approval the EC letter shall be issued.
Item No.[2] Environment Clearance for construction of Sewage Treatment Plant
(4.0 MLD) at Village-Kithwari, Tehsil-Palwal, District-Palwal,
Haryana by Public Health Engineering Department.
Lastly the case was taken up in the 112th meeting held on 02.05.2018 and
the case was deferred.
In the today’s meeting the reply dated 24.05.2018 submitted by the project
proponent was considered. It was observed by the Aurhotity that:
[1] The project proponent should submit the plan to segregate bio-degradable and
non-biodegradable waste of the incoming sewage to the plant.
In view of the above, the Authority decided to agree with the
recommendations of SEAC and Environment Clearance would be accorded to project
proponent provided they submits the satisfactory clarification to the above raised
observations within 15 days. It was also decided that the project proponent shall supply
the copies of information to all the members of SEIAA and after their approval the
Environment Clearance letter shall be issued.
Item No.[3] Environment Clearance for Expansion of Commercial Colony on the
land measuring 2.9125 acres in the revenue estate of Village Maidawas,
Sector-67, Gurugram- Manesar urban Complex by M/s Martial
Buildcon Pvt. Ltd.
Lastly the case was taken up in the 112th meeting held on 02.05.2018 and
the case was deferred. The reply submitted by the PP is as under:
In the today’s meeting the reply dated 15.05.2018 submitted by the project
proponent was considered. The project proponent has submitted the revised water balance
diagram while reducing the demand from 259 KLD to 227 KLD.
After detailed deliberation the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the standard conditions in practice.
Item No.[4] Environment Clearance for proposed Boulder, Gravel and Sand Minor
Mineral Mines at “Karanpur Block PKL B-3” over an area of 8.23 ha
with production capacity of 3.9 Lakhs TPA near Village Karanpur,
Tehsil-Pinjore, District-Panchkula (Haryana) by Sh. Sushil Kumar S/o
Sh. Mam Chand,
Lastly the case was taken up in the 112th meeting held on 02.05.2018 and
the case was deferred. The reply submitted by the PP is as under:
In the today’s meeting the reply dated 08.05.2018 submitted by the project
proponent was considered. It was observed by the Authority that:
3
[1] As per “Office memorandum” dated 24.12.2013 of MoEF & CC, in case of river
sand mining project since the lease area 8.23 Ha, mining activity shall be done
manually then how the diesel is required?
[2] The project proponent should submit location and layout/ topology of the area
indicating the distance from bridge and embankment.
[3] The project proponent should submit NOC/approved conservation plan from
Forest Department.
[4] How would the project proponent ensure that the depth of mining should be
restricting to 3 meter that water level is not exposed?
[5] How the project proponent would ensure that no in-stream mining would take
place?
[6] How does project proponent ensure that water from washing of wheels may be
done efficiently & minimum water is consumed? What is location of Water
trough?
[7] The project proponent has proposed to use treated water for dust suppression and
sprinkling to conserve water. Has the project proponent identified any source of
treated water?
[8] The project proponent should submit the plan to ensure no natural water
course/water body would be obstructed due to any mining operations or dumping
of the materials.
[9] How the project proponent would reclaim the area concerned and reclamation plan
of the mining site should be submitted.
[10] The project proponent should submit the topography of the mine area to ensure
that leasing of mine does not result into a cluster situation.
In view of the above, the Authority decided to agree with the
recommendations of SEAC and EC would be accorded to project proponent provided
they submits the satisfactory clarification to the above raised observations within 15 days.
It was also decided that the project proponent shall supply the copies of information to all
the members of SEIAA and after their approval the EC letter shall be issued.
Item No.[5] Environment Clearance for Affordable Group Housing Colony located
at Village-Badshahpur, District- Gurugram Haryana by M/s Sai Aaina
Farms Pvt. Ltd.,
Lastly the case was taken up in the 112th meeting held on 02.05.2018 and
the case was deferred. The reply submitted by the PP is as under:
In the today’s meeting the reply dated 08.05.2018 submitted by the project
proponent was considered. The project proponent has submitted the details of
requirement of water for visitors and parking plan.
