MINISTRY OF WATER, SANITATION AND IRRIGATION
THWAKE MULTI-PURPOSE WATER DEVELOPMENT PROGRAM PHASE 1
TERMS OF REFERENCE
FOR
CONSULTANCY SERVICES FOR UNDERTAKING ENVIRONMENTAL AND SOCIAL
AUDIT AT THWAKE MULTI-PURPOSE WATER DEVELOPMENT CONSTRUCTION
SITE
YEAR 2021
2
2
1.0 Project Background Information
The Ministry of Water, Sanitation and Irrigation is implementing Thwake Multipurpose
Water Development Program (TMWDP), a flagship program under Vision 2030. The program
commenced with construction of Thwake dam which is located 1 km downstream of the
confluence of Thwake and Athi rivers in the counties of Kitui and Makueni. The program
whose budget is KES 42.6B is jointly funded by the Government ofKenya and African
Development Bank (AfDB) and comprises of construction of:-
a. Phase 1; Construction of a 80.5 m high multi-purpose dam (688 Million Cubic Metre
storage capacity) and associated preliminary works needed to enable the other three
phases;
b. Phase 2; Development of hydropower generating system with an installed capacity
of approximately 20 MW;
c. Phase 3; Development of Water Supply, Sanitation & Waste water Infrastructure to
supply estimated 150,000 m3/day of treated water to approximately 1.3million
people drawn from the rural areas of Kitui and Makueni Counties and those in Konza
Techno City and its environs;
d. Phase 4; Irrigation Scheme Development to ultimately irrigate approximately 40,000
hectares (approx. 100,000 acres) of land;
The dam is located at a distance of about 180 km south east of Nairobi and is accessible
from Wote Town in Makueni County through Wote – Mavindini gravel road or through Kwa-
Vonza – Kanyangigravel road in Kitui County.
3
3
The reservoir will cover an area of 2,900 Hectares spanning from the embankment to about
12 Km upstream and an estimated catchment area of 10, 276 square kilometres. The
catchment area constitutes about 35% arable and 65% semi-arable land. The Dam project is
expected to serve the greater lower eastern areas of Makueni, Kathonzweni, Mbooni East
(all in Makueni County) and lower Yatta in Kitui County. The principal areas which have been
targeted as the main beneficiaries of water from the dam are the towns of Kathonzweni,
Wote, Kibwezi and their sounding areas, the Konza ICT City and the neighbouring areas of
Makueni County and the Yatta Plateau in Kitui County.
The project area is characterized by very low levels of rainfall averaging about 690mm per
annum. This results in frequent droughts and acute water shortages. The area is not
endowed with surface water resources except Athi River which is a perennial river and
drains along the Athi basin andfinally into the Indian Ocean. The source of Athi river is
Gatamayo forest in Kiambu County and flows through Nairobi, Machakos and Kajiado
Counties. The river is fed by several other tributaries which are seasonal in nature but which
carry huge volumes of water during the rainy seasons. Thwake River, one of the tributaries
4
4
joins Athi River near Kathukuni and Nduyu Hills in Makueni and Kitui counties respectively,
and at a distance of approximately 1.0 km upstream of the proposed dam axis.
Ephemeral tributaries into Athi River include Kaiti, Muooni, and MutitoAndei Rivers. Other
tributaries that form the catchment of Athi River are Mbagathi, Ngong, Ruiru, Thiririka,
Nairobi, Mathare, Ndarugu, Kiboko, Makindu, Kibwezi and Tsavo Rivers.
