Metode de consolidare.pdf

Embed Size (px)

Citation preview

  • Strengthening and Repair of Reinforced

    ConcreteStructures

    Strengthening and Repair of Reinforced

    ConcreteStructures

    Ian Wienholt

    Business Development Manager

  • u 34 years of Concrete Repair and Strengthening Experience

    u Over 12,000 Repair Projectu Over 25,000 PT Projectsu 1,500 Employeesu 22 Offices- International

    UAE and UK

    u 34 years of Concrete Repair and Strengthening Experience

    u Over 12,000 Repair Projectu Over 25,000 PT Projectsu 1,500 Employeesu 22 Offices- International

    UAE and UK

  • Structural Group delivers services, systems and technologies that build, repair, protect, strengthen and reinforce concrete, steel, masonry, wood, timber and soils.

  • Concrete Repair & WaterproofingConcrete Repair & Waterproofing

  • Masonry RestorationMasonry Restoration

  • Building Envelope Group:Historic Division

    Building Envelope Group:Historic Division

  • Building Envelope Group:Multi-Family Division

    Building Envelope Group:Multi-Family Division

  • Concrete Repair ServicesConcrete Repair Services

    Honeycombs

    Missing Reinforcement

    ConstructionDefects

  • General Repair Group:Strengthening DivisionGeneral Repair Group:Strengthening Division

  • AgendaAgenda

    u Strengthening Case StudiesCFRP & NSM RodExternal / Internal PT Section Enlargement / Supplemental Beams

    u Strengthening Case StudiesCFRP & NSM RodExternal / Internal PT Section Enlargement / Supplemental Beams

  • CFRP & NSMCFRP & NSM

  • Externally Bonded FRP Sheet

    550,000 psi Tensile

    10x that of steel

    Lightweight

    Does NOT corrode

  • FRP Design GuidelinesFRP Design Guidelines440.2R-02 440.2R-08

    To Date: Nationwide 15-18M sqft installedSPS 7M sqft installed on over 700 + projects

    ACI 440.2R-08Em

    ergin

    g Tec

    hnolo

    gy

  • FRP Materials

    SEM Image of FRP

    FiberFiber

    ResinResin

  • Tension Steel

    Yield

    FRP carries TENSION

    What Is FRP Flexural Strengthened R/C?

    Positive Moment

  • CompressionConcrete carries COMPRESSION

    TOP

    BOTTOM

    Steel Tension

    Yield

    FRP carries TENSION

    What Is FRP Flexural Strengthened R/C?

    Column

    Negative Moment

  • SHEAR

    What Is FRP Shear Strengthened R/C?

  • CFRP Installation Step 1CFRP Installation Step 1

    Surface Grinding / Shot Blasting to open pores

  • CFRP Installation Step 2CFRP Installation Step 2

    VE primer

  • CFRP Installation Step 3CFRP Installation Step 3

    VE putty

  • CFRP Installation Step 4CFRP Installation Step 4

    VE tack coat

  • Carter Ave Bridge UpgradeCarter Ave Bridge Upgrade

    Tack coat QC

  • CFRP Installation Step 5CFRP Installation Step 5

    CFRP saturator

  • CFRP Installation Step 6CFRP Installation Step 6

    CFRP sheet lay up

  • CFRP Installation Step 7CFRP Installation Step 7

    Embedding of CFRP in tack coat

  • CFRP Installation Step 8CFRP Installation Step 8

    Rib rolling

  • Finished CFRP- Top, Sides, Bottom

    CFRP Installation CompletedCFRP Installation Completed

  • Carter Ave Bridge UpgradeCarter Ave Bridge Upgrade

  • Carter Ave Bridge UpgradeCarter Ave Bridge Upgrade

    Acrylic / Intumescent Topcoat installation

  • CFRP Finished ProductCFRP Finished Product

  • Supplemental Strengthening ONLY w/FRP!

    42

    FRP?

  • Supplemental Strengthening ONLY w/FRP!

  • CFRP Interfacial Shear FailureCFRP Interfacial Shear Failure

  • FRP Plates FRP Plates

  • FRP Rods

  • Flexural Strengthening Case Study

    FRP Rod InstallationFlexural Strengthening Case Study

    FRP Rod Installation

  • Parking Garage Ramp Parking Garage Ramp

  • Parking Garage Ramp FRP Sheet

  • NSM Rods Parking Garage Ramp

  • Damaged Double TDropped 2T in Parking Garage

  • Shear upgrade of 2T stem with FRP

  • Step plies

    Flexural Detailing GuidelinesFlexural Detailing Guidelines

    U Wrap

  • Quality ControlQuality Control

    Field ApplicationField Application

  • Quality Control-Cure Test Cups DailyQuality Control-Cure Test Cups Daily

    AB1Gal.

