Ministry of Education, Science and Technology
Global Partnership for Education Programme Implementation Grant
Literacy and Numeracy Education Support (LANES)
Mid-Year Implementation Status Report
Reporting period: 01 July, 2016 to 31 December, 2016
ii
Table of Contents Table of Contents ............................................................................................................................................. ii
List of Abbreviations ...................................................................................................................................... iv
1. General Characteristics ....................................................................................................................1
1.2 Programme Information ..................................................................................................................1
1.3 Program financing resources ..........................................................................................................1
1.4 Duration .............................................................................................................................................1
2. Program Implementation ................................................................................................................2
2.1 Overall achievement on program objectives ................................................................................2
2.2 Progress towards achievement of overall objectives ...................................................................3
2.3 Overall progress in program implementation ..............................................................................4
2.3.1 Overview on progress for each component ..................................................................................4
2.3.2 Progress on Improved Teaching and Learning of the 3Rs .........................................................5
2.3.3 Progress on Improved Education Sector Management .............................................................11
2.3.4 Improved Community Engagement ............................................................................................14
2.4 Progress on Project Management Aspects ..................................................................................14
2.5 Factors delaying implementation and Mitigation Measures ...................................................15
2.6 Progress on achievement of Indicator Targets ...........................................................................16
3. Program Disbursement ..................................................................................................................26
4. Technical, policy, or knowledge products ..................................................................................27
5. Conclusion .......................................................................................................................................29
6. Annex ...............................................................................................................................................30
6.1 Standard Financial Report .............................................................................................................30
6.2 Actions on the Mid-Term Review Recommendations ..............................................................42
List of Tables
Table 3: Achievement of indicator targets .............................................................................................16
Table 4: Disbursements as per agreement .............................................................................................26
Table 5: Progress on Disbursements .......................................................................................................26
Table 6: Knowledge Products produced through GPE-LANES .........................................................27
iii
List of Figures
Figure 1: LANES Theory of Change ..............................................................................................................2
iv
List of Abbreviations
3Rs Reading, Writing and Arithmetic
ADEM Agency for Development of Education Management
AIDS Acquired Immune Deficiency Syndrome
ANFEDP Adult and Non Formal Education Development Plan
BE-MIS Basic Education Management Information System
CSO Civil Society Organization
DEO District Education Officer
DFID Department for International Development
DPP Department of Policy and Planning
E EGMA Early Grade Math Assessment
ECD Early Childhood Development
ED DPG Education Development Partners Group
EGRA Early Grade Reading Assessment
EMIS Education Management Information System
EQUIP Education Quality Improvement Programme
ERT External Review Team
ESA Education Sector Analysis
ESDC Education Sector Development Committee
ESDP Education Sector Development Plan
ESMIS Education Sector Management Information System
ESRAC Education Support Resources and Assessment Centres
GPE Global Partnership for Education
HIV Human Immunodeficiency Syndrome
HT Head Teacher
ICT Information Communication Technology
INSET In-Service Teacher Training
IRT Internal Review Team
JESR Joint Education Sector Review
L&N Literacy and Numeracy
LANES Literacy and Numeracy Education Support
LCU LANES Coordination Unit
LGA Local Government Authority
LIC LANES Implementation Committee
M&E Monitoring and Evaluation
MDAs Ministries, Departments and Agencies
MEGQO Measuring Early Learning Quality and Outcomes
MoEST Ministry of Education, Science and Technology
MoFP Ministry of Finance and Planning
v
MTEF Medium Term Expenditure Framework
MTR Mid Term Review
MWAKEM Mafunzo ya Walimu Kazini Elimu ya Msingi
NACTE
National Accreditation Council for Technical
Education
NECTA National Examination Council of Tanzania
NGO Non-Government Organization
ODL Open Distance Learning
PEDP Primary Education Development Plan
PO-RALG
President’s Office-Regional Administration and Local
Government
PReM Primary Education Records Manager
PTP Parent Teacher Partnership
QA Quality Assurance
SB-CPD School Based Continuous Professional Development
SLO Statistics and Logistics Officer
SMC School Management Committee
T&L Teaching and Learning
TENMET
Tanzania Education Network/Mtandao wa Elimu
Tanzania
TIE Tanzania Institute for Education
TRC Teacher Resource Center
TTC/TC Teacher Training College/Teacher College
TVET Technical, Vocational Education and Training
TWG Technical Working Group
TWS Technical Working Session
UDOM University of Dodoma
UNICEF United Nations Children’s Fund
USAID United States Agency for International Development
WASH Water, Sanitation and Hygiene
WEC Ward Education Coordinator
1
1. General Characteristics
1.2 Programme Information
Program Name: LITERACY AND NUMERACY EDUCATION SUPPORT (LANES)
Developing Country Partner: TANZANIA
Grant Agent: SWEDISH EMBASSY
Program Amount: US$ 94.8MILLION
1.3 Program financing resources
The programme implementation is financed by the GPE, while technical support is
provided through Sida funds.
1.4 Duration
Start date of Program: JULY 2014/15
End date of Program: JUNE 2016/17
Start date of ESPIG: JULY 2014/15
Original end date of ESPIG: JUNE 2016/17
Revised end date of ESPIG: DECEMBER 2018
2
2. Program Implementation
2.1 Overall achievement on program objectives
Programme Overview
The GPE supported, Literacy and Numeracy Education Support (LANES), Programme
aims at improving the acquisition of reading, writing and numeracy skills (3Rs) among
children in and out of school. It aims to support the implementation of a coherent and well
aligned sector plan, as reflected in the Primary Education Development Programme (PEDP
III); Adult and Non Formal Education Programme (ANFEDP); and Folk Education
Development Programme (FEDP). The age group is 5 through 13 years (with a
consideration of 2 to 4 year old children in pre-primary; and 9 to 13 year old children in
Non Formal Education programmes).
The programme focuses on three major areas and they include 1) improved teaching and
learning of 3Rs for children aged 5 to 13 years, 2) improved education sector leadership,
planning and management, and 3) increased community engagement in literacy and
numeracy. The program pathways is indicated in Figure 1.
Figure 1: LANES Theory of Change
Improved T&L of
3Rs for Ages 5 to
13 years
Improved
Education
Sector
Management
Increased
community
engagement
Improve
d Basic
Skills in
Literacy
and
Numera
cy for
children
aged 5 –
13
years.
Improved methodology for learning and teaching
3Rs
Increased Teacher Skills for Teaching 3Rs
Increased Interaction with 3Rs T&L materials
Increased School Readiness
Increased use of data for evidence based planning
Improved planning and coordination
Improved Field Management
Improved Capacities of Implementing Sector MDAs
Increased Community Sensitization
Increased Parents Engagement
3
GPE LANES Focus during the reporting period
During the reporting period, emphasis has been at material (curricular, syllabi, teacher
guides and textbooks) development, printing & supply to schools, teacher’s training and
strengthening implementation and ownership of the activities by the MDAs, regions and
LGAs. Regional level activities such as educational meetings, awareness raising and
community engagement are monitored by regional secretariats, District Education Officers
and Quality Assurers.
Regional level activities are focused in regions not covered by other Development Partners
to avoid duplications. These are Arusha, Dar es Salaam, Geita, Kagera, Katavi, Kilimanjaro,
Morogoro, Mwanza, Pwani, Rukwa, Ruvuma, Singida, Tanga, Mbeya, Njombe, Iringa,
Songwe, Mtwara and Manyara. It should, however, be noted that support to monitoring of
3Rs was/is provided to all regions regardless of the presence of other partners.
2.2 Progress towards achievement of overall objectives
It has been presumed, from the programme onset, that the LANES key result will be
achieved when teaching and learning of the basic literacy and numeracy skills and
education sector management are improved, and community engagement has increased. In
order to check the progress towards achieving the intermediary results (and after 50% time
has elapsed), mid-term review was conducted in May 2016. In part, this has contributed to
an understanding of the progress against the results framework made since the inception
of the programme.
The overall implementation of activities has steadily increased and commitments for the
majorly cost drivers’ activities, including printing and distribution of textbooks completed.
As of 31st December 2016, the programme had spent 31% of the total grant, which is a 13%
increase from the cumulative spending reported at the end of FY2015/16 (at 18%). The
forecast expenditure at the end of FY2016/17 is slightly over 75% of the total grants. This is
based on the commitments done and activities which necessary preparations has been
completed, including school supplies for establishment of 'Talking Classrooms' and printing of
25 titles of the story books among others.
The programme objectives, its efficiency and its relevance has remained stable since
programme inception and is expected to remain the same for the remaining programme
period. Changes for some activities and implementation duration were made and
approved by the LEG and consented by GPE Secretariat for the purposes of improving
aspects that ensures achievement of the programme objective. With this in mind it is
reasonable that the progress towards achievement of the overall objective can be rated
satisfactory.
4
2.3 Overall progress in program implementation
2.3.1 Overview on progress for each component
a) Component 1: Improved Teaching and Learning of 3Rs
Overall progress during the reporting period on this component is satisfactory. Pre Primary
books (6 titles) that align with the curriculum for teaching and learning of preprimary
education has been developed and printing process has been initiated. 9,5887,843 units of
the textbooks and 169,348 curricular package will have been printed and distributed to schools
by the end of March 2017. In addition, distribution of standard one textbooks have been
completed and distributed to all schools in the 26 regions. Further, printing of standard II
& III textbooks is on-going and 6,862,800 units and 6,818,181 units of the textbooks
respectively will be printed and distributed. Among the standard II textbooks, 752,044
units titled “Najifunza Kuhesabu” has been distributed to schools in 13 regions, while
distribution of the remaining textbooks expected to be completed by end of March 2017. In
addition, 1,664,000 curricular package for standard III – VI and additional 872,728
curricular package for standard I&II are in the printing process, expected to be at school in
March 2017. The development of standard IV textbooks will be initiated in the second half
of the FY 2016/2017.