2.0 Program Goals.
The program seeks to meet the following specific goals:-
1. To provide clean and adequate domestic water supply for about 1.3 million
people
2. To provide water for irrigation
3. To facilitate water storage and reduce rain water losses, and
4. To generate hydro-electric power.
The Dam project began with the concept development that involved desk and field
assessment with a view to establishing the need for the project. A wide range of
considerations including the capacity of the existing water sources, water demand and uses
as well as social and economic linkages of water in the target area have been taken into
perspective. The concept was followed by a detailed feasibility study involving the
environmental scoping process. This study involved determination of the viability of the
proposed Dam project with respect to sustainability of water feed, environmental
suitability, social acceptability and economical justifications. Preliminary physical surveys,
measurements and social evaluations were carried out in conjunction with all stakeholders
and in reference to all other social and economic initiatives in the project area. According to
the feasibility study report, the Dam project is a fulfillment of the communities’ long-time
desire to have access to water both for domestic consumption and economic development.
The positive implications of the proposed project override the potential negative impacts of
the project that would be mitigated through integrated measures proposed in this report.
5
5
Before the commencement of the dam construction, the Ministry undertook a baseline
survey to determine and describe the then existing situation on the ground on all aspects of
cultural, social and economic characteristics of the society and the environment. The survey
was aimed at providing baseline data and information on the area for decision making
during the project implementation period as required in the program execution and
financing.
3.0 Project Organization
The dam is currently under construction by the appointed contractor- China
GezhoubaGroup Co., Ltd. (CGGC)and has engaged several sub-contractors. The construction
project is supervised by SMEC International Pty ltd, a consultant. The Ministry of Water,
Sanitation and Irrigation has established Project Implementation Team (PIT) which reports
to the AfDB through its Principal Secretary and is responsible for procurement, financial
management, land compensation and all RAP and ESIA related activities. Program Steering
Committee (PSC) has been set to guide the program and comprise of Principal Secretaries
from the Stakeholder ministries, i.e. Ministry of Water, Sanitation and Irrigation, Ministry of
Agriculture, Livestock and Fisheries, Ministry of Health, Ministry of Energy, Ministry of
Information, Communication and Technology, National Treasury, Ministry of Environment
and Natural Resources. Other members of the Committee include representatives of Water
Resources Authority, National Irrigation Board, National Environmental Management
Authority, National Construction Authority, Tanathi Water Works Development Authority
and Makueni and Kitui Counties.
4.0 Project Commencement and Progress
The Dam Construction Site handed over to contractor on 27th March 2018 which is also the
commencement date of works. The expected completion date is November 2022. As at 30th
June 2020, the construction works progress stood at 37% against time lapse of 49.08%. The
main work activities of the Dam being undertaken currently include:
a) Water diversion Tunnels A and B of respectively 731m and 791m distances.
b) Spillway which include excavation and concrete works
c) Access Adit – drilling, blasting and rock excavation
d) Construction of Embankment wall
6
6
e) Construction of Coffer Dam
f) Construction of Employer’s / Engineer’s permanent site office
The process of compensating Project Affected Persons (PAPs) was completed before the
project site was handed over to the contractor.
5.0 Justification for the Audit
Environmental Impact Assessment (EIA) for Thwake Multi-Purpose Water Development
Project was conducted and completed in April 2013 and EIA license issued in December
same year.
This Environmental and Social Audit (ESA) is being undertaken in accordance with the
requirements of Environmental Management and Coordination Act (EMCA) 1999section 68
(4)that obligates the proponent of a project to prepare and submit environmental audit
report to NEMA annually. The ESA report shall describe how far the project conformsin
operation with the statements made in the EIA study reportsubmitted under section 58 (2)
of EMCA 1999.TMWDP is a new project undertaken after Environmental (Impact
Assessment and Audit) Regulations, 2003 were effected and thus Regulation 31-(1) require
an environmental audit study be undertaken on the projectactivities which are likely to have
adverse environmentalimpacts. According to Regulation 31(4b) the proponent of a project
that has undergone EIA study is required within a period of twelve months of
thecommencement of the operations, and not more than twenty four monthsafter the
completion of a project whichever is earlier, to undertake anenvironmental audit of the
project.
The African Development Bank’s (AfDB) Environmental and Social Assessment Procedure
(ESAP) define requirements and obligations of the Borrower to conduct Environmental and
Social compliance audit to assess level of compliance of the project with the Environmental
and Social Management Plan (ESMP). The audit will inform the AfDB compliance levels of
the project construction and actions required to address any gaps identified in the project.
