TSXV:NARTSXV: NAR
Mel ProjectKimberlite & Diamond Discovery
Nunavut
Press Release Companion PresentationOctober 16 , 2017
This presentation contains projections and forward looking information that involvevarious risks and uncertainties, including, without limitation, statements regarding thepotential extent of mineralization, resources, reserves, exploration results and plans andobjectives of North Arrow Minerals Inc. These risks and uncertainties include, but arenot restricted to, the amount of geological data available, the uncertain reliability ofdrilling results and geophysical and geological data and the interpretation thereof andthe need for adequate financing for future exploration and development efforts. Therecan be no assurance that such statements will prove to be accurate. Actual results andfuture events could differ materially from those anticipated in such statements. Theseand all subsequent written and oral forward-looking statements are based on theestimates and opinions of management on the dates they are made and are expresslyqualified in their entirety by this notice. The Company assumes no obligation to updateforward looking statements should circumstances or management's estimates oropinions change.
2
CAUTIONARY STATEMENT
Forward Looking
Information
Qualified Person under
NI 43-101
Disclosure of a scientific or technical nature related to North Arrow’s projects in thispresentation has been reviewed and approved by Ken Armstrong, P.Geo. President andCEO of North Arrow and a Qualified Person under NI 43-101.
NORTH ARROW’S PROJECTS
EXISTING DIAMOND MINE 3
Grassroots
1. Timiskaming Project (80% NAR with SWY)
1
DIAVIKEKATI
VICTOR
RENARD
GAHCHOKUE
Discovery Stage
1) Mel Project (100%)2) Loki Project (100%)3) LDG Project (~35% NAR with DDC )4) Pikoo Project (100%)5) Luxx Project (100%)
Advanced Stage
1. Naujaat Project (100%)Evaluating Q1-4 Kimberlite
Assessing a known kimberlite or diamond deposit
1Next stage of exploration could lead to discovery
1
4
5
Target development
MEL DIAMOND PROJECT
Mel Project
4
7,500 hectares on the Melville Peninsula.
18 km from ocean; 140 km south of Hall Beach; 210 km northeast of Naujaat.
Acquired in 2013, NAR exploring for the last 4 years; 1 to 6 days every summer; total spend to discovery ~$800,000.
Exploration camp and drilling permits are in place for 2018; additional staking currently underway.
10 km
“Mel North”
“Mel South”
Two target areas: “Mel North” and “Mel South”.
Most work has focused on Mel North.
2017 kimberlite discovery located at Mel North.
MEL PROJECT - NU
195
ArcticOcean
MEL NORTH EXPLORATION: 2013 to 2016
Sample yielded over 1300 KIMs
>200 samples to define KIM Train.
Up to +200 KIMs.
Highest KIM counts were ~10 grains.
Pre-2013:
2013 & 14: Focused on the
potential cut-off. Extended Train up
ice; up to 23 grains.
111 samples. Train is cut-off. +1,200 KIMs means
close to source.
2015:
2016:
6
Historic Data and
NAR 2013-2016
At least three distinct indicator trains
MEL 2017 – DISCOVERY BY PROSPECTING
ML-8 Kimberlite discovery
>200 samples to define KIM Train.
Up to +200 KIMs.
Highest KIM counts were ~10 grains.
Pre-2013:
2013 & 14: Focused on the
potential cut-off. Extended Train up
ice; up to 23 grains.
111 samples. Train is cut-off. +1,200 KIMs means
close to source.
