35
MICRO-SURF ACE FIELD REVIEWS c-54

MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

MICRO-SURF ACE FIELD REVIEWS

c-54

Page 2: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

·-· \

.. I

FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS

Date of Field Review: March 13 ,1996

Field reviewed by: Bernard T. BeHner P.E.

Route: M-40

Control Section : 03071 Job Number: 33472 Length (mi.) : 7.634

Project Termini: Baseline Line Rd. (Van Buren Co. line) north to S Cedar St. in Allegan

Pavement Type : Seal coat Width (ft.) : 24

Shoulder Type : Bituminous Width (ft.) : 2&5

Year Last Improved : 1984 ADT : 4300-6700 % Commercial : 6-9

PM Work Type : Micro-Surface PM Work Completed : 1992

Contractor : Strawser Inc.

Overall Pavement Condition : The ride was less than satisfactory. There was extensive cracking.

Overall Treatment Condition : There was extensive block and transverse cracking. Most oftbe cracks were open with slight ravelling along the edges. The was a lot of longitudinal cracking at the centerline. 1/8 inch ruts in the left wheel path and 1/4 inch ruts in the right wheel path were measured north of 102 Tb. St. No rutting was measured north of 32 ND. St. There were isolated areas where some of the Micro­Surface has come up. Several of these areas have been patched.

General Comments : This Micro-Surface is in relatively poor condition.

c-55

Page 3: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

Typical cracks on M-40 north of102 Th. Rd.

Delamination on M~40 north of 32 nd. Rd.

C-56

Page 4: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

· .. _,

FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS

Date of Field Review: April11,1996

Field reviewed by: Bernard T. BeHner P.E.

Route : US-27BR

Control Section : 18031 Job Number: 36273 Length (mi.) : 1.007

Project Termini : Pinehurst St. to the Tabacco River in Clare

Pavement Type : Composite Width (ft.) : 62

Shoulder Type : Curb and gutter

Year Lastlmproved : 1977 ADT: 9900-16000 %Commercial: 2-4

PM Work Type : Micro-Surface PM Work Completed: 1994

Contractor : Slurry Seal of Southern Ohio

Overall Pavement Condition : The ride and overall pavement condition were both satisfactory.

Overall Treatment Condition : The surface is moderately to severely cracked. The cracks are tight with minor ravening. Most of the transverse cracks are multi cracks. There is a bump at a few of the transverse cracks. It appears that some of the cracks have been sealed. The longitudinal joints at the lane lines were tight with some delamination occurring at isolated locations. The Micro-Surface looked tight. No rnts were measured at First St. or John R St.

General Comments : The speed limit is 30 mph.

C-57

Page 5: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

c-58

Typical cracks on US-27 BRat

John R St. in Clare

Typical cracks and minor delamination

on US-27BR at First ST. in Clare

Page 6: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS

Date of Field Review: April10,1996

Field reviewed by : Bernard T. Bellner P.E.

Route: I-75 SB

Control Section : 20015 Job Number : 33444 Length (mi.) : 4.41

Project Termini : South Down River Rd. north to north of Hartwick Pines Rd.

Pavement Type : Bituminous

Shoulder Type : Bituminous

Width (ft.) : 2@24

Width (ft.) : 3 & 9

Year Last Improved : 1979 ADT : 4450-7000 %Commercial: 10-17

PM Work Type : Micro-Surface PM Work Completed : 1992

Contractor: D. G. Slurry Seal of Toledo, Inc.

Overan Pavement Condition : The ride and overan pavement condition were both satisfactory.

Overan Treatment Condition : The surface is severely cracked with a lot of block cracking. Most ofthe cracks are single , open cracks with no ravelling. There are a number of wider cracked areas that have a minor amount of ravelling. A number of cracks are 1/4 to 1/2 inches wide. There are random longitudinal cracks in the area of the center line and some longitudinal cracking in the wheel path of the outside lane. Both the center line joint and the edge line joint are tight. 1/ 4 inch ruts were measured at both North Down River Rd. and at approximately mile post 257,5. Four areas of delamination were observed. Each area was less than fifteen square feet. The Micro-Surface looked uniform.

General Comments : Micro-Surface was placed on the outside shoulder. There were less cracks in the shoulder area than on the traveled lanes.

c-59

Page 7: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

C-60

Typical cracking em 1-75 SB north of the

cross over at N Down River Rd.

Typical transverse crack on 1-75 SB

at mile Post 257.5

Page 8: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

.. i

A severe transverse crack on I-75 SB north ofthe cross over at N Down River Rd.

