79
QUALITY ASSURANCE PLAN FOR AC Contactor -3 Pole Revision No. 0 Date Page No. Page 1 of 79 QUALITY ASSURANCE PLAN FOR DOPPLER EFFECT LOCOMOTIVE SPEED SENSOR (PATCH ARRAY ANTENNA) ELIXIR Part No.: EE/RSSAT201204BNG KAYSONS ELECTRICALS PVT. LTD. Prepared & Reviewed by Approved by

Microsoft Word - Quality Assurance Plan Radardlwdesign.org/dlw_va/documents/738/kepco qap _radar...  · Web viewThis document and the information here is the property of Elixir Engineering.,

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Microsoft Word - Quality Assurance Plan Radar

QUALITY ASSURANCE PLAN

FOR

DOPPLER EFFECT LOCOMOTIVE SPEED SENSOR (PATCH ARRAY ANTENNA)

ELIXIR Part No.: EE/RSSAT201204BNG

INDEX

CONTENTS PAGE No.

1) Control and Confidentiality 03

2) Profile of the Company 04

3) Overview of Some of the Products Manufactured 06

4) Quality Policy 08

5) Organization Structure/ Chart 09

6) Key Personnel Activities. 10

7) Sequence and Interaction of Quality Management System Process 13

8) Process Flow chart of the manufacturing 14

9) Process Flow Chart for Production of the Product 15

10) Product Control 16

11) Procedure for Inspection & Testing 23

12) Procedure for Purchase Vendor Selection 33

13) Block Diagram of RADAR Assembly 38

14) Technical Specifications of RADAR Assembly 39

15) Proto type Testing 41

16) Proposed RADAR test setup 42

17) Process Flow Chart of RADAR Assembly 43

18) Process Flow 45

19) List of Plant & Machinery used in Manufacturing of RADAR 53

20) List of Testing Equipments used in Manufacture of RADAR 54

21) List of Tools used in Manufacturing of RADAR 55

22) Certificate of Conformity 56

CONTROL AND CONFIDENTIALITY

This document and the information here is the property of Elixir Engineering., It must not be reproduced in whole or in disclosed without the prior consent in writing from Elixir Engineering., This controlled copy of the manual is to be returned to the Management Representative whom the holder of this document has not further requirement for it or when the holder ceases to be employee of the company.

Folder in possession of controlled copies shall receive revisions or additions as and when made.

PROFILE OF THE COMPANY

We Elixir Engineering would like to introduce ourselves as a Major Service provider for Design and Development and supply of replacement spare parts and introducer of new electrical and electronics equipment for the Indian Railways EMD/GM, GE – Diesel Locomotives in India.

We established an engineering company and product development for developing locally quality OEM Electrical & Electronics products for EMD/GM freight and passenger locomotives in order to bring down the purchase cost to the Indian Railways as well as provide best local service solutions and support for the life of the product.

We are dealing with Indian Railways from past 20 years giving service in replacement of locomotive parts and customized design in monitoring and control systems for railways and other industries, also we designed and executed Indigenized automatic Emergency Braking system for 50 Locomotives (WDG4) for the first time in India at SWR – Hubli.

We are in the process of establishing the supply chain for providing very fast and efficient delivery system for skilful items in locomotives of Indian railways.

Therefore we would like to mention briefly about our company and our works. It is our pleasure to introduce ourselves as a Multi-disciplinary Engineering Services Company, located in Bangalore.

We undertake new design and development, customized manufacturing, engineering solutions, Engineering services, Installations, commissioning and Engineering co-ordination between the customer and the supplier.

We are number of Associated Persons having Engineering background with vast experience in the industry around 15 -20 years which includes engineering disciplines like Mechanical, Electrical, Electronics, Process control and Automation Engineering, etc.

All of us are BE/M-Tech graduates and having versatile experience and knowledge in Manufacturing, Process engineering, Installation & Commissioning of various Turnkey Projects, typically entail the sophisticated engineering process.

Our Capabilities further fine-tuned to timely advising us as technical adviser on Design Development Realization of the state of the art of Doppler Radar Assembly.

All our products will be tested to IEC571 standards and if required to MIL202F to quality the product for environmental reliability.

We are also capable of manufacturing various types of Electric products and control systems for GM Locomotives, based on our experience of manufacturing the same in our previous assignment and projects.

OVERVIEW OF SOME OF THE PRODUCTS MANUFACTURED

PRODUCT NAME

SPECIFICATIONS

APPLICATION

CUSTOMER & PO NO.

Design Development and Installation of Microprocessor Based AEB system for WDG4

Locomotives

For EMD Locomotives

South Western Railway - Hubli

PO. No. 1/07H/M/DSL/AEB/00 for

120 Locomotives

Design Development of GPS type Microprocessor based non- contact type electronics speed distance travel Indication and data recording unit

RDSO SPEC No. MP.0.370007 (REV-3)

For ALCO Locomotives

Southern Railway- Trichy

PO. No. 28055158.14 for 18

Locomotives.

Engine Notch sensing and

Loco status logging unit

As per Elixir Spec

For Alco Locomotives

South Central Railway

PO. No. 12055094149065

Computer Power Filter Panel for GE Microprocessor Based Locomotives

For Microprocessor

Locomotives

South Western Railway

PO. No. 66/05/0336/1/25281/01

Surge Suppressor for

Electromagnetic Relay Coils

As per Elixir Spec

For Alco Locomotives

South Western Railway

PO. No. 6606007216512501

Indigenous Rotating Coil Rectifier equivalent to EMD Part No. 2803017

EMD Part No. 2803017

For EMD Locomotives

South Western Railway

PO. No. DSL/UBL/01420/494

Design Development and

Installation and commissioning of online cope

– drag Identification and temperature monitoring system

As per RWF Spec

Cope & Drag

Rail Wheel Factory

PO. No. RWF/M&P/08-09/online C&D Identification of Temperature monitoring

Design Supply, Erection,

testing and commissioning of Data Recording system for Laddle pre heat burns of Steel Melt Shop

As per RWF Spec

Laddle Pre- heat

Rail Wheel Factory

PO.No. RWF/M/M&P/08-09/PH-

41/Temp LPH

Installation of 5 Nos Online Mould Temperature Alerter system

As per RWF Spec

Rail Wheel Factory

PO. No. RWF/M/M&P/08-

09/MR/WS/OTO1

Display System for Furnace

Specto meter lab

As per RWF Spec

Furnace

Rail Wheel Factory

PO. No. 200925004

Digital Speed Indicator for

WDG -4 Locomotives

As pre EMD Part No

EMD Locomotives

South Western Railway

QUALITY ASSURANCE PLAN

FOR

AC Contactor -3 Pole

Revision No.

