Microsoft Word - CO NOTES-ILOGIC.pdf

Embed Size (px)

Citation preview

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    1/239

      1

    SAP CO NOTES

    INDEX

    PARTICULARS Page No.CO Areas and Basic Settings for Controlling 3

    Cost Center Accounting 11

    Online Reconciliation Leger 23

    1. Creation of GL Masters2. CO Customization

    3. FI Customization

    2527

    28

    Cross Company Code Postings 31

    Maintain Overhead structure 34

    Statically Key Figures (SKF) 38

    Assessment 42

    Internal Orders 46Budgeting and Availability Control 60

    Profit Center Accounting 64

    Integration 76

    1. 

    Transaction Key /Process Key

    2.  Valuation Class3.

     

    Assignment of accounts

    4. 

    MM Customization

    5.  FI Consultant job in MM

    6.  Assignment of Accounts for Automatic Postings(MMto FI)

    7. 

    FI Consultant job in SD8.  SD Steps9.

     

    77

    7889

    90

    97

    100

    115

    Co-Profitability Analysis (CO-PA)1. Data flow in CO-PA

    2. Customization

    3. SD End user area

    120120

    122

    126

    Report Painter 129

    Product Costing 132

    1. 

    Co Consultant Job (Activity based costing)

    2.  PP Consultant job

    3. 

    CO End User area4.

     

    MM End User area

    5.  PP End user area

    134

    144

    146147

    149

    Actual Costing 153

    1. 

    CO Consultant job

    2. 

    PP consultant area

    3.  Asset Accounting area

    153

    167

    174

    New General Ledgers (ECC 6 New Features ) 179

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    2/239

      2

      1. Customization

    2. Document Splitting

    180

    188

    Central Excise and Sales Tax

    1. Central Excise Customization (Purchase)

    2. Central Excise customization (Sales)

    3. SD End user area

    192

    195

    211

    217Financial Statement Version 228

    Asset Accounting Area 237

    Project Report 238

    CONTROLLING (CO)

    This is used for internal reporting in Co organizational Hierarchy – Highest node is

    controlling area. In FI Highest node is company , Company code

    CO AREAS :

    1. Cost Elements Accounting: To update Co records / sub modules cost elements

    are required.

    There are two types of cost elements

    1.  primary cost elements2.

     

    Secondary cost Elements

    2. Cost Center Accounting: This is used to view department wise costs.

    3. Internal orders: This is used to view costs for specific task.

    Eg: Vehicle wise running expenses / Petrol expenses, Repairs to that Vehicle,Telephone wise expenses production order costs / Exhibition costs.

    Create each vehicle as n order and capture the costs

    Production order:

    Create production order as on internal order and capture the costs.

    Exhibition costs: Sales men salaries , Advertisement discounts to customers

    conveyance. Create a exhibition order

    4. Profit center accounting : This is used to view profitability product wise /

    Division wise / Location wise if business area is not used in FI

    5 Product Costing :This is used for valuation if inventories

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    3/239

      3

    Eg: Finished goods and work in process.

    6. Profitability analysis: This is used to view profitability for number of parametersat a time.

    Eg. Sales order wise / Customer wise / Product wise / Plant wise / Sales

    organization wise profitability this is reporting tool

    BASIC SETTINGS FOR CONTROLLING:

    Maintain controlling area 

    FI Organization Structure CO. Organization Structure

    Company Controlling

    | |Company code |

    | |Business area Cost Center

    Scenario – 1

    Company

    |

    Company code = Controlling Area

    | |Business area ---  Cost Center

    (a)Controlling area at company code level, b)Business area will be assigned in cost

    centers.)

    Scenario -2

    Company = Controlling Area

    | |

    Company code || |

    Business area ---  Cost Center

    (a )Controlling area at company (group) level no. of company codes will have one

    controlling area, b) Business area will be assigned in cost centers.

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    4/239

      4

    1)  When management wants to view number of company codes cost centers data at a

    time – It is not possible in 1st Scenario – It is possible 2

    nd scenario.

    In report it will ask only one controlling area and not multiple controlling area.

    2) 

    When management wants to view number of cost centers data of company code –Directly it is possible in 1st scenario.

    Also it is possible in 2nd Scenario – By creating cost center groups.

    It means 2nd

     Scenario is more flexible.

    MAINTAIN CONTROLLING AREA:

     Path : SPRO – Controlling – General controlling – Organization – Maintain

     controlling area (Tr.Code is OKKP)

    If we go for 1st scenario – company code should be the controlling area.

    If we go for 2nd

     scenario we can use any code for controlling area code.

    Double click maintain controlling area.

    Select new entries button

    Controlling area :BIL

    Name :controlling area forBIL

    Company code to controlling area : Select controlling area same as company codeCurrency type : select 10 company code currency.

    Once we select 10 company code currency , currency field, Chart of Accounts filed andFiscal year variant filed will be updated automatically.

    Cost Center standard hierarchy : BILHIER

    SaveSelect yes button for the message system to create as a standard hierarchy

    Select create request button

    Short description : Co customization for BIL

    Press enter

    Press enter once again to save in the request.

    COST CENTER STANDARD HIERARCHY:

    Cost center standard hierarchy : BILHIER|

    Cost centers Dept. A Dept.B Dept.C

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    5/239

      5

     

    At the time of cost center creation – It will ask under which hierarchy we are creating thecost centers.

    In the report – when we give cost center Dept.A – It gives only Dept.A date. When we

    give cost center Dept.B – It gives only Dept.B date.

    When we give cost center hierarchy BILHIER – It gives all the cost centers data.

    Double click on assignment of company codes folder

    Select new entries button

    Give the company code : BIL

    Select save button or Ctrl+S

    Press enter to save in your request

    Double click on a activate components / control indicators folder

    Select new entries button

    Fiscal year :2007

    Cost center : Select component active

    Select active type check box

    Order management select component active.

    Select profit center accounting check box

    Save

    Ignore the warning message press enter

    MAINTAIN NUMBER RANGES FOR CONTROLLING DOCUMENTS:

    1.  CO through posting from FI (Business transaction – COIN

    CO No rang interval for the business transaction –COIN

    FI Document type CoAnd no.ranges

    SA COIN| |

    01 |

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    6/239

      6

      |

    1-100000 1-00000Manual posting F-02 Automatic posting

    1.  Repost Co line items (Business transaction –RKU3)

    Option 1

    Posting in FI

    Wages A/c Dr 100000 Dept.AWages A/c Dr 200000 Dept.B

    Wages A/ Dr 300000 Dept C

    To bank 600000

    FI Document

    Co Document – COIN

    Note :Automatic posting is a business transaction

    Option 2

    Posting in FI Posting in CO

    Wages A/c Dr 600000 Dept common Dept A 100000

    Dept.common Dept B 200000

    Dept. Common Dept C 300000

    To Bank 600000 Post Co line item

    2 Documents

    1 FI Document No FI document

    1 CO Document –COIN 1 CO Document – RKU3

    Transfer document wise/line item wise

    Total documents generated

    1. 

    FI Document

    2. 

    CO Documents

    Wages A/c Dr 600000 Dept Common Dept A 300000

    Dept Common Dept B 200000

    Dept Common Dept C 300000

    Rent A/c Dr 50000 Dept A

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    7/239

      7

      To bank 650000 Repot CO line item

    Transfer line item wise

    Transfer document wise / Line item wise

    Report costs ( Business transactions – RKU1)

    This is used when we split the cost center into number of cost centers or transfer for

    wrong cost center postings.

    No FI document will be generated

    CO document only will be generated

    Transfer cost element wise (GL Account wise) 01/07/2007 split into Dept A and Dept X

    Dept A Dept X

    30/04/2008 400100 Salaries 200000

    30/05/2008 400100 Salaries 25000030/06/2008 400100 Salaries 275000

    ----------

    400100 total 725000 400100 Salaries 200000

    30/04/2008 400101 wages 100000

    03/05/2008 400101 wages 150000

    30/06/2008 400101 wages 125000----------

    Total 400101 375000 400101 wages 125000

    30/04/2008 400300 Rent 500000

    31/05/2008 400300 Rent 50000

    30/06/2008 400300 Rent 50000

    --------400300 Total 150000 400300 Rent 40000

    Planning primary costs ( Business transaction RKP1)

    Planning cost center wise or no. range interval for all the types , budgeting cost center

    wise for each cost element.

     Path: SPRO- Controlling – General controlling – Organization- Maintain number

     ranges for controlling document (T.Code is KANK)

    Controlling area : BIL

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    8/239

      8

    Select maintain groups button

    From the menu select group – InsertText: Co doc no. range interval for BIL

    From number : 1

    To number :100000

    EnterDouble click on business transactions COIN

    RKU3RKU1

    RKP1

    Select Co.No.range interval for BIL check boxFrom the menu select Edit – Assignment element group

    Save

    Ignore the message press enter

    Note :Usage of Version locked authorized person only Eg; Cost Accountant

    MAINTAIN VERSIONS:

    Version are nothing but budgets

    Original budgets Version 0

    Revised budget version 1

    Re revised budget Version 2

    We can compare actual with original budget, Revised budget and Re revised budget

     Path: SPRO – Controlling –General controlling – Organization – Maintain

    versions

    Select version 0 (Plant /actual version )

    Double click on settings for each fiscal year folder

    Give the controlling area : BIL

    Enter

    Select new entries button

    Fiscal year :2008

    Exchange rate type :select B (Bank selling rate)

    Once budgeting is completed at end user are a select version locked – So that no body

    can change budget figures.