4
After detailed deliberation the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the standard conditions in practice.
Item No.[6] Environment Clearance for proposed Commercial Colony at Sector-65,
Gurgaon, Manesar Urban Complex, Haryana by M/s Wellworth
Project Developers Pvt. Ltd.
Lastly the case was taken up in the 112th meeting held on 02.05.2018 and
the Authority decided to defer this case and to depute Sh. Hitender Singh, Member SEAC
to visit the site and submit the report at the earliest possible.
As per the site visit report submitted by the member, It was concluded that
the excavation had been done after obtaining prior Environmental Clearance in 2009.
There is no construction / construction activity at site at present.
In the today’s meeting the reply dated 11.05.2018 submitted by the project
proponent was considered. The project proponent has submitted the revised water balance
diagram while reducing the demand from 253 KLD to 224 KLD along with the complete
area statement showing proposed green area 2654.2 sqm (25.19%) of net plot area,
5250.87 sqm as proposed ground coverage and 2627.48 sqm under road and paved area
keeping the net plot area at 10532.55 sqm.
After detailed deliberation the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the standard conditions in practice.
Item No.[7] Environment Clearance for construction of “Ruhil Township” (Plotted
Development) at Sector-36, Jhajjar, Bahadurgarh, Haryana by M/s
GNEX Realtech Pvt. Ltd.
Lastly the case was taken up in the 112th meeting held on 02.05.2018 and
the Authority was of the unanimous opinion that it needs more time to study and analyze
the case, therefore it has been deferred for the next meeting.
In the today’s meeting the Authority decided to defer this case and to
depute Sh. Hitender Singh, Member SEAC to visit the site and submit the report at the
earliest possible.
Item No.[8] Extension of EC for Group Housing Complex “Parikarma” at Sec-20,
Village Kundli, Panchkula, Haryana by M/s Santur Projects Pvt. Ltd.
Lastly the case was taken up in the 112th meeting held on 02.05.2018 and
the Authority decided to defer this case with the decision that the project proponent
should be heard before taking a final view on this issue as per the request of authorized
signatory of M/s Santur Projects Pvt. Ltd.
In the today’s meeting after detailed deliberations the Authority
unanimously decided that it needs more time to study and analyse the case and Authority
decided to give an opportunity to the project proponent to personally present and plead
5
his case. The project proponent may please appear with all the necessary documents in
the next SEIAA meeting.
Item No.[9] Environment Clearance for the “Revision and Expansion of Group
Housing Colony” located at Village Chauma, Sector-110A & 111,
Gurgaon, Haryana by M/s Puri Construction Pvt. Ltd.
Lastly the case was taken up in the 98th meeting held on 05.12.2016 and the
Authority decided to defer this case with the decision that the project proponent may be
asked to submit satisfactory reply within 15 days and Sh. Hitender Singh and Sh. S. N.
Mishra, Members SEAC shall visit the site for inspection and shall submit the report
within 15 days period.
In the today’s meeting, it was noticed that the site visit report is not
received from the members. The project proponent has submitted a request for
withdrawing their case for “Revision and Expansion of Group Housing Colony” located
at Village Chauma, Sector-110A & 111, Gurgaon, Haryana. The project proponent
informed that the expansion part of project will be undergoing re-design to avail
additional FAR as per the TOD (Transit Oriented Development) norms.
After detailed deliberations the Authority unanimously decided to defer this
case till the receipt of site visit report.
Item No.[10] Environment Clearance for proposed Expansion of Miri Piri Institute
of Medical Sciences and Research Campus at Shahbab markanda, Ku
rukshetra, Haryana by M/S Miri Piri Institute of Medical Sciences &
Research (Charitbale Trust)
The SEAC has recommended this project for Environmental Clearance
subject to stipulation stated therein. The Project Proponent has proposed Expansion of
Miri Piri Institute of Medical Sciences and Research Campus at Shahbab markanda, Ku
rukshetra, Haryana on a total plot area of 101782 sqm (25.14 Acres). The total built up
area shall be 67776.13 sqm. The proposed project comprise of Hospital Building,
Institute Building, Animal House, Mortuary, Laundry/Workshop, auditorium, Boys
Hostel, Girls Hostel, Type IV (64 no. of Unit), Type III (32 no. of Unit), Type II (16 no.