0

Date

Page No.

Page 55 of 57

KAYSONS ELECTRICALS PVT. LTD.

Prepared & Reviewed by

Approved by

QUALITY POLICY

“WE ARE COMMITTED TO PROVIDE QUALITY PRODUCTS AND SERVICES AT OPTIMUM COST AND TO CONTINUALLY IMPROVE THE QUALITY MANAGEMENT SYSTEM THROUGH TQM APPROACH FOR ENSURING CUSTOMERS’ SATISFACTION ON A SUSTAINED BASIS”

KEY PERSONNEL ACTIVITIES

DIRECTOR (FINANCE)

The director (Finance) is ultimately responsible for the formulation of the company commercial aspects relevant to Elixir Engineering Business.

CHIEF EXECUTIVE OFFICER

The CEO is responsible for the control of the following

Quality Assurance

Customer liaison

General office

Production

Purchasing

Secretarial services

Manufacturing and stores area

General safety

Maintenance of office and factory

Sales and export sales price lists, INDIA and overseas agents

Director (Technical)

Director (Technical) is responsible for the administration of the following functions within the company

Research and development

Technical feasibility and design

Product certification and approvals

Administration of technical staff

Customer support

In respect of all matters pertaining to IEC/MIL Certification, of products

The organization and management structure of Elixir Engineering is detailed in our organization chart of this manual. It shows an accurate picture of the responsibilities and interaction between departments to ensure clear and precise communication throughout the company.

Any individual may report a potential Quality system Non-conformance to the Quality Manager.

Only the Quality Manager is permitted to authorize agreed action to prevent the occurrence of any non-conformities relating to Quality system.

Engineering and Manufacturing personnel may report a potential product non-conformance to the Director - Technical.

Engineering personnel may be authorized by the Director - Technical to undertake agreed action to prevent the occurrence of any non-conformities relating to product.

As general principle any individual may identify and record a product, process or Quality system problem. The problem is verified and its significance graded by the relevant manager.

The Quality Manager is responsible for identifying and recording Quality system problems via, the internal audit.

Manufacturing, test, incoming inspection and engineering personnel have specific responsibilities for identifying and recording product problems.

Manufacturing and test personnel have specific responsibilities for identifying and recording process problems.

Any individual may be authorized by the quality manager to investigate the specific root causes of a non-conformance, and develop and implement further corrective actions. All further corrective actions are to be approved by the Quality Manager and other personnel as designated by the Quality Manager before implementation.

The Quality Manager is responsible for the verification of further corrective actions.

Relevant production managers and test engineers are responsible for the control of further processing, delivery or installation of non-conforming product until the deficiency are unsatisfactory condition has been corrected.

The Chief executive officer identifies management activity requirements and ensures the provision of adequate resources and assignment of trained personnel for such activities.

Department managers identify performance of work activity requirements and ensure the provision of adequate resources and assignment of trained personnel for such activities.

The Director - Technical identifies product design verification requirements and ensures the provision of adequate resources and assignments of trained personnel for such activities.

The Director - Technical and Quality Manager identify in house product verification requirements.

SEQUENCE AND INTERACTION OF QUALITY MANAGEMENT SYSTEM PROCESS

Customer Order

Non regular work Order

Regular Work order OEM Work order

Design

Purchasing Purchasing

Purchasing

Receiving Inspection

Receiving Receiving Inspection

Inspection

Production and assy

Production of Prototype

Final Inspection Dispatch

Final Inspection

Dispatch

Dispatch

Fitment trial

Joint Inspection with customer

Prototype approval

PROCESS FLOW CHART

PROCESS FLOW CHART FOR PRODUCTION

PRODUCT CONTROL

7.1 Planning of Product Realization

Planning of the realization processes is consistent with the requirements of the organization’s

Quality management system and documented.

Quality objectives and requirements of the product

establish the processes and documentation, and provide resources and facilities to the product along with the needs.

Criteria for acceptability with respect to verification and validation of activities, monitoring, inspection and test activity.

Records those are necessary to provide evidence for the activity that has been carried out.

7.2 Customer related process

7.2.1 Determination of requirements related to the product

Elixir Engineering receives an enquiry and undertakes supplies; the following system is implemented to meet the Quality Management system.

All requirements specified by the customer, including requirements for delivery and post- delivery activities are determined.

Care is also taken to ensure that requirements not stated by the customer but necessary for specified on intended uses are determined.

Statutory and regulatory requirements related to the product are also determined.

Any additional requirements considered necessary by the organization.

The organization ensures to implement all the requirements of the customer contractually agreed. Under these circumstances, the document of agreement will be the basis for identifying such requirements for reference. Marketing personnel maintain these documents.

7.2.2 Review of requirements related to product

Customer requirements are identified and reviewed including the additional requirements if any. This review is conducted prior to the commitment to supply a product to the customer.

A Review is made to ensure that

Product requirements are well defined.

The customer requirements are confirmed before acceptance, where the customer provides no documented statement of requirement.

Contract or order requirements differing from those previously expresses (e.g. Quotation)

are revised.