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    9/239

      9

    Select save button or Ctrl+S

    Press enter to save in your request

    Select bank arrow

    Planning is made attend user area after planning’s completed we select version locked

    check box , no body can change planned figures.

    COST ELEMENT ACCOUNTING:

    To update CO records / sub modules cost elements are required

    There are 2 types of cost elements

    1. Primary cost element 2 Secondary cost elements

    A)Primary cost elements are our general

    ledger accounts

    A)Secondary cost elements are other than

    general ledger accounts

    B) Posting to primary cost elements are

    possiable

    B) Postings to secondary cost elements are

    not possible. They are used to allocations /

    Settlements

    Dept C Dept A Dept B(Service Dept) (Production Depts)

    Salaries 100000

    Wages 200000Power 5000

    In the month end, by using secondary cost

    element, we allocate costs from service to

    production Depts.

    COST ELEMENT CATEGORIES

    PRIMARY COST ELEMENT CATEGORIES:

    1. Primary cost / costs redacting revenues. This used for expenditure accounts

    3. Accrual / Deferral per surcharge :This is used for month end provisions only inCO

    11. Revenues: This is used for income accounts

    12. Sales Deduction: This is used for expenditure accounts like sales commissionTrade discount where CO-Profitability analysis module is activated

    22. External settlement( Settlement from CO – FI): This is used for allocation of

    internal order settlement to GL Accounts / Assets.

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    10/239

      10

    SECONDARY COST ELEMENT CATEGORIES:

    21. Internal settlement (Settlement from CO to CO) This is used for allocation of

    internal order settlement cost to cost centers.

    31. Order/ Project Results analysis: This is used for work in process calculations is

    product costing.41. Overheads rates :This is used for calculation of raw material overhead rate /

    Production overhead rate in product costing .42. Assessment: This is used for allocation of primary cost element posing and

    secondary cost postings from one cost center to other cost centers.

    43. Internal Activity Allocation: This is used for calculation of activity types inproduction cost.

    Eg: Machine hours rate / labour hour rate in product costing.

    COST CENTER ACCOUNTING

    This is used to view department wise costs we use cost center accounting.1.

     

    Creation of primary cost elements, we can create

    A) FI Area |

    B)CO Area |- Co AreaC)Automatic creation |

    2.  Display cost elements created

    3.  Creation of filed status group by making cost center required entry field4.

     

    Assign new filed status group in GL expenditure accounts

    5.  Creation of cost centers.

    6.  Creation of cost center groups.7.

     

    Creation of cost element groups

    8. 

    To enter exchange rate for type M for INR to Euro

    9.  Posting of transaction in FI10.

     

    To view cost center wise report.

    11. 

    To view CO documents

    1.  A) Creation of primary cost element at FI areaUse to FS00 – GL masters creation

    Give the GL account number : 400100 Salaries Account

    Company code : BILForm the menu select GL Account display

    Now select edit cost element button

    Valid from date :01.04.2008To date :31.12.9999 comes automatically

    Enter

    Cost element category : Select 1 (Primary cost / cost reducing revenues)Select save button or Ctrl+S

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    11/239

      11

    1.  B) Creation of Primary cost element at CO area:

    Use transaction code FS00

     Path: Accounting- Controlling- Cost element accounting-Master data-Costelement –Individual processing-Create primary (Tr.code KA01 )

    Cost element : 400300 Rent Account

    Valid from :01.04.2008 to 31.12.9999Enter

    Cost element category :1 (primary cost /cost reducing revenue)

    Save

    1. 

    C) Automatic creation of primary cost elements:

    1)  Marked default settings (OKB2)

     path : SPRO-Controlling-Cost element accounting-Master data – Cost elements – Automatic creation primary and secondary cost elements-Make default

     settings.(Tr.code is OKB2)

    Give the chart of Accounts : BILEnter

    Account from :400301

    Account to :499999

    Cost element category select 1Save

    Press enter to save in your request

    Create batch input session (OKB3)

    Same path as above

    Give the controlling area : BIL

    Valid from :01.04.2008

    Valid to :31.12.1999

    Session name :BIL (This is text field)

    Execute

    Execute batch input session (Tr code is SM35)

    Same path as above

    Select session name : BIL

    Select process button

    Select session :BIL

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    12/239

      12

    Select display errors only radio button

    Select process button

    We get a message processing of batch input session completed.

    Ignore the message & select exit batch input button

    Display primary cost elements created (KA03)

     Path: Accounting-Controlling-Cost element accounting-Mater data-Cost

    element –Individual processing – Display- (Tr code is KA03)

    Select drop down button beside cost elementGive the Controlling area : BIL

    Enter

    Creation of field status group by making cost center required entry field:

    (Tr.Code is OBC4)

    Select field status variant: BIL

    Double click on filed status groups folder

    100000 equity share capital G001 We can’t make cost center required forbalance sheet accounts

    400100 Salaries Account G001For G004 we make cost center required and

    assign in salaries account (i.e in expenditure

    accounts)

    Double click on field status group G004 cost accounts

    Double click on General data

    Text make it required entry field

    Select next group button

    Cost center select required entry filed

    Select next page or page down button two times.

    Business area make it option entry filed

    Save

    Press enter to save in your request

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    13/239

      13

     

    Assign group new field group in GL expenditure accounts (FS00)

    Give the GL account 400100 salaries account

    Company code :BIL

    From the menu select GL account change select create / Bank / Interest tab

    Filed status group change to G004

    Save

    Give the GL Account No.400300 Rent A/c

    Company code :BIL

    From the menu select GL account change

    Change field status group to G004

    Save

    Creation of cost centers:

     Path: Accounting-Controlling-Cost center accounting-Master data-Cost center-

     Individual processing-create (Tr.code is KS01)

    Cost center : Dept A

    Valid from :01.04.2008 to 31.12.9999

    Enter

    Give the name : Dept A

    Give the description : Dept A

    Person responsible :Mr.A

    Cost center category : Select 1 production

    Hierarchy area : select BILHIER

    Business area :BILH

    Currency :INR

    Select save button or Ctrl+S

    Ignore the warning message press enter

    One more cost center : Dept B

    Valid from :01.04.2008 to 31.12.9999

    Reference cost center : Dept A

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    14/239

      14

    Controlling area : BIL

    Enter

    Change the name to Dept B

    Change the description to cost center Dept B

    Change the person responsible : Mr B

    Other fields are common

    Select save button

    Ignore the warning message press enter

    Cost center : Dept C

    Valid from :01.04.2008 to 31.12.9999

    Reference cost center : Dept A

    Controlling area : BIL

    Enter

    Change the name to : Dept C

    Change the description to cost center : Dept C

    Change person responsible to Mr.C

    Cost center category : Select to 2 (service cost center)

    Select save button or Ctrl+s

    Ignore the warning message press enter

    Creation cost center groups:

    Hierarchy : BILHIERCost centers Dept A Dept B Dept C Dept X Dept Y Dept Z

    Category Production Prod Service Production Production Service

    Business Area HYD HYD HYD BGL BGL BGL

    If we want to see all cost centers data – BILHIER

    If we want to see production cost centers data – Create a cost center group and assignDept A . Dept B, Dept X and Dept Y.

    If we want to see HYD cost centers data cost – cost center group and assign Dept A, Deptb and Dept C

    If we want so settled production cost centers data – create A cost center group and assignDept A and Dept B

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    15/239

      15

     Path : Accounting – Controlling – Cost center accounting – Master data- Cost center group – Create (Tr.code is KSH1)

    Give the cost center name : BILHYD PROD

    Enter

    Description Hyderabad production cost centers BIL

    Select Edit Cost Center Insert cost center button

    Select the cost centers Dept A

    Dept B

    Save

    Creation of cost Element group:

    FI : Account groups Personnel cost CO:Dept wise personal cost or

    Administration

    400100 salaries Create cost element group personnel andassign 400100 -400199

    400101 Wages

    400102 Bonus

    400103 Staff welfare and Administration Create cost element group administrationand assign 400300-400399

    400300 Rent

    400301 Telephone exp400302 Petrol exp In the report center Dept A Dept C

    Or

    Cost center GRP

    Cost element

    OrCost element GRP personneladministration

     Path: Accounting –Controlling-Cost center accounting-Master data-Cost element group –Create (Transaction code: KAH1)

    Cost element group name : BILADMIN

    Enter

    Description : Administration expenses for BIL

    Select insert cost element button (Shift+F4) (Edit –Cost element –Insert cost element)

    From 400300 to 400399

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    16/239

      16

    Save

    To enter exchange rate for type M for INR to EURO (Tr.Code is OB08)