C-61

Page 9: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS

Date of Field Review : April1,1996

Field reviewed by: Bernard T. Hellner P.E.

Route: M-99

Control Section : 30041 Job Number :33484 Length (mi.) : 1.171

Project Termini : Carleton Rd. north to Steamburg Rd. in Hillsdale

Pavement Type : Composite Width (ft.) : 24-60

Shoulder Type : Curb and Gutter

Year Last Improved : 75 & 76 ADT : 7500-9300 % Commercial : 3-4

PM Work Type: Micro-Surface PM Work Completed : 1992

Contractor : Strawser Inc.

Overall Pavement Condition : The ride and overall pavement condition were both good.

Overall Treatment Condition : The surface texture looks fairly uniform. Some minor amount delamination of the mix has occurred at the south end of the project. There is a moderate amount of surface cracking. The cracks. are generally transverse, short and tight ( less than 1/8 inch wide ) with slight ravelling. There is very little secondary cracking. More cracking has occurred in the area of the centerline. The centerline joint is tight. 1/8 inch ruts were measured in the NB outside lane at Bacon St. and in the SB outside lane at Sharp St.

General Comments : A two tenths mile area between Indiana St. and Waldron St. and the parking lanes were not Micro-Surfaced. The speed limit on this section of M-99 is 30 mph.

C-62

Page 10: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

Typical cracks on M-99 SB at Sharp St. in Hillsdale

Typical cracks on M-99 NB at Bacon St. in Hillsdale

C-63

Page 11: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS

Date of Field Review: AprilS ,1996

Field reviewed by : Bernard T. BeHner P.E.

Route: M-36

Control Section : 33021 Job Number: 36574 Length (mi.) : 2.36

Project Termini: US-127 (Cedar St.) east to Temple Rd.

Pavement Type : Composite & bituminous Width (ft.) : 30-64

Shoulder Type : Curb and gutter and 4 ft. paved bituminous shoulder at east end

Year last improved : 68 & 73/86 ADT: 5800-16000 %Commercial: 1-4

PM Work Type : Micro-Surface PM Work Completed: 1994

Contractor : Slurry Seal of Southern Ohlo

Overall Pavement Condition : The ride and over all pavement condition were both satisfactory.

Overall Treatment Condition : The surface is moderately to severely cracked. There is a lot of block cracking. Most of the cracks are single , tight cracks with little ravelling. There is some multi cracks that are three to four inches wide. These cracks are relatively tight. The Micro-Surface looks fairly uniform except in some areas where there are utility cuts. No delamination was observed. 1/4 inch rnts were measured at the approach to the Columbia Rd. traffic sigual. No rnts were measured at S Washington St.

General Comments : The speed limit is 30 mph. All four lanes were Micro-Surfaced in the one block downtown area.

C-64

Page 12: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

Typical cracks on M-36 EB at Columbia Rd. m Mason

Typical cracks on M-36 at S Washington St. in Mason

C-65

Page 13: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS

Date of Field Review: April1,1996

Field reviewed by: Bernard T. Bellner P.E.

Route: M-50

Control Section : 38071 Job Number : 33484 Length (mi.) : 0.94

Project Termini : Lansing St. north to Riverside Dr. in Brooklyn

Pavement Type : Seal coat Width (ft.) : 22 & 44

Shoulder Type : Bituminous & curb & gutter Width (ft.) : 3

Year Last Improved : t 969 ADT : 4200 % Commercial : 2

PM Work Type: Micro-Surface PM Work Completed : 1992

Contractor : Strawser Inc.

Overall Pavement Condition : The ride and overall pavement condition were both marginal.

Overall Treatment Condition : The cross section is a little distorted. The surface is severely cracked. Most cracks are multi cracks covering an area of about five inches or less. The individual cracks are less than 1/8 inches wide, open with very little ravelling. The centerline is fairly tight with a little cracking. There is severe longitudinal cracking along the outside lane edge. No rutting was measured at Lake St. No rutting was observed at any other location on this section ofM-50. Minor delamination has occurred at isolated locations at the north end ofthe project.

General Comments : In the multi lane sections of this project, only the inside two lanes were Micro-Surfaced except in the one block downtown area where the four inside lanes were Micro-surfaced. The speed limit in the project limits is 40 mph.

C-66

Page 14: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

C-67

Typical cracks on M-50 NB at Lake St.

Loss ofmixm NB M-50 south of Riverside St.