2015:
2016:
7
ML-8 KIMBERLITE DISCOVERY
100 m long by 10 m wide area with
float in moss & boulder
piles
8
ML-8 Kimberlite Discovery Hand Sample – Weathered Surface
10 cm
Eclogitic garnets
Illmenite
9
Micro-xenolith : garnet in olivine macrocryst 10
Garnet & Olivine Macrocrysts
ML-8 KIMBERLITE – POLISHED HAND SAMPLES
1 cm
1 cm
ML-8 MICRODIAMOND RESULTS COMPARISON
11
1
10
100
1000
10000
100000
1000000
10000000
100000000
1E+09
0.00001 0.0001 0.001 0.01 0.1 1
Mel Project: ML-8 Kimberlite SPTUI* vs Aviat (AV-1) and Q1-4
Aviat (946kg)
Q1-4 (321kg)
ML-8 (62 kg)
Number of Diamonds per Sieve Size (mm Square Mesh Sieve)SampleWeightDry Kg
+0.106-0.150
+0.150-0.212
+0.212-0.300
+0.300-0.425
+0.425-0.600
+0.600-0.850
+0.850-1.18
TotalStones
62.1 9 3 5 4 0 1 1 23
*Stones per tonne per Unit Interval
Sample yielded over 1300 KIMs
12
MEL – POTENTIAL FOR MORE DISCOVERIES
ML-8 Kimberlite Discovery at head of Train 1
Sample yielded over 1200 KIMs
13
Identified magnetic targets
ML-8 Kimberlite Discovery
Vertical magnetic gradient colour grid
MEL – POTENTIAL FOR MORE DISCOVERIES
Vertical Gradient Colour Grid
MEL - 2018 POTENTIAL DRILL TARGETS
Sample yielded >1,300 KIMs
14
ML-8
L111
10
L111
70L1
1200
ML-8 Kimberlite
COINCIDENT MAG TARGET AT ML-8 DISCOVERY
15
ML-8 ML-1L11110L11200
S NSN
ML-9 MAG TARGET AREA
View west from ML- 9 Mag Target: Permissive Area Potential Drill Target
ML-9 Profile
16
MEL KIM TRAIN 2
Sample with >1,300 KIMs
17
Vertical Gradient Colour Grid
> 1,300 KIMs
ML-3 TARGET - KIM TRAIN 2
18
MEL PROJECT – PROXIMITY TO TIDE WATER!
19
ML-3
ML-9
ML-1
OCEAN
20
ML-8
MEL PROJECT – WHAT’S NEXT
1. Additional staking underway to expand project area.
2. Drill & camp mobilized in spring 2018 for geophysics & drilling in the spring/summer.
3. All exploration permits are in place for 2018 exploration.
4. Detailed study of quaternary geology to aid in interpretation of unsourced KIM trains.
5. Full petrologic characterization of ML-8 kimberlite is underway & evaluation of the composition and abundance of KIMs for comparison against the project till database.
6. 2018 till sampling of expanded project area.
Proposed location of Mel Exploration Camp21
NORTH ARROW - THE WAY FORWARD
Project Location Commodity Interest CommentNaujaat(Q1-4 kimberlite)
Nunavut Diamonds 100% 2017 – Mini-bulk sample & microdiamond results; Modelling 2017 drilling results2018 – Microdiamond results; delineation drilling; bulk sample leading to PEA
Mel Nunavut Diamonds 100% 2017 – Staking underway; KIM characterization2018 – Geophysics / delineation & expl’n drilling
Loki NWT Diamonds 100% Lac de Gras area; Incl. EG05 + 4 other kimberlites2017 – Winter drilling EG05 & expl’n targets
Lac de Gras NWT Diamonds ~35%JV with DDC
2017 – Airborne & Ground Geophysics results 2018 – Winter drilling
Pikoo Saskatchewan Diamonds 100% 10 kimberlites discovered; drill ready targets2017/2018 – Till sampling to define more targets
Luxx Nunavut Diamonds 100% Drill ready targetsTimiskaming Ontario Diamonds 80% Database evaluationHope Bay Nunavut Gold 100% Northern Hope Bay greenstone belt
3km north of TMAC’s Doris Gold MineSeveral Au showings / JV potential
GrassrootsDiscovery StageAdvanced Stage Brownfields Gold
3022
MEL PROJECT DISCOVERY – THE FIRST PIECE
23
TSXV: NARKen Armstrong
President & CEO
Nick ThomasCommunity and Investor
Relations Manager
Suite 960-789 West Pender StreetVancouver, BC
Canada V6C 1H2Tel: +1.604.668.8354Fax: +1.604.336.4813
www.northarrowminerals.com
@narminerals
northarrowminerals