4/7/20
BARAKAH NUCLEAR POWER PLANT PROJECT
P ease Turn o your
mobile! Or Switch to
vibration mode!
BARAKAH NUCLEAR POWER PLANT PROJECT
Check! Right Now!
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 2/24
4/7/20
SCREEN
Don’t Panic11
Switch Off All Electrical Equipment22
BARAKAH NUCLEAR POWER PLANT PROJECT
Don’t Run, Walk Fast!33
Go to the Assembly Point44
Wait for the Final Instruction55
1. Safety Moment
2. Previous Meeting
1. Safety Moment
2. Previous Meeting
6. Incident Reports
7. Weekly Inspection
Committee Inspection
6. Incident Reports
7. Weekly Inspection
Committee Inspection. rograms
4. HSE Statistics
Performance per Area and Total
5. HSE Findings Summary
Findings analysis- cause
. rograms
4. HSE Statistics
Performance per Area and Total
5. HSE Findings Summary
Findings analysis- cause
Weekly Inspection
8. Environmental Issues
9. Action Plans
Advan
Sung Chang
Weekly Inspection
8. Environmental Issues
9. Action Plans
Advan
Sung Chang
BARAKAH NUCLEAR POWER PLANT PROJECT
w se, ompany, an rea HSE Findings by Company
Reported Near Miss
Evaluation by Findings Score
w se, ompany, an rea HSE Findings by Company
Reported Near Miss
Evaluation by Findings Score
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 3/24
4/7/20
BARAKAH NUCLEAR POWER PLANT PROJECT
NO.NO. ITEMSITEMS ACTION ACTION PLANSPLANS ACTION BY ACTION BYDUEDUE
DATEDATESTATUSSTATUS
1High HSE
Findings
Top findings issued by KEPCO & HSJV
ADVAN got the highest findings landing to
16.1 for this week. Advised to report their
Corrective Action Plan next meeting.
AdvanNext
Meeting
The or anization raised low number of HSE
BARAKAH NUCLEAR POWER PLANT PROJECT
2 Low HSEFindings
noncompliance compare
to
Contractors
number of HSE issues.
Sungchang NextMeeting
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 4/24
4/7/20
BARAKAH NUCLEAR POWER PLANT PROJECT
Descripti on :Descripti on :
Clear GlassClear Glass
Combination GlassCombination Glass
a ety ass tan ar y ana ety ass tan ar y an --
Z87.1,Z87.1,
1.1. Glasses must have s ide shieldsGlasses must have side shields
2.2. Tinted lenses are not al lowed unlessTinted lenses are not al lowed unl ess
required (for example, welding w orks)required (for example, welding w orks)
3.3. Frames must bear manufacturer ’sFrames must bear manufacturer’s
ident i f icat ion trademark for both frontsident i f icat ion trademark for both fronts
and tem le.and tem le.
BARAKAH NUCLEAR POWER PLANT PROJECT
Reading GlassReadi ng Gl as s Glas ses im properl y u sedGlasses imp roper ly used Us ing sung lassesUsing sunglasses
4.4. Lenses made of 3 mm. th ickLenses made of 3 mm. thick
5.5. Lenses must be marked wi th the let ter Lenses must be marked with th e let ter “ H” and “ CE” .“ H” and “ CE” .
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 5/24
4/7/20
BARAKAH NUCLEAR POWER PLANT PROJECT
Descript ion :Descript ion :
Monthly HSE and Quality Recognit ion Ceremony, awards given to BestMonthly HSE and Quality Recognit ion Ceremony, awards given to Best
Subcontractor , Indiv idual and Spot Awards, Slogan and Poster contest awards.Subcontractor , Indiv idual and Spot Awards, Slogan and Poster contest awards.
Total o f Total o f 3535 awards given this month.awards given this month.
BARAKAH NUCLEAR POWER PLANT PROJECT
Descript ion :Descript ion :
The Subcontractor shou ld correct unsafe condit ion s present in their workp lace.The Subcontractor shou ld correct unsafe condit ion s present in their workp lace.
