PARTIDA UND CANT. LARGO (m) MOVIMIENTO DE TIERRAS 1.-EXCAVACIONES 1.1-FALSO PISO TOTAL NFP 37-37 A 43-43 M3 1 9.099 1.2-ZAPATAS A'-B EN 43-43'' M3 1 0.95 B-C' EN 43-43' M3 1 0.3737 C'-D EN 43-43'' M3 1 0.95 A-B' EN 37 M3 1 3.3 B'-C EN 37 M3 1 2.9 C-D' EN 37 M3 1 3.3 Z1 EN 38 M3 2 1.8 A-B' EN 39//40 M3 1 3.3 B'-C EN 39//40 M3 1 2.9 C-D' EN 39//40 M3 1 3.3 Z1 EN 41 M3 2 1.8 Z1 EN 42 M3 2 1.8 A'-B EN 43 M3 1 2.9 B-C' EN 43 M3 1 3.3 C'-D EN 43 M3 1 2.9 1.3.CIMIENTO CORRIDO 37-38 EN X M3 1 3.125 38-39 EN X M3 1 5.515 40-41 EN X M3 1 3.124 41-42 EN X M3 1 3.5 42-43 EN X M3 1 3.194 37-38 EN Y M3 1 3.125 38-39 EN Y M3 1 5.515 40-41 EN Y M3 1 3.124 41-42 EN Y M3 1 3.5 42-43 EN Y M3 1 3.194 38'1 ENTRE X-Y M3 1 5.9 38'2 ENTRE B1-Y M3 1 3.434 38'3 ENTRE B1-C M3 1 2.525 38'4 ENTRE X-B3 M3 1 3.725 38'5 ENTRE C-Y M3 1 0.975 B2 ENTRE 38'1-38'2 M3 1 0.761 B3 ENTRE 38'3-38'5 M3 1 0.375 C ENTRE 38'1-38'2 M3 1 0.761 C ENTRE 38'5-39 M3 1 0.9

Metrado de Costos

Embed Size (px)

DESCRIPTION

Modelo básico de resumen de metrado de un proyecto de mucha utilidad.

Citation preview

Page 1: Metrado de Costos

PARTIDA UND CANT. LARGO (m)MOVIMIENTO DE TIERRAS1.-EXCAVACIONES1.1-FALSO PISOTOTAL NFP 37-37 A 43-43 M3 1 9.0991.2-ZAPATASA'-B EN 43-43'' M3 1 0.95B-C' EN 43-43' M3 1 0.3737C'-D EN 43-43'' M3 1 0.95A-B' EN 37 M3 1 3.3B'-C EN 37 M3 1 2.9C-D' EN 37 M3 1 3.3Z1 EN 38 M3 2 1.8A-B' EN 39//40 M3 1 3.3B'-C EN 39//40 M3 1 2.9C-D' EN 39//40 M3 1 3.3Z1 EN 41 M3 2 1.8Z1 EN 42 M3 2 1.8A'-B EN 43 M3 1 2.9B-C' EN 43 M3 1 3.3C'-D EN 43 M3 1 2.91.3.CIMIENTO CORRIDO37-38 EN X M3 1 3.12538-39 EN X M3 1 5.51540-41 EN X M3 1 3.12441-42 EN X M3 1 3.542-43 EN X M3 1 3.19437-38 EN Y M3 1 3.12538-39 EN Y M3 1 5.51540-41 EN Y M3 1 3.12441-42 EN Y M3 1 3.542-43 EN Y M3 1 3.19438'1 ENTRE X-Y M3 1 5.938'2 ENTRE B1-Y M3 1 3.43438'3 ENTRE B1-C M3 1 2.52538'4 ENTRE X-B3 M3 1 3.72538'5 ENTRE C-Y M3 1 0.975B2 ENTRE 38'1-38'2 M3 1 0.761B3 ENTRE 38'3-38'5 M3 1 0.375C ENTRE 38'1-38'2 M3 1 0.761C ENTRE 38'5-39 M3 1 0.9

Page 2: Metrado de Costos

PARTIDA UND CANT. PERIMETRO1.2-EXCAVACION DE TALUDES DE CIMENTACIÓNTALUD 1 (INTERIOR) M3 1 25.48

TALUD 2 (INTERIOR) M3 1 45.50

TALUD 3 (EXTERIOR) M3 1 113.00

PARTIDA UND CANT. AREA1.3-ZONA CENTRALZONA 1 M3 1 13.71

ZONA 2 M3 1 0.85

ZONA 3 M3 1 0.85

ZONA 4 M3 1 0.28

PARTIDA UND CANT. LARGO (m)

