Upload
brita
View
50
Download
0
Tags:
Embed Size (px)
DESCRIPTION
MICE Absorber and Focus Coil Magnet. MICE Collaboration Meeting 16 – 19 th October 2012. Tom Bradshaw John Cobb Wing Lau Matt Hills Roy Preece. Oxford University and RAL Cryogenics Group. Elwyn Baynham Mike Courthold Victoria Bayliss Victoria Blackmore Jason Tarrant etc. - PowerPoint PPT Presentation
Citation preview
MICE Absorber and Focus Coil Magnet
Tom BradshawJohn CobbWing LauMatt HillsRoy Preece
MICE Collaboration Meeting 16 – 19th October 2012
Elwyn BaynhamMike CourtholdVictoria BaylissVictoria BlackmoreJason Tarrant etc...
Oxford University and RAL Cryogenics Group
Turret buildThe Helium turret was finished some time ago and installed in the AFC
General
The Absorber and Focus Coil magnet is in its final stages of assembly prior to delivery to RAL. All of the major sub-systems are assembled with the cold mass in the Outer Vacuum Can. The last major work is the installation and welding of the warm bore (completed) followed by extensive leak testing.
Welding of the inner bore
Assembly
Monitoring of the work at Tesla continues with weekly visits from either T Bradshaw and/or Wing Lau and/or Roy Preece. The schedule and any outstanding technical issues are discussed at this meeting. In addition visits are made by Roy Preece to understand and check on thermometer calibrations, sensor locations and general interfaces with the control system. Final welding
Preparation for receiptPreparation for reception of the magnet in the R9 test facility are essentially complete with the cryocooler compressors in place, water and electrical supplies available. R9 has been cleared and tidied. The floor has been marked with the 5 gauss limit and the scaffolding and magnet supports are in place. Tesla have already secured adequate supplies of helium that should cover the commissioning (you may be aware that this is in short supply at the moment). Once the magnet has been commissioned CERN will be performing a full field map.
Installation of the He turret pipework
Scaffolding
Commissioning test diagram
Courtesy of Tesla
Quench protection circuit
NI Compact DAQ (NI-9188)
Magnet power supply
Lakeshore 230 temperature transmitter
Helium level sensor monitor
System control unit
Cryocooler 1 Cryocooler 2
Vac monitor 1
Vac monitor 2
To 8 temperature sensors
To 12 voltage taps
1
2
3
4
5
Helium level sensor
AFC absorber magnet cryostat
6
7 8
9 10 11
12
13
14
15
X4
X4
16
17
18
19
20 21
22
23
24
25
26
27
X3
28
X2
29
X2
30
31
33
32
35
To 8 temperature sensors
36
37
CON1 CON2 CON3
CON4
CON5 CON6 CON7
X7
X7
Commissioning Programme
Detailed sequence is available:
•System set-up and operation check•Leak check magnet under vacuum and pressure•Pre-cooling with LN2 to 80-90K•Cool-down with Helium to 4K•Steady state thermal performance check zero boil off•Cryocooler excess performance check•Step by step current ramp to full current (Flip mode)o Thermal performance check
•Step by step current ramp to full current (Solenoid mode)o Thermal performance check
Instrumentation and control
•Various tests conducted at Tesla to check interfaces to control system•Control system is networked for debugging•It is all ready to plug in.
Operating pointsFlip mode Solenoid mode200 MeV/c 240 MeV/c 200 MeV/c 240 MeV/c
Current 187.14 224.75 94.15 113.09Current density NbTi 584.82 702.35 294.23 353.41Current density coil 104.75 125.80 52.70 63.30Bz max 3.090 3.711 2.598 3.121Bpeak conductor 6.264 7.523 3.763 4.520
Absorber
Had another look at absorber to check interfaces – there may be a problem with accommodation of Fisher connector. Some minor modifications may be required. This will be done following a fit check on the magnet at RAL.
Schedule
Module/Activity Due DateAFC1 at RAL Target date week 22-26th
OctoberAbsorber integration and test +3mths elapsedAFC2 at RAL January 2013 (TBC)Absorber integration and test <3mths
AFC 2 parts are being progressed in parallel with AFC 1 manufacture so assembly should follow quite swiftly.
•The schedule is reviewed at the weekly visits and Tesla are still on target to meet delivery at the end of October 2012. •Need to confirm planning with CERN over the field mapping