of Unit), Type I (8 no. of Unit), Laundry/Workshop, Incinerator. The maximum height of
the building shall be 18 meters. The total water requirement shall be 470 KLD. The fresh
water requirement shall be 345 KLD. The waste water generation shall be 268 KLD
which will be treated in the STP of 323 KLD capacity. The total power requirement shall
be 5700 KVA which will be supplied by UHBVN. The Project Proponent has proposed
to develop green belt on 30534.6 sqm (30%) of project area (Green belt Plantation 2770.6
sqm + Peripheral Plantation is 1769 sqm + Avenue Plantation 2370 sqm + Lawn area
23625 sqm). The Project Proponent proposed to construct 25 rain water harvesting pits as
approved by the Central Ground Water Authority (CGWA). The solid waste generation
will be 1854 kg/day. The total parking spaces proposed are 487 ECS.
6
The above recommendation of SEAC was taken up for consideration in the
today’s meeting. The case has been thoroughly examined and pointed out that:
[1] Since the Rudraksh Enviro Care Pvt. Ltd. has not got any Environment Clearance,
hence project proponent cannot be allowed to have agreement with this firm.
[2] The project proponent has not explained as to how they would handle and dispose
the bio-medical waste they are advised to come up with proposal as how they
would dispose are handle of bio-medical waste with latest technology.
After detailed deliberations the Authority unanimously decided to defer this
case with the decision that the project proponent may be asked to submit reply to the
above raised observation within 15 days period and give presentation on the technology
being proposed to install.
Item No.[11] Environment Clearance for proposed Boulder, gravel and Sand (Minor
Mineral) at “Charnia Block/PKL B 4” at Village Karanpur, Johluwala,
Charnian, Kiratpur, Tehsil- Pinjore, District-Panchkula (Haryana). by
M/s Shiri Ganesh Royalty Co.,
The SEAC has recommended this case for Environment Clearance to M/s
Shiri Ganesh Royalty Co for Mining of Boulder, gravel and Sand at “Charnia Block/PKL
B 4” at Village Karanpur, Johluwala, Charnian, Kiratpur, Tehsil- Pinjore, District-
Panchkula (Haryana) by imposing stipulations stated therein.
It was noticed that the Mines and Geology Department has granted lease for
a period of 10 years subject to the terms and conditions as indicated in Letter of Intent
(LOI) dated 16.07.2017. The lease has been granted for an area of 29.65 Ha having Village
Karanpur, Johluwala, Charnian, Kiratpur, Tehsil- Pinjore, District-Panchkula. The project
proponent on 16.08.2017 uploaded online application along with copy of approved Mining
Plan under category B-1. The validity of Mining Scheme in the Mining plan is for 5 years.
NOC from Forest Department has been obtained.
Brief details of the project:
1. Category/Item no. (in schedule): 1 (a) B-1
2. Location of Project Village Karanpur, Johluwala, Charnian, Kiratpur,
Tehsil- Pinjore, District-Panchkula
3. Project Details
Khasra No.
Charnia Block/PKL-B-4
Production capacity
Mining of Boulder, gravel and Sand at “Charnia
Block/PKL B 4” an area of 29.65 Ha
Karanpur 162 min
Johluwala 16 min
Charnia 12 min
Kiratpur 548 min, 549 min & 598 min
14,00,000 TPA @ 187 Trips/day (25 Ton/Trip)
4. Project Cost 5 Crore
7
5. Water Requirement & Source 64 KLD through Tankers
Dust suppression 48 KLD
Plantation 12 KLD
Drinking 4 KLD
6. Environment Management Plan
Budget
20 lakh
7. CSR Activates Budget 15 Lakh
8. Production The proposed production for the five years is @
14,00,000 TPA. Ground water will not be
contaminated as river bed mining will be restrected
up to depth of 3 m where as the general ground
water talble is 8-10 meter bgl. The Bench mRL will
be 479.39-473.80 for five years.