2.-RELLENOSA'-B EN 43-43'' M3 1 2.2

B-C' EN 43-43' M3 1 0.75

C'-D EN 43-43'' M3 1 2.2

A-B' EN 37 M3 1 1.3

B'-C EN 37 M3 1 0.475

C-D' EN 37 M3 1 1.3

Z1 EN 38 M3 2 2.25

Z1 EN 41 M3 2 2.25

Z1 EN 42 M3 2 2.25

38'1 ENTRE X-Y M3 2 0.45

38'2 ENTRE B1-Y M3 2 0.45

38'3 ENTRE B1-C M3 2 0.45

38'4 ENTRE X-B3 M3 2 0.45

38'5 ENTRE C-Y M3 2 0.45

B2 ENTRE 38'1-38'2 M3 2 0.45

B3 ENTRE 38'3-38'5 M3 2 0.45

C ENTRE 38'1-38'2 M3 2 0.45

C ENTRE 38'5-39 M3 1 0.225

M3

PARTIDA UND CANT. PERIMETRORELLENOS DE TALUDES DE CIMENTACIÓNTALUD 1 (INTERIOR) M3 1 25.48

TALUD 2 (INTERIOR) M3 1 45.50

TALUD 3 (EXTERIOR) M3 1 113.00

PARTIDA UND CANT. AREARELLENOS DE ZONA CENTRALZONA 1 M3 1 13.71

Page 3: Metrado de Costos

ZONA 2 M3 1 0.85

ZONA 3 M3 1 0.85

ZONA 4 M3 1 0.28

Page 4: Metrado de Costos

ANCHO (m) ALTO (m) PARCIAL TOTAL

380.779216

44.48

32.591 0.15 44.4818264

154.25

2.45 0.15 0.3491251 0.15 0.056055

2.45 0.15 0.3491251.55 1.85 9.46275

0.725 1.85 3.8896251.55 1.85 9.46275

2.5 1.85 16.653.3 1.85 20.14651.5 1.85 8.04753.3 1.85 20.14652.5 1.85 16.652.5 1.85 16.65

2.45 1.85 13.144251 1.85 6.105

2.45 1.85 13.14425

31.29

0.3 1.4 1.31250.3 1.4 2.31630.3 1.4 1.312080.3 1.4 1.470.3 1.4 1.341480.3 1.4 1.31250.3 1.4 2.31630.3 1.4 1.312080.3 1.4 1.470.3 1.4 1.341480.6 1.4 4.9560.6 1.4 2.884560.6 1.4 2.1210.6 1.4 3.1290.6 1.4 0.8190.6 1.4 0.639240.6 1.4 0.3150.6 1.4 0.63924

0.225 1.4 0.2835

sub 230.026516

Page 5: Metrado de Costos

ALTURA PENDIENTE PARCIAL Total

1.4 45° 17.8367

1.4 45° 31.85

1.4 45° 79.1

sub 128.7867

ALTURA PENDIENTE PARCIAL

1.4 - 19.194

1.4 - 1.19

1.4 - 1.19

1.4 - 0.392

sub 21.966

ANCHO (m) ALTO (m) PARCIAL TOTAL

192.7321540.95 0.65 1.3585

0.3737 0.65 0.18217875

0.95 0.65 1.3585

3.3 0.65 2.7885

2.9 0.65 0.895375

3.3 0.65 2.7885

1.8 0.65 5.265

1.8 0.65 5.265

1.8 0.65 5.265

5.9 0.65 5.31

3.434 0.65 3.0906

2.525 0.65 2.2725

3.725 0.65 3.3525

0.975 0.65 0.8775

0.761 0.65 0.6849

0.375 0.65 0.3375

0.761 0.65 0.6849

0.9 0.65 0.2025

SUB 41.9794538

ALTURA PENDIENTE PARCIAL Total

1.4 45° 17.8367

1.4 45° 31.85

1.4 45° 79.1

sub 128.7867

ALTURA PENDIENTE PARCIAL

1.4 - 19.194

Page 6: Metrado de Costos

1.4 - 1.19

1.4 - 1.19

1.4 - 0.392

sub 21.966

Page 7: Metrado de Costos
Page 8: Metrado de Costos

283.00761213

Page 9: Metrado de Costos
Page 10: Metrado de Costos

PARTIDA UND CANT.CONCRETO DE CIMENTACION CONCRETO DE CIMENTACION CORRIDACOTA NPT -80 A NPT-15037-38 EN X 138-39 EN X 140-41 EN X 141-42 EN X 142-43 EN X 137-38 EN Y 138-39 EN Y 140-41 EN Y 141-42 EN Y 142-43 EN Y 138'1 ENTRE X-Y 138'2 ENTRE B1-Y 138'3 ENTRE B1-C 138'4 ENTRE X-B3 138'5 ENTRE C-Y 1B2 ENTRE 38'1-38'2 1B3 ENTRE 38'3-38'5 1C ENTRE 38'1-38'2 1C ENTRE 38'5-39 1

COTA NPT -15 A NPT-80X EN 37-39 1X EN 40-43 1Y EN 37-39 1Y EN 40-43 138'1 ENTRE X-Y 138'2 ENTRE B1-Y 138'3 ENTRE B1-C 138'4 ENTRE X-B3 138'5 ENTRE C-Y 1B1 ENTRE 38'3-38'5 1B2 ENTRE 38'1-38'2 1B3 ENTRE 38'3-38'4 1B3 ENTRE 38'3-38'5 1C ENTRE 38'1-38'2 1C ENTRE 38'5-39 1