The organization has the ability to meet defined requirements. The results of review and subsequent follow up actions are recorded.

When product requirements are changed, the organization ensures that relevant aware of the changed requirements.

The above requirements are addressed in the procedure Sales and Marketing.

7.2.3 Customer communication

The organization has identified and implemented arrangements for communication with customers relating to

Product information

Enquiries, contracts or order handling, including amendments.

Customer feedback including customer complaints

7.3 DESIGN AND DEVELOPMENT

7.3.1 Design and Development Planning

Elixir Engineering after considering the customer requirements initiates the design and development activity by considering,

a) Stages of Design and Development

b) Stages of all design activities including, Review, verification and validation. c) Responsibilities of Design personnel.

As the design and development stage progresses the planning output shall be updated accordingly.

7.3.2 Design and Development Input

The Inputs of the Design and development includes, a) Functional and performance of the product

b) Applicable statutory and regulatory requirements c) Information derived from previous similar designs

d) Other requirements essential for design and development

A documented procedure has been made which details the process of Design and development activity.

7.3.2 Design and Development Output

The Design and Development output is in the form of Drawings and specifications and shall be approved prior to release in order to ensure

a) Whether output is meeting all the requirements of input

b) Provides adequate information to purchase and production c) Specifies the characteristics of the product

d) Contains reference for product acceptance criteria.

A Review is made to ensure that

Product requirements are well defined.

The customer requirements are confirmed before acceptance, where the customer provides no documented statement of requirement.

Contract or order requirements differing from those previously expresses (e.g. Quotation)

are revised.

The organization has the ability to meet defined requirements. The results of review and subsequent follow up actions are recorded.

When product requirements are changed, the organization ensures that relevant aware of the changed requirements.

The above requirements are addressed in the procedure Sales and Marketing.

7.2.3 Customer communication

The organization has identified and implemented arrangements for communication with customers relating to

Product information

Enquiries, contracts or order handling, including amendments.

Customer feedback including customer complaints

7.3 DESIGN AND DEVELOPMENT

7.3.1 Design and Development Planning

Elixir Engineering after considering the customer requirements initiates the design and development activity by considering,

a) Stages of Design and Development

b) Stages of all design activities including, Review, verification and validation. c) Responsibilities of Design personnel.

As the design and development stage progresses the planning output shall be updated accordingly.

7.3.3 Design and Development review

A minuted, Design Review Meeting will take place, chaired by the Director - Technical on a nominally fortnightly basis. This meeting will discuss progress and problems encountered with current development projects and also to evaluate the results of Design and Development. The minutes of these meetings will form the basis of a monthly report to the CEO on the progress of developments.

The development plan is updated, as necessary, after the monthly report to the CEO.

7.3.4 Design and Development Verification

Elixir Engineering after considering the customer requirements initiates the design and development activity by considering,

a) Stages of Design and Development

b) Stages of all design activities including, Review, verification and validation.

c) Responsibilities of Design personnel.

As the design and development stage progresses the planning output shall be updated accordingly.

7.3.5 Design and Development Validation

Design and Development validation carried out in order to ensure whether the resulting product is capable of meeting the requirements.

The prototype sample is made and all functional tests are carried out as per test specification. The tests results are reviewed to ensure the acceptability of the results. If the results are acceptable the design is freeze and the drawing is released for Production. If any changes need to be done, a review has been taken and all the required changes are incorporated in the drawing before releasing to production. Records of design and development validation shall be maintained. A Documented procedure has been prepared which explains in detail about the design and development

7.3.7 Control of Design and Development changes

If any change needs to be carried out in the design, the same has been reviewed, verified and validated and approved before implementation. Records of changes and necessary actions are recorded.

7.4 Purchasing

7.4.1 Purchasing Process

The purchasing process for selection, evaluation and control of purchased products is ensured that they satisfy needs and requirements that are identified and implemented. A System in the form of documented procedures exists in order to ensure that all purchased and sub contracted parts meet the specified requirements.

This includes supplier evaluation, selection and approval. The requirements relating to Quality system and Quality assurance are taken into consideration for evaluation of the supplier.

7.4.2 Purchasing information:

Effective purchasing is on clear communication of the requirements to the supplier/sub- contractor. To ensure this purchase documents contain details of established specifications, grades and standard where appropriate. Adequacies of the specified purchase requirements are ensured before communication to the supplier.

7.4.3 Verification of Purchase products:

The necessary verification activities of the purchased product is identified and implemented through procedure for monitoring and measurement of products. Where customer requires

performing verification activities at the supplier premises, the same are to be communicated to the supplier.

7.5 Production and service provision

7.5.1 Control of production and service provision

Procedures/work instructions are maintained for control of production and service provision to ensure that all processes directly affecting quality are monitored and carried out under controlled condition. These procedures and work instructions ensure that personnel working on these processes have sufficient skill, training and /or instructions and are adequately equipped.

The documented procedures/work instruction includes

Use of suitable equipment/working environment

Compliance with reference to standards/codes, quality plans

Monitoring and control of suitable process parameters and product characteristics

Approval of processes and equipment’s as appropriate

Acceptance criteria including criteria of workmanship.

These procedures/instructions are accessible to operating personnel.

7.5.2 Validation of processes for production and service provision

The organization validates any processes for production where the output cannot be verified by subsequent monitoring and measurement where the process deficiencies become apparent only after the product is in use.

The organization have established arrangements for these processes including, as applicable

Defined criteria for review and approval of processes

Approval of equipment’s and qualification of personnel.

Use of specific methods and procedures.

Soldering is considered as a process which requires prior validation, where validation carried out by conducting continuity test by qualified personnel and records will be maintained.