The skills to teach 3Rs for 22,993 teachers who teaches standard III & IV from 19 regions
was enhanced through eight-day face-to-face training on the revised curriculum package.
In addition, 519 standard I&II special needs education teachers were trained on delivering
3Rs skills. Preparation for training pre-primary teachers, on the other hand, has been
completed and the training of 16,129 teacher will be done in January 2017.
b) Component 2: Improved Education Sector Management
Focus of the activities during the reporting period is on 1) increased use of data for
evidence based planning, 2) improved sector planning and coordination and 3) improved
field management. Little was done on the capacity development for effective delivery of
education services. Overall, the foundation activities for execution of four action oriented
research, roll-out of the pilot of Record Manager (PReM) System for Basic Education,
support infrastructure for Basic Education Management Information System (BE-MIS),
development of the ESDP and supporting regional secretariats and LGAs to effectively
monitor classroom teaching and learning of the 3Rs were completed.
The GPE LANES programme continued to support development of the ESDP where a
study on fee free education was conducted to input into development of the ESDP and its
operational plans.
Strengthening of the BE-MIS focuses at the extension of Local Area Network (LAN) from
Finance Department to REO/DEO office, enhancement of PO-RALG data center in
Dodoma, installation and commissioning of Wide Area Network in 19 newly established
LGAs and data collection facilities at PO-RALG and at all LGAs (this include provision of
5
computers sets, printers, tables and chairs. Tendering process is in the final process and it
is expected that by end of June 2017 all materials and equipment will be in use at the LGAs,
Regional Secretariats and PO-RALG.
As part of capacity development for effective delivery of education services, piloting of the
PReM has been completed in 2 regions of Ruvuma and Mwanza. Report is under
preparation and will inform the countrywide roll-out plan.
Regional level LANES budgeted action plans for FY2016/17 were developed and approved
and 40% of the total budget disbursed towards the end of Q2 of FY2016/17. To ensure
consistency, region level monitoring guide and tools were developed and shared to all
regional secretariats and LGAs.
Despite steady improvements in this component, overall implementation remains un-
satisfactory due to the intrinsic and extrinsic factors that are associated to completion of the
ESDP, procurement of the ICT infrastructure and roll out of the PReM countrywide.
c) Component 3: Improved Community Engagement
Overall the implementation of the component is satisfactory. During the reporting period,
foundation activities for strengthening School Management Committee (SMC) were
completed, notably the re-defining of the SMC composition and mandate through
Educational Circular No. 4 of 2016 and came into effect from 01st October 2016, revising
SMC Guideline and orientation of 516 LGA facilitators. 11,647 committees from 129 LGAs
will be reached by the end of January 2017.
2.3.2 Progress on Improved Teaching and Learning of the 3Rs
The following outputs are expected:
i. Development and printing of pre-primary, Standard II, III and IV textbooks that
align with the revised curricular as well as development of E-content for the
3Rs and review of Pre-Service Teacher Training (PRESET) Curricular to
incorporate 3Rs
ii. Increased Teacher Skills for Teaching 3Rs through the training of teachers on
revised curricular;
iii. Increased Interaction with 3Rs T&L materials through printing and distribution
of developed materials to all schools; and
iv. Improved School Readiness through training of learning needs assessors and
provision of learning needs assessment kits as well as Meeting with Special
Needs Education Officers (SNEOs) from 184 LGAs to discuss take off of LANES
activities conducted.
During the reporting period, the following progress was made in achieving the
intended outputs as follows:
6
a) Improved Methodology for Teaching and Learning of the 3Rs
Print Standard II Books; Develop and Print Pre Primary, Standard III & IV Books
Pre Primary and Standard III-VI Curricular Materials:
The Tanzania Institute of Education (TIE) completed development and pre-testing
of 5 titles of Standard II textbooks, 6 titles of pre-primary textbooks, and 6 titles of
standard III textbooks. Printing of standard II and standard III textbooks has started
and 752,044 units of the standard II textbook titled Najifunza Kuhesabu has already
been distributed to 13 regions.
TIE also completed development of pre-primary, Standard III-VI curricular package
materials and started process for procurement and distribution to schools. Approval
for printing of Standard III-VI and additional standard I & II curricular package has
been granted. A total of 1,664,000 units of the standard III-VI and pre-primary
curricular package will be printed and distributed to schools. Further, development
of standard IV books is expecting to start in the Q4 of the FY 2016/2017.
Develop E-content for the 3Rs for use in schools with relevant electronic devices
TIE has already developed a plan to incorporate E-Learning into the institution
activities. The plan is under review at the MoEST alongside the development of a
National E-Learning Framework.
Pre-Service Teacher Training (PRESET) Curricular reviewed to incorporate 3Rs
The focus in the reporting period has been to ensure that textbooks for pre-primary,
standard I-III are in schools and utilized. This led to some delays in affirming plans
for revising the PRESET curricular, however TIE has completed the plans and
discussions are underway to ensure that the revised document is available for use
by the end of Q4 of the FY2016/17.
b) Increased Skills for teaching Basic Literacy and Numeracy
Train 2 Standard III&IV Teachers on revised curricular.
The teaching skills for 22,993 teachers who teaches standard III & IV from 19 regions
was enhanced through eight-day face-to-face training on the revised curriculum
package. ADEM coordinated the training. .
Train additional Std I&II teachers on revised curricular.
Plans are underway to train standard I&II additional teachers from schools with
higher enrolment rates. The training is expected to take place in Q3 and Q4 of the
FY2016/17 following finalization of the modality and compilation of the names of
teachers to be trained.
7
Develop SB-CPD Modules for Standard I&II
The School Based Continuous Development Modules were developed and pre
tested. The aim is to provide teachers with self-learning materials to continue
building their knowledge and skills around teaching of the 3Rs. Discussions are
ongoing at TIE involving partners to complete and agree on modality of carrying
out SB-CPD.
National 3Rs Implementation Guide developed, printed and distributed
A draft has already been developed. However the final guide will be defined based
on the consensus reached on the SB-CPD modality.
Train Special Needs Education Teachers on the adapted 3Rs Curriculum
519 Visual and Hearing Impairment Teachers were trained on the revised curricular.
This was a collaborative work between Special Education Unit at MoEST, TIE and
PO-RALG. The training was guided by a Teacher’s Guide for teaching 3Rs to
children with Visual (VI) and Hearing Impairment (HI).
Development of Intellectual Impairment (II) guide is ongoing and will be completed
in Q3 of the FY2016/17. Following the accomplishment of the guide, training of
teachers teaching children with Intellectual Impairment will be conducted, currently
planned for March 2017. Likewise Training of III&IV teachers teaching children with
visual and hearing impairment is awaiting printing of curriculum materials. The
training is expecting to take place in May 2017.
c) Train at least one Pre Primary Teacher from each public school on the revised
preprimary curriculum
Foundation activities for the training, including modality, list of teachers to be
trained and budget has been completed and no-objection granted. A total of 16,129
teachers are expected to be trained in January 2017.
d) Increased interaction with 3Rs Learning Materials
Print and distribute standard II Books and Curriculum materials for Pre Primary,
standard III to VI
As indicated elsewhere in the report, 5 titles of standard II textbooks are going to be
distributed to schools and these include:
1. Najifunza Kuhesabu 1,403,800
2. Najifunza Kuandika 1,403,800
3. Najifunza Kusoma 1,403,800
4. Najifunza Kutunza Afya na Mazingira 623,800
5. Najifunza Sanaa na Michezo 623,800
8
Of the 1,403,800 units of the Najifunza Kuhesabu, 53.6% (752,044) has already been
distributed to schools in 13 regions. Distribution of all textbooks to all schools is
expected to be done by end March 2017.
A cross section of some of the standard II textbooks
Approval for printing of Standard III-VI curricular package has been granted and
printing started. To ensure that each school has a copy, each school which
participated in the training received at least one copy of the curricular package.
Print and distribute standard III Books
Printing of standard III textbooks is ongoing. A total of 6,818,181 textbooks will be
printed and distributed by the end of March 2017.
Print and distribute 25 titles of story books to all schools
Evaluation of the tender to print 7,835,670 books (25 titles where the number of
books per title is indicated in the table below) has been completed by TIE. The
evaluation is waiting for approval from the Grant Agent. Likewise the procurement
process to print 6 titles of preprimary textbooks is ongoing. Tender opening is
expected in January 2017.
S/N Title of the Book Number of books per title
1. Ninapenda kwenda Shule 396,567
2. Tijufunze Kuhesabu 396,567
3. Herufi Zetu 396,567
4. Mifugo ya Nyumbani kwetu 396,567
9
S/N Title of the Book Number of books per title
5. Rangi zetu 396,567
6. Safari ya Mjini 396,567
7. Tatu na Paka wake 396,567
8. Viumbe katika Maji 396,567
9. Vyakula Vyetu 396,567
10. Tucheze Pamoja 396,567
11. Jasiri Arudi Nyumbani 258,000
12. Upile na Bustani 258,000
13. Yuko wapi Rafiki yangu? 258,000
14. Rafiki yetu Jua 258,000
15. Mimi na Bibi yangu 258,000
16. Hii ni kazi ya nani? 258,000
17. Shani na Mazingira 258,000
18. Tausi na Rafiki zake 258,000
19. Sungura Mjanja 258,000
20. Hamisi ajifunza Kusoma 258,000
21. Musa si Mzigo 258,000
22. Kabula 258,000
23. Tembo na Mkonga wake 258,000
24. Dogo na Sisimizi Jasiri 258,000
25. Chiriku na Panzi 258,000
Total 7,835,670
Print 8400 braille books (regular) and 4400 large print text books for standard I & II
pupils: Printing of braille books for children with disabilities is ongoing. Delays in
printing was a result the delays of the printing of the regular school textbooks.