Page 11: Metrado de Costos

CONCRETO DE ZAPATASA-B' EN 37 1B'-C EN 37 1C-D' EN 37 1Z1 EN 38 2A-B' EN 39//40 1B'-C EN 39//40 1C-D' EN 39//40 1Z1 EN 41 2Z1 EN 42 2A'-B EN 43 1B-C' EN 43 1C'-D EN 43 1

Page 12: Metrado de Costos

LARGO (m) ANCHO (m) ALTO (m) PARCIAL TOTAL

33.79948

3.125 0.3 0.7 0.656255.515 0.3 0.7 1.158153.124 0.3 0.7 0.65604

3.5 0.3 0.7 0.7353.194 0.3 0.7 0.670743.125 0.3 0.7 0.656255.515 0.3 0.7 1.158153.124 0.3 0.7 0.65604

3.5 0.3 0.7 0.7353.194 0.3 0.7 0.67074

5.9 0.6 0.7 2.4783.434 0.6 0.7 1.442282.525 0.6 0.7 1.06053.725 0.6 0.7 1.56450.975 0.6 0.7 0.40950.761 0.6 0.7 0.319620.375 0.6 0.7 0.15750.761 0.6 0.7 0.31962

0.9 0.225 0.7 0.14175sub 15.64563

14.39 0.3 0.65 2.8060518 0.3 0.65 3.51

14.69 0.3 0.65 2.8645518 0.3 0.65 3.51

5.9 0.25 0.65 0.958750.6 0.25 0.65 0.0975

2.15 0.25 0.65 0.3493753.5 0.25 0.65 0.568750.6 0.25 0.65 0.0975

0.35 0.25 0.65 0.0568752.61 0.25 0.65 0.4241250.35 0.25 0.65 0.0568750.45 0.25 0.65 0.0731251.21 0.25 0.65 0.19662515.9 0.25 0.65 2.58375

sub 18.15385

Page 13: Metrado de Costos

3.3 1.55 0.7 3.58052.9 0.725 0.7 1.471753.3 1.55 0.7 3.58051.8 2.5 0.7 6.33.3 3.3 0.7 7.6232.9 1.5 0.7 3.0453.3 3.3 0.7 7.6231.8 2.5 0.7 6.31.8 2.5 0.7 6.32.9 2.45 0.7 4.97353.3 1 0.7 2.312.9 2.45 0.7 4.9735

sub 58.08075

Page 14: Metrado de Costos

ELEMENTO ACERO

DESCRIPCION DIAM.

CIMIENTO CORRIDOACERO EN CIMIENTO CORRIDO ( 5/8''-9.6 ml/m2)38'1 ENTRE X-Y 5/8''

38'2 ENTRE B1-Y 5/8''

38'3 ENTRE B1-C 5/8''

38'4 ENTRE X-B3 5/8''

38'5 ENTRE C-Y 5/8''

B2 ENTRE 38'1-38'2 5/8''

B3 ENTRE 38'3-38'5 5/8''

C ENTRE 38'1-38'2 5/8''

C ENTRE 38'5-39 5/8''

CIMENTACION CORRIDA TRANSVERSALESTRANS-5/8''- X EN 37-39 5/8''

EMP 5/8''

TRANS-5/8''- X EN 40-43 5/8''

EMP 5/8''

TRANS-5/8''- Y EN 37-39 5/8''

EMP 5/8''

TRANS-5/8''- Y EN 40-43 5/8''

EMP 5/8''

TRANS-5/8''- Y EN 40-43 5/8''

EMP 5/8''

TRANS-5/8''- 38'1 ENTRE X-Y 5/8''

TRANS-5/8''- 38'1 ENTRE X-Y 5/8''

TRANS-5/8''- 38'2 ENTRE B1-Y 5/8''

TRANS-5/8''- 38'3 ENTRE B1-C 5/8''

TRANS-5/8''- 38'4 ENTRE X-B3 5/8''

TRANS-5/8''- 38'5 ENTRE C-Y 5/8''

TRANS-5/8''- B1 ENTRE 38'3-38'5 5/8''

TRANS-5/8''- B2 ENTRE 38'1-38'2 5/8''

TRANS-5/8''- B3 ENTRE 38'3-38'5 5/8''

TRANS-5/8''- C ENTRE 38'1-38'2 5/8''

TRANS-5/8''- C ENTRE 38'5-39 5/8''

TRANS-3/8''- X EN 37-39 3/8''EMP 3/8''TRANS-3/8''- X EN 40-43 3/8''EMP 3/8''TRANS-3/8''- Y EN 37-39 3/8''