Page 15: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS

Date of Field Review: March 29 ,1996

Field reviewed by : Gary Chapman, MDOT Maintenance Division, & B. T. Bellner

Route: 1-94

Control Section : 38101 Job Number : 34527 Length (mi.) : 3.12

Project Termini: West ofUS-127 north east to east ofEhn Rd. in Jackson

Pavement Type : Composite Width (ft.) : 2@24

Shoulder Type: Bituminous Width (ft.): 3&9

Year Last Improved: 72/89 ADT: 23000-27000 %Commercial: 13-15

PM Work Type : Micro-Surface PM Work Completed : 1993

Contractor : Strawser Inc.

Overall Pavement Condition : The ride and overall pavement condition were satisfactory.

Overall Treatment Condition : The longitudinal centerline joint and the edge line joint were not sealed with Micro-Surface mixture. Both of these longitudinal joints were open. Transverse cracks have retlected through the Micro-Surface. The spacing ofthe cracks is approximately fifty feet. Most ofthe transverse cracks are single cracks with a minor amount of secondary cracking and slight crack ravelling. The majority of the cracks were 1/4 inches wide or less. Most of the transverse cracks extended across the full lane width. The following rot depths were measured ; 1/8 inch WB at mile post 139, 1/2 inch and 1/4 inch WB west ofEhn Rd. and 1/4 inch EB at Cooper Rd.

General Comments : The Micro-Surface was placed only in the outside lane in both directions. The shoulders were in good condition.

C-68

Page 16: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

f.--.

C-69

Typical transverse crack on I-94 EB at the Cooper St.

"on" ramp

Transverse crack on I-94 WB west

ofEimRd.

Page 17: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS

Date of Field Review: April17,1996

Field reviewed by: Bernard T. Bellner P.E.

Route: M-72

Control Section : 40023 Job Number: 33434

Project Termini: 0.3 mi. west ofTiffeny Rd. east to US-131

Pavement Type : Seal coat

Shoulder Type : Bituminous

Width (ft.) : 24

Width (ft.) : 8

Length (mi.) : 7.549

Year Last Improved : 1962 ADT: 6100-10000 %Commercial :3-6

PM Work Type : Micro-Surface PM Work Completed : 1992

Contractor: D. G. Slurry Seal of Toledo, Inc.

Overan Pavement Condition : The ride and overan pavement condition were both satisfactory.

Overan Treatment Condition : The surface was moderately to severely cracked. Most cracks are short and tight (about 1/8 inch wide) with no ravelling. Very few transverse cracks extend across both lanes. There is random longitudinal cracking in the vicinity of both the center line and both edge lines at isolated locations. No rotting was measured at either Fairground Rd. or Rapid City Rd. The Micro­Surface is generally tight. There is some loss of mix due to the snow plows but these areas are very sman in area. The surface is not uniform in color. There are a lot of dark streaks.

General Comments : The shoulders were in good condition. They were not Micro­Surfaced.

c-70

;.· .. ·

Page 18: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

Typical cracking on M-72 at Fairground Rd.

Loss of mix and cracking on M-72 east of Thornburg Dr.

C-71

Page 19: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

Loss of mix at center line on M-72 at Rapid City Rd.

C-72

Page 20: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS

Date of Field Review: April17,1996

Field reviewed by : Bernard T. Bellner P.E.

Route : M-201

Control Section : 45091 Job Number: 34613 Length (mi.) : 0.97

Project Termini: 8Th. St. to 2ND St. in the Village of Northport

Pavement Type : Bituminous

Shoulder Type : Bituminous

Year Last Improved: 1967

PM Work Type : Micro-Surface

Contractor : Strawser Inc.

ADT: 3400

Width (ft.) : 22

Width (ft.) : 4

% Commercial : 3

PM Work Completed : 1993

Overall Pavement Condition : The ride and overall pavement condition were both satisfactory.

Overall Treatment Condition : The surface looks uniform and tight. There is some loss of mix at the center line between 4 Th. St. and 5 Th. St. due to the snow plows. There is very little cracking. The cracks that have developed are single tight cracks with no ravelling. There are some short cracks less than one foot long near the center line. Very few transverse cracks extend across the full pavement width. The center line and edge line joints were tight. No rntting was measured at either 7 Th. St. or between 4 Th. St. and 5 Th. St.

General Comments : The speed limit is 25 mph.

C-73

Page 21: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

Typical cracks in pavement on M-201 at 7 Th. St. in Northport

Loss of mix on M-201 between 4 Th. and 5 Th. Sts. in Northport

C-74

Page 22: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS

Date of Field Review : March 25 ,1996

Field reviewed by : Andy llieff, MDOT Maintenance Division & Bernard T. Bellner

Route: M-1

Control Section : 63051 Job Number : 36733 Length (mi.) : 3.64

Project Termini : Square Lake Rd. south east to Quarton Rd.