7.5.3 Identification and Traceability

All the materials at incoming/in process / final stages are identified by tags. The tags contain the details such Part No, Part name, nature of the customer. Inspection status etc. Product status with respect to monitoring and measurement requirements is identified. The system of identification is as follows

SL NO

STAGE

Method of Identification

ACCEPTED

REJECTED

FOR INSPECTION

FOR REWORK

1

Incoming Materials

Green Tag

Red Tag

White Tag

Yellow tag

2

In process materials

Green Tag

Red Tag

White Tag

Yellow tag

3

Finished products

Green Tag

Red Tag

White Tag

Yellow tag

The identification of materials in stores shall be carried out in following ways.

1. Items made to Elixir Engineering are identified by EE Drawing number

2. Normal stock items are identified by a EE allocated stock number

3. Items for use on Engineering projects are identified on receipt by a works order reference number

4. Free issue items are identified by a works order number.

Sub-assemblies for standard products are identified by a Elixir Engineering 'EE' drawing number. Final standard products are identified by a 'EE' product code.

From the start of manufacture a works order number is used to relate manufactured product to a customer’s order. Work order documentation details the description of the product, the part number or drawing number, quantity and the works order number which is unique to that particular batch of products.

The works order documentation remains with the product through all stages of manufacture and test. The works order documentation is used to record stages of manufacture and test and remains with the product until the point of dispatch. After successful completion of test final product is labeled with its 'EE' number (standard products) and works order number.

Dispatch documentation bearing the works order number subsequently accompanies the final product

7.5.5 Preservation of product

Conformity of product is assured during internal processing and delivery to the intended destination. This includes proper identification, handling, packaging and storage of all the constituent parts of the product.

7.6 Control of Monitoring and measuring equipment

Procedures are established and documented to define the methods which ensure all equipment used to demonstrate product quality is subjected to control, calibration, recording, inspection and maintenance procedures. A Procedure is established for calibration, which address the following requirements.

Determination of the measurements to be made and the accuracy required and selection of equipments.

Identification of equipments and calibration against known traceable standards at regular intervals and establishing basis used for calibration in the absence of such standards.

Defining the process employed for calibration including details of equipment, type, unique identification, location, acceptance criteria etc and the action to be taken when the results are unsatisfactory.

Method and basis of calibration / verification of equipments that does not have a relation to national standards.

Maintaining status of equipment calibration

Maintenance of calibration records

Assess and document the validity of previous results when out of calibration.

Correct handling and storage of instruments, gauges and equipments.

Safeguard equipment against adjustments, which may invalidate calibration setting.

PROCEDURE FOR INSPECTION AND TESTING

1 PURPOSE

This procedure defines the mechanisms for testing and inspecting items within the following departments:

i) Incoming inspection

ii) Standard products manufacture

2 PHILOSOPHY

Every completed standard product or system manufactured by Elixir Engineering is subjected to final test and/or inspection.

The inspection and/or test of any item are performed in accordance with a test and inspection schedule, or with a general procedure against a drawing.

2.1 STANDARD PRODUCTS

The majority of standard products are intended for use in hazardous or safety critical applications. The products are also manufactured to order in small batches. Many of the products are certified and have mandatory production tests as a condition of certification.

These factors mean that statistical techniques are inappropriate, and each standard product is subjected to a full test or inspection.

2.1.1 IN-PROCESS TESTING

Some sub-assemblies are tested prior to incorporation in a complete product

2.2 INCOMING INSPECTION

Every incoming item manufactured to a drawing number (i.e. an item for a standard product) or to a Systems Project drawing is inspected and/or tested.

Certain standard items from suppliers undergo incoming inspection and/or test. These items are selected by the Quality Manager with the assistance of engineering staff on the following basis:

i) Previous component non-conformances detected in-process or after production

ii) The supplier is known to have inadequate testing facilities from Vendor

Assessment Questionnaire or audit

iii) The item has a critical effect upon the Quality of the final product and the supplier does not provide a certificate of conformity

3 PERSONNEL INVOLVED AND RESPONSIBILITIES

The Mechanical Inspector is responsible for ensuring that all items (incoming, in-process or final)

selected for mechanical inspection conform to specified requirements.

The Quality Engineer is responsible for ensuring that selected incoming electrical items and Elixir Engineering manufactured standard products are tested in accordance with formally approved test and inspection, using controlled test rigs and equipment, and conform to specified requirements prior to release.

Test & Validation Engineer should have the following responsibilities

In- house prototype Testing

In-house final functional testing

In-house customer joint inspection testing

3rd party Prototype testing

4.0 INCOMING GOODS INSPECTION AND TEST

4.1 MECHANICAL INSPECTION

Incoming items to undergo mechanical inspection are placed with an accompanying a tag in the mechanical inspection area.

If a standard item is to be inspected then parameters specified on the specification are used.

If a Part number item the inspector obtains a copy of the relevant drawing from the

Documentation Department.

Inspection is performed against the drawing and/or schedule using the following guidelines as appropriate for the item type.

After inspection the copy of the drawing used for inspection purposes is to be filed in the respective drawing file.

4.1.1 MECHANICAL INSPECTION GUIDELINES

4.1.1.1 CASTINGS

Castings are checked for blow holes, cracks and any other physical defects. The wall thickness of castings as shown on the drawing is verified.

The inspector verifies that there is sufficient material for any subsequent machining.

If the casting is to be incorporated in an Ex d item then the inspector verifies that there is a certificate of conformity for the item and places it in a dedicated file.

4.1.1.2 PRINTED CIRCUIT BOARDS

All whole sizes are verified and track work checked on one item from within a batch. The remaining items within a batch are inspected for visual defects.

4.1.1.3 GASKETS

Gaskets are inspected against the drawing.

4.1.1.4 MOULDINGS

NOTE: Sample testing is only permitted for components for certified products when the component does not affect the protection concept of the product. Components for certified products are indicated by stamping of the relevant drawing as relating to a certified product. The Technical Manager or deputy will advise upon query.

If these items are received in batches then sample testing against the drawing is employed. The rest of the batch is visually inspected for cracks and other defects.

Sample dimensional testing in this situation is justified as all items are produced by the same mould.