Page 15: Metrado de Costos

EMP 3/8''TRANS-3/8''- 38'1 ENTRE X-Y 3/8''TRANS-3/8''- 38'2 ENTRE B1-Y 3/8''TRANS-3/8''- 38'3 ENTRE B1-C 3/8''TRANS-3/8''- 38'4 ENTRE X-B3 3/8''TRANS-3/8''- 38'5 ENTRE C-Y 3/8''TRANS-3/8''- B1 ENTRE 38'3-38'5 3/8''TRANS-3/8''- B2 ENTRE 38'1-38'2 3/8''TRANS-3/8''- B2 ENTRE 38'3-38'5 3/8''TRANS-3/8''- C ENTRE 38'1-38'2 3/8''TRANS-3/8''- C ENTRE 38'5-39 3/8''

ESTRIBOS-3/8''-0.30X ENTRE 37-38 3/8''X ENTRE 38-39 3/8''X ENTRE 40-41 3/8''X ENTRE 41-42 3/8''X ENTRE 42-43 3/8''Y ENTRE 37-38 3/8''Y ENTRE 38-39 3/8''Y ENTRE 40-41 3/8''Y ENTRE 41-42 3/8''Y ENTRE 42-43 3/8''

ESTRIBOS-3/8''38'1 ENTRE X-B2 3/8''38'1 ENTRE B2-C 3/8''38'1 ENTRE C-Y 3/8''38'2 ENTRE C'-Y 3/8''38'3 ENTRE B1-B3 3/8''38'3 ENTRE B1-C' 3/8''38'4 ENTRE X-B1 3/8''38'4 ENTRE B1-B3 3/8''38'5 ENTRE C-Y 3/8''B1 ENTRE 38'3-38'4 3/8''B2 ENTRE 38'1-38'2 3/8''B3 ENTRE 38'3-38'4 3/8''B3 ENTRE 38'4-38'5 3/8''C ENTRE 38'1-38'2 3/8''C ENTRE 38'5-39 3/8''

Page 16: Metrado de Costos
Page 17: Metrado de Costos

ACEROLONGITUD TOTAL

N° DE VECES/ LARGO LONG. PARCIAL/ AREA1/4" 3/8"

0.6 5.9 3.54

0.6 3.434 2.06

0.6 2.525 1.515

0.6 3.725 2.235

0.6 0.975 0.585

0.6 0.761 0.46

0.6 0.375 0.225

0.6 0.761 0.46

0.225 0.9 0.2025

4 1 14.924 1 0.84 1 18.524 1 0.84 1 15.214 1 0.84 1 18.524 1 0.84 1 18.524 1 0.54 1 7.024 1 7.024 1 1.124 1 2.674 1 4.324 1 1.124 1 1.174 1 1.9314 1 1.624 1 2.0314 1 2.51

6 1 14.92 89.526 1 0.5 36 1 18.52 111.126 1 0.5 36 1 15.21 91.26

N° DE ELEM/ ANCHO

Page 18: Metrado de Costos

6 1 0.5 36 1 7.02 42.126 1 1.12 6.726 1 2.67 16.026 1 4.32 25.926 1 1.12 6.726 1 1.17 7.026 1 1.931 11.5866 1 1.62 9.726 1 2.031 12.1866 1 2.51 15.06

18 1 3.02 54.3629 1 3.02 87.5819 1 3.02 57.3820 1 3.02 60.419 1 3.02 57.3820 1 3.02 60.429 1 3.02 87.5819 1 3.02 57.3820 1 3.02 60.419 1 3.02 57.38

11 1 2.92 32.126 1 2.92 17.526 1 2.92 17.522 1 2.92 5.843 1 2.92 8.764 1 2.92 11.68

10 1 2.92 29.23 1 2.92 8.762 1 2.92 5.842 1 2.92 5.845 1 2.92 14.62 1 2.92 5.842 1 2.92 5.845 1 2.92 14.67 1 2.92 20.44

TOTAL 0.00 1,298.61

FACTOR 0.23 0.56

Page 19: Metrado de Costos

TOTAL KG 0.00 727.22

Total Kg

Page 20: Metrado de Costos

LONGITUD TOTAL

1/2" 5/8" 3/4" 1" 1 3/8"

33.984

19.77984

14.544

21.456

5.616

4.38336

2.16

4.38336

1.944

59.683.2

74.083.2

60.843.2

74.083.2

74.082

28.0828.084.48

10.6817.284.484.68

7.7246.48

8.12410.04

Page 21: Metrado de Costos

0.00 595.94 0.00 0.00 0.00

0.99 1.55 2.24 3.97 7.91

Page 22: Metrado de Costos

0.00 923.70 0.00 0.00 0.00

Total Kg 1650.93

Page 23: Metrado de Costos

PARTIDA UND CANT.Encofrado -0.15 A NPT-0.80X EN 37-39 M2 2X EN 40-43 M2 2Y EN 37-39 M2 2Y EN 40-43 M2 238'1 ENTRE X-Y M2 238'2 ENTRE B1-Y M2 238'3 ENTRE B1-C M2 238'4 ENTRE X-B3 M2 238'5 ENTRE C-Y M2 2B1 ENTRE 38'3-38'5 M2 2B2 ENTRE 38'1-38'2 M2 2B3 ENTRE 38'3-38'4 M2 2B3 ENTRE 38'3-38'5 M2 2C ENTRE 38'1-38'2 M2 2C ENTRE 38'5-39 M2 2