The audit will also inform the Employer/PIT level of implementation of the Environmental
and Social Management Plan (ESMP) and compliance to EMCA 199 and related Regulations.
7
7
The audit shall be conducted by a qualified and authorized environmental auditor who shall
be an expert or a firm ofexperts registered in accordance with regulation 14.
6.0 Audit Objectives
The objective of the environment and social compliance audit is to assess the level of
compliance of the project with the requirements of EMCA 1999 and related Regulations and
those of the AfDB Environmental and Social Safeguards. The audit will focus specifically on
assessing the extent of compliance with the financial agreements provisions, including
national legislations, regulations and procedures, the Bank’s environmental and social
requirements and international industrial best practices (IIBP) of the project’s sector. The
audit will identify non-compliance, good practices and deficiencies, and recommend
corrective actions.
7.0 Scope of the Audit:
The audit will cover all the dam construction site activities including quarries and
neighborhood. The audit will also cover health, safety, welfare and social aspects of the
workers, impact of the project construction activities and processes on the neighboring
communities.
As part of the assignment, the Consultant is required to visit all the project sites and engage
with therelevant stakeholders of the project. The Consultant is expected to undertake a
detailed analysis of the environmental and social risksposed by the project and determine
compliance and adequacy of the ESMP. The detailed analysis of the environment includes
but not limited to measurement of air quality, Athi and Thwake river water quality, analysis
of levels of siltation if any, noise, excessive vibrations and other measurements necessary in
order to obtain full picture of the environmental protection. The Consultant will examine
contractor’s documents on management of environment, health and safety and draw up
conclusions. Separate reports for noise, air quality, water quality, excessive vibrations will
be required to be prepared and submitted together with the final environmental report.
8
8
In carrying out the EA study, theauditor/consultant shall ensure that an appraisal of all the
project activities, includingthe production of goods and services is carried out, give
adequateconsideration to environmental regulatory frameworks, environmental health and
safety measures including detailed measurement and analysis of exposure to noise,
excessive vibrations, dust, noxious gases, and sustainable use of natural resources.
The auditor/consultant, in carrying out the audit shall comply with any existing
nationalenvironmental regulations and standards prescribed by NEMA, andin the absence of
such national environmental regulations and standardsshall use such other international
standards
The Consultant will develop audit questionnaire based on the AfDB’s requirements on ESAP,
Environmental National legislation and contract conditions related to management of
environment, health and safety.
The Consultant will prepare draft for presentation and discussion with the Client and then
prepare final report for submission to the Client, NEMA and AfDB.
The Consultant selected will be expected but not limited to:
a) Organize audit opening meeting with the PIT, Contractor and Supervising
Consultant’s management, and where applicable, representatives of local
community
b) Determine and agree on the scope, methodology and specific set of criteria for the
compliance audit with the PIT.
c) Review Bank’s environmental and social policies’ requirements, including climate
change and gender.
d) Review applicable national legislations, policies, frameworks on health and safety,
sustainable use of natural resources and on acceptable national and international
standards.
e) Review available reports on the project including the project appraisal report, the
Loan/grant agreements, the project periodic implementation reports, any relevant
9
9
documentation and records available and necessary for the assessment of the
project EHS performance.
f) Examine monitoring programs, parameters, and procedures in place for control and
corrective actions in case of emergencies.
g) Examine records of incidents and accidents and the likelihood of future occurrence
of the incidents and accidents.
h) Inspect all buildings, premises and yards in which manufacturing, testing and
transportation takes place within and without the project area,as well as areas
where goods are stored and disposed of and give a recordof all significant
environmental risks associated with such activities.