Findings related to scaf folding nonconformance ( incomplete plat form, open edge,Findings related to scaf folding nonconformance ( incomplete plat form, open edge,
no toe boards, & others). Structure open edge and housekeeping are another no toe boards, & others). Structure open edge and housekeeping are another
concerns which the organizat ion need to act .concerns which the organizat ion need to act .
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 6/24
4/7/20
Descript ion :Descript ion :
1.1 . Gas fue led and e lec t r ical ly poweredGas fueled and electrically powered
stoves are st r ic t ly prohi bi ted ins idestoves are st r ic t ly prohi bi ted ins ide
the room accommodat ions tothe room accommodat ions to
ensure that no occupants w i l lensure that no occupants w i l l
at tempt to cook ins ide their rooms.at tempt to cook ins ide their rooms.
2.2 . Any one f ound w i t h cook ing An y one found wi th cooking
utensi ls shal l be quest ioned i f theyutensi ls shal l be quest ioned i f they
have cooking stoves ins ide their have cooking stoves ins ide their
rooms.rooms.
BARAKAH NUCLEAR POWER PLANT PROJECT
COOKING INSIDE ACCOMODATION ROOM ARECOOKING INSIDE ACCOMODATION ROOM ARE
STRICKTLY “PROHIBITEDSTRICKTLY “PROHIBITED”
Descript ion :Descript ion :
Date : 2013 Apri l 4 ~ 15Date : 2013 Apri l 4 ~ 15
Time : 16:30 PMTime : 16:30 PM
Locat ion : HSE TrainingLocat ion : HSE Training
Center Center
At ten dee At ten dee
Sub Contractor ForemanSub Contractor Foreman
Site Manager Site Manager
Trainer Trainer
BARAKAH NUCLEAR POWER PLANT PROJECT
ENEC Safety Cu ltur e(SC)ENEC Safety Cu ltur e(SC)Team (Team (Mr Mr. Christopher . Christo pher))
HSJV HSE Train er HSJV HSE Train er
TopicTopic
Safety AwarenessSafety Awareness
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 7/24
4/7/20
DAILY NOISE
LEVEL
MONITORING
@
POWER
BLOCK
No . Date
Measurement, dB(A) in these locations
L3 RCB 1
Hearin Protection Pro ramHearin Protection Pro ram
AB 2/4 AB 1/3 TGB 1 TGB 1 CPB CPBOutside Topside Inside
1 02 April 2013 82.1 81.5 95.9 87.4 89.2 85.5 6 7. 7 75 .1 79 .5
2 03 April 2013 88.1 81.8 89.1 86.4 93.8 83.9 81.3 75.8 82.5
3 04 April 2013 86.8 82.6 83.3 87.6 92.8 81.2 84.1 82.6 87.9
BARAKAH NUCLEAR POWER PLANT PROJECT
AccordingAccording toto HSEHSE‐‐PP5353 NoiseNoise procedure,procedure, whenwhen employeesemployees areare exposedexposed toto
noisenoise levelslevels of of 8585dBdB andand above,above, hearinghearing protectionprotection andand suitablesuitable warningwarning
signssigns shouldshould bebe providedprovided..