9. Corner Coordinates of the lease
area
Block Latitude Longitude
Charnia
Block/PKL-
B-4
N30°50'19.20”
to
N30°51'44.2
E76°50 '53.80"
to
E76°51 '51.5"
10. Green belt/ plantation
Year of Plantation Proposed Plantation
I Yr. 4000 Trees
II Yr. 4000 Trees
III Yr. 4000 Trees
IV Yr. 4000 Trees
V Yr. 4000 Trees
11. Machinery required Excavator/ JCB Tipers/Trucks, Water Tanker Light
Vehicles/Geep and Maintaniance Van
The above recommendation of SEAC was taken up for consideration in the
today’s meeting. The case has been thoroughly examined and pointed out that:
[1] The project proponent should submit location and layout/ topology of the area
indicating the distance from bridge and embankment.
[2] How would the project proponent ensure that the depth of mining should be
restricting to 3 meter so that water level is not exposed?
[3] How the project proponent would ensure that no in-stream mining would take
place?
[4] How does project proponent ensure that water from washing of wheels may be
done efficiently & minimum water is consumed? What is location of Water
trough?
[5] The project proponent has proposed to use treated water from nearby STP for dust
suppression and sprinkling. Have the project proponent identified the source of
STP or have they entered any MoU with the supplier of water?
[6] The project proponent should submit the plan to ensure no natural water
course/water body would be obstructed due to any mining operations or dumping
of the materials.
8
[7] How the project proponent would reclaim the area concerned and reclamation plan
of the mining site should be submitted.
[8] The project proponent should submit the topography of the mine area to ensure
that leasing of mine does not result into a cluster situation.
In view of the above, the Authority decided to agree with the
recommendations of SEAC and EC would be accorded to project proponent provided
they submits the satisfactory clarification to the above raised observations within 15 days.
It was also decided that the project proponent shall supply the copies of information to all
the members of SEIAA and after their approval the EC letter shall be issued.
Item No.[12] Environment Clearance for mining of “Boulder, Gravel and Sand”
(Minor Mineral) at Dhanaura Block/YNR B-18, over an area of 18.18
Ha. at Village Dhanaura, District-Yamuna Nagar (Haryana) by M/s
JPY Consortium Pvt. Ltd,
The SEAC has recommended this case for Environment Clearance to M/s
JPY Consortium Pvt. Ltd, for “Boulder, Gravel and Sand” (Minor Mineral) at Dhanaura
Block/YNR B-18, over an area of 18.18 Ha. at Village Dhanaura, District-Yamuna Nagar
(Haryana) by imposing stipulations stated therein.
It was noticed that the Mines and Geology Department has granted lease for
a period of 10 years subject to the terms and conditions as indicated in Letter of Intent
(LOI) dated 28.12.2017. The lease has been granted for an area of 18.18 Ha having Village
Dhanaura, District-Yamuna Nagar (Haryana). The project proponent on 04.04.2018
uploaded online application along with copy of approved Mining Plan under category B-2.
The validity of Mining Scheme in the Mining plan is for 5 years. It was noticed that The
Mines & Geology, Department has clarified that no other mine lease exists within 500
meter radius of this mine accordingly the SEAC appraised this project as category B-2.
NOC from Forest Department has been obtained.
Brief details of the project:
1. Category/Item no. (in schedule): 1 (a) B-2
2. Location of Project Village Dhanaura, District-Yamuna Nagar (Haryana)
3. Project Details
Khasra No.
Dhanaura Block/YNR B-18
Production capacity
Mining of Boulder, gravel and Sand at Dhanaura
Block/YNR B-18, over an area of 18.18 Ha.
67, 72 min, 75 min, 74,73,72,71,68/1,68/2,68/3 min,
68/4, 68/5, 68/6, 68/7, 68/8, 68/9, 68/10, 69/3 min,
69/4,69/5,69/6,69/7,69/8, 69/9, 69/10, 69/11 min,
69/12, 69/13. 69/14, 69/15, 69/16, 69/17, 69/18,89/1,
89/2, 89/3, 89/4, 89/5, 89/6, 89/7, 89/8 min, 89/9,
89/10, 89/11, 89/12, 89/13, 89/14, 89/15, 89/16, 89/17,
89/18 min, 89/19, 89/20, 89/21, 89/22 min, 89/26 min,
89/27, 89/28, 89/29, 89/30 min, 88/1 min, 86/27, 69/19
9,50,000 TPA @ 3545 MT/day, Truck / Dumper
(142 Nos.)
9
4. Project Cost 3.5 Crore
5. Water Requirement & Source 25 KLD through Tankers
Dust suppression 13 KLD
Plantation 9 KLD
Drinking 3 KLD
6. Environment Management Plan
Budget
23.50 lakh
7. CSR Activates Budget 8.75 Lakh
8. Production The proposed production for the five years is @
14,00,000 TPA. Ground water will not be contaminated
as river bed mining will be restrected up to depth of 3
m where as the general ground water talble is 8-10
meter bgl. The Elevation Rang of the mine site will be
338.60-339.90 Amsl, for five years.
9. Corner Coordinates of the lease
area
Block Latitude Longitude
Dhanaura
Block/YNR
B-18
N30°25'48.5”
to
N30°26'7”
E77°22 '25"
to
E77°22 '49.3"
10. Green belt/ plantation
Year of Plantation Proposed Plantation
I Yr. 1800 Trees
II Yr. 1800 Trees
III Yr. 1800 Trees
IV Yr. 1800 Trees
V Yr. 1800 Trees
11. Machinery required Excavator/ JCB Tipers/Trucks, Water Tanker Light
Vehicles/Geep and Maintaniance Van
The above recommendation of SEAC was taken up for consideration in the
today’s meeting. The case has been thoroughly examined and pointed out that:
[1] As per “Office memorandum” dated 24.12.2013 of MoEF & CC, in case of river
sand mining project since the lease area 18.18 Ha, mining activity shall be done
manually then how the diesel is required?
[2] The project proponent should submit location and layout/ topology of the area
indicating the distance from bridge and embankment.
[3] How would the project proponent ensure that the depth of mining should be
restricting to 3 meter that water level is not exposed?
[4] How the project proponent would ensure that no in-stream mining would take
place?
[5] How the project proponent would ensure that the mining operations will not
intersect groundwater table so that no natural water course/water body would be
obstructed due to any mining operations?.
[6] The project proponent should submit NOC/approved conservation plan from
Forest Department.
10
[7] How does project proponent ensure that water from washing of wheels may be
done efficiently & minimum water is consumed? What is location of Water
trough?
[8] The project proponent should submit the topography of the mine area to ensure
that leasing of mine does not result into a cluster situation.
[9] The project proponent has proposed to use treated water for dust suppression and
sprinkling to conserve water. Has the project proponent identified any source of
treated water?
[10] How the project proponent would reclaim the area concerned and reclamation plan
of the mining site should be submitted.
In view of the above, the Authority decided to agree with the
recommendations of SEAC and EC would be accorded to project proponent provided
they submits the satisfactory clarification to the above raised observations within 15 days.
It was also decided that the project proponent shall supply the copies of information to all
the members of SEIAA and after their approval the EC letter shall be issued.
Item No.[13] Environment Clearance for the Common Bio-Medical Waste
Treatment Facility at Dhor, Tehsil-Beri, Distt-Jhajjar, Haryana by
Tokas Waste Management,
The recommendation of SEAC was taken up in the today’s meeting and it
was noticed that the project proponent vide letter dated 09.04.2018 for withdrawal of
their case due to some unavoidable reasons / circumstances.
After detail deliberation the Authority decided to accept the
recommendations of SEAC and allow the project proponent to withdraw the case.
Item No.[14] Environment Clearance for proposed Group Housing project at
Village Sukhrali, Sector-28, Gurugram, Haryana by M/s Silverglades
Infrastucture Pvt. Ltd.,
The SEAC has recommended this project for Environmental Clearance
subject to stipulation stated therein. The Project Proponent has proposed the construction
of Group Housing project at Village Sukhrali, Sector-28, Gurugram, Haryana on a total
plot area of 19627.25 sqm (4.85 Acre). The total built up area shall be 118744.253 sqm.
