The Problem

The Phoenix metro area has the 16th largest population in the country, but the transit system is only the 26th.

Roadway construction will not keep up with population and travel growth.

Maricopa County gains 1 million new people per decade.

Infrastructure has not kept pace with growth.

Page 4: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Continued Population Growth

3.10

4.15

5.21

6.24

7.33

2.0

3.0

4.0

5.0

6.0

7.0

8.0

2000 2010 2020 2030 2040

Popula

tion in M

illions

Page 5: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Downtown Phoenix 2005

Page 6: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

ForensicLab

ForensicLab

GraceCourtGraceCourt

Summit at Copper

Square

Summit at Copper

Square

44 Monroe44 Monroe PortlandPlace

PortlandPlace

SheratonDowntown

Hotel

SheratonDowntown

Hotel

ASU Cronkite School

ASU Cronkite School

Phoenix Convention

Center Expansion

Phoenix Convention

Center Expansion

ASU Nursing School

ASU Nursing School

TaylorPlaceTaylorPlace

Downtown Phoenix 2008

Page 7: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Travel Increasing Faster Than Population

100

600

1,100

1,600

2,100

2,600

3,100

3,600

1940 1950 1960 1970 1980 1990 2000

Gro

wth

In

de

x:

19

40

=1

00

Population Vehicles

Page 8: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

20-Mile Light Rail Line

Page 9: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Park-and-Ride Locations

Page 10: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Light Rail Moves More People

Page 11: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Operations and Maintenance Center

Page 12: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Light Rail Vehicles

50 of 50 vehicles have arrived in Phoenix Final assembly complete the first week of November at the OMC by Kinkisharyo

Page 13: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Clean electric propulsion Regenerative braking - puts energy back in system on braking CFC free refrigerant in high efficiency air conditioning system Asbestos free brake pads Bio-degradable flange lubricant, GPS / computer controlled mist

application

Light Rail Vehicle

Page 14: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Light Rail Vehicle

Heat reflective paint Minimum use of

hazardous materials Bicycle racks

Low E, solar reflective windows Insulated car bodies to reduce cooling loss Wide use of energy efficient LED / fluorescent lighting

Page 15: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

1st Shading and Cooling Strategies Adjacent Pedestrian Areas

2nd Station Design 3rd Security 4th Vehicle Design

Overhead Wiring Maximizing Bus Connections

System Design Priorities

Page 16: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Climate Adaptation

Page 17: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Metal surfaces will overheat

Lack of vertical protection

Shade falls onto the street

Traditional LRT Station Canopy

Page 18: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

“Cool Screen” Station

Page 19: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Stations

Landscaping maximize shade Louvers, tensile fabric Chilled water fountains

Page 20: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Unique Art at Each Station

24th Street and Washington

Encanto and Central Ave

1st Ave and Jefferson

Central and Camelback

Page 21: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Town Lake Bridge art

Page 22: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Ticket Vending Machines

Passes are good for rail and local bus

Passes are good for rail and local bus

Two machines at station entrance ramps Buy at Valley Metro outlets

(Fry’s, libraries, Web) Cash or credit card Pass must be validated before boarding Random fare inspection

Page 23: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Ticket Vending Machine

Environmental Protection

The shade structure reduces heat gain and cooling costs while increasing the lifecycle of the screen and selection buttons.

Page 24: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Safety and Security

Security cameras: vehicles stations, park and rides

Emergency call boxes Security lighting Security personnel and fare

inspectors

Page 25: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Safety and Security

Train bell rings at departure and arrival Tactile strips at crosswalks Level-floor entry

Page 26: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Construction Status

Overall Construction: 93%

Park N Rides

complete in November

Station Construction and

Fare Collections

complete in early December

Page 27: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Testing: Why We Do It

We certify all 50 vehicles in our fleet by: Ensuring compliance with performance specifications. “burn-in” miles on each vehicle – just like a new car. Testing all aspects: vehicles, operator signals, track, traffic

lights, clearances at stations, power systems.

Page 28: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Ongoing Safety Education

MetroLightRail.org/Safety

Page 29: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Safety Education: How we do it

Printed materials MetroLightRail.org/Safety News media Advertising Door-hangers & direct mail Personal presentations Fliers and posters Schools, daycares, parks

& youth programs Driver education video Businesses & employers

help us

Page 30: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Downtown Phoenix 2005

Page 31: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

ForensicLab

ForensicLab

GraceCourtGraceCourt

Summit at Copper

Square

Summit at Copper

Square

44 Monroe44 Monroe PortlandPlace

PortlandPlace

SheratonDowntown

Hotel

SheratonDowntown

Hotel

ASU Cronkite School

ASU Cronkite School

Phoenix Convention

Center Expansion

Phoenix Convention

Center Expansion

ASU Nursing School

ASU Nursing School

TaylorPlaceTaylorPlace

Downtown Phoenix 2008

Page 32: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Development Along Route2004 to present

$6.0+ billion total investment along light rail route $4.6 billion private investment $1.4 billion public investment

15,000+ Residential units (planned, under construction, or completed)

7+ million SF commercial (planned, under construction, or completed)

1+ million SF government 1,800+ hotel rooms

$1.4 Billion $1.4 Billion

$6.0 Billion$6.0 Billion

Light Rail investment Non-rail investments

Page 33: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Development Along RoutePublic Facilities

Translational Genomics Research Institute – 12/04

Civic Plaza expansion - 12/08 1,000 room Sheraton - fall 08 ASU Downtown Campus

First students in 2006 15,000 students at completion 1.5 million SF academic & support

space 4,000 student beds within 10 yrs

Sheraton

Civic Plaza T-Gen

Page 34: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

New Residential Development

1,768 Units Under Construction 865 ownership units

Chateaux on Central Tapestry on Central Artisan Village Monroe Place Portland Place Century Plaza

Page 35: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Only 105 Days until Grand Opening !

Grand Opening Weekend:

December 27 – 28, 2008

Free rides

Station celebrations

Food & entertainment

Beginning of Passenger Service:December 29, 2008

Page 36: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Light Rail/High Capacity Transit System 57-Mile System

Page 37: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008

Project SchedulesProject SchedulesProject Schedules

Page 38: METRO Light Rail IRWA Richard J. Simonetta Chief Executive Officer September 12, 2008