i) Carry out project site inspections to assess project implementation activities
including contractor management and related environmental and social risks and
impacts;
j) Conduct assessment and detailed analysis and measurement (to be undertaken by
accredited NEMA Laboratory) of the current biophysical environment:
I. noise pollution,
II. excessive vibrations,
III. water and soil within and outside the site,
IV. air quality,
V. water quality,
VI. levels of rivers siltation (Athi and Thwake), and
VII. aspects of ecosystem.
Separate reports of each of these audit elements should be prepared and submitted
to PIT.
k) Assess adequacy of site waste management and disposal and prepare
recommendations based on good practices
l) Examine and seek views on health and safety issues from the projectemployees, the
local and other potentially affected communities.
m) Prepare a list of health and environmental concerns of past andongoing activities.
n) Evaluate the actual capacity for managing and monitoring implementation of agreed
mitigation measures and related Environmental Management documents applicable
to the project.
10
10
o) Hold consultation(s) with stakeholders (including but not limited to contractor, sub-
contractors, supervising Consultant, PIT, local beneficiaries and project affected
persons on the status of the planned and implemented Environmental mitigation
measures and legal permits.
p) Prepare comprehensive Audit report. The report should present a cogent analysis on
findings and causes as related to the predetermined compliance audit scope and
criteria. It should present a logical (qualitative and quantitative) examination of the
effectiveness of mitigation measures, residual risks, environmental issues, etc. The
report will also include a Corrective Action Plan (CAP) summarizing the concrete
recommendations for follow-up actions on findings and remedial measures including
clearly estimated costs, specific roles and responsibilities.
q) Organize a closing meeting with the PIT, management of the Contractor and
Supervising Consultant and those responsible for the functions audited. The purpose
of this meeting is to present audit findings to ensure that they are clearly understood
and acknowledged by the auditee. Any outstanding diverging opinions between the
audit team and the auditee should be discussed and recorded.
8.0 Consultants Qualifications
Considering the scope of the audit, the Firm of Experts must comprise of the following
experts who meet the stated requirements and qualifications:
a) Team Leader – NEMA registered EIA/EA Lead Expert with minimum 10 years’
experience. At least Master’s Degree in Environmental Science/ Natural Science;
should have relevant work experience in environmental assessment of
infrastructure, water and energy projects. Good command of International
standards, including African Development Bank and/or World Bank/IFC safeguard
policies, is also required.
b) Sociologist– With at least Master’s Degree in Social Science; minimum 8 years of
relevant work experience in social impacts assessment of infrastructure, water
and energy projects. Must have good command of International standards,
includingAfrican Development Bank and/orWorld Bank/IFC safeguard policies, is
also required.
11
11
c) Ecologist (Biodiversity Expert)- NEMA Registered with at least Bachelor’s Degree
in Ecological Studies and minimum 7 years of relevant work experience in
environmental assessment of infrastructure, water and energy projects. Must
have good command of International standards, including African Development
Bank and/or World Bank/IFC safeguard policies, is also required.
d) Hydrologist – At least Bachelor’s Degree in Hydrological studies or related with
minimum 6 years of relevant work experience in environmental impact assessment
and audits in water and energy projects.
e) Health & SafetyExpert –An approved Health and Safety Advisor by DOHSS with at
least 10 years’ experience and minimum Bachelor’s Degree in Biological, Physical
Science or Engineering disciplines.
All the Experts must have:
Sound knowledge and experience in application of the provisions of the
Environmental Management and Coordination Act (EMCA), 1999 and Regulations
under the Act.
A good knowledge and experience in developing and managing the implementation
of Environmental and Social Impact Assessments (ESIAs), Environmental and Social
Management Plans (ESMP), Environmental Management Frameworks, the social
aspects of development projects (health and safety aspects, involuntary
resettlement and gender issues, etc.), monitoring, evaluation and conformity
assessment;
A proven knowledge and practice of ISS, including the safeguards policies,
procedures and practices of development agencies of key bilateral and multilateral
partners in regional member countries.