The Group Housing project shall comprise of 15 Towers, 2 Basement + 19 Floors. The
proposed project shall have 543 Dwelling units (Main Units 274 + EWS units 48 +
Service Units 221), Community facilities, Office Buildings, Commercial Buildings and
Club. The maximum height of the building shall be 102.75 meter. The total water
requirement shall be 383 KLD. The fresh water requirement shall be 180 KLD. The
waste water generation shall be 234 KLD which will be treated in the STP of 280 KLD
capacity. The total power requirement shall be 4794.84 KVA which will be supplied by
DHBVN. The Project Proponent has proposed to develop green belt on 4953.80 sqm
(25.24%) of project area (Green belt plantation 408.61 sqm + peripheral plantation
11
768.83 sqm + Avenue plantation 460.38 sqm + Lawn area 3315.98 sqm). The Project
Proponent proposed to construct 5 rain water harvesting pits. The solid waste generation
will be 1817 kg/day. The bio-degradable waste will be treated in the project area by
adopting appropriate technology. The total parking spaces proposed are 1180 ECS.
In the today’s meeting it was noticed that the project proponent has
submitted the proposed final green area is 4939.5 sqmt (25.17%) of plot area and also
submitted undertaking in this regard. The Project proponent has submitted revised water
balance diagram with total 78 KLD water for HVAC cooling. The Project proponent has
submitted affidavit regarding no untreated water to be discharged in external sewer,
structural stability certificate and submitted reply as asked under point 2.1, 2.2, 2.3, 2.13
and 5.4 of form-1A.
After detailed deliberation the Aauthority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the standard conditions in practice.
Item No.[15] Environment Clearance for construction of “Affordable Residential
Plotted Colony” project at Village-Kailash, Sector-28 A, Karnal,
Haryana M/s Fantabulous Town Developers Pvt. Ltd,
The SEAC has recommended this project for Environmental Clearance
subject to stipulation stated therein. The Project Proponent has proposed the construction
of “Affordable Residential Plotted Colony” project at Village-Kailash, Sector-28 A,
Karnal, Haryana on a total plot area of 60702.38 sqm (15 Acre). The total built up area
shall be 59506.93 sqm. The proposed project shall comprise of Residential plotts,
Commercial facilities and community building. Office Buildings, Commercial Buildings
and Club. The maximum height of the building shall be 10.55 meter. The total water
requirement shall be 412 KLD. The fresh water requirement shall be 244 KLD. The
waste water generation shall be 278 KLD which will be treated in the STP of 340 KLD
capacity. The total power requirement shall be 1155 KWA which will be supplied by
UHBVN. The Project Proponent has proposed to develop green belt on 12158.06 sqm
(20.03%) of project area (Green belt plantation 217.65 sqm + peripheral plantation
1902.45 sqm + Avenue plantation 732.46 sqm + Lawn area 9305.98 sqm). The Project
Proponent proposed to construct 15 rain water harvesting pits. The solid waste generation
will be 1982 kg/day. The bio-degradable waste will be treated in the project area by
adopting appropriate technology. The total parking spaces proposed are 822 no’s of
Scooter parking.
In the today’s meeting it was noticed that the project proponent has
submitted the location of 15 RWH pit and proposed landscape Area @20.02% of the plot
area 12,158.06 sqm. The Project proponent has submitted affidavit regarding no untreated
water to be discharged in external sewer, structural stability certificate and submitted
reply as asked under page no. 70 complete detail of soil erosion of form-1A.
12
After detailed deliberation the Aauthority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the standard conditions in practice.
Item No.[16] Environment Clearance for construction of “Affordable Residential
Plotted Colony” project at Village-Kailash, Sector-28 A, Karnal,
Haryana by M/s MAA Vaishno Net-Tech Pvt. Ltd,
The SEAC has recommended this project for Environmental Clearance
subject to stipulation stated therein. The Project Proponent has proposed the construction
of “Affordable Residential Plotted Colony” project at Village-Kailash, Sector-28 A,
Karnal, Haryana on a total plot area of 60702.38 sqm (15 Acre). The total built up area
shall be 59492.72 sqm. The proposed project shall comprise of Residential plots,
Commercial facilities and Commercial / Convenient shopping facilities. The maximum
height of the building shall be 10.55 meter. The total water requirement shall be 410
KLD. The fresh water requirement shall be 243 KLD. The waste water generation shall
be 277 KLD which will be treated in the STP of 340 KLD capacity. The total power
requirement shall be 1478 KW which will be supplied by DHBVN. The Project
Proponent has proposed to develop green belt on 12212.821 sqm (20.119%) of project
area (Green belt plantation 233.060 sqm + peripheral plantation 1041.336 sqm + Avenue
plantation 903.595 sqm + Lawn area 10034.830 sqm). The Project Proponent proposed to
construct 15 rain water harvesting pits. The solid waste generation will be 1965 kg/day.
