Milwaukee Roundhouse. Craig Myers, OSC Region 8. Milwaukee Roundhouse Case Study. Facility overview - 1923. Bunker Oil Tank. Elevated Tank. Site Background. Sources Historic 500,000 gallon abandoned Bunker C tank - PowerPoint PPT Presentation
Citation preview
www.oscreadiness.org
15th Annual OSC Readiness Training Program
Milwaukee RoundhouseCraig Myers, OSC
Region 8
15th Annual OSC Readiness Training Program www.oscreadiness.org 2
Milwaukee Roundhouse Case Study
15th Annual OSC Readiness Training Program www.oscreadiness.org 3
Facility overview - 1923
Elevated TankBunker Oil Tank
15th Annual OSC Readiness Training Program www.oscreadiness.org 4
Site Background
Sources Historic 500,000 gallon abandoned Bunker C tank
Steam equipment was switched to oil fire prior to diesel equipment coming on-line in the ’40-’50s.
Drain line from roundhouse to oil/water separator
15th Annual OSC Readiness Training Program www.oscreadiness.org 5
Site Background
SourcesDiesel fueling operations for yard engines in later years
Small AST (not shown) Large tank was buried by the FD to snuff a fire using soil/debris on site.
15th Annual OSC Readiness Training Program www.oscreadiness.org 6
Brownfields Referral Across the river from the roundhouse at the
former passenger refueling area, not the roundhouse - initially.
12+ inches of LNAPL in one well Passenger area still being evaluated
ERU involvement at the former roundhouse OSC: “Is there much oil on the site?” BF staff reply: “I don’t think so.” OSC elected to stay in his lane. Until…
15th Annual OSC Readiness Training Program www.oscreadiness.org 7
Communication – always the #1 lesson learned…
OSC, ERT, NPFC case officer and State RPM meeting with the Mayor about the refueling area
OSC mentions something about the old bunker oil tank at the roundhouse State RPM looks shocked and says “it’s never
been removed.” NPFC case officer issues a verbal ceiling of
50k for assessment, with the caveat that, if the tank is there, an approved ceiling of $250k.
15th Annual OSC Readiness Training Program www.oscreadiness.org 8
Side Note: PRPs under OPA OPA amended in 2007
Included CERCLA-like language re: involuntary acquisition for state/local governments
No liability if the property is acquired through tax liens or other sovereign acts
Powell County purchased this property in hopes of establishing a business park. Are they an RP? CERCLA attorneys had determined the county to
be exempt from liability. Yes, according to the NPFC, Powell County is
the only viable PRP.
15th Annual OSC Readiness Training Program www.oscreadiness.org 9
The tank is, indeed, still present.
START, ERT and an EM 31 in town for the other site. ERT conducted Geophysical investigation to locate the tank/piping.
15th Annual OSC Readiness Training Program www.oscreadiness.org 10
Initial Assessment MT DEQ installed monitoring wells in 1990
Product identified on the ground water around the tank.
Additional work ~ 2008 by County consultant under Brownfields grant.
Severely under estimated the threat posed by the former tank and associated contamination.Assumed Bunker C not mobile in the sub-surface, and thus low priority.
15th Annual OSC Readiness Training Program www.oscreadiness.org 11
Where did the BF project derail?
BF program model – use state VCUP County consultant failed to develop an
acceptable plan EPA BF rep instructed that some cleanup is
better than none, had to spend the stimulus funds BF program did not have the expertise to
directly oversee the process/cleanup Resulted in lack of proper
prioritization/perspective.
15th Annual OSC Readiness Training Program www.oscreadiness.org 12
The Problem(s)Top half high in Lead and Arsenic – highest XRF reading was ~ 8,000 for lead – but low in petroleumBottom half very high in extractable petroleum hydrocarbons (C40 and shorter) ~ 30-45,000+ ppm.Tank contained ~15,000 gallons of oily water from surface infiltration.
15th Annual OSC Readiness Training Program www.oscreadiness.org 13
What to do?
The Problem: 10,000+ yds petroleum contaminated soil, some
with elevated lead levels 15,000 – 20,000 gallons oily water
Logistics: Nearest landfill – 40 miles away, TEPH limit Nearest oily waste facility – 80 miles away Nearest refinery – 300 miles away
15th Annual OSC Readiness Training Program www.oscreadiness.org 14
Tank Excavation and Dewatering
15th Annual OSC Readiness Training Program www.oscreadiness.org 15
OSC Authorities (or lack of) under CWA…
Excavation (in a flood plain) and dewatering, and waiting on analytical was not be possible for dewatering.
Did I need a 404 permit to dig? What about discharging the water? NPDES
permit? Permit waiver is in 300.400(e)
Specifically applies to actions under CERCLA Sections104, 106, 120, 121, and 122.
Does not apply to CWA 311(c) actions.