Encofrado -0.80 A NPT-1.5037-38 EN X M2 238-39 EN X M2 240-41 EN X M2 241-42 EN X M2 242-43 EN X M2 237-38 EN Y M2 238-39 EN Y M2 240-41 EN Y M2 241-42 EN Y M2 242-43 EN Y M2 238'1 ENTRE X-Y M2 238'2 ENTRE B1-Y M2 238'3 ENTRE B1-C M2 238'4 ENTRE X-B3 M2 238'5 ENTRE C-Y M2 2B2 ENTRE 38'1-38'2 M2 2B3 ENTRE 38'3-38'5 M2 2C ENTRE 38'1-38'2 M2 2C ENTRE 38'5-39 M2 2

Encofrado ZAPATAS -0.15 A NPT-0.80

Page 24: Metrado de Costos

Z3 //37M2 1M2 1M2 4M2 1M2 1M2 1M2 1

Z3/39/40M2 4M2 2M2 4M2 2

Z6/43/43''M2 1M2 2M2 4M2 2M2 2M2 2

Z1M2 12M2 24

Page 25: Metrado de Costos

LARGO (m) ANCHO (m) ALTO (m) PARCIAL TOTAL

14.39 - 0.65 18.707 207.090818 - 0.65 23.4

14.69 - 0.65 19.09718 - 0.65 23.4

5.9 - 0.65 7.670.6 - 0.65 0.78

2.15 - 0.65 2.7953.5 - 0.65 4.550.6 - 0.65 0.78

0.35 - 0.65 0.4552.61 - 0.65 3.3930.35 - 0.65 0.4550.45 - 0.65 0.5851.21 - 0.65 1.57315.9 - 0.65 20.67

SUB 128.31

3.125 - 0.7 4.3755.515 - 0.7 7.7213.124 - 0.7 4.3736

3.5 - 0.7 4.93.194 - 0.7 4.47163.125 - 0.7 4.3755.515 - 0.7 7.7213.124 - 0.7 4.3736

3.5 - 0.7 4.93.194 - 0.7 4.4716

5.9 - 0.7 8.263.434 - 0.7 4.80762.525 - 0.7 3.5353.725 - 0.7 5.2150.975 - 0.7 1.3650.761 - 0.7 1.06540.375 - 0.7 0.5250.761 - 0.7 1.0654

0.9 - 0.7 1.26Sub 78.7808

81.6165

Page 26: Metrado de Costos

9.51 - 0.7 6.6571.555 - 0.7 1.0885

1.5 - 0.7 4.20.983 - 0.7 0.68812.903 - 0.7 2.0321

0.83 - 0.7 0.5811.71 - 0.7 1.197

-1.5 - 0.7 4.22.9 - 0.7 4.060.9 - 0.7 2.523.3 - 0.7 4.62

2.5 - 0.7 1.752.9 - 0.7 4.061.3 - 0.7 3.64

0.93 - 0.7 1.3020.572 - 0.7 0.8008

3.3 - 0.7 4.62

2.5 - 0.7 210.75 - 0.7 12.6

SUB 81.6165

Page 27: Metrado de Costos

ITEM DESCRIPCIÓN CANTIDADCONCRETO EN COLUMNASCOLUMNA C1 PRIMER PISO 6COLUMNA C1 SEGUNDO PISO 6COLUMNA C1 TERCER PISO 6

COLUMNA C2 PRIMER PISO 8COLUMNA C2 SEGUNDO PISO 8COLUMNA C2 TERCER PISO 8

COLUMNA C3 PRIMER PISO 4COLUMNA C3 SEGUNDO PISO 4COLUMNA C3 TERCER PISO 4

COLUMNA PA PRIMER PISO 4COLUMNA PA SEGUNDO PISO 4COLUMNA PA TERCER PISO 4

COLUMNA PB PRIMER PISO 1COLUMNA PB SEGUNDO PISO 1COLUMNA PB TERCER PISO 1

COLUMNA PC PRIMER PISO 22COLUMNA PC SEGUNDO PISO 22COLUMNA PC TERCER PISO 22

COLUMNA PE PRIMER PISO 10COLUMNA PE SEGUNDO PISO 10COLUMNA PE TERCER PISO 10

ITEM DESCRIPCIÓN CANTIDADENCOFRADO Y DESECONFRADOCOLUMNA C1 PRIMER PISO 6COLUMNA C1 SEGUNDO PISO 6COLUMNA C1 TERCER PISO 6