TheThe noisenoise levelslevels of of 8585dBdB isis similarsimilar withwith belowbelow
11.. HairHair drierdrier
22.. CityCity TrafficTraffic (inside(inside car)car)
Daily Noise Level MonitoringDaily Noise Level Monitoring
Provision of Controls Provision of Controls
1.1. Warning SignsWarning Signs
2.2. Ear plugs or muffsEar plugs or muffs
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 8/24
4/7/20
BARAKAH NUCLEAR POWER PLANT PROJECT
Item Ancil lary Ar ea Camp Area Offic e Area Power Blo ck Village 1 Village 2 HSJV Total NMDC Total
For theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
Cum
Near Misses 0 0 0 0 0 2 1 11 0 0 0 0 1 13 0 0
Over speeding 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0
(This Week From March 30 – April 5, 2013)
First Aid Cases
(FA) 1 2 0 0 0 1 3 16 0 4 0 2 4 25 0 0
Medical
Treatment Cases(MTC)
0 1 0 1 0 4 0 4 0 0 0 1 0 11 0 0
Restricted WorkCases (RWC) 0 1 0 1 0 0 0 2 0 0 0 0 0 4 0 0
LTI’s 0 0 0 0 0 0 0 3 0 0 0 0 0 3 0 0
Property/Vehicle
Accid ents 0 2 0 1 0 2 0 6 0 1 0 1 0 13 0 0
Environmental
BARAKAH NUCLEAR POWER PLANT PROJECT
Legend : Ancill ary – Rebar Shop, Batch Plant, Paint Shop, Heavy Equipm ent Shop
Power Block – Cut –Off Wall, Wharf Area, Concrete Block Area
* : 41 cases (Oc t- Dec. 2011), 64 cases (2012), 10 (2013)
Release
For this week Cumulative
One Strike Policy 0 115*
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 9/24
4/7/20
BARAKAH NUCLEAR POWER PLANT PROJECT
(This Week From March 30 – April 5, 2013)
Issued
Near MissNear Miss
CARCAR
0 1 0 1
0 68 174 242
Findings TotalK
E
P
C
O
H
S
J
V
S
U
B
C
O
N
Open Closed
KEPCO HSJV Subcon KEPCO SubconHSJV
0 0 0 0 1 0
0 8 0 0 60 174
BARAKAH NUCLEAR POWER PLANT PROJECT
TOTALTOTAL
OC &
WFOC
&
WF 0 30 426 456
0 99 600 699
0 0 0 0 30 426
0 8 0 0 91 600
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 10/24
4/7/20
4445
4950
57
Material Management
Electrical Safety
Scaffolding
PPE
Access & Egress
(This Week From March 30 – April 5, 2013)
1314
2020
2425
273030
3139
43
Documents
Excavation
Fall Protection
Training
Lifting
Health & Welfare
Working at Height
Hand & Power Tools
Waste Management
Plant & Equipment
Color Coding
Signs, Barriers & barricades
Fire Prevention
BARAKAH NUCLEAR POWER PLANT PROJECT
11
26 7
810
12
0 10 20 30 40 50 60
Manual Handling
Confined Space
Road Safety
Supervision
Poor Illumination
Environmental
Hot Works
PTW
Source: CAR, Near Miss, Walkthrough and Observation Card
Arrangemen t of weld ingcable obstructing pathway
( Power Block,( Power Block, YounYoun ChangChang Damaged and rusted scaffold
Securing ladder with
approved clamps
( CPB,( CPB, Advan Advan))
1 32
PB)PB)
Proper keeping of
protruding nails scattered
on ground (Power (Power Block,Block, Advan Advan))
Practice proper cable
management.
(CWDC,(CWDC, GusanGusan))
p p es s ou no e use .(Power Block,(Power Block, SamjinSamjin))
Toe boards shoul d be
installed in any scaffold
(TGB,(TGB, IsamIsam KabbaniKabbani))
Workers will use only
inspected scaffold
(RCB/AB1,(RCB/AB1, JonghapJonghap))
Scaffold should have the
appropriate handrails (Power (Power
Block,Block, SamjinSamjin))
Close the gap on access
located across a concrete
slab.
(CWDC,(CWDC, GusanGusan))
BARAKAH NUCLEAR POWER PLANT PROJECT
Access & Egress Scaff old ingPPE
Observe good
housekeeping at floor areas
(ADB, Hyundai C&I)(ADB, Hyundai C&I)
Scaffold tag should beinspected and updated in
timely manner. (Village(Village
2,2, HanlimHanl im))
Provide access for carpenters working i n
vertical form erection.