10
Establish reading corners at 46 Libraries at regional and District Levels
A feasibility study was completed from where operational plans and budgets for
establishment of the centers was drawn. Materials to be procured were identified,
tender document developed and shared with the Embassy of Sweden for no-
objection to advertise.
Provide grants for establishment of 'Talking Classrooms' to all schools
A guide for establishment of a talking classroom was developed following a
consultative approach and lessons from USAID supported TZ21 project in Mtwara.
35,000 copies of the guide has been printed and distribution to schools to be done in
January 2017. Further, preparation of the modality for grants disbursement to
schools has been completed and will follow the capitation grant mechanisms in
place (with an addition of a directive letter on the use of the funds to all schools via
the existing structures of accountability).
Additional standard I&II Curricular Materials Distributed to all schools
Approval for printing of the materials has been granted. A total of 872,728 units for
both Kiswahili and English version will be printed and distributed.
e) Increased School Readiness
Procure and distribute Special Needs Assessment Kits to identified centers for
assessment of children prior to enrolment
125 Learning Needs Assessment Kits have been procured and delivered to MoEST
in mid-Dec 2016. A special task force that include representatives from MoEST,
University of Dar es Salaam, PO-RALG, National Assessment Resource Centre, LGA
and Primary Schools were assigned to verify and receive the consignment.
Distribution of the kits will commence after the verification of the actual needs from
each centre, which is expected to be done before end of Jan. 2017.
Establish NFE Centers
Despite the fact that training of NFE Facilitators was conducted in FY2014/15,
evidence shows that the centers were not yet in operation by end 2015. A plans has
been established by PO-RALG given the newly installed NFE Unit at PORALG for
implementation in FY2016/17. List of all centers including names of facilitators has
been provided and verification in ongoing. This will be the base for retroactive
payment to the facilitators and a refresher training which is planned for Q3 and Q4
of the FY2016/17.
Establish and operationalize Satellite Schools in 6 LGAs of Mkalama, Rufiji,
Ngorongoro, Liwale, Ukerewe and Longido
Needs assessment of the satellite schools has been completed and it shows that
satellite schools exist and need both materials and infrastructure support.
11
Operational plans and budget for operationalization to be established in Q3 of the
FY2016/17.
Conduct Assessment of Children Prior to Enrolment
The activity is dependent of the presence of the assessment kits. Regional plans and
modality for conducting assessment were developed alongside regional action plans
for monitoring of the teaching and learning of the 3Rs. With the kits in-country,
regions will start the assessment in Q4 for the preparation of the 2018 enrolment.
Conduct a meeting with Special Needs Education Officers (SNEOs) from 184 LGAs
to discuss take off of LANES activities
Meeting with 184 special needs education officers was conducted and facilitated by
PO-RALG with main discussion focusing on the roles and responsibilities for
fostering inclusive education.
2.3.3 Progress on Improved Education Sector Management
a) Increased use of data for evidence based planning
Follow up of Std I&II curriculum implementation
This activity is done jointly by MoEST through QA and PO-RALG through
supportive supervision and monitoring visits done by regional secretariats and LGA
officers. Whereas supportive supervision and monitoring visits has been conducted
by the PO-RALG structures, MoEST have continued to strengthen QA department
from where a draft of the 3 years QA plan has been developed and process are
underway to engage a consultant for the development of the national basic
education quality assurance framework.
Conduct Academic and Action Oriented Research studies
Proposals have been selected for four research areas as shown below:
• Promoting Reading & Arithmetic Skills among Standard I & II Pupils in
Tanzanian Primary Schools: The Role of Home and Classroom Environment
• Improving pupils’ reading fluency ability in early grades: A teacher professional
development strategy in Tanzania
• Enhancing Early Grades Primary School Pupils’ Comprehension Through E-
Contents
• Development of a National Framework for the Assessment of Children’s Literacy
and Numeracy Learning in Tanzania
Three of those research proposals were shared during the November 2016 JESR
meeting. These studies are expected to be completed by May 2017.
Establish Regional and LGA infrastructure and tools for Basic Education
Management Information System (BE-MIS)
The activity aims at improving and strengthening an online Education Sector
Management Information System (ESMIS); the system for data collection, analysis,
12
and reporting at the regions and LGAs. Assessment of the tenders has been done
and reports will be shared with the Grant Agent in January for no-objection to
award. The following areas are covered in this process:
• LAN Extension from Finance Department to DEOs/REOs Office
• Enhancement of PORALG Data Centre by:
o Creating Alternative power source
o Increase the computing capacity of the current server at PO-RALG.
o Acquisition of Software License
• Install and Commission Wide Area Network (WAN) in 19 newly
established LGAs-Based on existing contract with TTCL
• Improve data collection facilities at PORALG and at all LGAs (3 PCs, 1
printer and furniture)
• Support/Strengthen BEMIS team at PO-RALG
• Prepare, Print and Distribute 6000 copies of Regional and Pocket 2016
BEST
Support dissemination of ETP and development of the ESDP
Support was given to translate the Education and Training Policy at which a draft
Policy was completed in December 2015 and revisions have been done to the Policy
by a team that was formulated by the Commissioner for Education. However
incorporation of proposed inputs has not been done and therefore printing has not
been done.
Draft ESDP document was completed with support from UNESCO, however
discussions at the ministerial level indicated need to review the document. The
document is therefore under review. As part of the process, one study (Fee Free
Education) has been conducted and results used during the review of the ESDP
document.
b) Capacity Development for Effective Delivery of Education Services
Prepare Record Manager (PReM) System for Basic Education
The pilot of the Record Manager (PReM) System in 2 regions of Ruvuma and
Mwanza has been completed by NECTA. The preliminary results indicate that 1,556
(92%) schools from 16 LGAs (8 in Mwanza and 8 in Ruvuma) have timely uploaded
their data into the system with less delays in Mwanza at 4% (38 schools) as
compared to Ruvuma at 14% (106 schools). A detailed report is under development
and will be used to inform the roll-out of the programme.
13
Develop Education Sector Quality Assurance framework and key recommendations
implemented
A consultant to be engaged to develop the framework has been identified.
Negotiation is ongoing. The consultant is expected to start working in February
2017.
Resource persons trained on braille repair and maintenance
A programme for training of 7 resource persons at Perkins School for the Blind on
braille repair and maintenance identified has been established. Approvals from the
MoEST has been granted. Follow up is being made with the US Embassy to secure
visas for the selected candidates.
Timely Audits and VFM exercises of the LANES programme conducted annually
KPMG was engaged to conduct rolling audit on financial, procurement and Value
for Money (VFM) management which was completed by the end of June 2016. Based
on the audit, capacity building plan for key officials was been developed. One
training was conducted on Value for Money was conducted on 24th Nov 2016
targeting key officials. These included Directors; procurement and finance officers
from LANES implementing MDAs. Follow up of the training outcomes such as
revision of the Operations Manual is being done.
Recruitment of staff
Recruitment of 2 additional staff for the Unit was successful done in October 2016.
The Staff included: LANES Assist Procurement Officer and the E-Learning Officer.
Unfortunately the latter is deceased.
c) Improved Field Management
LANES activities taking place within the region/LGA monitored and support
provided to improve school level implementation
Regional level LANES action plans for FY2016/17 have been developed and
approved through Regional Administrative Secretary and submitted to PO-RALG.
Funds have already been transferred from MOEST to PORALG exchequer for first
disbursement to regions/LGAs. 40% of the budget has been disbursed to the 26
Region Secretariat and 93 LGAs.
Procure and distribute Motorbikes
The procurement process for motorbikes is ongoing. Initially, the tender was
advertised and evaluation found that no bidder met all specifications as well as
conditions imposed upon the said bid. In so doing, specifications were revised and
the bidders who had applied were requested to re-apply based on revised
specifications. During the reporting period, tender re-evaluation was completed.
However, the Grant Agent recommended to re-advertise the tender to ensure
competitiveness.
14
Procure Vehicles and provide fuel to Quality Assurers at District level
Thirty eight vehicles were distributed in December 2015 while procurement of
additional 10 vehicles has been delayed by UNDP who were reviewing their
supplier list. By end of the reporting period the additional vehicles were yet to be
ordered and discussions were ongoing with UNDP to fast track process.
2.3.4 Improved Community Engagement
In raising community awareness, 6000 copies of information, education communication
(IEC) materials have been printed and distribution is ongoing. Also a booklet showing key
areas of LANES programme has been prepared and planned for printing in Q3 of the
FY2016/17. In addition, 2 TV sessions were aired in 2 TV stations and 7 radio programs
were aired in 4 radio stations both focusing at showcasing government’s efforts in
improving literacy and numeracy in Tanzania.
At the community level, foundation activities for strengthening School Management
Committee (SMC) were completed, notably the re-defining of the SMC composition and
mandate through Educational Circular No. 4 of 2016 and came into effect from 01st October
2016, revising SMC Guideline and orientation of 516 LGA facilitators. 11,647 committees
from 129 LGAs will be reached by the end of January 2017. A total of 45,000 copies of SMC
guideline will be printed and each school will receive 2 copies of the guideline.
2.4 Progress on Project Management Aspects
a) Procurement process
Although it usually looks as if the Government procurement processes is by far the most
challenging process, in fact the decisions required to be made on any procurable items
before the actual procurement process is initiated are the ones that consume the most time.
The procurement process has various levels engaging various departments before the
agreed TOR are submitted to the procurement department. Hence, while it is reasonable to
talk about delays in the procurement process, it is important to note that this refers to the
holistic nature of the process and not just the part that befalls the procurement department.
