Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented to: DENR / ADB / NGO & Development Partners Presented by: Outsource Sampling Project (TRC/TEEM) September 18, 2006

Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

Embed Size (px)

Citation preview

Page 1: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

Metro Manila Air Quality Improvement Sector Development Program

Outsourcing Sampling Project (OSP)ADB Loan No. 1665-PHI

OSP Project Overview

Presented to:

DENR / ADB / NGO& Development Partners

Presented by:Outsource Sampling Project (TRC/TEEM)

September 18, 2006

Page 2: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

2

OSP Project Scope of Work

Primary objectives

– Perform 960 facility surveys and provide necessary instruction

to modify sources for testing (test ports, platforms, ladders)

– Perform minimum of 6,048 individual test runs (the equivalent

of 960 sources) for PM, SO2, NOx, CO and metals

– Generate representative emission test data in comparison with

the Philippine Clean Air Act standards

– Produce EPA-quality test reports suitable for EMB regulatory

follow-up actions (NONC, Technical Conference, CAP)

Page 3: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

3

Page 4: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

4

Page 5: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

5

Page 6: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

6

Page 7: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

7

Page 8: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

8

Page 9: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

9

Page 10: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

10

Page 11: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

11

Page 12: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

12

Page 13: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

13

Page 14: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

14

Page 15: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

15

Page 16: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

16

Page 17: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

17

Project Status (through Aug 31)

Status

  Through August 31, 2006

    Current Percent

  Goals Accomplishment of Target

Specific Outputs      

Number of Stack Surveys 960 1,592 166%

Number of Test Runs 6,048 7,489 124%

Number of Equiv. Sources Tested 960 1,189 124%

Number of Analyses 12,500 15,790 126%

Number of Test Reports --- 424 ---

Stacks Failing the Standard --- 388 ---

Page 18: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

18

Project Status (through Aug 31)

Status

  Regional Accomplishments

         

  NCR Reg 3 Reg 4a Total

         

         

Number of Stack Surveys 636 484 472 1,592

Percent of Total 40% 30% 30%  

         

Number of Test Runs 2,691 2,206 2,592 7,489

Percent of Total 36% 29% 35%  

         

Number of Stacks Tested 308 247 255 810

  38% 30% 31%  

         

Number of Stacks Failing 161 142 85 388

         

Page 19: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

19

Stack Test Results

Of the 795 stacks reported, 388 are above the CAA standard for at least one parameter:

– 289 stacks are failing for SO2

– 161 stacks are failing for PM

– 83 stacks are failing for CO

– 26 stacks are failing for NOx

– 1 stack is failing for lead

Page 20: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

20

General Observations

The following are some of the typical

– Sources firing bunker C fuel oil are exceeding the SO2 and PM standards (boilers, gensets, heaters)

– Gensets are exceeding the NOx standard

– Solid fuel-fired units are exceeding the CO standard

– Only 1 source was exceeding the lead standards

– No sources have exceeded the mercury (or other metal) standards

Page 21: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

21

Equipment Returned to DENR

At the conclusion of the project OSP provides over $230,000 equipment:

– 7 vehicles (3 Revos and 4 Kia Vans)

– Stack testing equipment (meter boxes, sample probes, impingers, etc)

– Laboratory equipment (analytical balance, spectrophotometer, support equipment)

Page 22: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

22

OSP Supplemental ItemsAlthough not required by our contract, the OSP has provided the following support (at the request of EMB):

• Extensive regulatory and policy guidance and support (CEMS, accreditation, methodology questions, emission averaging, mass emission rates, correction factors, etc)

• Established test port and platform standards with industry

• Created culture of safety in stack testing

• Training (test procedures, laboratory procedures, test report review, regulatory follow-up, PCO workshops)

• Survey and testing of large sources outside the Airshed

Supplemental Items

Page 23: Metro Manila Air Quality Improvement Sector Development Program Outsourcing Sampling Project (OSP) ADB Loan No. 1665-PHI OSP Project Overview Presented

23

Primary Goal

“Improve air quality over the medium term”

– Of the 795 stacks that have been reported, 388 (49%) are

failing (without DENR applying the appropriate dilution

correction factors). This leads to a NONC and compliance

plan.

– For sources that pass, the report generally provides the

necessary data to make that compliance sustainable

– The vast source data should now be used to re-evaluate,

and where necessary, tighten the emission standards