    Select new entries button

    Exchange rate type : M (Average rate)

    Valid from :01.10.2008

    From currency : INR

    To : EUR

    Direct quotation :0.02

    Select save button or Ctrl+S

    Press enter to save in your request

    Posting of transaction in FI Transaction code:F-02

    Give the document date : Today’s date

    Type :SA

    Company code :BIL

    Posting key :40Account :400100 salaries account

    Enter

    Give the amount :500000Cost center : Dept A

    Text :Salaries posting

    One more expenditure

    Post key :40

    Account :400300 Rent accountEnter

    Amount :100000

    Cost center : Dept AText : Rent posting

    Posting key : 50

    Account :200105 SBI current accountEnter

    Amount :*

    Business area :BILHText : Expenditure posting

    From the menu select Document Simulate

    Select save button or Ctrl+S

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    17/239

      17

    To view cost center wise report:

     Path: Accounting –Controlling-cost center accounting –Information system-Report for

     cost center accounting-Line items –Cost centers: Actual line items (Transaction:KSB1)

    Cost center select Dept A (if you want change the posting dates)

    Select execute button

    Keep the cursor and the first line item

    Select document button

    Select back arrow

    Select change layout button (Ctrl+F8)

    Select Document no.under column set

    Select value in reporting currency under displayed columns

    Select left arrow or show selected filed button

    Select reference document no.under column set

    Select value in report current under displayed columns

    Select left arrow

    Select business transition under column set

    Select document no. under displayed columns

    Select left arrow

    Enter

    To view co documents:

     Path :Up to reports for costs center accounting path is same -Line items – Co

     documents :Actual costs (transaction code is KSB5)

    Document no. :1 to 100000

    Execute

    Select folder button for document no.1

    Report co line items:

    Business transaction RKU3

    FI doc.13001 400100 Salaries 500000 Dept A 150000 Dept B

    50000 Dept C

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    18/239

      18

     

    Report co line item002 400300 Rent 100000 Dept A

    003 200105 SBI 600000

    Report co line itemTransfer document wise /line item wise , transfer line item wise

    No FI document will be generatedOnly document will be generated

     Path: Accounting – Controlling-Cost center accounting –Actual postings-Report lineitems-Enter (Transaction code is KB61)

    Select document no. :13

    Company code :BILFiscal year :2008

    ExecuteDouble click on line item no.1Amount under new account assignment 150000

    Cost center :Dept B

    Select new item buttonSelect next button

    Amount under new account assignment 50000

    Cost center : Dept C

    Save

    Go and see the cost center report KSB1

    Give the cost center Dept A

    Select execute button

    To view cost element wise to total

    Select cost element column

    Select sub totals button

    (Note:That is dues cost element wise total)

    Repot costs (Business transaction RKU1)

    This is used when we split a cost center in to number of cost centers or wrong cost center

    postings.

    No FI document will be generatedOnly CO document will be generated

    Transfer cost element wise (GL account wise)

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    19/239

      19

     Path : Accounting-Controlling-cost center accounting –Actual postings-manual reporting of costs – Enter (Transaction code is KB11N)

    Cost center (old) : Dept A

    Cost element 400100 Salaries

    Amount :100000

    Cost center new : Dept C

    One more cost center (old) : Dept A

    Cost element :400300 Rent

    Amount :25000

    Cost center (new) : Dept C

    Enter

    Select save button or Ctr+S

    Period lock:

    FI CO

    A) Transaction which effect

    FI and CO eg:COIN

    To open To open

    B) Transaction which effect

    only CO Eg.RKU3, RKU1

    No check To open

    C) Transaction which effectonly FI Eg.Debit balance

    sheet and credit balance

    sheet

    To open No check

    Sept .08 March Oct 2008 to March 2009

    An expenditure posting in FI for September. We can’t post since periods are not open.

     Path: Accounting – Controlling-cost center accounting-Environment –Period lock-

     chang (Tr.code is OKP1)

    Controlling area : BILFiscal year :2008

    Select actual button

    Select period :01

    Select lock period button

    Save

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    20/239

      20

     

    Set controlling area :(OKKS): 

     Path :up to Environment the path is same     Set controlling area

    Give the controlling area :BILEnter

    Real time integration of controlling with FI on line reconciliation ledgerThis is used when we get for 2nd scenario (no.of company codes having one controlling

    area ) all the company codes should use same Char of Accounts.

    Planning cost center wise 

     Path :Accounting –Controlling cost center accounting –Planning –Cost and Activityinputs –Change (KP06)

    Version :select 0 (Original budget)From period :1

    To period :12

    Fiscal year :2008

    Select next page or page down button

    Cost center group :BILHIER

    Cost element From :400000

    Cost element To :499999

    Free Form Bsed

    If we select radio button If we select from based radio button

    We have to select cost element from the

    drop down list and plan against theCliments

    The cost element list in a available on

    screen plant against cost elements

    Select form based radio button

    Select overview screen button

    For cost element 400100 Plan Fixed cost 1500000Distribution key 1 Equal distribution

    Select cost element 400100

    From the menu select Goto –Period screen

    Select back arrow

    Fro cost element 400300 Plan fixed cost 960000

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    21/239

      21

    Distribution key 1

    To plan for Dept B –Select next combination button

    To go back to previous dept –select previous combination button

    Save

    To view variance report cost center wise

     Path :Accounting – Controlling-Cost center accounting –Information system –Reports

     for cost center accounting –Plan /Actual comparisons –Cost centers: Actual

     /Plan/Variance (Tr code is S_ALR_87013611)

    Controlling area :BIL

    Fiscal year :2008

    From period :10

    To period :10

    Plan version :0

    Cost center Value :Dept A

    Execute

    Keep the cursor on Salaries A/c actual costs amount

    Select call up report button

    Double click on cost centers : Actual line items keep the cursor on the first line item.

    Select document button

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    22/239

      22

     

    ONLINE RECONCILIATION LEDGER

     Reconciliation used when

     when number of company codes having one controlling area – 2nd Scenario

     It can be at controlling area

     All the company codes should use the same Chart of Accounts due to online reconciliation ledger, it generated in a document in FI

    BIL Controlling area|

    ------------------------------------------------------------------------

    | |Company code BIL company code BSL

    | |

    ------------------------------------ ------------------------------------

    | | | | | |Dept A Dept B Dept C Dept X Dept Y Dept Z

    If salaries paid and posted FI at (F-02)

    Salaries A/c

    ----------------------------------

    100000 |

    |Out of 100000 salaries 20000 belongs to company code BIL

    If we use the reconciliation account at cost center level and the 20000/- is transfer tocompany code BSL (Dept X) it passes the entry in financial automatically

    Here Reports at – No FI records

    In BIL BooksBSL Dr 20000

    To Salaries a/c 20000

    In BSL books

    Salaries account Dr 20000

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    23/239

      23

      To BIL a/c 20000

    Customization at Finance:

    To copy company code BIL customization including accounting to BSL

     Path :SPRO-Enterprise structure – Definition –Financial accounting –Edit, copy,

     Delete, Check company code(T.Code EC01)

    Double click on copy, delete, check company code

    From the menu select organization object – copy organization object

    From Company code :BIL

    To company code : BSL

    Enter

    Select Yes for the message (for copy the GL accounts)Select No button allocate a different local currency

    Ignore the message press enter

    Select create request button

    Short description :Customization for Birla Steel Limited

    Press enter

    Enter once again to saving the request

    Go on press enter till you got the message company code BIL copied to BSL with out 75

    number range object

    Ignore the message press enter

    Select back arrow

    Double click on edit company code data

    Select position button

    Give the company code :BSL

    Enter

    Select company code : BSL

    Select address button

    change the company name to : Birla Steel limited

    Enter

    save and Save in your request button

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    24/239

      24

     

    Assign company code to company

    Path :SPRO-Enterprise structure-Assignment –Financial accounting-Assign

    company code to company

    Select position button

    Give the company code : BILEnter

    For the company code :BSL assign BIL(group name)

    Select save button or Ctrl+SPress enter to save in your request

    Document type SA should allow inter company postings: (OBA7)

    Select type : SA

    Select details button

    Select inter company postings check box

    Save

    Press enter to save in your request

    Creation of GL Masters FS00

    BIL Books BSL Books

    1) FI/CO reconciliation account under only

    expediter group which should not be a costelement 400150 –Personnel group

    1)FI/CO reconciliation account under any

    expenditure group which should not be acost element 400150 personnel group

    2) Birla Steels limited, current assets,

    Loans & Advances 200160 Birla SteelLimited

    2)Birla Industries Limtied current Assets,

    Loans & Advances 200161 – BirlaIndustries Limited

    Same chart of accounts

    BIL chart of accounts BIL

    BSL chat of accounts BILWhen we use same chart of accounts, account description should be same in all the

    company codes.

    In BSL books – If we create account No.200160 – It takes Birla Steels Limited- we can

    not crate our account in our books.