The percentage tested of a batch is as follows:

Number of Items Percentage Inspected Against Drawing

1 to 10 100

10 to 20 50

20 to 50 20

50 to 100 10

100 to 200 5

200 to 500 2

500 to 1000 1

4.1.1.5 MACHINED ITEMS

The following aspects of machined flame path items are verified:

i) Flatness of flame paths

ii) Surface finish of flame paths iii)Fit of all threaded flame paths

iv) Depth of drillings and tapings to ensure adequate residual wall thickness v) Dimensional requirements of all flame paths

Where possible, the flatness of flame path surfaces may be assessed by placing a straight edge on the surface under scrutiny and sliding feeler gauges into any gap revealed.

The inspector places a self-adhesive arrow adjacent to all flame path surfaces. This identifies the flame path surface and warns all staff who subsequently handles the item.

Threads (on items other than screws) are to be verified using appropriate calibrated ring and plug gauges.

The finish on a machined surface is to be verified using a Rupert Scale.

4.1.1.5.1 Screws, Bolts, Nuts, Terminals

NOTE: Sample testing is only permitted for components for certified products when the component does not affect the protection concept of the product. Components for certified products are indicated by stamping of the relevant drawing as relating to a certified product. The Technical Manager or deputy will advise upon query.

Such components manufactured to a Part number drawing are batch tested as follows: Number of Items Percentage Inspected Against Drawing

1 to 10 100

10 to 20 50

20 to 50 20

50 to 100 10

100 to 200 5

200 to 500 2

500 to 1000 1

4.1.1.6 FABRICATED ITEMS

Fabricated items are visually inspected for finishing.

Welded joins are visually inspected for mechanical integrity.

4.1.1.7 RUBBER ITEMS

All purchased rubber items are passed through the Mechanical Inspection department to be labeled with a self expiry date set a nominal three years after date of inspection.

4.1.2 RECORDING OF RESULTS

Supplier name

Date

Purchase Order number

Product code Quantity involved Test results

Identity of the measuring equipment

Identity of the inspector

The test results are also noted on the route card

4.1.3 LABELLING OF PASSED ITEMS

Items passing inspection are stamped with Work Order number and inspectors stamp where possible.

Alternately passed items are marked with a green self-adhesive disc.

Batch items are placed in a bag and a green 'PASS' label attached. The label is marked with the following information:

Purchase order Number Work Order No number Drawing number Supplier’s name

Supplier’s delivery note reference

Description

Quantity

4.1.4 RETURN OF PASSED ITEMS TO STORES

The Quality Engineer is responsible for placing the pased items on the ‘PASSED INSPECTION' shelf in Stores. The Quality engineer ensures that the items do not become separated by using trays, boxes or bags as appropriate.

4.1.5 NON-CONFORMING ITEMS

Non-conforming items are kept in the specified area in the Production Hall, Quality department or in Stores.

4.2 ELECTRICAL INSPECTION

Incoming items to undergo electrical inspection are placed on the AWAITING INSPECTION' bench in the Quality department.

The Quality Engineer requests a copy of the relevant drawing or test schedule held by the

Quality department.

After inspection the copy of the drawing or test schedule used for inspection purposes is to be destroyed

4.2.1 RECORDING OF RESULTS

Test results and the identity of the tester are recorded as required by the test schedule. The Pass/Fail status of the items is recorded.

The identity of measuring equipment, route card number and item type is also recorded.

4.2.2 LABELLING OF PASSED ITEMS

Items passing inspection are stamped with Work order number and inspectors stamp where possible. A green self-adhesive disc is also attached.

4.2.3 RETURN OF PASSED ITEMS TO STORES

The Quality Engineer is responsible for placing the passed items PASSED INSPECTION' shelf in Stores. The Test Engineer ensures that the items do not become separated by use of trays, boxes or bags as appropriate.

5.0 PRODUCT TEST

5.1 AVAILABILITY OF ITEMS FOR TESTING

Standard products undergoing in-process or final test are placed on the 'AWAITING TEST' bench in the Quality department

5.2 TEST AND INSPECTION SCHEDULES

The relevant Test and Inspection schedule is withdrawn from Technical Department. Formal production testing must be performed in accordance with an issued approved Test and Inspection schedule.

5.3 SELECTION OF MEASUREMENT EQUIPMENT

Equipment of appropriate accuracy is selected for use. All equipment used for test and inspection purposes must be controlled and within its calibration due date.

5.4 RECORDING OF RESULTS

Test results for conforming units and the identity of the Quality Engineer are recorded as required by the Test Schedule in the Test Report section. The identity of measuring equipment, Work order number and item type is also recorded.

5.5 LABELLING OF PASSED ITEMS

Items passing inspection are stamped with Work order number and inspectors stamp where possible. A green self-adhesive disc is also attached.

5.6 NON-CONFORMING ITEMS

Non-conforming items are kept in the specified area in the Production Hall, Quality department or in Stores.

6.0 SYSTEM TEST

6.1 MECHANICAL INSPECTION AND WIRECHECKING

Mechanical Inspection is usually performed after completion of a complete assembly. However wire-checking may be carried out on a sub-assembly when later checking would

6.1.1 SELECTION OF MEASUREMENT EQUIPMENT

Appropriate measurement equipment is selected for use. All equipment used for test and inspection purposes must be controlled and within its calibration due date.

6.1.2 RECORDING OF TEST RESULTS

Results are recorded on the generic Test and Inspection schedule.

The identity of the Test Engineer and Test Instruments are also recorded on the Test and

Inspection schedule.

6.1.3 NON-CONFORMANCES ARISING DURING MECHANICAL INSPECTION

Non-conforming items are kept in the specified area in the Production Hall, Quality department or in Stores.

6.2 FUNCTIONAL TESTING

Functional tests are carried out for all Class A projects.

6.2.1 SELECTION OF MEASUREMENT EQUIPMENT

Appropriate measurement equipment is selected for use. All equipment used for test and inspection purposes must be controlled and within its calibration due date.

6.2.3 RECORDING OF TEST RESULTS

Results are recorded on the Functional Test schedule as required.

The identity of the Test Engineer and Test Instruments are also recorded on the schedule.

6.2.4 NON-CONFORMANCES ARISING DURING FUNCTIONAL TESTING

Non-conforming items are kept in the specified area in the Production Hall, Quality department or in Stores.

6.3 PASS/FAIL STATUS INDICATION

During each stage the occurrence of non-conformances is indicated on the sheet.

6.4 VALIDATION

The Test and validation Engineer is responsible for testing and Validation of the product. The following procedure can be followed to do the validation testing

Validation matrix MIL 202F Validation matrix IEC 60571

Test jigs required to conduct Prototype

The following Reference documents can be used to do the testing and validation

Customer Spec

Applicable Standard Documents

Increase Protection Standard

Documents which Test & Validation will record while conducting a functional test

Internal functional test report

Mutual test report

OEM test Certificate

PCB Test Certificate (For Grade and Standard) Number of Samples under test as per customer

PROCEDURE FOR PURCHASE AND VENDOR SELECTION

1. PURPOSE

This procedure defines how requests to procure products and services are raised and approved, and how purchase orders are subsequently placed upon suppliers.

2. SCOPE

This procedure applies to the procurement of all products and service that are incorporated into the design, manufacture, test, or supply of a Elixir Engineering product.

Examples of such products include:

Standard EE parts or sub-assemblies

Capital Equipments

Test and inspection equipment

Process consumables such as solder, adhesives

Examples of such services include:

Sub-contracted design work Sub-contracted manufacture Sub-contracted test

Calibration of test and inspection equipment

3. PERSONNEL INVOLVED AND RESPONSIBILITIES

All personnel may raise purchase requisitions and must be aware of the requirements of this procedure.

Departmental Managers are responsible for approving purchase requisitions.

The Purchasing Officer is responsible for reviewing purchase requisitions, and raising orders upon preferred suppliers.

4 PROCEDURE

4.1 Orders may only be issued by the Purchasing Officer.

4.2 The product or service to be ordered must be defined in one of the following ways:

i) Part number (for standard EE parts)

ii) Suppliers identity and order reference (for standard supplier parts not corresponding to a standard EE part)

iii) Controlled drawing or specification (for non-standard parts or services)

iv) Adequate description of product or service to be specified on purchase order

(for non-standard parts or services)

4.3 Before any orders can be processed a Purchase Requisition must be completed.

The following details are MANDATORY:

i) Definition of product or service (see above)

ii) Issue status (for items with a EE Part number reference)

iii) Required Delivery Date iv) Quantity required

v) The identity of any free issue material

The following details are OPTIONAL:

i) Suppliers identity and order reference (for standard EE parts)

4.4 Orders for capital equipment must also be completed on a Capital Expenditure form. Such orders are to be approved by the Managing and Finance directors before further processing.

4.5 The originator of the requisition should check that any specified suppliers are in

Approved Vendor list issued from the Quality Assurance Department.

4.6 All purchase requisitions must be approved by the Departmental Manager. The

Purchase Requisition is then submitted to the Purchasing Officer.

4.7 The purchase requisition is reviewed by the Purchasing Officer to ensure it meets the above requirements. The purchase requisition may only be accepted after it meets above requirements.

4.8 The Purchasing Officer selects the supplier upon which the order is to be placed. This may be as specified by the originator, or an alternate supplier.

For standard EE parts a SUGGESTED supplier may be available within the part description on the company computer system. This supplier has not necessarily been approved by the Quality Department.

The Purchasing Officer must ensure that a PREFERRED supplier is selected by consulting the Approved Vendor List issued by the Quality Assurance Department.

Orders may not be placed upon new suppliers until the Quality Department has evaluated the supplier and confirms their capability.

The Purchasing Officer is required to pass the concerned requisition to the Quality

Department to be held until the supplier’s capability is confirmed.

4.9 After acceptance of the purchase requisition copies are circulated as follows: Purchasing Department: White

Originator of Requisition: Pink

4.10 The order is entered onto the company computer system and a purchase order is raised carrying the following information:

Suppliers address

Delivery address (nominally the Elixir address) Purchase order number

Date

Standard EE Part Number or Suppliers Order Reference

Issue status of part Product/Service description Quantity

Price per item showing discount where applicable

Total value per item Delivery date Signature of buyer

4.11 The Purchasing Officer contacts the supplier to determine whether the supplier holds a current copy of any relevant drawings or specifications referenced within the requisition before issuing the Purchase Order to the Supplier.

If the part concerned is related to a certified product then the CURRENT issue of the drawing must be used by the Supplier. If the Supplier does not hold a current issue drawing then a copy must be forwarded with the order.

4.12 Where purchase orders and work instructions require the use of free issue material, such material will be listed on the purchase order.

4.13 A footnote is included as standard upon the Purchase Order to inform the supplier those incoming inspection criteria may be included upon the Purchase Order itself or within referenced drawings or specifications.

4.14 Copies of Purchase Orders are issued as follows: White Copy to Supplier

Copy to purchase order file

Copy, sent to stores when free issue material is involved

4.15 All orders are progressed as scheduled.

4.16 Each progress is registered on the order copy as follows: Date, Comment, Signature

4.19 On receipt of a Goods Received Note for part delivery, each quantity delivered is entered onto the Stores register. The Purchasing Department checks the quantities against the original order on the file.

4.20 OUTSOURCING

The principal objective of Outsourcing is the acquisition of quality goods and services responsible sources of supply. Outsourcing seeks a wide range of products and services from an equally wide range of vendors. Vendors include Original equipment manufacturers, certified job shops, and service providers of all sizes.

If the Vendor is an OEM supplier, or a certified dealer/stockiest like RS Components, Farnell, Mouser Electronics, etc or an already proven source for the same product in the territory of Railways and deference would be automatically considered as an approved vendor. Before placing a Purchase order for machined item or any mechanical fabrication etc Quality department needs to assess the vendor capability (which include vendor's capacity, infrastructure, technical competence and quality of human resources, work location, availability of technology and related matters such as financial stability, experience and references, availability of experts with knowledge of their industries and processes for managing strategic issues). The Purchase department will verify the offer and its commercial terms and conditions. After assessment the Vendor would be added in the approved vendor list. All the vendors who had supplied as on 02-12-2010 would be considered as the approved vendor. EE will be assigned a vendor number and placed on the Approved Vendor list.

A primary responsibility of Outsourcing is to allow for open competition among vendors. The vendor must meet minimum specification as required by EE. The competition finalist(s) shall be selected based on the analysis and evaluation of all proposals. If, or when, a final proposal or proposals are selected, EE reserves the right to request that a selected vendor or vendors provide with further information related to their offer, if that information is required to complete the decision making process.

TECHNICAL SPECIFICATIONS

1.0 Electrical Specifications

· RF FREQUENCY: Transmit Frequency: 24.125 GHZ

· RF POWER: 5 to 10 mW

· TYPE OF ANTENNA: Patch array Antenna

· ANTENNA APERTURE WITH RADOME: 98x98 mm square

· BEAM DIVERGENCE ANGLE: 6° from centre

· OFFSET ANGLE ALIGNMENT: 37.5°±3.5°

· SPEED MEASUREMENT: 0.5 KMPH to 500KMPH

· TARGET DISTANCE:0.5 Meters to 500 Meters.

· OUTPUT:+15 Volt pulse wave with 50% duty cycle (square wave).

Single – ended signal with 22.5 Hz/MPH (Miles per Hour).

· UPDATE INTERVAL: Can be configured to 20 milliseconds to 1 seconds.

· VALID FREQUENCY RESPONSE: Between 10 ms to 20 milliseconds.

· POWER SUPPLY: 14.5 to 15 VDC

· OPERATING TEMPERATURE: -20 Deg to +65 Deg. RH 95%

· MECHANICAL ENCLOSER: Shock, Vibration and Weather Resistant.

Part numbers: EMD # 40034353 and EMD # 40081692

Climatic & Environmental Condition:

Maximum Atmospheric Temperature : 550C (in Sun) & +470C (in Shade) Ambient Temperature (Operating) : -20…. +700C

Ambient Temperature (Storage) : -30…. +800C Normal humidity : 90%

Maximum Humidity : 100% saturation during rainy season

Altitude : 1200 m.a.s.l

Rain fall : Between 1750mm to 6250mm, the locomotive shall be designed to permit its running at 5km/h in flood water level of 10.2cm above the water level.

Atmosphere during hot weather : Extremely dusty & desert terrain in certain areas

Coastal Areas : Locomotive & equipment will be designed to work even in coastal area in humid & salty laden atmosphere

PROTO TYPE TESTING

Sl No

Type Test

Routine Test

Specification

Agency/place of Test

1

Performance Test

Performance Test

IEC60571

In House

2

Dielectric Test

Dielectric Test

IEC60571

Third party agency

3

Voltage surge test

-

IEC60571

In house

4

Dry Test

-

IEC60571

Third party Agency

5

Vibration Shock and

Bump test

-

IEC61373

ETDC Bangalore

ANTENNA TESTING:

SL.no

Particular of testing

Range

Place of testing

1

VSWR/ return loss-db

1.29/18 db

In house

2

Bandwidth(MHZ)

±100 MHZ

In house

3

Beam Divergence angle

6° from centre offset angle alignment 37.5°±3°

In house

4

Trans receiver module output

35dB

In house

5

Signal strength

Minimum 35 dB

In house

6

Testing different frequency v/s speed

voltage

In house

Frequency

In house

speed

In house

PROPOSED RADAR TEST SETUP

PROCESS FLOW CHART FOR RADAR ASSEBLY

INWARD OF MATERIALS

STORES

NO

INWARD

REJECT

INSPECTION

YES MOUNTING SOLDERING OF

COMPONENTS ON PCB

NO CHECKINGTHE PCB TO ENSURE THAT ALL THE

COMPONENTS SOLDERED

YES

PCB CLEANING

STORES

IF FAIL

CONTINUIT REJECT Y TESTING

IF PASS

MECHANICAL HOUSING PREPERATION

INSERTION OF THE ASSEMBLED PCB IN TO THE HOUSING

COMPLETE ASSEMBLY OF MECHANICAL

STORES FINAL NO

INSPECTION & REJECT TESTING

YES

CLEANING PACKING DISPATCH

PROCESS FLOW

1. Collect all the necessary tools such as Screw driver set, cavity, speed sensor, filament, PCB, Rubber grip for PCB, Slide guides.

2. Keep the filament on one above the other and place them in a cavity where the sensor screw matches before placing the speed sensor.

Filament

3. Place the speed sensor in the cavity as shown in the Pic 1.0, tight all the four screws gently.

Speed sensor

Sensor cable sensor screw

4.Place the slide guide on both the ends of the cavity as shown in the Pic 1.1, the thicker side of the slide guide to be inserted to the inner side of the cavity.

SLIDE GUIDE

5.The slide guide must be facing towards sensor as shown in the Pic 1.1.

PIC 1.1

Slide guides (Black)

6.Bare Board PCB

Pic 1.2

7.Place the rubber grip to the PCB as shown in the PIC 1.3

PIC 1.3

Rubber grip

8. Insert the PCB in the cavity, Make sure that power connector and sensor connector of PCB will be facing as shown in the PIC 1.5.

PIC 1.4

9.After placing the PCB in the cavity, Place the sensor connector on to the board which has a mating part soldered on PCB. The PIC 1.6 shows the over view.

PIC 1.5

Sensor cable connection to PCB

10. Insert another set of slide guide in the Cavity below the PCB and above the previously inserted set of card slide guide. As shown in the PIC 1.6

PIC 1.6

11.Overview of the sensor, sensor connector, PCB alignment, Card grid.

PIC 1.7

Sensor Connector Slide guide

12. Back Panel plate rare side overview.

PIC 1.8

Back panel plate (rare side)

13.Power connector connection to the PCB as shown in PIC 1.9

PIC 1.9

sensor

14.Back panel fixture PIC 1.11

PIC 1.11

Screw placing

15.MAIN POWER SUPPLY CONNECTOR PIC 1.12

I/O CONNECTOR TO THE LOCO

PIC 1.12

16. Final Radar picture PIC 1.13

PIC 1.13

BILL OF MATERIAL FOR MODIFIED RADAR ASSEMBLY DRG NO :

SL NO

EE PART NO

DECRIPTION

Nos.

DRG

REMARKS

1

Radar Housing

1

ELIXIR DWG

Indigenous Developed Inhouse.

2

Back Cover Plate

1

ELIXIR DWG

3

Processor Board

1

ELIXIR DWG

4

Transceiver Assy.

1

ELIXIR DWG

5

Micro-Strip Antenna Assy.

1

ELIXIR DWG

6

Seal O ring

1

ELIXIR DWG

7

Cap Radar lens

1

ELIXIR DWG

8

RF Connector With Filter Assy.

1

ELIXIR DWG

9

Gasket

1

ELIXIR DWG

10

Screw M4x14 CH

1

ELIXIR DWG

11

Washer # 6 Flat

1

ELIXIR DWG

12

Screw M3x14 CH

1

ELIXIR DWG

13

Washer # 4 Flat

1

ELIXIR DWG

18

Insulator

1

ELIXIR DWG

19

Retainer Upper

1

ELIXIR DWG

20

Conformal Quoting

1

ELIXIR DWG

21

Cap PTFE

1

ELIXIR DWG

22

Insulator

1

ELIXIR DWG

23

Static control

1

ELIXIR DWG

24

2

2

2

2

2

25

AISI304

Stainless Steel

26

40033657

Housing Radar

C

EMD/DLW

27

A.I.2400

Tolerances

Elixir drg attached

ESSENTIAL TESTING EQUIPMENT:

Sl.No

Name of testing equipment

Make

Model No:

Range and specification

Accuracy

Application of this instrument

Remark

1.

Vector network analyzer

Keysight

PNAN5242A

10MHZ to 26.5 GHZ

Dynamic accuracy:0.1 dB compression with =13 dBm I/P at receiver

High accuracy standard for test and measurement as network analyser. For testing of Sparameter/smith chart/polar/SWR etc

High accuracy standard test and measurement equipment

2.

Signal analyzer

keysight

N9020A

10HZ to 26.5GHZ

±0.23dB absolute Amplitude accuracy

High accuracy standard for test and measurement as network analyser. For testing signal strength

High accuracy standard test and measurement equipment

3.

Signal generator

keysight

N5173B

9KHZ to 40GHZ

±0.23dB absolute Amplitude accuracy

High accuracy standard for test and measurement as source generator

High accuracy standard test and measurement equipment

4

Network analyzer

keysight

E5071C

300KHZ to 20GHZ

Dynamic accuracy:0.1 dB compression with =13 dBm I/P at receiver

High accuracy standard for test and measureme-nt as network analyser. For testing of Sparameter/smith chart/polar/SWR etc

High accuracy standard test and measureme-nt equipment

5

Digital oscillosc-ope

Tecktro-nicx

MS2022

500Mhz

Frequency accuracy:10ppm,storage sampling:1GHZ

To test and modulate DC/AC signals

High accuracy standard test and measureme-nt equipment

6

Digital multimeter

Fluke

106

AC volts:6/ 60/600V

DC volts: 6/60/ 600V Resistance:400Ω/4KΩ/40KΩ/

400KΩ/4MΩ,40MΩ

AC Volts:1.0%+3;DC volts:0.5%+3;

Resistance:

0.5%=3;

Test preliminary parameter, measure and monitor voltage/current etc.

Test preliminary parameter

7

Wave-guide adopter WR-28

Narada

V4607

18GHZ to 40GHZ

0.01 mm±0.1dB

Waveguide to coaxial adopter

High standard to coaxial converter

8

LCR meter

CHY FIREMATE

24CS

Inductance:200µ/2m/20m/200m/2/20H Resistance:200/2k/20k/200k/2M/20M/200M/ 2000MΩ Capacitance:200p/2n/20n/200n/2µ/20µ/200µ/2m/20mF Frequency:2k/20k/200k/15MHz Temperature :-20 to 750°C Diode test: 1mA, 3V

Resistance: ±(0,3% + 1 digit); Capacitance: ±(2% + 10 digits); Inductance: ±(5% + 3 digits); DC voltage : ±(2% + 1 digit); Frequency : ±(0,1% + 1 digits);

Test preliminary parameters, measure and monitor voltage/current etc.

Test prelim

-nary parameter

9

Wave-guide adopter WR-42

Narada

4608B

18GHZ to 26.5 GHZ

0.01mm±0.1dB

Waveguide to coaxial adopter

High standard

to coax-

ial converter

10

Test port cables low loss RF assembly

keysight

F03A2

30774

300KHZ

-26.5 GHZ

Imped-

ance:50Ω

phase matched:

±1°

±0.01 dB vswr 1:1.05±1°

Test

and measure port 1 and port 2

Test

and measure-

ment

cables

11

Caliberation kit

keysight

85052D

300KHZ

-26.5GHZ

APC/SMA precision calibration adopter

For calibrating I/P or O/P

Calibration

kit

12

Adopter

keysight

x-series

DL-26.5GHZ, 2.4 mm-3.5mm/

2.92mm adapter

±0.01dB

Source adopter

Source(

signal adopter)