(TGB, D & I)(TGB, D & I)
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 11/24
4/7/20
BARAKAH NUCLEAR POWER PLANT PROJECT
61
5148
60
13
31
10 119
20
30
40
BARAKAH NUCLEAR POWER PLANT PROJECT
2 1 2 1 1 1 2 1 1 1 2
0
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 12/24
4/7/20
60
70Poor Illumination3
Supervision2Emergency & Evacuation
Road Safety
Supervision
Manual Handling
20
30
40
Environmental
Poor Illumination
PTW
Documents
Health & Welfare
Hot Works
Fall Protection
Hand & Power Tools
Training
Color Coding
Excavation
LIfting
Fire Prevention
BARAKAH NUCLEAR POWER PLANT PROJECT
0
10Plant & Equipment
Waste Management
Working at Height
Electrical Safety
Material Management
Signs, Barriers & Barricades
PPE
Scaffolding
Housekeeping
Access & Egress
700
800
70
80KEPCO/HSJV
SUBCON
(This Week From March 30 – April 5, 2013)
100
200
300
400
500
600
10
20
30
40
50
60 Manpower
BARAKAH NUCLEAR POWER PLANT PROJECT
00
S e o y o n g
S e o y o n g ( P B )
T o w e r s T e c h
G u s a n
G u s a n ( P B )
E u n m i n
J o n g h a p
J o n g h a p ( P B )
Y o u n C h a n g
Y o u n C h a n g ( P B )
H w a c h o n
W B G
H i l a l c o
A d v a n
H a n l i m
U w e l l
Y o o A
H y u n d a i C & I
S a m j i n
E u g e n e
D a e m y u n g
S e o b o n
D & I
A l R a e e l
D O W
S a m h o
S u n g c h a n g
S e i l
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 13/24
4/7/20
10.0
12.0
8.6
Findings Score = Number of Causal x Risk(Factor Score)Findings Score = Number of Causal x Risk(Factor Score)
Source: CAR, Near Miss, Walkthrough and
Observation Card reported by KEPCO & HSJV
0.0
2.0
4.0
6.0
8.0
4.4
6.6
0.7 1.0 1.22.2 1.9
1.0
3.5
.
1.51.0 1.0
2.02.9
1.0
2.51.5
0.2
2.0
BARAKAH NUCLEAR POWER PLANT PROJECT
Action PlanAction Plan for Company requiring assistance and support from the systemfor Company requiring assistance and support from the system
1. Joint Inspection will be carried out by Area Management Team.
2. Spot Training will be given to workers about major findings
3. Action plan will be submitted to HSJV HSE Team develop by D&I
Legend : (I) Infra, (PB) Power Block
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 14/24
4/7/20
Top Hazards
Total No. of Findings: 45 Access & Egress, 11
Electrical Safety, 1
Health & Welfare, 1
Working at Height,
1
PTW, 1Lifting, 1
Poor Illumination,
1
Access & Egress 11
Scaffolding 6
Control Measure Due Date
Ladder should be fixed by
suitable part, access must
be clear of obstruction
Alw ays
Waste Management, 3
Color Coding, 2
Signs, Barriers & Barricades, 2
BARAKAH NUCLEAR POWER PLANT PROJECT
Ensurethat toe boards &
platform are properly
installed
Alw ays
Scaffolding, 6
Hand & Power Tools, 5
Housekeeping, 4Fire Prevention, 3
PPE, 3
Source: CAR, Near Miss, Walkthrough and Observation Card
Top Hazards
Total No. of Findings: 42
Fire Prevention, 7
Color Coding, 2Fall Protection, 1
Plant & Equipment, 1 Working at
Height, 1Hand & Power
Tools, 1 Waste Management, 1
Cause Nos
Fire Prevention 7
Signs & Barriers 7
Control Measure Due Date
Proper handling and
inspection of cylinder gas
regularly.