The bio-degradable waste will be treated in the project area by adopting appropriate
technology. The total parking spaces proposed are 822 no’s of Scooter parking.
In the today’s meeting it was noticed that the project proponent has
submitted visitor parking, population detail to Form-IA, detail of Area Statement and an
Affidavit regarding no release of un-treated water in external sewer against the queries
raised.
In view of the above the Authority decided to agree with the
recommendations of SEAC to accord Environment Clearance to this project by imposing
the standard conditions in practice.
Item No.[17] Environment Clearance for shopping/commercial Building on 32.36
acres site (Mall of India) in Block-V, DLF City Phase-III, Sector-25 A,
Gurgaon, Haryana by M/s DLF City Centre Ltd.
The SEAC has recommended this project for approval of TOR subject to
stipulation stated therein. The Project Proponent has proposed shopping/commercial
Building on 32.36 acres site (Mall of India) in Block-V, DLF City Phase-III, Sector-25 A,
Gurgaon, Haryana.
In the today’s meeting the SEIAA approved the “Terms of Reference” and
it was decided that the project proponent will prepare the EIA by using Model Terms of
Reference of MoEF & CC along with the following additional terms of reference:
13
Specific condition
1. The project proponent should submit traffic study and impact on the air ambient
quality along with mitigation measures.
2. The PP should submit joint study report conducted with HUDA.
3. The PP should submit traffic circulation plan including traffic of nearby projects
and overall impact of the national highway along with mitigation measurement.
4. The PP should submit fire fighting plan with hydraulic ladder.
5. The PP should submit green belt plan for 25%.
6. The PP should submit the drainage plan of 5 KM surrounding area.
7. The PP should submit aravali NOC.
Item No.[18] Environment Clearance for proposed Textile Park(for manufacturing
activity on an area measuring 59.081 acre (239091.945 sqm) at 80 Mile
Stone, NH-1, Village Diwana, Tehsil and District-Panipat, Haryana by
M/s Aalishan Eco Textile Park Pvt. Ltd,
The case was taken up for approval of Terms of Reference in 168th meeting
of the SEAC held on 11.05.2018 for approval of Terms of Reference.
The project proponent neither attended the meeting nor requested for
adjournment.
It was revealed that project proponent has applied under category 8(b) i.e.
Township and Area Development Projects whereas the said project is covered under
category 7(h) as the project relate to CETP.
After discussion the Authority allow the project proponent to withdraw the
project and project proponent may be advised to apply afresh under Category 7(h) of the
EIA Notification, 14.09.2006.
Item No.[19] Environment Clearance for Expansion/Modification of Residential
Plotted Colony (Green wood city) at Sector-26, 26A & 27, Sonipat,
Gurgaon, Haryana by M/S Jai Krishna Artec-J.V. 8-B,
The SEAC has recommended this project for approval of TOR subject to
stipulation stated therein. The Project Proponent has proposed Expansion/Modification of
Residential Plotted Colony (Green wood city) at Sector-26, 26A & 27, Sonipat, Gurgaon,
Haryana.
In the today’s meeting the SEIAA approved the “Terms of Reference” and
it was decided that the project proponent will prepare the EIA by using Model Terms of
Reference of MoEF & CC along with the following additional terms of reference:
Specific condition
1. The PP should submit the approved building plans as well as zoning plan.
2. The PP should submit the area details such as Area of services laid down in the
plotted colony and area of EWS Houses constructed if any.