Pavement Type : Composite Width (ft.) : 44

Shoulder Type : Curb & gutter

Year Last Improved : 69/89 ADT: 20500-23500 % Commercial : 2

PM Work Type: Micro-Surface PM Work Completed : 1994

Contractor : Slurry Seal of Southern Ohio

Overall Pavement Condition : Both the ride and overall pavement condition are good.

Overall Treatment Condition : The surface looks uniform and tight. There was no loss of mix. Several cracks have retlected through the Micro-Surface. Most cracks are tight. There is some secondary cracking at the transverse cracks. No ravelling was observed. The longitudinal joint line was sealed. The cracks in the NB lanes have been sealed by the overhand method. Generally, the underlying cracks have come through the overhand seal. The longitudinal cracks that were sealed are performing better than the transverse sealed cracks. No rutting was measured in the SB outside lane at Manorwood Rd. 1/8 inch ruts were measured in the outside NB lane at Chamg Cross Rd.

General Comments : No Micro-Surface mix was placed on any ofthe auxiliary tum lanes.

C-75

Page 23: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

c-76

US-24 SB looking north at Mano:rwood Dr.

Typical transverse crack on US-24 SB at Mano:rwood Dr.

Page 24: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

C=77

Sealed cracks on NB US-24

at Chamg Cross Rd.

Typical sealed transverse crack on NB US-24 at

Chamg Cross Rd.

' · .. •

Page 25: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS

Date of Field Review: April11 ,1996

Field reviewed by: Bernard T. BeDner P.E.

Route: M-33

Control Section : 65052 Job Number : 33439 Length (mi.) : 10.8

Project Termini : M-55 north to Grand Jean Rd.

Pavement Type : Bituminous & seal coat

Shoulder Type : Bituminous

Width (ft.) : 24

Width (ft.) : 3

Year Last Improved : 1979 ADT : 3900-7000 % Commercial : 4-9

PM Work Type : Micro-Surface PM Work Completed: 1992

Contractor : Strawser Inc.

Overall Pavement Condition : The ride was marginaL The overall pavement condition was satisfactory.

Overall Treatment Condition : The pavement surface is moderately to severely cracked with a lot of block cracking. The cracks are generally tight with minor ravelling. The transverse cracks are generally multi cracks that extend across the full pavement width. There is a bump at many transverse cracks. Random longitudinal cracking is occurring at the center line area and at the edge of the shoulder. The center line joint is tight. The Micro-Surface is tight. No delamination was observed. No ruts were measured in the SB lane across from Glen's Market in Rose City. 1/4 inch ruts were measured just south of Ogemaw Center Rd.

General Comments :Only the two through lanes were Micro-Surfaced in Rose City.

C-78

Page 26: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

C-79

Typical cracks on M-33 south of Glen's Market

in Rose City

Typical transverse crack on M -33 south of

Ogemaw Certer Rd.

' · .. •

Page 27: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS

Date of Field Review: April10,1996

Field reviewed by : Bernard T. Bellner P.E.

Route : US-23

Control Section : 71072 Job Number: 34383 Length (mi.) : 8.44

Project Termini : M-65 south to M-68

Pavement Type : Seal coat

Shoulder Type : Bituminous

Width (ft.): 22 & 24

Width (ft.) : 3 & 8

Year Last Improved : 1979 ADT : 3000-6400 % Commercial : 3-5

PM Work Type : Micro-Surface PM Work Completed : 1993

Contractor : Slurry Seal of Southern Ohio

Overall Pavement Condition : The ride and overall pavement condition were both satisfactory.

Overall Treatment Condition : The surface is moderately cracked. Most cracks are transverse and extend the full pavement width. The transverse cracks are generally multi cracks approximately 1/4 inches wide with little or no ravelling. The transverse crack spacing is approximately thirty feet. There is random longitudinal cracking in the area of the center line and at the edge line. Both the center line joint and the edge line joint are tight. The shoulder has random longitudinal cracking. The Micro-Surface looks very gray in color. The surface is tight with no observed delamination. No rutting was measured at 0.2 miles north ofPeterville Rd. or Golf Course Rd.

General Comments : This pavement surface bad a lot of full width transverse cracks for a flexible pavement structure.

C-80

Page 28: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

C-81

Typical transverse cracks on US"23 north of

Golf Course Rd.

Longitudinal cracks along edge of metal

on US-23 north of Golf Course Rd.