    Creation of GL masters FS00

    Give the GL account no. :400150

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    25/239

      25

    Company code :BIL

    Select with template button

    Give the GL account o. :400100 Salaries

    Company code : BIL

    Enter

    Change short text & GL account long text to FI/CO reconciliation account

    Select create / bank /interest tab

    Field status group change to ‘ICCF’ CO < -> FI reconciliation posting

    Save

    Give the GL Account No.200160

    Company code : BIL

    Select with template button

    Give the GL Account No.200100 Cash A/c

    Company code :BIL

    Enter

    Select type/Description /tab

    Change short text GL account long text to BIRLA STEEL LIMITED

    Select create / Bank/Interest tab

    Filed status group change to G067

    Deselect relevant to cash flow check box

    Save

    Give the GL account No.400150

    Company code :BSL

    Select with template button

    Give the GL account 400150

    Company code :BIL

    Enter & Save

    Give the GL account 200161

    Company code :BSL

    Select with template button

    Give the GL account 200160

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    26/239

      26

    Company BIL

    Enter

    Select type / Description tab

    Change short text +GL long text to Bila Industries limited

    Save

    Prepare cross company code Transaction (Transaction code is OBYA)

     Path :SPRO-Financial accounting-GL accounting –Business transactions-Prepare

     cross company code transactions

    Company code 1 BIL

    Company code2 BSL

    Enter

    Posted in BILcleared against BSL

    Debit posting key :40Account debit :200160 ( Birla Steel Limited)

    Credit posting key :50

    Account credit :200160

    Posted in BSLCleared against BIL

    Debit posting key :40

    Account debit :200161 Bilra Industries LimitedCredit posting key :50

    Account credit :200161SavePress enter to save in your request

    CO customization ( tr code is OKKP) 

    Maintain controlling area

    Assign company BSL to controlling area BIL

    Select controlling area :BIL

    Select details button

    Company code to controlling area: Select cross company code cost accounting

    Reconciliation ledger document type :SA (GL accounts document)

    Double click on activate components / control indicators folder

    Select company code validation check box

    Double click on assignment of company codes folder

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    27/239

      27

    Select company code :BIL

    Select copy as button

    Change the company code to BSL

    Enter & save

    Ignore the warning message press enter

    Activate reconciliation ledger (Tr code KALA)

    Note: Follow through path

     Path:SPRO –Controlling –Cost element accounting-Reconciliation ledger-Activate deactivate reconciliation ledger

    Double click on activate reconciliation ledger

    Controlling area :BILSelect Execute button

    Ignore the warning message press enter

    Define adjustment accounts for reconciliation posting (Tr code is OK17)

    Same path

    Double click on define accounts for automatic postings

    Select change account determination button

    Save

    Reconciliation account: Give the account no.400150 FI/CO

    Save

    Press enter to save in your request

    FI CUSTOMIZATION

    Define variant for real time integration:

     Path :SPRO-Financial accounting (new) Financial accounting global setting (new) –

     Ledger-Real time integration of controlling with financial accounting –Define variants for real time integration

    Select new entries button

    Variant for real time integration B1

    Select real time integration active check box

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    28/239

      28

    Select account determination active check box

    Key date active from :01.04.2008

    Document type :SA

    Ledger group (FI) :0L

    Text variant for :BIL

    Select cross company code check box

    Select cross business area check box

    Select cross profit center check box

    Save

    Press enter to save in your request

    Assign variants for real time integration to company code:

    Same path.

    Select new entries button

    Company code :BIL

    Variant :B1

    Company code :BSL

    Variant :B1

    Save

    Press enter to save in your request

    Creation of cost center for company code BIL (KS01)

    Give the cost center department X

    Valid from :01.04.2008

    To date :31.12.9999

    Reference cost center :Dept A

    Controlling area :BIL

    Enter

    Change the name to :Dept X

    Change the description to cost center dept X

    Change company code to BSL

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    29/239

      29

    Select save button or Ctrl+s

    Ignore the warning message press enter

    Repost costs (F-02)

    Cost center old :Dept A

    Cost element :400100 SalariesAmount :20000

    Cost center new Dept X

    Save

    To make text filed optional for field status group G004 cost accounts(Tr.code is

    OBC4)

    Select field status variant for BIL

    Double click on field status groups folder

    Double click field status G004

    Double click on General data

    Text make it optional entry field

    Press enter to save in our request

    Go and see the FI documents (Tr.code is FB03)

    Select document list button

    Give the company code :BIL

    Enter the date :From date To Date

    Execute

    Double click on document no.

    Select back arrow

    Chang the company code to BSL

    Execute

    Double click on document no.

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    30/239

      30

     

    CROSS COMPANY CODE POSTINGS

    Company code :BIL BSL

    Outstanding expenses of BSL paid by BIL

    BSL Dr 25000 Outstanding 25000To Bank 25000 To BIL 25000

    Paying company code : BILCredit Bank :BIL 25000

    Debit outstanding exp :BSL 25000

    Use the Transaction code :F-02

    Give the document date :Today’s date

    Type :SACompany code :BIL

    Posting key :50

    Account no. :200105 SBI CAEnter

    Amount :25000

    Business area :BILHText :outstanding expense payment on behalf of BSL

    Posting key :40

    Account no :100500 out standing exp.

    New company code :BSLEnter

    Amount :*

    Business area :BILHText :+

    From the menu select document Simulate

    Double click third line itemBusiness area :BILH

    Text :+

    Select next item buttonBusiness area :BILH

    Text :+

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    31/239

      31

    Select save button or Ctr+S

    Posting byCompany code :BIL

    Cross company code no. :15 08

    FI posted byCompany code :BSL

    Cross company code no. :2 08

    By viewing the cross company code document number – We know which company code

    has initiated the posting.

    Select continue button

    Accrual orders (Imputed cost calculation) 

    This is used for month end provision only in COThis is used for irregular expenses like BonusCost element category should be 3

    Accrual/ Deferral per surcharge

    Define CO.No.range in interval for business

    Transaction :KAZ1 – Actual cost center accrual

    FI Month end provision1.

     

    Accrual / Deferral document

    A.  Bonus provision for Nov

    30.11.2008 Bonus A/c Dr.10000To Out standing exp. 10000 Dept A

    B. 

    Reverse next month 1st 01.12.2008

    01.12.2008 Outstanding Exp. Dr.10000To Bonus A/c 10000 Dept A

    C.  Bonus provision for Dec.

    31.12.2008 Bonus A/c Dr 20000To Out standing exp 20000 Dept A

    2.  Open item managementA). Bonus provision for Nov.

    30.11.2008 Bonus A/c Dr10000

    To Outstanding exp. 10000 Dept AB). Bonus provision for Dec.

    31.12.2008 Bonus Dr.10000

    To Outstanding exp 10000 Dept A

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    32/239

      32

    Month end provision 

    Number of companies will not prepare profit & loss and Balance sheet every

    month, the will not make provision in the books every month in year end,

    companies follow accrual basis of accounting. They make provisions for the

    whole year.

    Expenditure for all the months Less (other than March)Expenditure for March More 

    In SAP when we take production an accounting entry will be generatedautomatically – Finished goods valuation will be based on costs for the month.

    Stock valuation will be accrual orders Lower in all month other than March

    Accrual orders Higher in March

    Create overhead structureSalaries 100000

    Bonus -10% on salaries 1000 Debit cost center credit cost center

    Dep Dummy (No accounting entry)

    In the month end Dept A

    Bonus 1000 allocation to Dept A costs willbe allocated to production orders –

    There by Dept A will be zero-

    production valuation will be correct.

    Dept Dummy

    Bonus 1000

    In the year end – in FI when we make bonus provision for the whole year.

    31.03.2009 Bonus A/c Dr 1200000To Outstanding 1200000 Dept Dummy

    Dept dummy values in the year end

    31.03.2009 Dept dummy 1200000 April to March 10000*12 = 120000====== =====

    In the year end Dept dummy values will be zero.