COLUMNA C2 PRIMER PISO 8COLUMNA C2 SEGUNDO PISO 8COLUMNA C2 TERCER PISO 8

COLUMNA C3 PRIMER PISO 4COLUMNA C3 SEGUNDO PISO 4

Page 28: Metrado de Costos

COLUMNA C3 TERCER PISO 4

COLUMNA PA PRIMER PISO 4COLUMNA PA SEGUNDO PISO 4COLUMNA PA TERCER PISO 4

COLUMNA PB PRIMER PISO 1COLUMNA PB SEGUNDO PISO 1COLUMNA PB TERCER PISO 1

COLUMNA PC PRIMER PISO 22COLUMNA PC SEGUNDO PISO 22COLUMNA PC TERCER PISO 22

COLUMNA PE PRIMER PISO 10COLUMNA PE SEGUNDO PISO 10COLUMNA PE TERCER PISO 10

ACERO EN CONLUMNAS

DESCRIPCION DISEÑO DEL FIERROɸ

C1 BARRAS 3/4"ESTRIBOS 3/8"

C2 BARRAS 3/4"ESTRIBOS 3/8"

C3 BARRAS 5/8"ESTRIBOS 3/8"

PA BARRAS 1/2"ESTRIBOS 1/4"

PB BARRAS 1/2"ESTRIBOS 1/4"

PC BARRAS 1/2"ESTRIBOS 1/4"

PE BARRAS 1/2"ESTRIBOS 1/4"

PESO UNITARIO (KG/m)PESO PARCIAL (KG)

PESO DESPERDICIO 5%

Page 29: Metrado de Costos

ALAMBRE N°16 6%PESO TOTAL (KG)

Page 30: Metrado de Costos

LARGO ANCHO ALTO PARCIAL

0.30 1.00 3.75 6.750.30 1.00 3.05 5.490.30 1.00 3.05 5.49

0.30 0.60 3.75 5.400.30 0.60 3.05 4.390.30 0.60 3.05 4.39

0.24 0.40 3.75 1.440.24 0.40 3.05 1.170.24 0.40 3.05 1.17

0.15 0.15 3.75 0.340.15 0.15 3.05 0.270.15 0.15 3.05 0.27

0.15 0.12 3.75 0.070.15 0.12 3.05 0.050.15 0.12 3.05 0.05

0.15 0.20 3.75 2.480.15 0.20 3.05 2.010.15 0.20 3.05 2.01

0.15 0.20 3.75 1.130.15 0.20 3.05 0.920.15 0.20 3.05 0.92

46.22 m3

LARGO ANCHO ALTO PERIMETRO PARCIAL

0.30 1.00 3.15 2.6 8.190.30 1.00 2.55 2.6 6.630.30 1.00 2.55 2.6 6.63

0.30 0.60 3.15 1.8 5.670.30 0.60 2.55 1.8 4.590.30 0.60 2.55 1.8 4.59

0.24 0.40 3.15 1.28 4.030.24 0.40 2.55 1.28 3.26

Page 31: Metrado de Costos

0.24 0.40 2.55 1.28 3.26

0.15 0.15 3.15 0.6 1.890.15 0.15 2.55 0.6 1.530.15 0.15 2.55 0.6 1.53

0.15 0.12 3.15 0.54 1.700.15 0.12 2.55 0.54 1.380.15 0.12 3.55 0.54 1.92

0.15 0.20 3.15 0.7 2.210.15 0.20 2.55 0.7 1.790.15 0.20 2.55 0.7 1.79

0.15 0.20 3.15 0.7 2.210.15 0.20 2.55 0.7 1.790.15 0.20 2.55 0.7 1.79

68.36 m2

LONGITUD X ɸ

LONG X PZAS 1/4" 3/8" 1/2"6 14 11.71

6 50 2.56 768

8 8 11.71

8 50 2.44 976

4 4 11.51

4 50 1.04 208

4 2 11.36 90.88

4 50 0.05 10

1 1 11.36 11.36

1 50 0 0

22 2 11.36 499.84

22 50 0.05 55

10 2 11.36 227.2

10 50 0.05 25

PESO UNITARIO (KG/m) 0.25 0.56 0.994PESO PARCIAL (KG) 90 1952 829.28

PESO 6107.83984DESPERDICIO 5% 305.391992

N° ELEMENTOS IGUALES

N°PZAS X ELEM

Page 32: Metrado de Costos

ALAMBRE N°16 6% 384.79390992PESO TOTAL (KG) 6798.02574192

Page 33: Metrado de Costos
Page 34: Metrado de Costos

LONGITUD X ɸ

5/8" 3/4"983.64

749.44

184.16

1.552 2.24184.16 1733.08

6107.83984305.391992

Page 35: Metrado de Costos

384.793909926798.02574192

Page 36: Metrado de Costos

DescripciónEncofradoEncofrado HorCant Veces AnchoV5 1 1 0.3V1 1 1 0.3V14 1 1 0.3V2 1 1 0.3VS-1 3 1 0.25VS-1 1 1 0.25VC-1-1 3 1 0.4VC-6-6 3 1 4VC-7-7 2 1 0.3VC-2-2 en 37- 1 1 0.15VC-2-2 en 40- 1 1 0.15Encofrado VerticalV5 1 3 0.3