A good knowledge and experience of multi-criteria assessments, stakeholder
engagement and consultation, community participation; analytical skills to assess
institutional capacity and to design/review practical arrangements for implementing
complex projects;
Demonstrate ability to work effectively in a multicultural environment and to
develop effective working relationships with clients and colleagues;
12
12
Have excellent technical and analytical skills, with a proven track record in
operational and political work on environmental and social issues;
Have a good knowledge of the assessment, preparation and/or management of the
implementation of the Bank's environmental and social safeguards for the
development of major projects;
Have solid practical experience in the evaluation, integration and monitoring of
social development concerns at the level of Bank operations;
10. Deliverables
The main deliverable from the audit will be Environmental &Social compliance audit report
which includes Corrective Action Plan (CAP) and updated ESMP. The audit reports should
provide information that will enable the Borrower (Government), Bank and stakeholders
identify, evaluate and manage environmental and social risks relating to the project.
Recommendations should be made on how to prioritize and develop action plans and
implement the management measures that best avoid, mitigate project risks and impacts.
The Consultant will prepare the following documents/reports indicated in the table below
for discussion and approval by the Client will observing the stated timelines:
S/no. Document/Report details Completion Time(after
contract signing)
No. of Copies Required
1 Pre-audit briefing meeting, validation
of audit plan and methodology,
resources required and contact
persons where needed
1 Week
Copies for the meeting
participants.
Consultant to take
minutes of the meeting
and members in
attendance
2 Validation of E&S and Public
Participation/Consultation
questionnaires detailing systematic
and progressive collection of
information and data required to
complete the audit.
3 Site Audit Kick-off meeting with the
PIT, Contractor and SMEC. The
Consultant to present audit plan,
2 Weeks Copies for the meeting
participants.
13
13
methodology, required documents and
resources
Consultant to take
minutes of the meeting
and members in
attendance
4 Audit document review and validation
of the audit plan
3 weeks
5 Inception Report – to provide
conceptual framework to be used in
the audit, the key evaluation questions
and methodology, including
information on data sources and
collection, sampling and key indicators.
4 Weeks One (1) hard copy and
one (1) soft copy
6 Site Audit exercise - Data collection
Obtain and analyze samples of soil,
water and air
Take measurements and analysis of
`noise and excessive vibrations
8 weeks
8 Public and stakeholders engagement 8 weeks Attendance lists, Minutes
of public
participation/consultation
meeting. Issues logs
9 Draft Audit Report. The Consultant to
present draft report and lead
discussions with PIT, Contractor and
SMEC Representatives
10 weeks One (1) hard copy, one
(1) soft copy
10 Final EA Report and submission to the
Clientand NEMA. Report submission
acknowledgement to be provided as
evidence that the report was received
by NEMA. The Client will submit the
report to the AfDB.
12 weeks 3 hard copies, one soft
copy
11. Duration of the assignment
The audit will take not more than three (3) months with reports submitted to the Client and
NEMA. This audit will cover year 2020. Same audit exercise will be repeated in years 2021
and 2022.
14
14
Undertaking of audits for 2021 and 2022 will be subject to satisfactory preparation of the
2020 audit. The PIT will be required to submit an evaluation of the consultant’s performance
for any prior audit, before the consultant undertakes subsequent audits.
12. Payment Schedule
Payment of the audit assignment will be made as follows:
a) Submission of Inception Report to the Client – 20% of the contract amount.
b) Submission and clearance of the draft Audit Report by the Client – 30% of the
contract amount.
c) Submission of the Final Report with Acknowledge Slip from NEMA – 50% (balance of
the contract amount)
13. Reporting Requirements
The consultant will report to the Thwake Multipurpose Water Development Program
(TMWDP) Coordinator and will work under the supervision of the Program Implementation
Team (PIT). All reports should be printed, bound and submitted in both hard (3copies) and
soft copies in a standard way by the consultant.
14. Document Control
All documents and data obtained during the audit shall remain the property of the Client.
The Consultant shall return the documents obtained to the Client immediately the
Consultants submits the Audit report and before any payment is made.
15. Confidentiality
The Consultant shall be bound by the confidentiality clause as provided in the contract.