Page 29: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

C-82

Typical cracking on US-23 0.2 miles north ofBL US-23

Typical transverse crack on US-23 0.2 miles north ofBL US-23

Page 30: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS

Date of Field Review: March 27,1996

Field reviewed by: Bernard T. Hellner P.E.

Route: M-57

Control Section : 73021 Job Number : 34641 Length (mi.) : 10.22

Project Termini : Meridian Rd. east to M-52

Pavement Type : Seal coat

Shoulder Type : Bituminous

Year Last Improved : 1984 ADT: 5600

PM Work Type : Micro-Surface

Contractor : Slurry Seal of Southern Ohio

Width (ft.) : 24

Width (ft.) : 3

% Commercial : 8

PM Work Completed: 1993

Overall Pavement Condition : The ride and overall pavement condition were both good.

Overall Treatment Condition : • The surface texture was uniform. The wheel paths were more gray than the remainder of the surface. No loss of mix was observed •. There was a moderate amount of cracking. Most ofthe transverse cracks were short and did not extend across both lanes and were near the center line. There was some alligator cracking also near the center line. The cracks were tight ( less than 1/8 inch wide ) with very little secondary cracking and ravelling. Very little cracking occurred in the middle of the lanes. About thirty percent of the center line joint was open. The edge line was generally sealed. 1/4 inch ruts were measured east of Fenmore Rd. and less than 1/8 inch ruts were measured at Brenam Rd.

General Comments : The shoulders were in good condition.

C-83

Page 31: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

C-84

Typical cracks on M-57 east o:f BrenamRd.

Typical crocks on M-57 east of

Fenmore Rd.

Page 32: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

' I . '

FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS

Date of Field Review: March 19,1996

Field reviewed by: Bernard T. BeHner P.E.

Route: M-46

Control Section: 79041 Job Number: 36515 Length (mi.) : 4.66

Project Termini: M-15 east to Vasser Rd.

Pavement Type : Bituminous

Shoulder Type : Bituminous

Width (ft.) : 24

Width (ft.) : 3

Year Last Improved :73/89 ADT: 5100 % Commercial : 8

PM Work Type : Micro-Surface PM Work Completed : 1994

Contractor :Slurry Seal of Southern Ohio

Overall Pavement Condition :The ride and overall condition were satisfactory.

Overall Treatment Condition : This fix is experiencing a lot of cracking. Most ofthe cracks are open transverse and block reflective type cracks spaced about ten feet apart and less than 118 inch wide. They are a single type crack with slight ravelling. At the center line, there is a ragged open crack about the entire length ofthe project. No rntting was observed or measured at Vasser Rd. or Bradleyville Rd. The texture of the Micro-Surface was uniform and was adhering to the underlying pavement. The shoulder was is satisfactory condition with some edge cracking.

General Comments: This section ofM-46 may have been too distressed for a Micro­Surface fix.

C-85

Page 33: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

:_ i

Typical cracking pattern on M .. 46 east of Bradleyville Rd.

Typical cracks on M-46 0.3 miles west of Vasser Rd.

C-86

Page 34: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS

Date of Field Review: April1 ,1996

Field reviewed by: Bernard T. Hellner P.E.

Route : US-12

Control Section :81031 Job Number: 33484 Length (mi.) : 2.139

Project Termini: Austin Rd. east to Industrial Dr. in Saline

Pavement Type : Seal coat Width : 38-60

Shoulder Type : Curb and gutter

Year last Improved : 78 & 81 ADT: 11000-24000 %Commercial: 5-6

PM Work Type : Micro-Surface PM Work Completed : 1992

Contractor : Strawser Inc.

Overall Pavement Condition : The ride and overall pavement condition were both satisfactory.

Overall Treatment Condition : The pavement surface is moderate to severely cracked. Most cracks are transverse and tight ( less than 1/8 inch wide ). The shorter length cracks are single cracks whereas the longer cracks are multi cracks. There is a little ravelling at these cracks. The centerline joint has some ragged longitudinal cracking. The surface texture is tight and uniform with very little delamination observed. There was no observed rutting.

'General Comments: The speed limit on this section ofUS-12 is 35mph.

C-87

Page 35: MICRO-SURF ACE FIELD REVIEWS - Michigan · MICRO-SURF ACE FIELD REVIEWS c-54 ·-· \ .. I FIELD CONDITION REVIEW OF COMPLETED HIGHWAY PREVENTATIVE MAINTENANCE (PM) PROJECTS ... cross

Typical cracks on US-12 WB west of Lewis St. in Saline

Typical cracks on US-12 WB east of Maple St. in Saline

C-88