1 3 0.6V1 1 3 0.3

1 3 0.6V14 1 3 0.3

1 3 0.6V2 1 3 0.3

1 3 0.6VC-6-6 2 3 0.8VC-7-7 2 3 0.35

Page 37: Metrado de Costos

Largo Aréa(m2)14.7 4.41

18 5.414.39 4.317

18 5.47.6 5.7

7.61 1.90257.6 9.125.9 70.8

0.35 0.219 1.35

1.7 0.255

14.7 13.2314.2 25.56

18 16.217.5 31.5

14.39 12.95113.89 25.002

18 16.217.5 31.5

5.9 28.320.35 0.735

Sub 310.0625

Page 38: Metrado de Costos

ConcretoConcreto VigasDescripción Cant Veces Ancho AltoV5 1 1 0.3 0.6V1 1 1 0.3 0.6V14 1 1 0.3 0.6V2 1 1 0.3 0.6VS-1 3 1 0.25 0.25VS-1 1 1 0.25 0.25VC-1-1 3 1 0.4 0.25VC-6-6 3 1 4 0.25VC-7-7 2 1 0.3 0.25VC-2-2 en 37- 1 1 0.15 0.25VC-2-2 en 40- 1 1 0.15 0.25

Page 39: Metrado de Costos

Largo Vol(m3)14.7 2.646

18 3.2414.39 2.5902

18 3.247.6 1.425

7.61 0.4756257.6 2.285.9 17.7

0.35 0.05259 0.3375

1.7 0.06375Sub 34.050575

Page 40: Metrado de Costos

PARTIDA

ELEMENTO CONCRETO

DESCRIPCION CANT.MEDIDAS

LARGO ANCHO ALTOVIGAS

V5- 3/4''V5- 5/8'' REF-Sup-IZQV5- 3/4'' REF-Sup-MEDV5- 5/8'' REF-InfEstribos 3/8'' ejes 37-38Estribos 3/8'' ejes 38-39

V1-5/8''V1-3/4'' REF-SUP-EXTRV1-3/4'' REF-SUP-MEDV1-5/8'' REF-INF-EXTRV1-5/8'' REF-INF-MEDESTRIBOS 3/8'' EN 40-41ESTRIBOS 3/8'' EN 41-42ESTRIBOS 3/8'' EN 42-43

V14-3/4''V14-3/4'' REF-SUP-IZQV14-1'' REF-SUP-MEDV14-5/8'' REF-SUP-DERV14-5/8'' REF-INF

V2-5/8''V2-3/4'' REF-SUP-EXTRV2-5/8'' REF-SUP-EXTRV2-3/4'' REF-SUP-MEDV2-5/8'' REF-INF-EXTRV2-5/8'' REF-INF-MEDESTRIBOS 3/8'' EN 40-41ESTRIBOS 3/8'' EN 41-42ESTRIBOS 3/8'' EN 42-43

VS-1-1/2''ESTRIBOS 1/2''VS-1-1/2''ESTRIBOS 1/2''

Page 41: Metrado de Costos

VC-1-1-1/2''VC-1-1-3/8''Estribos 1/4''

VC-6-6-1/2''VC-6-6-3/8''Estribos 1/4''

VC-7-7-1/2''VC-7-7-3/8''Estribos 1/4''

VC-2-2-3/8'' EN 37-39ESTRIBOS 1/4'' EN 37-39VC-2-2-3/8'' en 40-43ESTRIBOS 1/4'' EN 40-43

Placa Parapetohorizontal 3/8''

vertical 3/8''

SUMA Total

Page 42: Metrado de Costos

CONCRETO ENCOFRADO ACERO

TOTAL MEDIDAS TOTALDIAM. N° DE ELEM

m³. LARGO ANC/ALT m².

6332

2836

44621

272727

63312

442621

272727

1133

Page 43: Metrado de Costos

42

46

44

42

22

42

254

266

5757

44

0.00 Total 0.00

Page 44: Metrado de Costos

ACEROLONGITUD TOTAL

N° DE VECES1/4" 3/8" 1/2" 5/8"

3 15.323 3.46 10.38

3 5.2 15.6

3 4.693 1.88 52.64

3 1.88 67.68

3 18.52 74.08

3 2.213 4.23 3.32 6.64

3 3.36 3.36

3 1.88 50.76

3 1.88 50.76

3 1.88 50.76

3 15.023 3.473 5.23 2.72 2.72

3 4.69 9.38

3 18.52 74.08

3 2.213 2.16 4.32

3 4.23 3.32 6.64

3 3.36 3.36

3 1.88 50.76

3 1.88 50.76

3 1.88 50.76

3 8.73 26.19123 1 123

3 8.72 78.48123 1 369

LONG. PARCIAL

Page 45: Metrado de Costos

9 8.72 313.929 8.72 156.969 1.3 538.2

9 7.02 252.729 7.02 252.729 1.5 567

4 1.9 15.24 1.9 15.29 1.1 415.8

3 14.91 89.463 0.37 59.943 18.52 111.123 0.37 73.26

2 14.87 1695.182 18.56 2115.842 1.59 12.722 1.59 12.72

TOTAL 1,654.20 4,836.04 1,178.51 261.32

FACTOR 0.23 0.56 0.99 1.55

TOTAL KG 380.47 2,708.18 1,166.72 405.05

Total Kg

Page 46: Metrado de Costos

LONGITUD TOTAL

3/4" 1" 1 3/8"