During the reporting period, procurement items in the programme were much better
implemented after clear establishments of the process that would be required and close
engagement of each Unit involved in the process. Of ultimate importance is the decision to
engage KPMG as observers in tender opening and evaluation. Some of the items that faced
challenges included the procurement of 2,838 motorbikes.
d) Overall progress on monitoring and evaluation of programme implementation
➢ ESDC/LEG
Under the leadership of the Director for Policy and Planning, 2 extraordinary
ESDC/LEG meetings were held from where FY2015/16 report, FY2016/17 and
extension proposal were discussed and decisions made.
15
➢ Regional level activity Monitoring
Monitoring of region level activities implementation has so far been successfully
supported through LANES particularly with the engagement of regional secretariat,
LGA officials, Head Teachers, WECs and QAs including provision of vehicles to 38
LGAs for quality assurance.
2.5 Factors delaying implementation and Mitigation Measures
Decision making process
Intensive internal and external decision making processes largely affected the timelines set
for activity implementation. Approvals for all the above items depended on internal
Ministerial decision making, Inter-ministerial (Ministry of Finance) and Development
Partners (LEG) decisions. Widened decision making platform meant that for activity
implementation to be initiated over three months were used for engaging key stakeholders
to make decisions on activity design and implementation processes.
To mitigate this it has been suggested that a LANES Implementation Committee (LIC)
recommended in the original LANES proposal be formed alongside reviving of the
Education Sector Development Committee (ESDC) which also sits as the LEG.
Complex Institutional Arrangements
The Tanzania Education System is administered and managed by two Ministries: The
Ministry of Education, Science and Technology responsible for Policy and tertiary
education; and the President’s Office Regional Administration and Local Government
responsible for administration of basic education (Pre Primary, Primary, Secondary,
Special Needs and Adult and Non Formal). Two key issues hinder smooth operation:
• Physical distance of key implementing Ministries and Agencies - The MoEST is
based in Dar es Salaam while PORALG HQs are in Dodoma, a distance of 559
kilometers by road. This makes it difficult to jointly engage key implementers
especially because almost all key activities have both policy and administration
aspects. Likewise, most of the activities require that there is clear demarcation of
what within an activity should be defined as ‘policy aspect’ and what as
‘administrative aspect’.
• Clear business process - With all activities requiring engagement of various
institutions depending on mandate, the LANES programme has struggled with how
to bring all parts together in achieving a single result.
To mitigate risks associated with the complexity at which activities in the sector take place,
some of the newly engaged LANES Coordination staff will be based at PORALG once they
are well acquainted with programme requirements.
16
2.6 Progress on achievement of Indicator Targets
Table 1: Achievement of indicator targets
S/N OUTPUT/ACTIVITY DESCRIPTION
RESP BASELINE ANNUAL TARGETS
STATUS AS OF DECEMBER 2016 2014-16 JUNE 2017
1 Improved Teaching and Learning of 3Rs for children aged 5 to 13 years
1.1 Improve Methodology for Leaning and Teaching of 3Rs
Print Standard II Books
TIE
Books are in place-5 titles aligned to relevant competencies in the curriculum
Complete printing of the Books
Contracts were successfully issued to suppliers and printing is on-going (53.6% of one title – ‘Najifunza Kusoma’ already delivered in 13 regions). Final date for delivery is expected end Jan. 2017.
Standard III Books that align with standard 1&2 3Rs books developed and printed for distribution to all schools in Mainland Tanzania
TIE
Std I, II, III-VI Curriculum Package Materials+ Std I&II Books in place; Draft standard III Books in place being pre tested
Final Standard III books in place by Nov. 2016; and printed and delivered by end Feb. 2017
Books were developed and approved for printing; process to award printing contracts is ongoing.
Standard IV Books developed to align with standard 1-3 books and printed for distribution to all schools in Mainland Tanzania
TIE Books not in place; process not started
Draft pre tested standard IV books in place by Feb 2017; completed by June 2017
Start date for development of the books is January 2017
Pre Primary books (6 titles) that align with the curriculum developed printed for distribution to all schools in Mainland Tanzania
TIE
Pre-primary curriculum with reviewed and aligned to the 3Rs National Curriculum; Books not yet developed
Final Books in place by Oct 15th ; 13,087,254 units printed by end Jan 2017; distributed to all schools in by end March 2017
The books have been reviewed by CE and report given to TIE for incorporation of inputs. Meanwhile tender document has been prepared awaiting completion of the books before request for no objection to advertise is done.
17
S/N OUTPUT/ACTIVITY DESCRIPTION
RESP BASELINE ANNUAL TARGETS
STATUS AS OF DECEMBER 2016 2014-16 JUNE 2017
1.1.4
E-content for the 3Rs developed for use in schools with relevant electronic devices
E-LU
ICT Exhibition and conference held in 2015; various e-learning solutions exhibited
Studio for development of e-content established at TIE by June 2017
TIE has already developed plan to incorporate E-Learning into the institution activities. LANES Unit is working with TIE to refine the plan including on development of an National E-Learning Framework
1.1.5 Pre-Service Teacher Training (PRESET) Curricular reviewed to incorporate 3Rs
TIE Pre service curriculum does not offer courses on T&L of the 3Rs
Tanzania’s current system for teacher pre-service instruction & certification reviewed by Dec 2016; and existing programs to create a common pre-service model for all TTCs revised by June 2017
A plan has been developed and is under discussions with TIE on how to move forward with implementation.
1.2 Increased Skills for teaching Basic Literacy and Numeracy
1.2.1 Std III&IV Teachers trained on revised curriculum
ADEM Revised Std III-VI curriculum is in place alongside syllabi and Teachers Guides
22,995 Teachers trained by Sept 2016; activity and financial reports submitted to MoEST by mid-October 2016
Completed. A total of 22,993 teachers were trained through ADEM
1.2.2
Additional teachers (Std I&II) trained based on schools with highest number of students
ADEM
Curriculum materials already in place; Plan for training additional teachers not in place.
Additional Std I & II teachers trained as per plan by June 2017- Estimated total number of 5,625 teachers
Planning for the activity has started. This activity was awaiting approval from GPE on the revised LANES plans.
1.2.3 School Based Continuous Professional Development rolled out
TIE Draft Modules are in place being pre-tested
School Based Continuous Professional Development (SB CPD) Modules developed, printed and distributed; SB CPD Modality and plan for implementation in place
Modules have been developed. Discussions are ongoing at TIE involving partners to complete and agree on modality of carrying out SB-CPD.
1.2.4
National 3Rs Implementation Guide developed, printed and distributed
TIE Guide not in place Guide Developed by end Oct 2016; printed and distributed by end Dec 2016
A draft has already been developed however will be defined based on the conclusions for the SB-CPD modality. The agreement is to finalize the guide by mid Jan 2017.
18
S/N OUTPUT/ACTIVITY DESCRIPTION
RESP BASELINE ANNUAL TARGETS
STATUS AS OF DECEMBER 2016 2014-16 JUNE 2017
1.2.5
Special Needs Education Teachers trained on the adapted 3Rs New Curriculum
SNE
Curriculum package materials required for training in place; 519 Std I&II Special Needs Education Teachers already trained
Training conducted by end Aug 2016
Completed. A total of 519 teachers have been trained.
1.2.6
3Rs training for 450 teachers who teach learners with Intellectual Impairment conducted
PO-RALG
Guides for operationalization of centers and teacher's guide not in place
Guides developed by end Nov 2016; training conducted by end Jan 2017
Two guides have been developed and submitted to Press B for type setting and later approval before printing.
1.2.9
Std III&IV teachers for Visual and Hearing Impairment trained on revised Std III-VI Curricular
PO-RALG
Curriculum package materials required for training in place
Training conducted by end Dec 2016
TIE is printing curriculum materials before the training can take place.
1.2.10
Training for at least one Pre Primary Teacher from each public school on the revised preprimary curriculum conducted
TIE Revised curriculum in place; teacher and learning materials being developed
T&L materials developed by end Oct 2016; TOTs trained by end Oct 2016; Teachers trained by end Nov 2016
Training is on-going in 20 centers and expected to reach 16,129 teachers countrywide.
1.3 Increased interaction with 3Rs Learning Materials
1.3.1
Std II Books and Curriculum materials for Pre Primary, Std III&VI printed and distributed
TIE/PORALG
Revised books that align with the curriculum in place
5,459,000 copies printed and distributed to all schools based on number of students
No objection for to award contract to the successful bidders for printing and supply of curricular materials has been granted. The distribution plan has already been completed for distribution of all remaining materials under LANES.
1.3.2 Standard III books printed and distributed to all schools
TIE/PORALG
Draft Standard III Books in place being pre-tested
Procurement process completed; 6,818,818 Copies printed and distributed to all schools based on number of students
1.3.3 Print braille books for standard I & II pupils
SNE Regular books in place being transformed into braille print
12,800 braille books 8400 braille books (regular) and 4400 large print text books printed and distributed
19
S/N OUTPUT/ACTIVITY DESCRIPTION
RESP BASELINE ANNUAL TARGETS
STATUS AS OF DECEMBER 2016 2014-16 JUNE 2017
1.3.4
25 titles of story books printed and distributed to all schools in 22 regions (excluding those receiving support from Tusome Pamoja)
TIE N/A
Final Books in place by Oct 15th ; 12,000,000 units printed by end Jan 2017; distributed to all schools in by end March 2017
1.3.5
Reading Corner established and in operation at 46 Libraries at regional and District Levels
TLSB Feasibility study being conducted
Feasibility study report completed by July 2016; Plan for each Library developed by Aug 2016; materials procured by end Oct 2016
A feasibility study was completed alongside plans for establishment of the centers. No-objection to advertise tender for supply of the materials submitted to SE.