    Creation of GL master bonus account – personnel cost (FS00) group:-

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    33/239

      33

     

    Give the GL Account No. :400105Company code :BIL

    Select with template button

    Give the GL account no. :400100 (salaries)

    Company code :BILEnter

    Change short and GL account long text to Bonus accountSave

    Select edit cost element button (F8)

    Valid from date :01.04.2008 to 31.12.9999Enter

    Cost element category :Select 3 accrual deferral per surcharge

    save

    Creation of cost center – Dept dummy (KS01)

    Give the cost center : Dept dummy

    Reference cost center : Dept A

    Controlling area :BIL

    Enter

    Change name to Dept dummy

    Change description to cost center: Department dummy

    Select save button

    Ignore the warning message press enter

    Maintain overhead structure:

     Path:SPRO-Controlling –Cost element accounting-Accrual calculation –percentage

     method-maintain overhead structure (Transaction code is KSAZ)

    Select create over head structure button (F7)

    Over head structure :BIL1

    Description :BIL overhead structureSelect save button

    Row Base

    10  B1Enter

    Give the name salaries

    Select create buttonRow O/H rate (Over head rate) Description FR To CR

    20 B2 Bonus 10 10 B3

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    34/239

      34

    Enter

    Give the name BonusDependency :KRS1(controlling area)

    Select create button

    Save

    Ignore the message press enterKeep the cursor on overhead structure BIL1

    Select assignment button (F5)Controlling area :BIL

    Select actual accrual radio button

    Select continue button

    Valid from valid to overhead structure

    1 2008 12 2008 BIL1

    Save

    Double click on overhead structure BIL1Keep the cursor on B1

    From the menu select Goto calculation base

    From cost element 400100

    Save

    Kept the cursor on B2

    From the menu select Goto overhead rate

    Valid from Valid to Actual overhead1 2008 12 2008 10%Save

    From 10 To 10 Crdit B3

    Keep the cursor on B3

    From the menu select go to credit

    Company code :BIL

    Business area :BILH

    Valid to :12 2008

    Cost element :400105

    Cost center :Dept Dummy

    Save

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    35/239

      35

    Define CO.no range interval for the business transaction KAZ1-Actual cost Center

    accrual:(Transaction Code KANK)

    Give the controlling area :BIL

    Select maintain group button

    Double click on KAZ1- Actual cost center accrual

    Select CO.No range interval for BIL check box

    From the menu select Edit-Assigned element group

    Save

    Ignore the warning message press enter

    1.  Posting of salaries for the month of August F-02

    Give the document date end posting date :03.08.2008

    Date :03.08.2008

    Type :SA

    Company code :BIL

    Posting key :40

    Account no. :400100 Salaries A/c

    Enter

    Ignore the warning message press enter

    Amount :100000

    Cost center Dept A

    Text :Salaries posting

    Posting key :50

    Account no :200105 SBI current Account

    Enter

    Amount :*

    Business area :BILH

    Text :+

    From the menu select document Simulate and save

    Accrual calculation (KSA3)

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    36/239

      36

     Accounting – Controlling –Cost element accounting-Actual postings –Accrual calculationselect cost center radio button

    give the cost center : Dept A

    period :5

    fiscal year :2008deselect test run check box

    select details list check boxExecute

    Select next list level button

    Go and see the cost center report KSB1

    Give the cost center :Dept A

    Posting date :01.08.2008 to 31.08.2008

    ExecuteSelect back arrow

    Give the cost center : Dept dummy

    Execute

    Bonus provision in the year end in FI Transaction F-02

    Give the document date & Posting :31.03.2009

    Type :SA

    Company code :BILPosting key :40

    Account no. :400105 bonus account

    EnterIgnore the warning message press enter

    Amount :10000

    Cost center :Dept dummy

    Text :Bonus provision for the year 2008-09Posting key :50

    Account :100500 outstanding exp.

    EnterAmount :*

    Business area :BILH

    Text :+Document – Simulate and save

    Go and see the cost center report KSB1Give the cost center :Dept dummy

    Posting date :01.04.2008 to 31.03.2009

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    37/239

      37

    Execute

    STATICALLY KEY FIGURES (SKF)

    This is used as a basis for allocation of costs from one cost center to other costcenters.

    Eg. Employee / Area/ Telephone calls

    Dept C Dept A Dept B

    (service Dept) (Production departments)Salaries 500000 No.of employee of A and B

    Rent 100000 Sq.meter are of A & BTelephone Exp25000 No.of telephone calls of A & BEnter CO. No range interval for the business transaction.

    RKS (Enter statistical key figures)SKF category Fixed Total

    Fixed Total

    If we choose fixed, values If we choose total

    To SKF are common for all months in the

    year, if we don’t make changes in between

    Eg: Employee / Area

    We have to enter values for SKF, for each

    and every month

    Eg: Telephone calls

    No.of Employees No.of Telephone callsApril 2008 100 100 Aprl 2008 1000

    May 2008 | | May 1500

    June | | June 2000July | | July

    Aug | | Aug

    Sep | | Sep

    Oct | 150 Oct

    Dec | | Dec

    Jan.’09 | | Jan 2009Feb | | Feb

    March | | March

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    38/239

      38

    Define co.no range interval for the business transaction RKS-Enter Statistical key

    figures Transaction Code is (KANK )

    Give the controlling area : BIL

    Select maintain groups button

    Double click on RKS

    Select Co.No.range interval for BIL check box

    From the menu select Edit Assignment element group.

    Save

    Ignore the warning message press enter.

    Create Statistical key figures

     Path :Accounting – Controlling –cost center accounting   

     master Data-Statistical key figures – Individual processing – Create (Tr.Code is KK01)

    Give the statistical key figure :EMP

    Enter

    Give the Name :Employee

    Statistical key figure unit of measurement : Select EA each

    Key figure category :Select fixed values under radio button

    Save

     Path : Accounting –Controlling – Cost Center accounting –actual postings-statistical

     key figures-Enter (Tr.code is KB31N)

    Received cost center : Dept A

    Statistical KF : EMP

    Total quantity :500

    Received cost center : Dept B

    Statistical KF :EMP

    Total quantity :250

    Save

    Period end closing In the month end, we allocate costs from one cost center to other cost centers

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    39/239

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    40/239

      40

    4.  Indirect activity allocation.

    A)Transfer only primary cost postings.B) Receiving cost center can track original cost elements.

    C) Sender should be only cost center.

    D) Transfer quantities as well as values.

    E) Define Co.No.range interval for the business truncation.RKIL Indirect activity allocation .

    Which over method we follow, we have to create cycles.

    When the allocation basic is different for the cost elements in the cost center, we have tocreate number of cycles for number of segments for a cycle.

    Dept C Dept A Dept B

    (Service Department) (Production departments)

    Salaries 500000 No.of employees of A and BWages 300000 No.of employees of A and BRent 50000 Percentage basis

    Option 1:

    Cycle 1 Cycle 2

    (Salaries and wages allocation) (Rent allocations)

    | |Segment 1 Segment 1

    Option 2

    Cycle 1

    |

    ----------------------------------------------| |

    Segment1 Segment2

    (Salaries and wages allocation) (Rent allocation)

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    41/239

      41

     

    ASSESSEMENT

    1. 

    Creation secondary cost element : i.e (that is) assessment cost element :

     Path: Accounting –Controlling –Cost element accounting-Mater data-Cost

    element –Individual processing –Create secondary (KA06)

    Give the controlling area :BIL

    Enter

    Cost element :1000000

    Valid from :01.04.2008 to 31.12.9999

    Enter

    Name and description :Assessment cost element.

    Cost element category :42 (Assessment )

    Save

    2.  Define Co.No.range interval for the business truncation- RKIU-Actual overheadassessment

    Use the Truncation code :KANK

    Give the controlling area :BIL

    Select maintain groups button

    Double click on RKIU

    Select Co.No.range interval for BIL check box

    From the menu select Edit –Assignment element group.

    Ignore the message press enter

    Creation of assessment cycle:

     Accounting –Controlling –Cost center accounting-Period and closing –Current settings–Define assessment (Tr.code S_ALR_87005742)

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    42/239

      42

    Give the cycle :BIL1

    Start date :01.04.2008Enter

    Text : Assessment cycle

    Select iterative check box.

    Select save button or Ctrl+SPress enter to save in your request

    Select iterative check boxDept C Dept A 60% 300000 54000

    Salaries 500000 Dept B 30% 150000 27000

    Less :Allocation 500000 Dept Z 10% 50000 9000--------

    0

    Add: Allocation 90000

    Less :Allocation 90000-------

    0Add: Allocation 1800

    Dept Z

    Wages 400000 Dept X 50% 225000 4500Add: Allocation 50000 Dept Y 30% 135000 2700

    --------

    450000 Dept C 20% 90000 1800

    Less : Allocation 450000-------

    0

    ====

    We have to run number of items to make both cost center values zero. If we select

    interactive check box, system will run number of items automatically till both cost centervalues become zero.

    Select attaché segment button.

    Segment name : Segment 1

    Description : Salaries allocation

    Assessment cost element :select 1000000

    Sender rule :select posted amounts

    Share in % :100

    Select actual value origin radio button

    Receiver rule :Select variable portions

    Variable portion type :Select actual statistical key figures

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    43/239

      43

    Select sender / receivers tab

    Sender cost center :Dept C

    Under Cost element :400100 (Salaries a/c)

    Under Receiver cost center group :BILHYDPROD

    Select receiver tracing factor tab

    Statistical key figure :EMP

    Select receiver weight factors tab

    Select save button or Crl+S

    Press enter to save in your request

    Select attaché segment button

    Segment name segment2

    Description :Rent allocation

    Assessment cost element :1000000

    Sender rules :Posted amount

    Sharing in % :100%

    Select actual value origin radio button

    Select receive rule :Fixed percentages

    Select senders/ receivers tab

    sender cost center :Dept C

    Cost element :400300 (Rent )

    Receiver cost center group : BILHYDPROD

    Select receiver tracing factor tab

    Dept A 70

    Dept B 30

    Save

    Press enter to save in your request

    Go and see the cost center Report (Tr code is KSB1)

    Give the cost center :Dept C

    Posting date :01.10.2008 to 31.10.2008

    ExecuteSelect cost element column

    Select sub totals button

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    44/239

      44

     

    Dept C A BSalaries 1500000 No.of employees

    500  250

    100000 50000

    Rent 25000 Percentage basis70 

    30

    17500 7500

    Execution of assessment cycle:

     Path :Accounting –Controlling –Cost center accounting –Period end closing-Single

     functions-Allocations –Assessment (KSU5)

    Give the period :7 (October)

    Fiscal year :2008

    Deselect text run check box

    Select details list check box

    Cycle select :BIL1

    Execute

    Select receiver button

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    45/239

      45

     

    INTERNAL ORDERS

    This is used to view costs for a specific task.Eg. A) Vehicle wise running expenses

    Management has to task decision whether to sell the (or) keep the vehicle in company

    A) petrol expenses for the vehicle B) Repairs to the vehicle

    It we take GL accounts in FI –we will not create each vehicle wise petrol expenses andrepairs account.