    Pour off sample To verify cure

  • Tap test or other Tap test or other Pull testPull test

    Sounding and Bond Tests

    `

    PingPuck

  • Sounding

    6

  • Witness Panels for Testing

  • Pull off Bond Test Min. 200psi

  • Locate Bond Test Dollies outsidework area or on an additional piece of FRP

  • Locate Bond Test Dollies outsidework area or on an additional piece of FRP

    Ear plug to protect threads

  • Frequency for Pull Testing

    1 PULL PER INSTALLATION DAY MINIMUMOR

    PER ENGINEERS SPEC (per sqft installed)

  • Repair Procedure1 - Identify Repair Area

    Less than 2 Sq. In. / 5% Total Area Max. OK If 2 to 4 sq. in. inject with low pressure

  • Repair Procedure

  • Repair ProcedureStep 2 - Remove Composite Material

    If greater than 4sq. In. grind or sawcut area

  • Repair ProcedureStep 3 - Prepare Lap Area

    Minimum repair lap = 6 inches

    6

  • New Loads or low strength concreteNew Loads or low strength concrete

  • CFRP Column ConfinementCFRP Column ConfinementIncreased:

    Axial CapacityBuckling

    Resistance

    Bomb Blast

    Resistance

  • General Concept

  • Structural UpgradeResorts Casino- Atlantic City

    Structural UpgradeResorts Casino- Atlantic City

  • Structural UpgradeResorts Casino- Atlantic City

  • Structural Upgrade-Buckling ResistanceResorts Casino- Atlantic City

  • Structural UpgradeResorts Casino- Atlantic City

  • Blast Mitigation for ColumnsTruck bomb at curbside

  • Blast Mitigation for Columns Truck bomb at curbside

    No FRP

  • Blast Mitigation for Columns Truck bomb at curbside

    No FRP

  • Blast Mitigation for Columns Truck bomb at curbside

  • Guggenheim Museum NYCGuggenheim Museum NYC

    1959

  • Guggenheim Museum NYCGuggenheim Museum NYC

  • Guggenheim Museum NYCGuggenheim Museum NYC

  • Goal: Extend the life of the structure by 100 years

    Exhaustive investigative survey completed and found 11 coats of paint on the exterior

    All exterior surfaces would be restored so that the original form lines would once again be visible

    Guggenheim Museum NYCGuggenheim Museum NYC

  • Original Construction Photo Circa 1957

  • Destructive testing to

    open crack

  • SteelT-Section

    RebarDiscontinuous

  • Original Construction Photos

  • Guggenheim Museum

  • Guggenheim Museum-Analysis & Monitoring

    Circumferential Forces Vertical Forces

  • Initial repair concept

    FRP

  • Steel brackets b/n web walls

    Bond

    Grout

  • DoubleBarrier Walls

    Museum remained open!

  • Surface Preparation8,000 psi

    1,674,345,869 Diamond Cup Wheels Used!

  • Extensive Crack Repair Required

  • Rout & Sealvs.Epoxy Injection

  • CFRP Installation

  • Web WallBrackets

  • Gunite wall to apron slab bracket FRP

    Bracket

  • Apron bracket

    Stainless

    Steel

    Grout

  • Shear transfer plate across cracks

  • Completed repair prior to insulation and drywall

  • South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    Pier expansion design included new pre-cast deck panels as well as a new 92 ramp for RO/RO cargoChange in use and heavier loads required strengthening upgrade to pier capsCFRP system designed for increased strength and long-term durability in marine environment

  • South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    Challenge #1:Time Critical Schedule

  • South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    Challenge #2:Weather conditions

  • South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    Challenge #3:Access via work floats

  • South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    Challenge #4:Coordination with other trades

    Crane

  • South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    Challenge #5:Employee safetyWater dangerWind / Waves Boat wakes

    Rising tidesEnclosed space

  • South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    Change of Scope:Concrete repair performed per ICRI guidelines

  • South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    CFRP Termination Detail

    CFRP Fabric U Wrap

    NSM CFRP Rods

    Concrete Pile Cap

    1 2

  • South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    Completed CFRP Strengthening

  • South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    South Locust Point Marine TerminalRoll-On / Roll-Off Platform

    Completed Platform Ready for Cargo

  • Why do we love core

    drills?

  • - They keep us in business

  • - They challenge us.

  • - They make us laugh..