Alw ays
Signs, Barriers & Barricades, 7
Scaffolding, 3
Electrical Safety, 2
Material Management, 2
Hot Works, 2
BARAKAH NUCLEAR POWER PLANT PROJECT
Protruding rebarsand
sharp edges should be
provided with proper
protectionand precaution.
Alw ays
Access & Egress, 6
Housekeeping, 5LIfting, 5
PPE, 4
Source: CAR, Near Miss, Walkthrough and Observation Card
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 15/24
4/7/20
Top Hazards
Total No. of Findings : 24
Material Management, 5
Electrical Safety, 1Fall Protection, 1
Waste Management, 1 Health &
Welfare, 1 Excavation, 1
Cause Nos
Material Management 5
Housekeeping 3
Control Measure Due Date
Construction materials
should be stacked and
properly segregated.
Alw ays
Plant & Lifting, 1
Confined Space, 1
Documents, 1
BARAKAH NUCLEAR POWER PLANT PROJECT
Removal of protruding
nails and providing of cable
hangers.
Alw ays
ouse eep ng, 3
Access &
Egress,
2
PPE, 2Poor
Illumination, 1Hand & Power
Tools, 1
PTW, 1
Equipment, 1
Source: CAR, Near Miss, Walkthrough and Observation Card
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 16/24
4/7/20
AREA AREA : Power B lock AB (Seoyong): Power Block AB (Seoyong) Apri l 4, 2012 Apr il 4, 2012
CORRECTIVE ACTION:CORRECTIVE ACTION:
BARAKAH NUCLEAR POWER PLANT PROJECT
PLANNED SUPERVISOR PREVENTIVE ACTIONPLANNED SUPERVISOR PREVENTIVE ACTION
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 17/24
4/7/20
BARAKAH NUCLEAR POWER PLANT PROJECT
InspectionInspection DateDate Attendees Att endees RemarkRemark
Commit tee Inspec tion 2013-04-02 HSJV, KEPCO, HSE Managemen t Team 0 Find ings
Weekly Inspection 2013-04-03 HSJV HSE Team 15 Findings
4
5
6
Findings per Company Total
3
4
Improper Storage
Poor Management
Findings per Causal
5
1 1 12
4
10
1
2
Advan D&I Geumhwa Seoyong (PB) Yoo A Youn Chang Youn Chang (PB)
BARAKAH NUCLEAR POWER PLANT PROJECT
1
1
1
1
2
2
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5
No Color Coding
Damaged Hose
Damaged Regulator
No PTW
No Fire Extinguisher
Poor Housekeeping
Key item : Gas Cutting
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 18/24
4/7/20
BARAKAH NUCLEAR POWER PLANT PROJECT
No.Source of
In jury Area Descr iption
Immediate
Act ion
Planned
Supervisor
1Pain, low
back
HSJV
(Work Shop)
Concrete Pump
Operator
The worker was helping
with the cleaning of his
Concrete pump using a
hose. He was bending
forward while holding the
Assessment
done by Dr. Kim
Topical Analgesic
applied
Oral Analgesic
BARAKAH NUCLEAR POWER PLANT PROJECT
or s op rea
31‐03‐2013
13:30
hose when
felt
a sudden
pain on his back and thus
brought to the clinic.
Instructed of
proper body
mechanics
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 19/24
4/7/20
No.Source of
Injury Area Descr iption
Immediate
Act ion
Planned
Supervisor
2
Pain and
swelling in
the left ring
Seoyong
Carpenter
RCB AB UNIT‐2
While performing as a
steel fixer helper when
accidently his finger was
pinch in between rebar
size‐32 mm that result
his finger to get swollen
he was rush to safety
Cleaning and
dressing done
Analgesic spray
given
Referral to
BARAKAH NUCLEAR POWER PLANT PROJECT
finger02‐04‐2013
08:30 am
office cabin for first aid,
first aid given and was
brought to Kepco Clinic
for treatment
hospital‐
orthopedic
surgeon
No.Source of
In jury Area Descr iption
Immediate
Act ion
Planned
Supervisor
3Wound on
left arm
Seoyong
Carpenter
RCB AB ‐3
POWER BLOCK
While performing from
dismantling on RCBAD‐3
area together with his
foreman when accidently
his left hand finger
puncture with nail that
Cleaning and
wound dressing
done
Injection Tetanus
BARAKAH NUCLEAR POWER PLANT PROJECT
02‐04‐2013
10:30 am
.