    In cost center accounting –vehicles will be under administration cost center and the petrol

    expenses repairs and administration expenses will be posted to administration cost center.

    By creating vehicle as an internal order we can get the costs.

    B)  Telephone expenses:If we want to know telephone wise expenses in FI –we will have one account for all

    telephones.

    If we take cost center –It will be entered in administration cost center - We can notget telephone wise expenses directly.

    By creating telephone as an order we can get telephone wise expenses.

    C) 

    Production order costs

    In a month no. of production orders will be executed. Some production orders

    consume more raw material and same production orders consume less raw material.

    If FI we have only GL account raw material consumption – We don’t know orderwise consumption.

    By crating production order, we can get order wise costs.

    D) 

    Exhibition costs

    Company is conducting an exhibition

    Salesmen salaries One account

    Conveyance Different account

    Advertisement Different accountDiscounts Different account

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    46/239

      46

    We don't know the exhibition costs by creating an order we can get exhibition costs

    Orders will be of 2 types

    1)Real orders 2)Statistical orders

    Settlement is possible settlement not possible

    We can settle order statistical orders are used fordecision making

    To Cost Center(Internal settlement)

    From Co to Co

    GL Accounts

    Assets(External settlement )

    (From CO to FI)When we transfer from cost center –To cost centers allocation by assessment /Distribution periodic reposting / Indirect activity allocation.

    When we transfer from Internal order settlement.Eg. Telephone expenses Dr 50000 Cost center Dept

    Order Tel no.66110883

    To Bank 50000

    The cost will be allocation to productionorders from CO

    In the production order valuation we can’t take.(50000+50000)

    We have to take only one time 50000

    When we are posting to no. of cost objects are will be real and others will be statistical.

    At the time of order creation there is a statistical order check box.

    A) 

    When we select statistical order is statistical order check box.

    Order is statistical (Automatically cost center will be real)

    B) If we don’t select statistical order check boxOrder is real (Automatically cost center will be statistical )

    Statistical order :Telephonewise expenses order we create as statistical order.

    Telephone expense Dr 50000 Cost center Dept AOrder Telephone no.66611983 Statistical

    To Bank 50000

    Cost Center Dept A

    Telephone expenses 50000 Allocation to paid order 50000

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    47/239

      47

    Cost center Dept A – Zero

    In the month end we allocation costs from Dept A to production orders there by costcenter Dept A will be zero.

    Order telephone no.66611983

    Telephone expenses 50000

    Management can see telephone wise expense at any point of time afterwards.

    Suppose we create order as real order

    Telephone expenses Dr 50000 Cost center Dept ATo Bank 50000 order telephone no.66611983 Real

    Cost center c data

    Telephone Expenses 50000 Order Telephone no.6661987Telephone expenses 50000 Allocation to production 50000

    Order will be zeroIn the month end we allocate cost from order telephone no.66611983 to production order

    there by order will be zero.

    Afterwards management can’t see telephone wise expense.

    Creation of order types:

     Path : SPR O –Controlling –Internal orders – order master data-Define order types

    (KOT2_OPA)

    Select new entries button

    Order category :Select 01 Internal order (Controlling)

    Enter

    Order type :BILT

    Description :Telephone orders for BIL

    Planning profile :select 000001 (General budget /plant profile)

    Object class :Select Over head cost

    Select release immediately check box

    Save

    We get message no.range not processed

    Ignore the message press enter

    Select assign /change interval button beside no.reage interval

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    48/239

      48

    Double click order type :BILT

    Select motor pool A-ZZZZZZZZZZZZ(External)

    From the menu select Edit Assign element group

    Save

    Ignore the message press enter

    Creation of filed status group by making cost center and internal order required

    entry fields (OBC4)

    Select field status variant :BIL

    Double click on field status group folder

    Select field status group G004 cost accounts

    Select copy as buttonChange the filed status group to G002

    Change the text to cost accounts (CC & IO required) IO =Internal order

    Enter

    Save CC=Cost Center

    Press enter to save in your request

    Double click on G002

    Double click on additional account assignment

    CO /PP order make it required entry field.

    Save

    Creation of GL master telephone expense (FS00)

    Give the GL account no.400305

    Company code :BIL

    Select with template button

    GL account 400300 Rent account

    Company code :BIL

    Enter

    Change short text and GL a/c long text to Telephone expenses

    Select crate / Bank/Interest tab

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    49/239

      49

    Change the filed status group to G002

    Save

    Select edit cost element button

    Valid from date :01.04.2008

    Enter

    Cost element category :Select 1

    Save

    Creation of Internal orders:

     Path :Accounting –Controlling-Internal orders-Master data-Special functions –Order

     –Create (Tr code is KO01)

    Order type :Select BILT

    Enter

    Order no. :BIL 66611983 (Telephone no.)

    Description :Telephone order no.66611983

    Company code :BIL

    Business area :BILH

    Select control data tab

    Select statistical order check box

    Save

    One more order

    Order type :BILT

    Enter

    Order :BIL66611984

    Description :Telephone order no.66611984

    Company code :BIL

    Business area :BILH

    Select control data tab

    Select statistical order check box

    Save

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    50/239

      50

    Creation order group

    Up to master data the path is same     Order group    Create (Tr code is KOH1)Give the order group name :BILHYDTEL

    Enter

    Description :Hyderabad order group (GRP)for BILSelect insert order button(Select menu bar Edit Order Insert Order)

    Select to orders :BIL66611983:66611984

    Save

    Posting of transaction in FI (F-02)

    Document date :Today’s date

    Type :SA

    Company code :BILPosting key :40

    Account no. :400305 Telephone exp

    Enter

    Give the amount :100000

    Cost center :Dept A

    Order :BIL66611983

    Text :Telephone expenses

    Posting key :50

    Account no. :200105 (SBI current account )

    Enter

    Amount :*

    Business area :BILH

    Text :+

    From the menu select –Document –Simulate and save

    To view internal order wise report

     Path :Accounting –Controlling-Internal order-Information system-Reports for Interval orders -Line items –Order -Actual line items-(Tr. Code is KOBI

    Give the order no.BIL66611983

    Remove the order group

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    51/239

      51

    Execute

    Keep the cursor and telephone expense line item select document button

    Planning order wise

     Path :Accounting –Controlling –Internal orders –Planning –Cost and activity inputs –Change (KPF6)Version :0

    From period :8 (November)

    To period :8

    Fiscal year :2008

    Select next page or page down button

    Give the order no. :BIL66611983

    Cost element :400305 Telephone expense

    Select from based radio button

    Select view screen button

    Cost element :400305

    Total plan cost :75000

    Select save button or Ctrl+S

    To view variant report order wise

     Path :Accounting Controlling-Internal order –Information system-Reports for internal order-Plant /Actual comparisons-Order :Actual / plan / Variance (S_ALR_87012993)

    Controlling area :BIL

    Fiscal year :2008

    From period :8 (Current month)

    To period :8

    Pant version :0

    Order values :BIL66611983

    Execute

    Real orders:

    They are used for vehiclewise expenses

    Petrol expenses Dr 50000 Order no.AP9Z1234

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    52/239

      52

      To Bank 50000

    In the month end:

    Cost center Dept A

    Order no.AP9Z1234 Settle to Cost center Dept B

    Cost center Dept CSettlement can be percentage basis / ratio basis /Amount basis

    Order No AP9A1234

    Petrol expenses 50000 Allocation Dept A 25000Dept B 15000

    Dept C 10000

    ------- ------

    50000 50000==== ====

    Order will be zero

    Petrol expense Dr 50000 Cost center:Common

    Order No.AP9Z1234 StatisticalTo Bank 50000

    In the month end from cost center common allocate to Dept A, Dept B and Dept C by

    assessment / Distribution / Periodic posting /Direct activity allocation.

    Cost center common

    Petrol Expenses 50000 Allocation to Dept A 25000Dept B 15000

    Dept C 10000

    --------- -------

    50000 50000==== =====

    Cost center will be zero

    Order no.AP9Z1234

    Petrol expense 50000

    =====

    Management can see vehicle wise expenses at any point of item afterwards.

    Creation of filed status group by making only internal order required entry filed

    (OBC4)

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    53/239

      53

     

    Select filed status variant :BIL

    Double click on filed status group folder

    Select field status group G002

    Select copy as button

    Change field status group to G010

    Change the text to cost accounts (IO required )

    Enter and save

    Press enter to save in your request

    Double click on G010

    Double cock additional account assignments

    Cost center make it optional entry fieldSave

    Creation of GL master petrol expense under administration group (FS00)

    Give the GL Account no. :400310

    Company code :BIL

    Select with template button

    Give the GL account no.400300 Rent account

    Company code :BIL

    Enter

    Change short text and long text to petrol expenses

    Select create/bank /interest tab

    Field status group :G010

    Save

    Select edit cost element button

    Valid from date :01.04.2008

    Enter

    Cost element category :01

    Save

    Creation of secondary cost element i.e. Statement cost element (KA06):

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    54/239

      54

     

    Give the cost element :1000001Enter

    Name and description settlement cost element

    Cost element category :Select 21 internal settlement

    Save

    Maintain allocation structure:

     Path :SPRO-Controlling –Internal orders-Actual posting- Settlement-Maintain

     allocation structures

    Select new entries button

    Allocation structure :B1

    Text :BIL allocation structure

    Save

    Press enter to save in your request

    Select :B1

    Double click assignments folders

    Select new entries button

    Assignment :01

    Text :Vehicle expenses settlement

    Save

    Select :01

    Double click on source folder

    From cost element :400310 Petrol expenses

    Save

    Press enter to save in your request

    Double click on settlement cost elements folder

    Select new entries button

    Receiver category :Select CTR cost center

    Settlement cost element :1000001

    Save

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    55/239

      55

    Petrol expenses will be settled to cost center by using secondary cost element settlement

    cost element.Through orders.

    Maintain settlement profiles:

    Same path

    Double click on maintain settlement profiles

    Select new entries button

    Settlement profiles :BIL1

    Description :BIL settlement profile

    Allocation structure :B1

    Select to be settled in full radio button

    Double click on CTR cost center

    Select % settlement check box

    Select equivalence number check box

    Select amount settlement check box

    Under valid receivers

    For cost center :Select settlement required

    Max.no. distribution rules :999

    Residence time :12 months

    Save

    Press enter to save in your request

    Rule 1:

    Order no.AP9Z1234 settle cost center Dept A 30000Petrol expenses 50000 settle cost center Dept B 15000

    Dept C 5000

    Rule 2Order No.AP9Z1234 Settle to cost center Dept A 85%

    Petrol expenses 50000 Settle to cost center Dept B 10%5%

    Order no.AP9Z1234 settle to cost center Dept 4:

    Petrol exp 50000 Dept 3:Dept 1:

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    56/239

      56

    Maintain number range for settlement documents:

    Go through Same path (Tr.code is SNUM)

    Select maintain groups button

    Double click on controlling area BIL

    Select Standard accounting document check box

    From the menu select EditAssign element group

    Save

    Ignore the message press enter

    Creation of order type (KOT2_OPA)

    Select new entries button

    Order category :Select 01 Internal order (controlling)

    Enter

    Give the order type :BILV Vehicle order type BIL

    Settlement profile :BIL1

    Budget profile :0000001 (General budget profile)

    Object class select :Overhead costs

    Select release immediately check box

    Save

    Ignore the message press enter save in your request

    Select assign /Change intervals button beside no.range interval

    Double click on BILV

    Select motor pool A-ZZZZZZZZZZZZZZ external check box

    From the menu select Edit –Assign element group.

    Save

    Ignore the message press enter

    Define co.no.range interval for the business truncation K0A0-Actual settlement. Use

    the transactions code (KANK)

    Give the controlling area :BIL

    Select maintain groups button

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    57/239

      57

    Double click on KOAO actual settlement

    Select co.no.range interval for BIL check box

    Form the menu select Edit –Assign element group.

    Save

    Ignore the warning message press enter

    END USER AREA:

    Creation of internal order (KO01)

    Give the order type :BILV

    Enter

    Give the order :AP9Z1234

    Description :Vehicle no.AP9Z1234

    Company code :BIL

    Business area :BILH

    Select control data tab

    Deselect statistical order check box

    Select settlement rule button

    Category :CTR cost center

    Settlement receiver :Dept A

    Give the percentage :70

    One more

    Category :CTR

    Settlement receiver :Dept B

    Percentage :30

    Save

    Ignore the warning message press enter

    Posting of petrol exp F-02

    Give the document date :Today’s date

    Type :SA

    Company cod :BIL

    Posting key :40

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    58/239

      58

    Account no. :400310 petrol exp.

    Enter

    Give the amount :100000

    Give the order no. :AP9Z1234

    Text :Petrol exp.

    Posting key :50

    Account no. :200105 SBI current account

    Enter

    Amount :*

    Business area :BILH

    Text :+

    From the menu select menu document –Simulate and save

    Actual settlement :

     Path :Accounting –Controlling-Internal order-Period end closing-Single functions-

    Settlement –Individual processing (K088)

    Give the order :AP9Z1234

    Settlement period :8 (current month)

    Fiscal year :2008

    Deselect test run check box

    Select check transaction date check box

    Select execute button

    Select details list button

    Note : Order means overall expenses Eg: Vehicle Expenses

    Cost Element means each item wise :Eg.Vehicle expenses for Petrol, Repairs,

    Driver salary etc

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    59/239

      59

     

    BUDGETING AND AVAILABILITY CONTROL

    For budgeting SAP has given availability

    controlOrder no.AP9Z1234Budget amount 500000

    Option 1 Option2 Option 3Give Give warning Give

    Warning To the user Error1

    To the user And inform to

    Budget managerIf actual amount exceeds 85% of budget 425000

    Or

    If the variance is above 20000 i.e actual 5200000Or

    Both Whichever activity comes first

    OrIf a actual amount exceeds 70% of budget go for option1

    If actual amount exceeds 85% of budget go for option 2

    If actual amount exceed 100% of budget go for option 3

    When we do budgeting it generate a document –We have to give budgeting –No. range

    interval only for 04 (Hard coded by SAP)

    This is given at client level and not at controlling area level –it is not year specify.

    Note : Order Eg.Vehicle Expenses

    Cost element :Eg.Vehicle for petrol, repairs,Driver salary etc.,

    Maintain no.range for budgeting:

    Planning Budgeting

    1. We can plant cost element wise in theorder

    1.Budgeting will be done order wise

    2. We can do planning period wise in a

    year (Month wise)

    2. Budgeting should be done year wise

    3.Micro level (Lower level) 3. Marco level (High level)

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    60/239

      60

     Path :SPRO-Controlling-Internal orders-Budgeting / availability control-Maintain no.ranges for budgeting (Tr code is OK11)

    Select change intervals button

    Define tolerance limits for availability controlSame path

    Select new entries button

    Controlling area :BIL

    Profile :select 000001 General budget profile

    Tr.group :++ all activity groups

    Action :select 2 waring with mail to person response

    Usage :85

    SavePress enter to save in your request

    Specify exempt cost elements from availability control

    Same path

    Petrol expensesRepairs

    Drivers salary is Fixed cost

    We can specify when we post to driver’s salary all with order AP9Z1234 –Even if, it

    exceeds 85% of budget no. message need to be given.

    It is known expenditure

    Select new entries button

    Controlling area :BILCost element :400100 Salaries account

    Save

    Press enter to save in your request

    Maintain budget manager

    Same path

    Select new entries button

    Controlling area :BIL

    Order :BILV

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    61/239

      61

    Object class :OCost (Overhead cost)

    User name :SAP user (budget manager)

    Save

    Press enter to save in your request

    Budgeting order wise (END USER AREA)

     Path :Accounting-Controlling –Internal order-Budgeting-Original budget –Change

    (Tr code is K022)

    Order :AP9Z1234

    Enter

    For the period :500000 (Budget amount)

    Over / budget also 500000

    From the menu select Extras –Availability: Control –Activate

    Save

    Posting of petrol expenses (F-02)

    Give the document date :Today’s date

    Type :SA

    Company code :BIL

    Posting key :40

    Account no. :400310 Petrol expenses

    Enter

    Give the amount :350000

    Order :AP9Z1234

    Text :Petrol expense

    Posting key :50

    Account no. :200105 SBI current account

    Enter

    Give the amount :*

    Business area :BILH

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    62/239

      62

    Text :+

    From the menu select –Document –Simulate and save

    Ignore the message press enter

    To view in box of the budget managerPath :SAP MenuOffice –Work place (Tr code is SBWP)

    Select inbox folder

    We get a message accounting document no.