1.3.6 Reading Week organized at National level annually
TLSB Reading week organized by June 2017
Preparations for FY2016/17 week will start in Jan 2017 for the week to be held in April 2017.
1.3.7
Grants for establishment of 'Talking Classrooms' provided to all schools based on number of students per school, including in Special Needs Schools/Units
MoEST Agreement to transfer funds directly to schools reached
Guide for classroom branding developed by end July 2016; budget for school supplies approved by end Oct 2016; grants transferred to schools by end Jan 2017; schools completed branding of classrooms by end June 2017
Guide is in place and a total of 35,000 copies has been printed at Press A, delivery of the same to all public schools countrywide has started.
Additional standard I&II Curricular Materials Distributed to all schools
32,000 copies distributed 2 per school in all public primary schools
912,698 additional copies distributed based on number of student per school by Dec 2016
No Objection to award contract for printing and supply of the additional STD I & II curricular materials to the bidders granted.
1.4 Increased School Readiness
1.4.1
Special Needs Assessment Kits procured and distributed to identified centers for assessment of children prior to enrolment
SNE Procurement process is in final stages
125 Learning Needs Assessment Kits procured and distributed to 25 regions by Dec 2016; Grants given to districts by December 2016; At
Learning Needs Assessment Kits delivered in mid-Dec 2016; verification and receiving of the items completed by a special task force that included representative from MoEST, UDSM, PO-RALG, National
20
S/N OUTPUT/ACTIVITY DESCRIPTION
RESP BASELINE ANNUAL TARGETS
STATUS AS OF DECEMBER 2016 2014-16 JUNE 2017
least 80% of Schools in operation by Jan 2017
Assessment Resource Centre, LGA and Primary Schools; distribution to commence after the verification of the actual needs from each center, to be done before end of Jan. 2017.
1.4.3 NFE Centers in all 26 regions established and in operation
PO-RALG
Centers have been identified and children enrolled in 2016; Centers Facilitators Guide not in place; operational manual is in place but not distributed
Complete Facilitator's Guide by end Oct 2016; Train 1840 center facilitators (10 from each LGA) by end Dec 2016; print and distribute operational manual by end Oct 2016
PO-RALG has already provided list of all centers including names of facilitators. Retroactive payment is to be done based on completion of confirmation of Facilitators Names. Final confirmation is of visits by the MoEST QA team that are in the LGAs is on-going.
1.4.4
Satellite Schools in 6 LGAs of Mkalama, Rufiji, Ngorongoro, Liwale, Ukerewe and Longido established and in operation
PO-RALG
Needs per center not identified
Needs Assessment conducted and report presented by end Oct 2016; 60 Satellite Schools established-10 in each of the 6 LGAs
The needs assessment report is in place. Next activity is for targeted Districts to come up with plans on how to expend lumpsum allocation in LANES. Proposals could include refurbishment of existing infrastructure and possible upgrade to full schools.
1.4.5 Assessment of Children Prior to Enrolment conducted
PO-RALG
Assessors Guide is in place; 125 region level Assessors trained
Additional 736 Assessors trained (4 from each of the 184 Councils)
This was awaiting procurement of assessment Kits whose arrival is expected end Dec 2016; modality on how to undertake the assessment to be finalized in Jan. 2017 by the regions teams.
1.4.6
Meeting with Special Needs Education Officers (SNEOs) from 184 LGAs to discuss take off of LANES activities conducted
PO-RALG
SNE Officers not oriented on implementation of special needs activities under LANES support
Orientation Manual developed by end Nov 2016; SNE officers orientation workshop held by end Dec 2016
This activity has already been conducted by PO-RALG.
1.4.7 Training for LGA level assessors on assessing learning needs of children
PO-RALG
Assessors Guide and Facilitators Guide in place
LGA level assessors trained by end Dec 2016
Pending for a modality on how the activity will be carried out and implement it.
21
S/N OUTPUT/ACTIVITY DESCRIPTION
RESP BASELINE ANNUAL TARGETS
STATUS AS OF DECEMBER 2016 2014-16 JUNE 2017
prior to enrollment conducted
2 Improved Education Sector Management
2.1 Increased use of data for evidence based planning
2.1.1 Follow up of Std I&II curriculum implementation carried out.
QAD
Vehicles and fuel provided to QA at 38 Districts; 3Rs Inspection checklist in
place; Plan for District level QA in place; at least 80% of all schools Inspected to determine 3Rs learning achievements
Quality Assurance and M&E Framework is in place; a planning meeting was held in October where draft zonal strategic plans were developed and completion is ongoing however need to be fast tracked so that the lumpsum funds set in the LANES programme are prioritized accordingly
Plan to provide grants for follow up by QA not in place; 3Rs inspection checklist not in place
2.1.2 PSLE 2015 Item Response Analysis Booklets produced and Distributed annually
NECTA 254,530 Copies distributed in 2015
254,530 Copies distributed by July 2016
The books have been printed and distributed as planned.
2.1.3
Action Oriented Research studies to inform on key aspects of 3Rs implementation conducted
UDOM Grant provided to UDOM
Call for proposals conducted by end Aug 2016; research proposals to be provided with grants selected by end Sept 2016; proposals discussed at stakeholders meetings for inputs by mid Oct 2016; At least 4 Studies conducted by June 2017
Proposals have been selected for four research areas. Three of those research proposals were shared at the JESR 2016 in November. Studies are expected to be completed by May 2017.
2.1.4
Scholarships for Academic Studies (Masters and PhD) focusing on early grade education provided
UDOM 17 Students (10 Masters and 7 PhD) enrolled in 2016 academic year
Ongoing Ongoing at UDOM. A workshop to share progress on the studies being conducted is to be done in Feb. 2017
22
S/N OUTPUT/ACTIVITY DESCRIPTION
RESP BASELINE ANNUAL TARGETS
STATUS AS OF DECEMBER 2016 2014-16 JUNE 2017
2.1.5
National level field visits to review implementation of 3Rs activities conducted annually
DPP 2 Field Visit Conducted (1 in 2015 and 1 in 2016)
TORs for field visits prepared and approved; visits conducted by end Dec 2016.
One of the field visits was conducted in May 2016 as part of the LANES Mid Term Review. A report has been provided in-file.
TORs for field visits prepared and approved; field visits conducted by end June 2017
To be conducted in second half of FY2016/17.
2.1.6
Regional and LGA infrastructure and tools for Basic Education Management Information System established
PO-RALG
Plan is in place and approved
Equipment procured by Dec 2016; Equipment installed by end Dec 2016; Help desk team allocated room and started providing support directly to LGAs by beginning Jan 2017; Regional and National BEST produced by May 2017
Tender for the procurement of ICT infrastructure for 186 LGAs and 26 Regional Secretariats (RS) advertised; review process on-going.
2.1.7
The Education and Training Policy (ETP 2014) disseminated and ESDP and its sub sector operational plans developed
DPP
Policy translated however not printed; ESDP dissemination workshops held at region level
2000 English copies and 18000 Kiswahili copies of the ETP printed and distributed by Nov 2016; Internal workshops for discussing recommended ESDP strategies held and ESDP final draft document shared by end Oct 2016
Revisions have been done to the Policy by a team that was formulated by the CE: Agripina Habicht; Rose Upor and Issack Kitururu. Office of the DPP has been mandated to finalize and print the document.
2.1.8
Various studies conducted to input into development of the ESDP and its operational plans
DPP
Draft ESDP in place however requires key baseline data/information for operationalization
Recommendations for key studies to be carried out given by end Oct 2016; TOR and tools for studies drafted by end Nov 2016 including formulation of teams to conduct the studies.
One study (Fee Free Education) has already been conducted the report is being completed and should be submitted by Jan 2017.
23
S/N OUTPUT/ACTIVITY DESCRIPTION
RESP BASELINE ANNUAL TARGETS
STATUS AS OF DECEMBER 2016 2014-16 JUNE 2017
2.2 Improved Field Management
2.2.1
LANES activities taking place within the region/LGA monitored and support provided to improve school level implementation
PO-RALG
Regional and LGA plans for monitoring and support supervision in place; M&E Framework not developed
Regional level LANES action plans for FY2016/17 approved by end August 2016; implementation started by end Sept 2016; Region level Monitoring guide and tools developed by Sept 2016; 2 region education performance review meetings conducted in 26 regions; 4 field visits conducted by the Regional Education teams by June 2017
• The plans were developed and approved through RAS and submitted to PO-RALG. Funds have already been transfer to PORALG exchequer for first disbursement to regions/LGAs;
• 40% of the budget (TZS12.75 billion) sent to the 26 RS and 93 LGAs in week 1 of Jan. 2017 to for implementation of the planned activities.
2.3 Capacity Development for Effective Delivery of Education Services
2.3.1 Record Manager (PReM) System for Basic Education Prepared and Completed
NECTA Plan for pilot approved
Pilot completed by end Sept 2016; approval for roll out provided by mid Oct 2016; roll out completed by Jan 2017; system in use from Jan 2017
The pilot in 3 regions completed, NECTA to provide report to the senior MoEST & PO-RALG management for improvements in Jan 2017 before roll-out commence.
2.3.2
Training of key staff in the education sector based on training needs assessment report provided
DAHR Training plan is in place
Key staff to be trained identified and given approval for support through LANES; grants provided
A directive was given in a management meeting held in Oct 2016 for DAHR to provide a plan for expending lumpsum funding allocated in LANES. 1 MoEST staff supported to undertake MA studies at UDSM.
2.3.4
Education Sector Quality Assurance framework developed and key recommendations implemented
QAD Procurement process for engagement of consultants ongoing
Consultants engaged; work started; Basic Education Quality Assurance Framework (BE-QAF) developed
Recommendations were made by the tender board on engagement of selected consultants. Negotiation underway with the identified consultant.