  • Penetrations and the Core DrillShortest distance between 2 points is a straight line Penetrations and the Core Drill

    Shortest distance between 2 points is a straight line

  • Process for New Slab PenetrationsVariables- Quantity of bars cut and size of Hole

  • New Penetrations New Penetrations

    Column strip

  • New PenetrationsNew Penetrations

  • Internal & External Post Tensioning

    Internal & External Post Tensioning

  • External Post Tensioning

    F

    FTENSION

    NEW LOAD

    Uplift at Deviator

    Dead end

    Live end

  • Flexural Strengthening Case StudyEnvironmental Overload

    US Census Bureau HQ Suitland, MD.

  • Flexural Strengthening Case StudyEnvironmental Overload

    4-630

  • Flexural Strengthening Case StudyEnvironmental Overload

    Tension Tension

    YIELD

  • Flexural Strengthening Case StudyEnvironmental Overload

  • Flexural Strengthening Case StudyEnvironmental Overload

    Form & Pump

    Amplitude

  • Flexural Strengthening Case StudyEnvironmental Overload

    Dowel Hole Drilling

    High Pressure Water Blasting

    Dowel Insertion

  • Flexural Strengthening Case StudyEnvironmental Overload

  • Flexural Strengthening Case StudyEnvironmental Overload

  • Flexural Strengthening Case StudyEnvironmental Overload

  • Flexural Strengthening Case StudyEnvironmental Overload

  • Flexural Strengthening Case StudyEnvironmental Overload

  • Flexural Strengthening Case StudyEnvironmental Overload

    43

  • Internal PTInternal PT DrillPT

  • Higher Loads on 2T- Load PathHigher Loads on 2T- Load Path

  • PolyethyleneSheathing

    Intumescent FireRetardant Coating

    Heat Resistant TendonHeat Resistant Tendon

    Polyethylene Sheathing

    Grease

    270k P.T.Strand

  • Anchorage pin

    DeviatorExternal PT

    Higher Truck Loads- Ext. PT & OverlayHigher Truck Loads- Ext. PT & Overlay

  • Higher Truck Loads- Ext. PT & OverlayHigher Truck Loads- Ext. PT & Overlay

  • Higher Truck Loads- Ext. PT & OverlayHigher Truck Loads- Ext. PT & Overlay

  • Higher Truck Loads- Ext. PT & OverlayHigher Truck Loads- Ext. PT & Overlay

  • Deviator

    Higher Truck Loads- Ext. PT & OverlayHigher Truck Loads- Ext. PT & Overlay

  • Center Z Anchor

    Higher Truck Loads- Ext. PT & OverlayHigher Truck Loads- Ext. PT & Overlay

  • Anchorage pin

    DeviatorExternal PT

    Higher Truck Loads- Ext. PT & OverlayHigher Truck Loads- Ext. PT & Overlay

  • Section Enlargement & Supplemental

    Beams

    Section Enlargement & Supplemental

    Beams

  • East Coast Ski ResortTransfer Slab Upgrade

  • Transfer Slab Cracking Transfer Slab Cracking

  • Foundation & Column Enlargements

    Foundation & Column Enlargements

  • Foundation & Column Enlargements

    Foundation & Column Enlargements

    18 Column Enlargements

  • Demo and PrepDemo and Prep

    PAM Machine in Action

  • Supplemental Beam-Column Connection

    Supplemental Beam-Column Connection

  • Mechanical Anchoring and Reinforcement Cage

    Mechanical Anchoring and Reinforcement Cage

    2000 Undercut Anchors

    3000 HiltiStuds

  • Through-Bars at Column HeadThrough-Bars at Column Head

  • SCC Pumping Anyone???SCC Pumping Anyone???

    40 Tons of Steel

    1100 LF

  • Enlargement Prep & Placement

    NewExisting

  • Finished ProductFinished Product

    185 CU YDS / 375 Tons of

    Concrete

  • Finished ProductFinished Product

  • Finished ProductFinished Product

  • Repair, Upgrade and Strengthening ProcessRepair, Upgrade and Strengthening Process

    Existing Capacity New Demand

    Engineering

    Material

    Science

    Test/Verification

    Constructability

    Aesthetics

    Economics

  • Existing Capacity New Demand

    EngineeringMaterial ScienceTest/Verification Constructability

    Aesthetics

    Economics

    Repair and Strengthening Process

    ReverseEngineer

  • Concluding RemarksTHANK YOU!Concluding RemarksTHANK YOU!

    u Contracting Servicesu Preliminary Design and

    Estimate Supportu D/B Capabilitiesu Optimizing Repairsu Load Testingu Comprehensus

    u Contracting Servicesu Preliminary Design and

    Estimate Supportu D/B Capabilitiesu Optimizing Repairsu Load Testingu Comprehensus