15th Annual OSC Readiness Training Program www.oscreadiness.org 16
Permits by Rule – CWA 404 Work is in the Clark Fork flood plain. The excavation needs a 404 permit. Nationwide Permit 20
State/District riders exist for each USACE District, and usually exist for each state.
May require RRT concurrence of OSC action(s). Does not apply on “Wild and Scenic Rivers” Does not exempt EPA/OSCs from other state
requirements• NPDES and other water quality regulations
15th Annual OSC Readiness Training Program www.oscreadiness.org 17
Discharge AuthorityDe-watering the
tank to effect removal:
Oil water separator
Activated Carbon filtration bed State had
concerns over low levels of Vinyl Chloride in the area
15th Annual OSC Readiness Training Program www.oscreadiness.org 18
Roundtable Discussion:
Can the OSC discharge? Do they need a permit?
If so, from who? Do they have to sample first? Why or why not?
15th Annual OSC Readiness Training Program www.oscreadiness.org 19
Discharge Authority – Argument 1
Yes, the OSC can discharge. Sampling is neither here nor there. It’s better
than it started out, even if not perfect. Clean Water Act definition of a discharge –
311(a)(2)(d) …excludes discharges incidental to mechanical
removal authorized by the President (delegated to the OSCs)….
Intent is that the action is making the situation better.
States will counter with: CWA is a federal law, this exclusion does not apply to state laws.
15th Annual OSC Readiness Training Program www.oscreadiness.org 20
Discharge Authority – Argument 2
Yes, the OSC can discharge. They decide what sampling is necessary. 40 CFR 122.3(d) exempts any discharge under
the direction of an FOSC from requiring a permit. But, the State program can be more stringent.
Not in this case. 40 CFR 123.1(g)(1) reinforces this. Specifically
excepts the 122.3(d) exclusions w/r to states prohibiting all point source discharges.
Unless states have their own independent discharge permitting separate from NPDES rules, the buck stops at the OSC.
15th Annual OSC Readiness Training Program www.oscreadiness.org 21
Permit waivers are a CERCLA invention.
Montana Air Program permits Do not allow this material to be burned in a kiln,
or really burned period within the State of Montana.
Extend to what paving companies can have in their pit and use in their process• Can’t use it as road-base under a new paved road.• Can’t use it as aggregate for a new paved road.
15th Annual OSC Readiness Training Program www.oscreadiness.org 22
Permits, Permits, Permits Land-farming in Montana requires a permit
Not eligible if <25 feet to groundwater• Groundwater at the site was ~12 feet
Treating over 2,000 cubic yards is a permanent facility• Requires more robust liner, quarterly monitoring, etc.• Did I mention we had 10,000+ yards?
Sending the waste to a fuel blender was cost prohibitive started at $65 per yard to transport via rail, plus
disposal fees at the fuel blender
15th Annual OSC Readiness Training Program www.oscreadiness.org 23
Disposal Options Best viable option was re-use as road
base… Disposal concerns:
T&D costs ~ $54/yard due to distance Potential TCLP failure for lead Montana DEQ limit for TEPH at the landfill at
30,000 ppm. Solution: did not try to separate the lead and
petroleum soils during excavation. Average truckload: 2,000 ppm Lead, <10,000
ppm TEPH, no TCLP failure
15th Annual OSC Readiness Training Program www.oscreadiness.org 24
Removing the tank
Bedding material saturated w/ diesel.
15th Annual OSC Readiness Training Program www.oscreadiness.org 25
Beyond the tank removal
Discovery of diesel plume under the tank
Believe it to be the plume identified by the County contractor
Explains the excessive mobility of the bunker C oil.
15th Annual OSC Readiness Training Program www.oscreadiness.org 26
A whole new ballgame… Recovered ~9,600
gallons of waste oil out of the excavation before backfilling and suspending the removal in late July 2011
Groundwater study done August 2011
Cut-off/Recovery system being designed, planned installation Spring 2012
NPFC Ceiling to date: $1,900,000
15th Annual OSC Readiness Training Program www.oscreadiness.org 27
15th Annual OSC Readiness Training Program www.oscreadiness.org 28
15th Annual OSC Readiness Training Program www.oscreadiness.org 29
15th Annual OSC Readiness Training Program www.oscreadiness.org 30
15th Annual OSC Readiness Training Program www.oscreadiness.org 31
15th Annual OSC Readiness Training Program www.oscreadiness.org 32
15th Annual OSC Readiness Training Program www.oscreadiness.org 33
15th Annual OSC Readiness Training Program www.oscreadiness.org 34
15th Annual OSC Readiness Training Program www.oscreadiness.org 35
15th Annual OSC Readiness Training Program www.oscreadiness.org 36
Questions?
Bueller?......Bueller?
Craig [email protected] 303.312.7067