14
Item No.[20] Environment Clearance for expansion of area of Group Housing
Colony (19.244 acres) under mix land use at Sector-53, Gurugram,
Haryana by M/s Vipul Ltd,
The SEAC has recommended this project for approval of TOR subject to
stipulation stated therein. The Project Proponent has proposed expansion of area of
Group Housing Colony (19.244 acres) under mix land use at Sector-53, Gurugram,
Haryana.
In the today’s meeting the SEIAA approved the “Terms of Reference” and
it was decided that the project proponent will prepare the EIA by using Model Terms of
Reference of MoEF & CC along with the following additional terms of reference:
Specific condition
1. The PP should submit traffic study and impact on the air ambient quality along
with mitigation measures.
2. The PP should submit traffic circulation plan including traffic of nearby projects
along with mitigation measurement.
3. The PP should submit compliance report from Regional Director, MoEF as per
OM dated 29th August, 2017.
4. The PP should submit fire fighting plan with hydraulic ladder.
5. The PP should submit green belt plan for 35.20%.
6. The PP should submit the drainage plan of 5 KM surrounding area.
7. The PP should submit aravali NOC.
Item No.[21] Environment Clearance for Proposed Group Housing Colony
“Joyville” on Plot area measuring 17.9 Acres in Sector-102,
Gurugram Manesar Urban Complex, Gurgaon, Haryana by M/s
Eventual Builders Pvt. Ltd.
The SEAC has recommended this project for approval of TOR subject to
stipulation stated therein. The Project Proponent has proposed Group Housing Colony
“Joyville” on Plot area measuring 17.9 Acres in Sector-102, Gurugram Manesar Urban
Complex, Gurgaon, Haryana.
In the today’s meeting the SEIAA approved the “Terms of Reference” and
it was decided that the project proponent will prepare the EIA by using Model Terms of
Reference of MoEF & CC along with the following additional terms of reference:
Specific condition
1. The PP should submit permission for disposal of sewerage from competent
authority.
2. The PP should submit rain water harvesting plan.
3. The PP should submit solar power generation plan.
4. The PP should submit affidavit for BS-VI fuel for DG set.
15
Item No.[22]Request for confirmation regarding extension of validity of
Environment Clearance granted for setting up Residential Plotted
Colony measuring 221.93 acres at Sector-82-88 & 89, Faridabad being
developed by M/s Countrywide Promoters Pvt. Ltd.
The case has been transferred by MOEF & CC, GOI to SEIAA in purview
of OM dated 03.04.2018 for further consideration.
In the today’s meeting it was noticed that the MoEF GoI vide letter dated
01.08.2007 granted Environmental Clearance for setting up Residential Plotted Colony
measuring 221.93 acres at Sector-82-88 & 89, Faridabad being developed by M/s
Countrywide Promoters Pvt. Ltd. Then validity of the environment clearance was up to
31.7.2012. The project proponent submitted application to MOEF on 10.07.2012 with
respect to extension of validity of EC within validity period but no decision has been
taken by MOEF.
The project proponent within the validity period of EC submitted
application for extension of validity of EC to the SEIAA, Haryana on 03.02.2016 as per
MOEF GOI Notification dated 29.04.2015 and subsequently clarification dated
12.04.2016. The case has been taken up in the 133rd meeting of SEAC held on
06.05.2016 and it was decided to constitute a sub-committee for site visit. The report of
sub-committee was placed before the committee in the 148th meeting of SEAC held on
15.2.2017 and committee recommended for extension of validity of EC for period of 3
years. The case was again taken up in the 149th meeting of SEAC held on 30.03.2017 and
SEAC recommend the case to SEIAA for transfer the case to MOEF & CC, New Delhi in
purview of MoEF & CC Notification dated 09.12.2016. The case has been taken up in the
102nd meeting of SEIAA held on 20.04.2017 and decided that the case pertain to more
than 3 lakhs sqmt of built up area; as per notification dated 09.12.2016; the case
transferred to MOEF & CC, GOI on 01.05.2017. Now the case has been transferred by
MOEF & CC, GOI to SEIAA in purview of OM dated 03.04.2018 for further
consideration.
After detail deliberation the Authority decided to grant extension for two
year from the date of issuance of letter.
*****