1 Valmet Customer Days 2018 Meeting tightened emission limits at CIECH Soda Polska Inowroclaw and Janikowo CHP plants Marcin Małek Director, Investment and Maintenance Division, CIECH Soda Polska S.A. Valmet Customer Days 2018 October 3–5 Vienna, Austria

Meeting tightened emission limits at CIECH Soda Polska ... › globalassets › media › events › ... · Wet FGD and SCR in small scale •Lowest operating cost –as expected

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Meeting tightened emission limits at CIECH Soda Polska ... › globalassets › media › events › ... · Wet FGD and SCR in small scale •Lowest operating cost –as expected

1Valmet Customer Days 2018

Meeting tightened emission limits at

CIECH Soda Polska Inowroclaw and

Janikowo CHP plants

Marcin MałekDirector, Investment and Maintenance Division,

CIECH Soda Polska S.A.

Valmet Customer Days 2018

October 3–5 Vienna, Austria

Page 2: Meeting tightened emission limits at CIECH Soda Polska ... › globalassets › media › events › ... · Wet FGD and SCR in small scale •Lowest operating cost –as expected

2Valmet Customer Days 2018

• 2 x OP-140 boilers

• 280 t/h steam

• Coal sulfur 0.5...1.3%

CIECH Soda Polska Soda plants in Poland

• 4 x OP-110 boilers

• 440 t/h steam

• Coal sulfur 0.5...1.3%

Inowroclaw Janikowo

Page 3: Meeting tightened emission limits at CIECH Soda Polska ... › globalassets › media › events › ... · Wet FGD and SCR in small scale •Lowest operating cost –as expected

3Valmet Customer Days 2018

Inowroclaw solution

Valmet’s scope of delivery

• Selective catalytic NOX reduction (SCR) for

each boiler

• Wet limestone flue gas desulfurization

(FGD)

• EPC delivery

• Take over 2016 to 2018

Flue gas cleaningCIECH Soda Polska

Case

Future location of wet limestone FGD

Page 4: Meeting tightened emission limits at CIECH Soda Polska ... › globalassets › media › events › ... · Wet FGD and SCR in small scale •Lowest operating cost –as expected

4Valmet Customer Days 2018

Selective catalytic reduction (SCR)Leading NOX control technology

Ammonia

injectionVaporized ammonia

Flue gas duct

Economizer 2

Economizer 1

SCR

reactor

bypass

SCR reactor

Layer 1 for future

Layer 2

Layer 3

Rotating air preheater

TIC

Page 5: Meeting tightened emission limits at CIECH Soda Polska ... › globalassets › media › events › ... · Wet FGD and SCR in small scale •Lowest operating cost –as expected

5Valmet Customer Days 2018

Wet limestone FGDLeading FGD technology

Flue gas Absorber

Waste water

treatment

Gypsum

dewatering

Oxidation air blowerLimestone slurry preparation

Page 6: Meeting tightened emission limits at CIECH Soda Polska ... › globalassets › media › events › ... · Wet FGD and SCR in small scale •Lowest operating cost –as expected

6Valmet Customer Days 2018

Inowroclaw

Two SCR reactors in place Flue gas desulfurization plant Wet stack

Page 7: Meeting tightened emission limits at CIECH Soda Polska ... › globalassets › media › events › ... · Wet FGD and SCR in small scale •Lowest operating cost –as expected

7Valmet Customer Days 2018

Janikowo solution

Flue gas cleaningCIECH Soda Polska

Case

Flue

gas

Waste water

treatment

GypsumLimestone

Waste from semi-dry FGD

Valmet’s scope of delivery

• Wet limestone flue gas desulfurization

(FGD) for two OP-140 boilers

• Utilizing of waste from semi-dry FGD

• EPC delivery

• Take over 2018

Page 8: Meeting tightened emission limits at CIECH Soda Polska ... › globalassets › media › events › ... · Wet FGD and SCR in small scale •Lowest operating cost –as expected

8Valmet Customer Days 2018

Wet limestone FGD with waste utilizationInnovation in circular economy

Flue gas Absorber

Waste water

treatment

Gypsum

dewatering

Oxidation air blowerLimestone slurry preparation

Waste from

semi-dry FGD

Page 9: Meeting tightened emission limits at CIECH Soda Polska ... › globalassets › media › events › ... · Wet FGD and SCR in small scale •Lowest operating cost –as expected

9Valmet Customer Days 2018

Janikowo

Absorber and wet stack Gypsum storageConnection of waste fromsemi-dry FGD to wet FGD

Page 10: Meeting tightened emission limits at CIECH Soda Polska ... › globalassets › media › events › ... · Wet FGD and SCR in small scale •Lowest operating cost –as expected

10Valmet Customer Days 2018

Converting waste to useful material

• Waste from semi-dry FGD is converted to

gypsum in wet FGD

• Wet FGD operates without reagent cost

• Semi-dry FGD waste disposal cost is avoided

Gypsum product

Page 11: Meeting tightened emission limits at CIECH Soda Polska ... › globalassets › media › events › ... · Wet FGD and SCR in small scale •Lowest operating cost –as expected

11Valmet Customer Days 2018

Wet FGD and SCR in small scale

• Lowest operating cost – as expected

• Comparative investment cost – against

common expectations

• Lowest life cycle cost

• Benefits of SCR/wet FGD combination:

ammonia slip and mercury removal

• Benefits of technology flexibility: potential to

utilize waste from semi-dry FGD as reagent

Boilers: 4 x OP-110

Flue gas: 520 000 Nm3/h

Page 12: Meeting tightened emission limits at CIECH Soda Polska ... › globalassets › media › events › ... · Wet FGD and SCR in small scale •Lowest operating cost –as expected

12Valmet Customer Days 2018

Project status

Investment Status Take over Emission target

SCR installation for boilers K1 to

K4 in Inowroclaw

K1: 100%

K2: 100%

K3: 100%

K4: 95%

K1: 14.07.2017

K2: 14.11.2016

K3: 16.01.2018

K4: 28.11.2018

NOx < 100 mg/Nm3

FGD installation for boilers K1 to

K4 in Inowroclaw100% 07.12.2017

SOx < 100 mg/Nm3

Dust < 10 mg/Nm3

FGD installation for boilers K4 and

K5 in Janikowo100% 1.6.2018

SOx < 100 mg/Nm3

Dust < 10 mg/Nm3

Page 13: Meeting tightened emission limits at CIECH Soda Polska ... › globalassets › media › events › ... · Wet FGD and SCR in small scale •Lowest operating cost –as expected

13Valmet Customer Days 2018

Lowest cost of compliance

CIECH Soda Polska selected Valmet’s FGD and SCR

solution because of a cost-efficient overall solution.

High performance expectations were met in a record

project time schedule. This project shows that thinking

‘out of the box’ while selecting the technical solution for

meeting new emission targets is important.

Page 14: Meeting tightened emission limits at CIECH Soda Polska ... › globalassets › media › events › ... · Wet FGD and SCR in small scale •Lowest operating cost –as expected

14Valmet Customer Days 2018