24
S/N OUTPUT/ACTIVITY DESCRIPTION
RESP BASELINE ANNUAL TARGETS
STATUS AS OF DECEMBER 2016 2014-16 JUNE 2017
2.3.5
MOEST HQ Registry computerized to increase efficiency in decision making
DAHR N/A MOEST HQ Registry computerization completed by December 2016
Pending plan by DAHR.
2.3.6 Resource persons trained on braille repair and maintenance
SNE
Perkins School for the Blind contacted; programme for training of 7 persons established
7 persons trained by Perkins School for the Blind on braille repair and maintenance
All approvals from the MoEST has been given. Follow up is being made with the US Embassy to secure visas for the selected candidates.
2.3.7
Timely Audits and VFM exercises of the LANES programme conducted annually
CIA N/A 1 FM training conducted by end Oct 2016
A training was conducted on 24th Nov 2016 at the Swedish Embassy targeting Directors; procurement and finance officers from LANES implementing MDAs; follow up is to be made on the key actions including revision of the Operations Manual
3 Increased Community Engagement
3.1 Increased Community Sensitization and Awareness Raising
3.1.2 Grants provided to CSOs to support monitoring of 3Rs activities at region level
CSO Modality for Grants provision not in place
Modality developed and agreed upon by end Oct 2016; grants provided by Dec 2016; implementation started by Jan 2017
Two meetings were held with the Swedish Embassy in the presence of the PS at which TENMET was asked to prepare and submit a concept note for expenditure of the lumpsum funding.
a)
The public sensitized about 3Rs through the International Literacy Week (UNESCO)
N/A
Programme for ILW developed; modality agreed upon; event organized emphasizing a theme on 3Rs
Event held successfully in collaboration with UNESCO
b)
IEC materials on the 3Rs programme-targeting school children produced, Printed and distributed
N/A
100 feature articles placed on different newspapers; 3 LANES briefing brochures produced quarterly; LANES newsletter prepared bi annually; and general
6000 copies of IEC materials have been printed-distribution is ongoing; a booklet has been prepared showing key areas of the LANES programme; should be printed for dissemination in Dec/Jan 2017
25
S/N OUTPUT/ACTIVITY DESCRIPTION
RESP BASELINE ANNUAL TARGETS
STATUS AS OF DECEMBER 2016 2014-16 JUNE 2017
education newsletter produced ones a year
c) LANES Website developed and updated periodically
N/A LANES Website updated weekly with all the news articles placed on mass media
The framework is in place; discussions have been held on its completion before it is displayed.
d) Radio and TV programmes produced to sensitize public engagement on 3Rs
N/A
At least 25 TV and radio programmes focusing on different thematic issues aired quarterly
Ongoing
3.2 Increased parents and Community Engagement
3.2.1
School Management Committees trained on Whole School Planning and Community Mobilization
PO-RALG
10,870 Head Teachers trained in 2015 however training of School Committees delayed pending agreement on modality
Modality completed by July 2016; Training of TOTs completed by Aug 2016; Grants sent to regions and LGAs by Oct 2016; training of 11,647committees (a total of 151,411 members) completed by Dec 2016
Educational Circular No, 4 of 2016 released and in effect from 01st October 2016; SMC orientation is on-going in 129 LGAs (19 regions); 11,647 committees with over 150,000 members to be reached; orientation is taking place at the ward level.
26
3. Program Disbursement
The planned schedule as per the Government and the Grant Agent agreement was as
indicated in table 4. The schedule was disrupted by delay in start of activity
implementation (for over a period of 8 months). Although the first disbursement was done
as per schedule from the Grant Agent, the Government did not start expenditure until
second half of the first year of implementation (FY2014/15). During the reporting period,
third allocation amounting to US$18 616 762. 56 was received. Further MoEST requested
the fourth allocation towards the end of Q2 of FY2016/17 and it is expected to be received
in early January 2017. .
Table 2: Disbursements as per agreement
S/N FISCAL YEAR Date Of
Disbursement
Disbursement
Amount (US$)
1 2014/15 2014-05-22 20 000 000. 30
2 2015/16 2015-02-01 19 597 448. 54
3 2015/16 2015-08-01 18 616 762. 56
4 2016/17 2016-02-01 18 277 282. 80
5 2016/17 2016-08-01 18 308 505. 80
TOTAL 94 800 000. 00
Table 3: Progress on Disbursements
Current reporting period
disbursement
Cumulative disbursement Next reporting period
disbursement
Planned (US$) Actual (US$)
Planned (US$) Actual (US$) Reporting
period
Future
planned
GPE
18,616,762. 56 18,616,762. 56 58,214,211.40 58,214,211.40 2016-2017 18,277,282.80
27
4. Technical, policy, or knowledge products
Various documents were produced through LANES in implementation of key activities. It
should be noted that the GPE-LANES programme support national 3Rs reform hence all
documents supported in the process are official documents.
Table 4: Knowledge Products produced through GPE-LANES
S/N AGENCY/DEPA
RTMENT
DOCUMENT TITLE (Translated)
PED Head Teacher Toolkit for School Management-General
Head Teacher ‘s Guide for Implementation of the 3Rs
School Management Committees Guide
ANFE Guide for Establishment and Operationalization of Non
Formal Education centers
NECTA PSLE Item Responses Analysis Booklets (8 Items) -2014
PSLE Item Responses Analysis Booklets (8 Items) -2015
Standard II 3Rs Assessment Item Responses Analysis
Booklets (2)-2015
QAD Quality Assurers 3Rs Checklist
MoEST School Management Committee Guideline
SNE Special Learning Needs Assessment Guide
PO-RALG Guide for Developing a Talking Classroom
TIE Curricular
• Standard I &II
• Standard III-VI
• Pre Primary
Syllabi
• Standard I
• Standard II
• Mathematics standard III-VI
• Civic and Ethics
• English Language
• Science and Technology
• Kiswahili
• Social Studies
Teachers Guides
• 3Rs Teachers Guide-Reading and Writing
Standard I&II
• 3Rs Teachers Guide- Arithmetic- Standard I&II
28
S/N AGENCY/DEPA
RTMENT
DOCUMENT TITLE (Translated)
• 3Rs Facilitators Guide- Standard I&II
• Standard I&II 3Rs Teachers Guide for Teaching
Children with Visual and Hearing Impairment
• Framework for Teaching 3Rs Standard I&II
Text-Books
• Standard I
o Reading Book I-Standard I
o Reading Book II-Standard I
o Writing Standard I
o Arithmetic Standard I
o Arts and Sports Standard I
o Health and the Environment Standard I
• Standard II
o Reading -Standard II
o Writing Standard I
o Arithmetic Standard I
o Arts and Sports Standard I
o Health and the Environment Standard I
Charts
• Arithmetic
• Reading
NOTE: Some documents are only available in Kiswahili. Translation of curricular package
materials is ongoing for use in English Medium Schools
29
5. Conclusion
The GPE LANES programme continues to be the largest grant support directly to the
Education Sector in Tanzania focusing specifically on activities for attainment of literacy
and numeracy skills for early grades.
The overall implementation of activities has steadily increased and commitments for the
majorly cost drivers’ activities, including printing and distribution of textbooks completed.
As of 31st December 2016, the programme had spent 33% of the total grant, which is a 15%
increase from the spending reported at the end of FY2015/16 (at 18%). The forecast
expenditure at the end of FY2016/17 will be at slightly over 75% of the total grants. This is
based on the commitments done and activities which necessary preparations has been
done, including school supplies for establishment of 'Talking Classrooms' and printing of 25
titles of the story books.
Harmonization with partners implementing 3Rs programme remains to be a key focus in
implementation of the LANES programme. This will particularly be the case in the
remaining programme period as GPE-LANES put more emphasis in region level
implementation, Monitoring and Evaluation.
Emphasis will also be given on pushing forward national frameworks particularly on
school management and 3Rs assessment in order to ensure consistency in key aspects
related to planning and assessment.
30
6. Annex
6.1 Standard Financial Report
OVERAL SUMMARY
S/N ACTIVITY DESCRIPTION RESP BUDGET(A) PRIOR PERIOD EXP.FY 2014-16(B)
CURRENT YR REPORT-July-
December 2016(C )
TOTAL CUMM AMOUNTS(D)
SPENT (%)
INCOME
Opening Balance 39,535,255,114
Grant Cash Received from Donor 40,361,513,565
Total Income 79,896,768,679
1 Improved Teaching and Learning of 3Rs for children aged 5 to 13 years
1.1 Improve Methodology for Learning and Teaching of 3Rs
Develop Std II, III&IV Curriculum Package Materials +Books
TIE 457,565,813
457,565,813 457,565,813
100
Review/Align Pre-primary curriculum with 3Rs National Curriculum
TIE 109,876,468
109,876,468 109,876,468
100
Assess curriculum implementation for inputs into curriculum review process
TIE
104,000,000 45,341,000.00
45,341,000.00
44
Development and airing of E-Content TIE
500,000,000 - -
Revise pre service curriculum to incorporate 3Rs TIE
1,219,643,000 14,176,500.00
14,176,500.00
1
31
S/N ACTIVITY DESCRIPTION RESP BUDGET(A) PRIOR PERIOD EXP.FY 2014-16(B)
CURRENT YR REPORT-July-
December 2016(C )
TOTAL CUMM AMOUNTS(D)
SPENT (%)
Sub Total
2,391,085,281 567,442,281 59,517,500
626,959,781
26
1.2 Increased Skills for teaching Basic Literacy and Numeracy -
3Rs Teacher Training interventions based on 3Rs assessment implemented by 2016
PO-RALG
12,092,130,749
12,092,130,749 12,092,130,749
100
Train National Facilitators for training of Std III&IV Teachers
TIE 101,993,500
101,993,500 101,993,500
100
Train College Tutors for training of Std III&IV Teachers
TIE 957,319,975
957,319,975 957,319,975
100
Train Special Needs Education Teachers on the adapted 3Rs New Curriculum
SNE 760,694,000
760,694,000 760,694,000
100
Train 2 Std III&IV Teachers ADEM
18,335,410,000 18,335,410,000
18,335,410,000
100
Additional Training for Std I&II teachers + rollout of SB CPD
ADEM
5,324,188,473 - -
Std I&II Special Needs Education Teachers oriented on the adapted 3Rs New Curriculum
SNE
777,987,000 - -
Train Pre Primary Teachers on the revised curriculum TIE
12,332,491,500 - -
Conduct training for 450 teachers of special needs education on adapted 3Rs curriculum for learners with intellectual impairments.
PO-RALG
1,022,230,000 - -
Std III&IV teachers for Visual and Hearing Impairment trained on revised Std III-VI Curricular
PO-RALG
1,144,730,000 - -
32
S/N ACTIVITY DESCRIPTION RESP BUDGET(A) PRIOR PERIOD EXP.FY 2014-16(B)
CURRENT YR REPORT-July-
December 2016(C )
TOTAL CUMM AMOUNTS(D)
SPENT (%)
Sub Total
52,849,175,197 13,912,138,224 18,335,410,000
32,247,548,224
61
1.3 Increased interaction with 3Rs Learning Materials -
Support Councils to undertake EFA and Literacy Week Celebrations
PO-RALG
157,920,000
157,920,000 157,920,000
100
Support Regional Secretariats to undertake Literacy/Education Week Celebrations
PO-RALG
36,000,000
36,000,000 36,000,000
100
Support National Literacy/Education Week MoEST 168,246,400
168,246,400 168,246,400
100
Print Std I Books and Curriculum materials for Std III&IV
TIE 5,658,173,014
5,658,173,014 5,658,173,014.00
100
Packaging and Distribution of Std I Books PO-RALG
473,013,474
473,013,474 473,013,474
100
Establish a reading Corner at 100 Libraries at regional and District Levels
TLSB 8,087,500
8,087,500 8,087,500
100
procure 8400 braille books (regular) and 4400 large print text books for standard I & II pupils
SNE
640,000,000 - -
Support printing of Std I-IV Books and Curriculum materials-Std II and III Books, Curriculum and Teachers Guides
TIE
17,012,000,000 4,658,561,657.72
4,658,561,657.72
27
Print curriculum materials and books for pre-primary, std I&II
TIE
7,551,176,200 110,144,381.00
110,144,381.00
1
Establish Reading Corners and Organize Reading Week
TLSB
956,000,000 865,632,000.00
865,632,000.00
91
33
S/N ACTIVITY DESCRIPTION RESP BUDGET(A) PRIOR PERIOD EXP.FY 2014-16(B)
CURRENT YR REPORT-July-
December 2016(C )
TOTAL CUMM AMOUNTS(D)
SPENT (%)
Organize Reading Week at regional levels TLSB
396,000,000 - -
Distribution of Std I Books PO-RALG
625,600,000 316,886,221.08 316,886,221.08 51
Distribution of Std II PO-RALG
625,600,000
- -
Distribution of Std III books PO-RALG
625,600,000
- -
Supplies to Schools for purchase of 3Rs learning aids-Units of measures equal to streams
PO-RALG 18,162,566,400
- -
School supplies-Education equipment and materials for learners with intellectual and Visual impairments
SNE
2,293,677,409 - -
Sub Total
55,389,660,398 6,501,440,388 5,951,224,260
12,452,664,648
22
1.4 Increased School Readiness -
Pre enrolment assessment of children to determine learning needs conducted at the beginning of each year of STD I in 25 Councils by 2016
PO-RALG
18,654,023
18,654,023 18,654,023
100
Conduct Assessment of Children Prior to Enrolment PO-RALG
283,102,000
283,102,000 283,102,000
100
Procure and Distribute Special Needs Assessment Kits SNE
4,037,851,600 - -
Establishment of 10 Satellite Schools PO-RALG 3,464,700,000
- -
34
S/N ACTIVITY DESCRIPTION RESP BUDGET(A) PRIOR PERIOD EXP.FY 2014-16(B)
CURRENT YR REPORT-July-
December 2016(C )
TOTAL CUMM AMOUNTS(D)
SPENT (%)
Establish and Operationalise NFE Centers and LCs PO-RALG 2,362,450,000
- -
Conduct Assessment of Children prior to enrolment PO-RALG
1,879,600,000 - -
Hold a meeting with SNEOs from LGAs to discuss take off of LANES activities(184)
PO-RALG
254,310,000 187,001,000 187,001,000.00 74
Train LGA Assessors on assessing Learning needs prior to enrollment-184
PO-RALG 826,470,000
- -
Sub Total
13,127,137,623 301,756,023 187,001,000
488,757,023
4
2 Improved Education Sector Management -
2.1 Increased use of data for evidence based planning -
2.1.1
Conduct 3Rs Assessments/Research, Publish and Share Knowledge
-
Official School Ranking to ensure school level data on performance is effectively used in planning and management
NECTA 646,737,497
646,737,497 646,737,497
100
Midline and Endline Assessments for Std II Conducted in 2015 and 2016
NECTA 939,692,839
939,692,839 939,692,839
100
254,530 copies of PSLE 2015 Item Responses Analysis Booklets produced and Distributed by February, 2016
NECTA 1,125,435,983
1,125,435,983 1,125,435,983
100
Conduct 2 Action Oriented Research UDOM 6,928,328
6,928,328 6,928,328
100
Conduct Academic Research- Masters and PhD UDOM 70,930,047
70,930,047 70,930,047
100
35
S/N ACTIVITY DESCRIPTION RESP BUDGET(A) PRIOR PERIOD EXP.FY 2014-16(B)
CURRENT YR REPORT-July-
December 2016(C )
TOTAL CUMM AMOUNTS(D)
SPENT (%)
Organize International Conference on Literacy and Numeracy
UDSM 182,799,469
182,799,469 182,799,469
100
Organize Conference and Exhibition on ICT in Education
E-LU 245,716,900
245,716,900 245,716,900
100
Support staff members to participate in international conferences/seminars
DPP 43,065,553
43,065,553 43,065,553
100
Conduct surveys and evaluation to input into ongoing planning and implementation processes.
DPP
1,029,590,000 - -
Endline Assessments for Std II Conducted in 2018 NECTA
1,014,314,438 - -
254,530 copies of PSLE 2015 Item Responses Analysis Booklets produced and Distributed
NECTA
1,557,469,976 1,405,893,126.11
1,405,893,126.11
90
Action Oriented Researches UDOM 1,107,300,000.00
- - -
Academic Oriented Researches - Masters and PhD Candidates
UDOM
1,539,506,072.01 - -
2.1.2
Coordinate, Monitor and Provide Support for LANES activities taking place within the Region
-
Programme Coordination Unit for the GPE programme components established by July 2014
DPP 230,242,493.58
230,242,493.58 230,242,494
100
Hold periodic reviews of implementation of the LANES programme
DPP 115,976,022.03
115,976,022.03 115,976,022
100
Provide support to MOEVT for M&E of LANES activities implementation
DPP 97,790,000.00
97,790,000.00 97,790,000
100
36
S/N ACTIVITY DESCRIPTION RESP BUDGET(A) PRIOR PERIOD EXP.FY 2014-16(B)
CURRENT YR REPORT-July-
December 2016(C )
TOTAL CUMM AMOUNTS(D)
SPENT (%)
Hold field visits to review implementation of LANES activities
DPP 61,851,590.89
61,851,590.89 61,851,591
100
Hold a Technical Working session to review progress of Action Plans implementation
DPP 154,350,000.00
154,350,000.00 154,350,000
100
Monitor LANES activities taking place within the Region
PO-RALG 358,363,608.47
358,363,608.47 358,363,608
100
Monitoring and supportive supervision by PO-RALG PO-RALG
710,400,000 315,008,140.00 315,008,140.00 44
Administrative Support to REOs/RAOs PO-RALG
124,800,000 - -
Monitoring and supportive supervision for 26 Regional Team
PO-RALG
1,291,680,000 - -
Monitoring and supportive supervision for 95 LGA Teams
PO-RALG
3,974,800,000 - -
Organize quarterly DEOs-QA-WEC meeting to discuss progress of basic education (including performance of 3Rs initiatives)
PO-RALG
6,649,088,000 - -
Organize bi-annual REO-DEOs-QA meeting to discuss progress of basic education (including performance of 3Rs initiatives)
PO-RALG
2,808,752,000 - -
Sub Total
26,087,580,817 4,279,880,331 1,720,901,266
6,000,781,597
23
2.2 Improved Planning & Coordination -
Support dissemination of ETP and ESDP +Operational Plans development
DPP 162,206,000
162,206,000 162,206,000.00
100
37
S/N ACTIVITY DESCRIPTION RESP BUDGET(A) PRIOR PERIOD EXP.FY 2014-16(B)
CURRENT YR REPORT-July-
December 2016(C )
TOTAL CUMM AMOUNTS(D)
SPENT (%)
National Coordination Unit for the LANES programme in Operations
LNCU 694,446,347
694,446,347 694,446,346.72
100
Support dissemination of ETP, ESDP and operational plans development
DPP 1,448,900,000
219,865,000.00 219,865,000.00
15
Hold periodic reviews of implementation of the 3Rs Programme
DPP 712,100,000
- -
LANES coordination LNCU 2,375,665,338
195730978 195,730,977.95
8
Enhancement of data collection and processing infrastructure
PO-RALG
3,617,010,116 26,490,000.00 26,490,000.00 1
Provide Grants to CSOs to provide support in establishment and monitoring of 3Rs activities at regional level
CSO 1,113,120,000
- -
Support collection, data verification, use and dissemination
PO-RALG
454,045,000 - -
Sub Total
10,577,492,801 856,652,347 442,085,978
1,298,738,325
12
2.3 Improved Field Management -
Train Quality Assurers on the 3Rs Curriculum revision
QAD 1,243,608,930
1,243,608,930 1,243,608,930.00
100
Procure vehicles for Inspectors to Undertake a follow-up
QAD 2,565,080,699
2,565,080,699 2,565,080,699.24
100
Provide fuel to Districts that received new vehicles QAD 290,740,000
290,740,000 290,740,000.00
100
38
S/N ACTIVITY DESCRIPTION RESP BUDGET(A) PRIOR PERIOD EXP.FY 2014-16(B)
CURRENT YR REPORT-July-
December 2016(C )
TOTAL CUMM AMOUNTS(D)
SPENT (%)
Train Head Teachers, Ward Education Coordinators and School Committees on Management and Supervision
ADEM 289,664,300
289,664,300 289,664,300.00
100
Train Head Teachers, Ward Education Coordinators and School Committees on Management and Supervision
ADEM 4,382,209,718
4,382,209,718 4,382,209,718.00
100
Quality Assurance of 3Rs implementation at region level
QAD
2,913,486,000 50,324,000.00
50,324,000.00
2
Develop Education Sector Quality Assurance System QAD
1,393,488,800 - -
Review of the school inspectorate tools to incorporate 3Rs
QAD
145,120,000 - -
Provide Motorbikes for WECs to conduct close to school/learning centre inspection, M&E
QAD
7,095,000,000 - -
Procure and provide vehicles to QAs QAD 1,483,600,000
- -
Provide Fuel to WECs PO-RALG 996,212,794
- -
Sub Total
22,798,211,241 8,771,303,647 50,324,000
8,821,627,647
39
2.3 Capacity Development for Effective Delivery of Education Services -
2.3.1
Overall support to Systems Strengthening -
Record Manager (PReM) System for Basic Education Prepared and Completed by June, 2017
NECTA 3,194,450,000
252,963,303.95 252,963,303.95
8
39
S/N ACTIVITY DESCRIPTION RESP BUDGET(A) PRIOR PERIOD EXP.FY 2014-16(B)
CURRENT YR REPORT-July-
December 2016(C )
TOTAL CUMM AMOUNTS(D)
SPENT (%)
National System for Registration and Exam results processing for Std II and IV completed
NECTA 3,180,320,000
- -
2.3.2
Overall support to MDAs for effective implementation of LANES activities
-
Record Manager (PReM) System for Basic Education Prepared and Completed by May, 2016
NECTA 8,307,600.00
8,307,600.00 8,307,600.00
100
Overall Institutional contribution to MOEVT/PMORALG to support LANES coordination
DAHR 204,578,496.57
204,578,496.57 204,578,496.57
100
Provide Institutional Contribution to TIE for increased capacity in LANES implementation TIE
274,262,380
274,262,380.00 274,262,380.00
100
Institutional contribution to MOEST/PO-RALG to support LANES coordination
DAHR 943,617,833
279,234,194.00 279,234,194.00
30
Overall capacity Development to staff DAHR 400,000,000
-
-
Computerisation of the MOEST HQ Registry DAHR 429,876,000
-
-
Operational Costs ADEM
709,787,954 - -
Conduct Internal Audit Exercises on LANES Programme
CIA
642,400,000 - -
To facilitate capacity building to LANES Implementers on Financial Management by June 2017
CIA
447,300,000 - -
Conduct External Audit Exercises on LANES Programme
CIA 150,000,000
-
-
40
S/N ACTIVITY DESCRIPTION RESP BUDGET(A) PRIOR PERIOD EXP.FY 2014-16(B)
CURRENT YR REPORT-July-
December 2016(C )
TOTAL CUMM AMOUNTS(D)
SPENT (%)
3% Institutional Contribution TIE 1,161,579,321
144,846,706.16 144,846,706.16
12
10% Institutional Fees UDOM 162,765,000
164,290,000.00 164,290,000.00
101
Resource persons trained on braille repair SNE
384,985,575 - -
Sub Total
12,294,230,160 487,148,477 841,334,204
1,328,482,681
11
3 Increased Community Engagement -
3.1 Increased Community Sensitization and Awareness Raising -
Launch the LANES Programme to ensure community involvement by end 2014
GCU 84,695,750
84,695,750 84,695,750.00
100
Communities sensitized on participation in both formal and non-formal education for OOS children age 5-13
ANFE 124,975,000
124,975,000 124,975,000.00
100
Sensitize the Public about LANES through Media and Tour programmes
GCU 42,342,739
42,342,739 42,342,739.22
100
KKK Songs video & Audio Production GCU 110,589,000
-
-
Sensitization through Media on enrolment in both Formal and Non Formal
GCU 101,400,000
-
-
Strengthening 3Rs Clubs GCU 521,856,000
-
-
41
S/N ACTIVITY DESCRIPTION RESP BUDGET(A) PRIOR PERIOD EXP.FY 2014-16(B)
CURRENT YR REPORT-July-
December 2016(C )
TOTAL CUMM AMOUNTS(D)
SPENT (%)
Air programmes through TV and Radio to sensitize communities on school feeding
GCU 251,000,000
- -
Communities sensitized on Enrolment GCU 70,000,000
- -
Communities sensitized to ensure provision of School meals
PED 71,132,250
- -
Sub Total
1,377,990,739 252,013,489
-
252,013,489
18
3.2 Increased parents and Community Engagement -
Train Management Committees on Whole School Planning and Community Mobilization
PO-RALG
692,557,360
692,557,360 692,557,360.00
100
Organize Policy week for regional and Council primary Education officers
PED
346,280,000 - -
Training of School Management Committees PO-RALG
6,255,171,273 49,930,000.00 49,930,000.00 1
Conduct Education Week at regional and district levels/Reading Competition
PO-RALG
402,475,000 - -
Sub Total
7,696,483,633 692,557,360 49,930,000
742,487,360
10
Total Expenditure
204,589,047,891 36,622,332,568 27,637,728,208
64,260,060,776
31
Surplus/Deficit for the Period 52,259,040,471.04
42
6.2 Actions on the Mid-Term Review Recommendations
SNo Recommendation Actions Taken During the Reporting Period
1 An extension of up to September 2018 to
allow implementation of remaining
activities
A revised result framework, budget and action plan for no-cost extension was approved by
LEG and the request submitted to the GPE Secretariat by the Supervising Entity, Embassy of
Sweden. A no objection to the no-extension request has been granted through a notification
letter dated December 15, 2016, with a new end-date of December 31, 2018.
2 Align LANES Activities to MTEFs FY2016/17 budgeted activities are appropriately aligned to the MTEF for both MoEST and
PO-RALG. Subsequently, efforts have been made to ensure that activities that are
implemented by the Regions/LGAs for the FY2017/18 are integrated.
3 LANES should get back on track as a
national programme and focus on
strengthening Government’s systems whilst
consolidating the national reform process.
ESDP roadmap was revised to update dates following the delay of release of required data.
As part of the process, a Task Force for finalization of the ESDP document alongside a costing
framework indicating was formed.
4 Enhancement of the Quality Assurance of
MoEST accompanied by TA (Technical
Assistance)
Process for engagement of a consultant to develop a Basic Education Quality Assurance
Framework was initiated, the actual work to commence in Q3 of FY2016/17.
5 In service Teacher training strategy should
be developed with support from LANES
An INSET strategy is in place, and revision to accommodate current changes alongside the
revision of pre-service primary teacher curriculum and modality for conducting INSET at
teacher colleges has started through TIE.
6 Community sensitization should be rolled
out
Community Sensitization activities have been incorporated in the LANES plans for FYs
2016/17 and 2017/18 at all levels. To start with, preparation for orientation of School
Management Committee in 19 regions completed with the work to be conducted in Q3 of
FY2016/17.
7 The overall management and oversight of
LANES needs to be examined with
Establishment of LIC was described in the LANES proposal to GPE however it was later
deemed that it could create parallel structure in addition to the ESDC and the previous BRN
43
SNo Recommendation Actions Taken During the Reporting Period
recommendation to establish a LANES
Implementation Committee
monitoring structure.
8 Disburse a materials fund directly to
schools
The budget has been adjusted to allow for additional funding to disburse grants to
schools for purchase of materials/teaching aids. A total of TZS 18.2 billion has been
allocated. A guide for creating 'talking classrooms' has also been developed based on
experience from Mtwara schools/Std I&II teachers. The modality for grants
distribution has also been developed based on 2016 data so that schools are allocated
grants based on number of students (Std I&II) to 16,109 schools.
9 Accelerate distribution of materials to
schools
Procurement process still takes long for materials printing and distribution to be done
effectively. Deliberate effort was made to ensure that the development, printing and
distribution of pre-primary and Standard I &-III textbooks and curriculum package
materials reaches school, latest by end of Q3 of FY2016/17.
10 Technical assistance to TIE Supervising Entity, Embassy of Sweden, engaged a consulting firm - NIRAS Indevelop - for
building TIE’s capacity in developing teaching and learning materials that communicate the
ethos of a revised competence-based curriculum package. Anise Waljee led the consulting
team from where: review of the existing curriculum package, textbooks and other
supplementary teaching and learning materials was done. Further the capacity of bookwriters
who work with TIE in developing teacher guides and early grade reading materials will be
developed.