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    63/239

      63

     

    PROFIT CENTER ACCOUNTING

    This is used to view profitability division wise /product wise /location wise if business

    area is not use in FI

    Idea scenario

    Company FI|

    Company code FI|Business area FI

    (Location)

    |----------------------------------------------------------------------------------------

    | | | |

    Steel Cement Pharma Co-profit center

    Division Division Division Accounting| |

    Product wise Co profitability

    Analysis

    Option 1 Option 2

    Hyderabad location HYD BGL MOM| | | |

    Steel Cement Pharma Steel cement Pharma

    Profitability Profitability Balance sheet

    The advantage of profit center accounting is it derives profit center automatically though

    derivation rules.A) In case of expenditure Tough cost centers

    B) IN case revenues Automatic account assignment

    C) In case of balance Though business area

    Sheet it items (Applicable for option 2)

    Eg:a) At the time of creation of cost center assign profit center

    Dept A-Assign profit center steel

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    64/239

      64

      b) At the time of posting

    wages a/c Dr 500000 Dept A

    To Bank 500000

    It updates cost center Dept A as well as profit center steel.

    We have to create dunning profit center. At the time of posting, when there is no

    derivation rules, system updates dummy profit center. Transfer form dummy profit centerto respective center. Create derivation rule so that future transactions will not go to

    dummy profit center. They will go to respective profit centers.

    Set controlling area (OKKS)

     Path :SPRO-Controlling –Profit center accounting-Basic settings-Set controlling areaGive the controlling area :BILEnter

    Maintain controlling area settings: (OKE5)(Follow through path )

     Path :Up to base settings the path is same- Controlling area settings-Maintain controlling area settings

    Standard hierarchy :BIL

    Select elimination of business volume check box

    Profit center local currency type :Select 20 Controlling area currency

    Select confirm button

    Select store truncation currency check box

    Save

    Elimination of internal business volume

    Purchase Material no. 1 Profit center steel

    Order Vendor no. 1234

    | Plant HYD| Profit center Steel

    | Qty 1 Kg

    | Rate 100Goods

    Receipt

    It should no take in steel profit center 100+100

    It should take only one time

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    65/239

      65

     

    Create dummy profit center

     Path :SPRO-Controlling-Profit center accounting-Master data-Profit center-Create dummy profit center(Tr code is KE59) 

    Double click on dummy profit center

    Give the dummy profit center :BIL dummy

    Select basic data button

    Name :BIL dummy

    Description :Dummy profit center for BIL

    Profit center group :BIL

    Save

    Set control parameters for actual date

     Path : Up to basis settings the path is same    Controlling area settings -Activate direct

     postings-Set control parameters for actual data (Tr code is 1KEF)

    Select new entries buttonFrom year :2008

    Select Line items check box

    Select online transfer check boxSave

    Maintain plan versions

    Up to activate the path is same

    Plan versionMaintain plan version

    Select version :0 Plan /Actual Version

    Double click on settings for profit center accounting folder

    Select new entries button

    Year :2008

    Select online transfer check box

    Select line items check box

    Exchange rate type :B (bank selling rate)

    Save

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    66/239

      66

    Press enter to save in your request

    Define no. ranges for local documents

    A) 

    At the time of creation of cost center –Assign profit center

    Dept A-Assign profit centerB)

     

    At the time of posting

    Wages A/c 500000 Dept A

    To Bank 500000

    When there is no derivation rule –It updates dummy profit centerTransfer from dummy profit center

    To Profit center steel

    No FI document will be generated

    No co document will be generated once profit center document will be generated

    (local)

     Path :SPRO-Controlling-Profit center Accounting-Actual postings-Basic

     settings: Actual –Define number ranges for local documents (Tr code is GB02)

    Select maintain groups button

    Select actual document from direct posting with GB01 check box

    From the menu select intervalMaintain

    Give the company code :BIL

    Enter

    Select interval button

    Year :2008

    From no :1

    To :100000

    Enter and save

    Press enter to save in your request

    Select back arrow

    Select planned doc.with direct posting with GB01 check box

    Form the menu select interval maintain

    Give the company code :BIL

    Enter

    Select interval button

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    67/239

      67

    Year :2008

    From no. :100001

    To no. :200000

    Enter and save

    Creation of profit center:

     Path :Accounting-Controlling-Profit center accounting-Master data-Profit

     center-Individual processing-Create (Tr code is KE51)

    Give the profit center :Steel

    Select master data button

    Analysis period to :01.04.2008 to 31.12.9999

    Name :Steel

    Long text :Profit center steel

    Person responsible :Mr A

    Profit center group :BIL

    select activate button (Shift+F1)

    One more profit center

    profit center cementselect master data buttonname :Cement

    long text :Profit center cement

    person responsible :Mr B

    profit center group :BILselect activate button

    Create account groups

    up to master data the path is same    Account group create (Tr code is KDH1)

    Give the account group name :PLITEMS ( Profit & Loss)

    Enter

    Description :P & L accounts for BIL

    Select insert account button

    From :300000

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    68/239

      68

      To :499999

    Save

    Select Back Arrow

    Account groups :BSITEMS

    Enter

    Description :Balance sheet accounts for BIL

    Select insert account button

    Form A/c :100000

    To A/c :299999

    Save

    Assign profit center in cost center

     Path :Accounting-Controlling-Cost center accounting-Master data-Cost center-

     Individual processing-Change (KS02)

    Give the cost center :Dept A

    Select master data button

    Give the profit center :Steel

    Select save button or Ctrl+S

    Ignore the warning message press enter

    Cost center :Dept B

    Enter

    Profit center :Cement

    Save

    Ignore the warning message press enter

    Creation of sales account as revenue element (FS00)

    Give the GL account no. :300000 Sales A/c

    Company code :BIL

    Select edit cost element button

    Enter

    Cost element category :Select 11 Revenues

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    69/239

      69

    Save

    Maintain automatic account assignment of revenue elements

     Path :SPRO-Controlling –Profit center accounting –Actual postings-Maintain

     automatic account assignment of revenue elements (Tr code is OKB9)

    Select new entries button

    Company code :BIL

    Cost element :300000 Sales A/c

    Account assignment details :Select 2 Business area is mandatory

    Save

    Press enter to save in your request

    Select :BIL with cost element 300000

    Double click on detail per business area /valuation area folder

    Select new entries button

    Option 1 Option 2

    HYD location

    |Steel cement Pharma HYD BGL MUM

    300000 | | |

    HYD  Steel Steel Cement Pharma300001 Sales cement 300000 Sales account

    HYD  Cement

    300002 Sales pharma HYD  Steel

    HYD Pharma BGL  CementMum  Pharma

    Business area : BILHProfit center : Steel

    Business area : BILB

    Profit center : CementSave

    Choose addition balance sheet and p & L accounts

    Applicable for second scenario: Application for second option

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    70/239

      70

     

    Same path     Select choose accounts (Tr code is 3KEH)

    select new entries button

    Account from :100000Account to :299999

    Default profit center :Steel

    Save

    Press enter to save in your request

    Select profit center determination button

    Select crate step button

    Step description :Profit center derivation though business area for balance sheet

    items.

    Select drop down button under name column

    Select GSBER businesses area

    Save

    Select maintain rule values button

    Select source field intervals on /off button

    Account no.100000

    To account no.299999

    Business area :BILH

    Profit center :Steel

    Account no :100000

    To account no. :299999

    Business area :BILB

    profit center :Cement

    Save

    END USER AREA

    1)  Planning profit center wise for p & L items

     Path :Accounting –Controlling –Profit center accounting –Planning –cost

     /Revenues-Change (Tr code is 7KE1)

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    71/239

      71

    Version select :0

    From period :8

    To period :8

    Fiscal year :2008

    Company code :BIL

    Select next page or page down button

    Profit center :Steel

    Account group :PLITES

    Select from based radio button

    Select overview screen button

    Per account no.300000 Sales account

    Profit center reporting currency :600000 (Minus report currency)

    For account no.400100 salaries A/c without any sign

    Save

    Planning profit center wise for balance sheet items (Only for second scenario)

    Up to planning the path is same     Balance sheet accounts change (Tr code is

    7KE3)

    Version :0

    From period :8

    To period :8

    Fiscal year :2008

    Company code :BIL

    select next page or page down button

    Profit center steel

    Account group :BSITEMS

    Select form based radio button

    Select overview screen button

    For account :100300 SBI rupee term loan

    Profit center reposting currency 20000- with minus sign

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    72/239

      72

    For 200105 SBI current account profit centers reporting currency 200000 without any

    sign

    Save

    Posting of cash sales (F-02)

    Give the document date :Today’s date

    Type :SA

    Company code :BIL

    Posting key :40

    Account no. :200105 (SBI current account)

    Enter

    Amount :550000

    Business area :BILH

    Text :sales posting

    Posting key :50

    Account no. :300000 (Sales a/c)

    Enter

    Amount :*

    Business area :BILH

    Text :+

    Form the menu select Document –Simulate and save

    Posting of salaries (F-02)

    Document date :Today’s date

    Type :SA

    Company code :BIL

    Posting key :40

    Account no. :400100 Salaries a/c

    Enter

    Give the amount :475000

  • 8/19/2019 Microsoft Word - CO NOTES-ILOGIC.pdf

    73/239

      73

    Cost center :Dept A

    Text :Salaries posting

    Posting key :50

    Account no. :200105 SBI current account

    Enter

    Amount :*

    Business area :BILH

    Text :+

    Document –simulate and save

    To View variance report profit center wise for P & L items

     Path :Accounting –Controlling –Profit center