91.92

9.38

8.84

25.2

90.12

10.41

15.6

8.84

25.2

Page 47: Metrado de Costos

269.91 15.60 0.00

2.24 3.97 7.91

604.60 61.93 0.00

Total Kg 5326.95

Page 48: Metrado de Costos

PARTIDA UND CANT. LARGO (m)CONCRETO PLACASPL-4 ENTRE X-Y M3 4 5.9PARAPETO

M3 2 14.31M3 2 18

ENCOFRADO PLACASEncofrado PL-4 M237 ENTRE X-Y EXT M2 1 6.5137 ENTRE X-Y INT M2

M2 1 5.91M2 1 5.91M2 1 5.91M2 1 5.91

Parapeto M2 2 14.31M2 2 18

Page 49: Metrado de Costos

ANCHO (m) ALTO (m) PARCIAL TOTAL10.297

0.25 0.65 3.835

1 0.1 2.8621 0.1 3.6

Sub 10.297186.576

10.2 66.402

0.65 3.84153.05 18.02552.85 16.84352.85 16.8435

1 28.621 36

SUB 186.576

Page 50: Metrado de Costos

PARTIDA

ELEMENTO CONCRETO

DESCRIPCION CANT.MEDIDAS

LARGOPLACAS

Placa Parapetohorizontal 3/8''

vertical 3/8''

PL-4REF-VERT-3/8''-L

VERT-3/8-2LEMPALME-VERT-3/8-2L

TRANS-3/8''

Page 51: Metrado de Costos

CONCRETO ENCOFRADO

MEDIDAS TOTAL MEDIDAS TOTAL

ANCHO ALTO m³. LARGO ANC/ALT m².

Page 52: Metrado de Costos

ACEROLONGITUD TOTAL

DIAM. N° DE ELEM N° DE VECES1/4" 3/8"

3/8" 57 2 14.87 1695.183/8" 57 2 18.56 2115.843/8" 4 2 1.59 12.723/8" 4 2 1.59 12.72

3/8" 4 46 3.2 588.80

3/8" 8 46 11.38 4187.84

3/8" 8 46 0.5 184.00

3/8" 8 68 7.02 3818.88

TOTAL 0.00 12,615.98

FACTOR 0.23 0.56

TOTAL KG 0.00 7,064.95

Total Kg

LONG. PARCIAL

Page 53: Metrado de Costos

LONGITUD TOTAL

1/2" 5/8" 3/4" 1" 1 3/8"

0.00 0.00 0.00 0.00 0.00

0.99 1.55 2.24 3.97 7.91

0.00 0.00 0.00 0.00 0.00

Total Kg 7064.95

Page 54: Metrado de Costos

PARTIDA

ELEMENTO ACERO

DESCRIPCION CANT. DIAM.

ACERO EN ZAPATAS ( 5/8''-9.6 ml/m2)

A-B' EN 37 1 5/8''

B'-C EN 37 1 5/8''

C-D' EN 37 1 5/8''

Z1 EN 38 2 5/8''

A-B' EN 39//40 1 5/8''

B'-C EN 39//40 1 5/8''

C-D' EN 39//40 1 5/8''

Z1 EN 41 2 5/8''

Z1 EN 42 2 5/8''

A'-B EN 43 1 5/8''

B-C' EN 43 1 5/8''

C'-D EN 43 1 5/8''

Page 55: Metrado de Costos

ACEROLONGITUD TOTAL

ANCHO LARGO ÁREA1/4" 3/8"

1.55 3.3 5.12 49.1040.725 2.9 2.10 20.184

1.55 3.3 5.12 49.1042.5 1.8 9.00 86.43.3 3.3 10.89 104.5441.5 2.9 4.35 41.763.3 3.3 10.89 104.5442.5 1.8 9.00 86.42.5 1.8 9.00 86.4

2.45 2.9 7.11 68.2081 3.3 3.30 31.68

2.45 2.9 7.11 68.208

TOTAL 0.00 0.00

FACTOR 0.23 0.56

TOTAL KG 0.00 0.00

Total Kg

METROS LINEALES

Page 56: Metrado de Costos

LONGITUD TOTAL

1/2" 5/8" 3/4" 1" 1 3/8"

49.10420.18449.104

86.4104.544

41.76104.544

86.486.4

68.20831.68

68.208

0.00 796.54 0.00 0.00 0.00

0.99 1.55 2.24 3.97 7.91

0.00 1,234.63 0.00 0.00 0.00

Total Kg 1234.63