MGM SPRINGFIELD OFF-SITE MITIGATION - 8/7/17 TO 8/18/17
WORK HOURS: 7:00 AM TO 3:30 PM
FOR CONSTRUCTION-RELATED INQUIRES PLEASE CONTACT: [email protected]
OFF-SITE MITIGATION
LOC# ZONE LOCATION DESCRIPTION DESCRIPTION OF WORK
1 A Dwight Street & I-291 Off RampReconstruction of sidewalks and curbing, along with installation of wheelchair curb ramps, signal conduits, foundations, and pull boxes. Lane shifts and/or alternating one way traffic will be required. Pedestrian access will be rerouted. Some noise, dust and vibration may result. A police detail is anticipated.
2 B Locust Street & Mill Street No work anticipated
3 B Main Street & East Columbus Avenue No work anticipated
4 C State Street & St. James Avenue No work anticipated
5 C State Street & Oak Street No work anticipated
6 C State Street & Federal Street No work anticipated
7 C State Street & Spring Street No work anticipated
8 D Plainfield Street & Riverside Road No work anticipated
9 D Plainfield Street & Avocado Street No work anticipated
10 D Plainfield Street (between Avocado Street & West Street) No work anticipated
11 D Plainfield Street & John Street No work anticipated
12 D John Street (between St. George Road & Plainfield Street) No work anticipated
13 E Main Street & Liberty Street No work anticipated
14 E Main Street & Taylor Street No work anticipated
15 E Main Street & Worthington Street No work anticipated
16 E Main Street & Bridge Street No work anticipated
MGM SPRINGFIELD OFF-SITE MITIGATION - 8/7/17 TO 8/18/17
WORK HOURS: 7:00 AM TO 3:30 PM
FOR CONSTRUCTION-RELATED INQUIRES PLEASE CONTACT: [email protected]
OFF-SITE MITIGATION
LOC# ZONE LOCATION DESCRIPTION DESCRIPTION OF WORK
17 E Main Street & Boland Way No work anticipated
18 E Main Street & Court Street No work anticipated
19 E State Street & Chestnut Street No work anticipated
20 E State Street & Dwight Street No work anticipated
21 E State Street & Main Street No work anticipated
22 E Main Street (between State Street & Union Street) No work anticipated
23 E Main Street & Union Street No work anticipated
24 E Boland Way & East Columbus AvenueReconstruction of sidewalks and curbing, along with installation of wheelchair curb ramps, signal conduits, foundations, and pull boxes. Lane shifts and/or alternating one way traffic will be required. Pedestrian access will be rerouted. Some noise, dust and vibration may result. A police detail is anticipated.
25 E Pynchon Street & East Columbus AvenueReconstruction of sidewalks and curbing, along with installation of wheelchair curb ramps, signal conduits, foundations, and pull boxes. Lane shifts and/or alternating one way traffic will be required. Pedestrian access will be rerouted. Some noise, dust and vibration may result. A police detail is anticipated.
26 E State Street (between Main Street & East Columbus Avenue ) No work anticipated
27 E State Street & MGM Way No work anticipated
28 E Union Street (between Main Street & East Columbus Avenue)
Utility work is underway and will continue throughout the summer at the intersections of Union, Howard West, and Bliss Street with East Columbus Ave. During this work, Union Street will be closed to through traffic from Main Street to East Columbus Avenue. Access to Pride Gas Station, the Colvest Building, and 55 State Street will be maintained at all times. Signage will be in place to direct patrons to business’ on Main Street via State Street and to provide updates and direction for drivers in the area.
East Columbus Ave will be open to through traffic throughout the project. At times, lanes will need to be reduced to accommodate utility crossings at the intersections. Police details will be present throughout the summer to help traffic flow as efficiently as possible.
MGM SPRINGFIELD OFF-SITE MITIGATION - 8/7/17 TO 8/18/17
WORK HOURS: 7:00 AM TO 3:30 PM
FOR CONSTRUCTION-RELATED INQUIRES PLEASE CONTACT: [email protected]
OFF-SITE MITIGATION
LOC# ZONE LOCATION DESCRIPTION DESCRIPTION OF WORK
29 E Boland Way (between East & West Columbus Avenue) Reconstruction of sidewalks and curbing, along with installation of wheelchair curb ramps, signal conduits, foundations, and pull boxes. Lane shifts and/or alternating one way traffic will be required. Pedestrian access will be rerouted. Some noise, dust and vibration may result. A police detail is anticipated.
30 E I-91 Off Ramp to West Columbus Avenue No work anticipated
31 E Memorial Bridge & West Columbus AvenueReconstruction of sidewalks and curbing, along with installation of wheelchair curb ramps, signal conduits, foundations, and pull boxes. Lane shifts and/or alternating one way traffic will be required. Pedestrian access will be rerouted. Some noise, dust and vibration may result. A police detail is anticipated.
32 E State Street & East Columbus AvenueReconstruction of sidewalks and curbing, along with installation of wheelchair curb ramps, signal conduits, foundations, and pull boxes. Lane shifts and/or alternating one way traffic will be required. Pedestrian access will be rerouted. Some noise, dust and vibration may result. A police detail is anticipated.
33 E East Columbus Avenue (between State Street & Union Street) No work anticipated
34 E Memorial Bridge Removal of concrete median down the middle of the bridge using chipping & patching type methods - work to be patched with asphalt when median removed. Lane shifts and/or alternating one way traffic will be required. Pedestrian access will be rerouted. Some noise, dust and vibration may result. A police detail is anticipated.
35 E Union Street & West Columbus AvenueReconstruction of sidewalks and curbing, along with installation of wheelchair curb ramps, signal conduits, foundations, and pull boxes. Lane shifts and/or alternating one way traffic will be required. Pedestrian access will be rerouted. Some noise, dust and vibration may result. A police detail is anticipated.
36 E Union Street & East Columbus AvenueReconstruction of sidewalks and curbing, along with installation of wheelchair curb ramps, signal conduits, foundations, and pull boxes. Lane shifts and/or alternating one way traffic will be required. Pedestrian access will be rerouted. Some noise, dust and vibration may result. A police detail is anticipated.
A
D
B
E
A
C
D
B
E
SPRINGFIELD REFERENCE PLAN
C
33
35
22
26
28
4
34
10
12
1
2
3
5
6
7
9
11
8
13
14 15 16 17 18
19
20
21
232425
29
30
3136
32
27
37