Safety officers
took
him
to
site office for first aid and
rush him to Kepco Clinic .
toxoid given
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 20/24
4/7/20
No.Source of
Injury Area Descr iption
Immediate
Act ion
Planned
Supervisor
Preventive Acti on
4Felt dizzy and
weak
Advan
HSE Supervisor
Power Block
(CPB)
While talking to one HSE
Supervisor, suddenly he
felt dizzy and weak.
IP brought to
KEPCO Clinic for
further
examination.
BARAKAH NUCLEAR POWER PLANT PROJECT
05‐03‐2013
07:47
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 21/24
4/7/20
BARAKAH NUCLEAR POWER PLANT PROJECT
Location TGB Unit 2, Power Block
Description Hazardous substances not contained in a safe and standard storage area. No Spill ki t and no driptray available.
Act ion taken Installed drip tray in chemical s torage and placed spill kits according to HSE P41 ‘Hazardous
Material Handling’
Status CLOSED
Metallic Waste Metallic Waste
Skip BinSkip Bin
Uncontained Uncontained
Metallic WasteMetallic Waste
Wood Waste Wood Waste
inside the inside the
Metal Skip BinMetal Skip Bin
BARAKAH NUCLEAR POWER PLANT PROJECT
Location Laydown Area, Power Block
Description Assorted met al waste w as not con tain ed inside a metal ski p, bu t on t he gro und .
Skip intended for metal w aste contained wood waste.
Act ion taken Conducted waste management spot training and segregated wood waste from metal w aste.
Status CLOSED
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 22/24
4/7/20
No.0 Date Action by
CompanyDescription Status Closing Date
Expiration
DateRef. No.
Main
AreaSub-Area Issued By
Issuer
Company
1 01-Ap ri l- 13 Seo yo ngHazardous subst ances not contained in
a safe and standard st orage area. No
Spill kit and Fire Extinguisher available.
CLOSE 06-April-1306-April-13 2013-0821 PB TGB 2 HSJVRenato
Ponce
3 01-April-13 Advan
Assor ted m etall ic w aste were no t
contained inside an intended skip and
left unattended.
Skip intended for metallic waste contain
ed waste wooden materials.
CLOSE 06-April-13 06-April-12013-0845
PB Laydown HSJVRenato
Ponce
BARAKAH NUCLEAR POWER PLANT PROJECT
WASTE MANAGEMENT UPDATE
Week = 30/03/2013 – 05/04/2013
WASTE TYPEThis week Last week
Collected (m3) Disposal (m3) Recycled (m3) Recycle(%) Collected (m3) Disposal (m3) Recycled (m3) Recycle(%)
Metal 56 0 0 64 0 45
Construction 64 1215 0 88 630 0
Concrete 0 0 0 0 0 0Wood(Good) 0 0 0 0 0 0Wood(Bad) 280 270 0 272 360 0
Plastic 136 0 45 96 0 0Municipal 0 288 0 0 336 0
BARAKAH NUCLEAR POWER PLANT PROJECT
Legend: Collected ‐ Waste from Site to Temporary Storage Area
Disposal ‐ Waste from Temporary Storage Area to Landfill Area
Recycle ‐ Treated waste ( GMET) to Recycling Plants
azar ous
0Total Solid Waste 640 1789 45 2.51% 592 1334 90 6.75%
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 23/24
4/7/20
BARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 113th HSJV Weekly Meeting
http://slidepdf.com/reader/full/113th-hsjv-weekly-meeting 24/24
4/7/20
BARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECT