7
WYNTER BUSINESS KEYNOTE TEMPLATE Mesa Antero Architectural Committee 2019

Mesa Antero 2019 · Mesa Antero Architectural Committee. 1. Filing. 2. Filing. 3. Filing. 5. Filing. 4. Filing. 5a. Filing. 4. 257 LOTS OWNED 35 LOTS VACANT 80% BUILT-OUT 93% SOLD-OUT

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mesa Antero 2019 · Mesa Antero Architectural Committee. 1. Filing. 2. Filing. 3. Filing. 5. Filing. 4. Filing. 5a. Filing. 4. 257 LOTS OWNED 35 LOTS VACANT 80% BUILT-OUT 93% SOLD-OUT

WYNTERB U S I N E S S K E Y N O T E T E M P L AT E

Mesa Antero Architectural Committee 2019

Page 2: Mesa Antero 2019 · Mesa Antero Architectural Committee. 1. Filing. 2. Filing. 3. Filing. 5. Filing. 4. Filing. 5a. Filing. 4. 257 LOTS OWNED 35 LOTS VACANT 80% BUILT-OUT 93% SOLD-OUT

2

OUR MISSION

MAACC was established by the covenants of Mesa Antero property owners and is staffed by elected volunteers. The Committee works to ensure the

harmony of external design with existing structures as required by the covenants. It’s our mission to

serve the property owners through review and approval of the plans for any new home and certain

exterior enhancements. 

“We work hard every day to to ensure the harmony of external designs are consistent with existing

structures as required by the covenants.”

Page 3: Mesa Antero 2019 · Mesa Antero Architectural Committee. 1. Filing. 2. Filing. 3. Filing. 5. Filing. 4. Filing. 5a. Filing. 4. 257 LOTS OWNED 35 LOTS VACANT 80% BUILT-OUT 93% SOLD-OUT

3

Narda Reigel(970) 376.3268

[email protected]

Kathy Roach(757) 879-1846

[email protected]

Jim Barker

(303) 601 [email protected]

June Rogers(505) [email protected]

Brenda Dempsey(303) 506-9686 [email protected]

VacantThis could be [email protected]

Meet Your Committee MembersMesa Antero Architectural Committee

1Filing

2Filing

3Filing

5Filing

4Filing

5aFiling

Page 4: Mesa Antero 2019 · Mesa Antero Architectural Committee. 1. Filing. 2. Filing. 3. Filing. 5. Filing. 4. Filing. 5a. Filing. 4. 257 LOTS OWNED 35 LOTS VACANT 80% BUILT-OUT 93% SOLD-OUT

4

257LOTS OWNED

35LOTS VACANT

80%

BUILT-OUT

93%

SOLD-OUT

FUN FACTS IN NUMBERSMesa Antero Architectural Committee

Page 5: Mesa Antero 2019 · Mesa Antero Architectural Committee. 1. Filing. 2. Filing. 3. Filing. 5. Filing. 4. Filing. 5a. Filing. 4. 257 LOTS OWNED 35 LOTS VACANT 80% BUILT-OUT 93% SOLD-OUT

5

NEW PROJECT SUBMISSIONS

New homes built from the ground up.

NEW HOMES

Additions built onto existing structures

ADDITIONS

Outbuildings and sheds

SHEDS

Solar panels with on roof or above ground

SOLAR ADDITIONS

Major deck projects extending away from the building

EXTERIOR DECKS

Fences which comply with the filing covenants

FENCES

19

Mesa Antero Architectural Committee

74

2

22

3

Page 6: Mesa Antero 2019 · Mesa Antero Architectural Committee. 1. Filing. 2. Filing. 3. Filing. 5. Filing. 4. Filing. 5a. Filing. 4. 257 LOTS OWNED 35 LOTS VACANT 80% BUILT-OUT 93% SOLD-OUT

6

NEW WEBSITE FOR 2020A completely redesigned website experience for project applications, research, project updates and communication.

Page 7: Mesa Antero 2019 · Mesa Antero Architectural Committee. 1. Filing. 2. Filing. 3. Filing. 5. Filing. 4. Filing. 5a. Filing. 4. 257 LOTS OWNED 35 LOTS VACANT 80% BUILT-OUT 93% SOLD-OUT

7

ME

SA

AN

TE

RO

AC

C

YOUTHANK