Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
1Valmet Customer Days 2018
Meeting tightened emission limits at
CIECH Soda Polska Inowroclaw and
Janikowo CHP plants
Marcin MałekDirector, Investment and Maintenance Division,
CIECH Soda Polska S.A.
Valmet Customer Days 2018
October 3–5 Vienna, Austria
2Valmet Customer Days 2018
• 2 x OP-140 boilers
• 280 t/h steam
• Coal sulfur 0.5...1.3%
CIECH Soda Polska Soda plants in Poland
• 4 x OP-110 boilers
• 440 t/h steam
• Coal sulfur 0.5...1.3%
Inowroclaw Janikowo
3Valmet Customer Days 2018
Inowroclaw solution
Valmet’s scope of delivery
• Selective catalytic NOX reduction (SCR) for
each boiler
• Wet limestone flue gas desulfurization
(FGD)
• EPC delivery
• Take over 2016 to 2018
Flue gas cleaningCIECH Soda Polska
Case
Future location of wet limestone FGD
4Valmet Customer Days 2018
Selective catalytic reduction (SCR)Leading NOX control technology
Ammonia
injectionVaporized ammonia
Flue gas duct
Economizer 2
Economizer 1
SCR
reactor
bypass
SCR reactor
Layer 1 for future
Layer 2
Layer 3
Rotating air preheater
TIC
5Valmet Customer Days 2018
Wet limestone FGDLeading FGD technology
Flue gas Absorber
Waste water
treatment
Gypsum
dewatering
Oxidation air blowerLimestone slurry preparation
6Valmet Customer Days 2018
Inowroclaw
Two SCR reactors in place Flue gas desulfurization plant Wet stack
7Valmet Customer Days 2018
Janikowo solution
Flue gas cleaningCIECH Soda Polska
Case
Flue
gas
Waste water
treatment
GypsumLimestone
Waste from semi-dry FGD
Valmet’s scope of delivery
• Wet limestone flue gas desulfurization
(FGD) for two OP-140 boilers
• Utilizing of waste from semi-dry FGD
• EPC delivery
• Take over 2018
8Valmet Customer Days 2018
Wet limestone FGD with waste utilizationInnovation in circular economy
Flue gas Absorber
Waste water
treatment
Gypsum
dewatering
Oxidation air blowerLimestone slurry preparation
Waste from
semi-dry FGD
9Valmet Customer Days 2018
Janikowo
Absorber and wet stack Gypsum storageConnection of waste fromsemi-dry FGD to wet FGD
10Valmet Customer Days 2018
Converting waste to useful material
• Waste from semi-dry FGD is converted to
gypsum in wet FGD
• Wet FGD operates without reagent cost
• Semi-dry FGD waste disposal cost is avoided
Gypsum product
11Valmet Customer Days 2018
Wet FGD and SCR in small scale
• Lowest operating cost – as expected
• Comparative investment cost – against
common expectations
• Lowest life cycle cost
• Benefits of SCR/wet FGD combination:
ammonia slip and mercury removal
• Benefits of technology flexibility: potential to
utilize waste from semi-dry FGD as reagent
Boilers: 4 x OP-110
Flue gas: 520 000 Nm3/h
12Valmet Customer Days 2018
Project status
Investment Status Take over Emission target
SCR installation for boilers K1 to
K4 in Inowroclaw
K1: 100%
K2: 100%
K3: 100%
K4: 95%
K1: 14.07.2017
K2: 14.11.2016
K3: 16.01.2018
K4: 28.11.2018
NOx < 100 mg/Nm3
FGD installation for boilers K1 to
K4 in Inowroclaw100% 07.12.2017
SOx < 100 mg/Nm3
Dust < 10 mg/Nm3
FGD installation for boilers K4 and
K5 in Janikowo100% 1.6.2018
SOx < 100 mg/Nm3
Dust < 10 mg/Nm3
13Valmet Customer Days 2018
Lowest cost of compliance
CIECH Soda Polska selected Valmet’s FGD and SCR
solution because of a cost-efficient overall solution.
High performance expectations were met in a record
project time schedule. This project shows that thinking
‘out of the box’ while selecting the technical solution for
meeting new emission targets is important.
14Valmet Customer Days 2018