Meeting of the Trustees of the City University Construction Fund 205 East 42 nd Street, 7 th Floor, Room 725 June 27, 2018 at 9:30 a.m. REVISED AGENDA ACTION ITEMS 1. Approval of the Minutes of the April 25, 2018 Meeting of the Fund (No. 2268). 2. Resolution of City University Construction Fund Authorizing Upgrades for the HVAC System Within the North Academic Center at City College of New York (No. 2269). 3. Resolution of the City University Construction Fund Approving the Annual Report on Procurement Contracts and the Guidelines for Procurement Contracts (No. 2270). 4. Resolution of the City University Construction Fund Authorizing the Architect of Record for Construction Administration Services for the Student Union at Thomas Hunter Hall, Hunter College (No. 2271). 5. Resolution of the City University Construction Fund Appointing Lisa Bova-Hiatt as General Counsel to the Fund (No. 2272). REPORTS Report of the Chair Report of the Executive Director Report of the Dormitory Authority

Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

Meeting of the Trustees of the City University Construction Fund 205 East 42nd Street, 7th Floor, Room 725

June 27, 2018 at 9:30 a.m.

REVISED AGENDA

ACTION ITEMS

1. Approval of the Minutes of the April 25, 2018 Meeting of the Fund (No. 2268).

2. Resolution of City University Construction Fund Authorizing Upgrades for the HVAC System Within the North Academic Center at City College of New York (No. 2269).

3. Resolution of the City University Construction Fund Approving the Annual Report on Procurement Contracts and the Guidelines for Procurement Contracts (No. 2270).

4. Resolution of the City University Construction Fund Authorizing the Architect of Record for Construction Administration Services for the Student Union at Thomas Hunter Hall, Hunter College (No. 2271).

5. Resolution of the City University Construction Fund Appointing Lisa Bova-Hiatt as General Counsel to the Fund (No. 2272).

REPORTS

• Report of the Chair

• Report of the Executive Director

• Report of the Dormitory Authority

Page 2: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

C I T Y U N I V E R S I T Y C O N S T R U C T I O N F U N D 5 5 5 W . 5 7 t h S t r e e t , 1 6 t h F l o o r , N e w Y o r k , N Y 1 0 0 1 9

Minutes of the Meeting of the Board of Trustees Wednesday, April 25, 2018, at 9:30 a.m. 205 East 42nd Street, Room 0725 New York, New York 10017

Trustees Present: Hon. Philip Berry, Acting Chairman Hon. Brian Obergfell Hon. Michael Walsh Hon. Victor Pichardo**

Jeffrey Beal, Team Leader, Division of Budget Higher Education Unit* Edward Moore, Section Head, Division of Budget Higher Education Unit*

In Attendance: Judith Bergtraum, Executive Director, CUCF Robert Lemieux, Executive Director, Department of Design, Construction & Management, CUNY John Antonelli, Deputy Executive Director, CUCF Gustavo Ordóñez, Chief of Staff, FPCM, CUNY Daniel Rothbaum, Controller, CUCF Gwen Perlman, Director, Capital Budget, CUNY Michael Stabulas, Managing Director, Managing Director, Downstate Operations, DASNY Nancy Nichols, Special Assistant to the Fund

* Designee for Robert F. Mujica, Jr., Executive Director of NYS Division of the Budget in Albany, attending via videoconference.

** Joined meeting via conference call.

At 9:31 a.m., Acting Chairman Berry called the meeting to order, noting there was a quorum and thanking the attendees for their participation.

Action Items

1. Approval of the Minutes of the March 16, 2018 Meeting of the Fund (No. 2266).

Acting Chairman Berry asked if there were any discussion or amendments to the minutes. There being none, Mr. Berry entertained a motion that this item be approved. On motion duly made and seconded, the minutes were approved.

Page 3: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

City University Construction Fund – Minutes of April 25, 2018 Meeting of the Fund, Page 2

2. Resolution of City University Construction Fund Authorizing a Purchase Order for Services and Equipment for the Design and Installation of Security Cameras at Queens College (No. 2267).

After reading the Resolution, Acting Chairman Berry called upon Executive Director Judith Bergtraum for an explanation of the item. Ms. Bergtraum reported that the resolution asks for an increased amount, above that authorized by the original resolution No. 2258, brought to the CUCF Trustees on November 1, 2017. The original amount was for $400,000; this amendment will allow for an additional $400,000 for the design and installation of security cameras and related work.

Questions from the Trustees included why the additional amount was necessary. Ms. Bertraum explained that this amended resolution is necessary because the original bid did not have a sophisticated enough system to handle the surveillance and did not include the number of cameras needed for such a large campus. Also, when the project was reviewed with the school, it was discovered there were materials and equipment needed that were not covered by the original estimate, including the number of cameras, 21 of which are equipped for providing outdoor images in all kinds of weather and lighting conditions. The additional equipment will provide video surveillance and technology sensitive enough to read license plates.

It was asked how this need to amend a prior resolution could be avoided in the future. Ms. Bergtraum stated that the original project scope was provided by the school and was insufficient for their needs. She said that the approval of the original estimate was given in order to usher the project along in a timely fashion, but that growth in the project scope made the increase necessary. In future, she explained, she and her team will be more vigilant in making sure the initial scope and estimates are complete.

Mr. Berry asked if there were any further comments or questions. There being none, Mr. Berry called for a motion to approve. On motion duly made and seconded, the resolution was approved.

REPORTS

Acting Chairman’s Report

Acting Chairman Berry let the attendees know the next CUCF meeting will be held on Wednesday, June 27 at 9:30 a.m.

Executive Director’s Report

Mr. Berry called upon Executive Director Judy Bergtraum for her report.

Ms. Bergtraum said that she plans to report on all the CUNY colleges’ projects at upcoming CUCF Board meetings, to inform the Trustees and attendees of the progress of these ongoing very important efforts.

Page 4: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

City University Construction Fund – Minutes of April 25, 2018 Meeting of the Fund, Page 3

Today, she stated, she would give an update of the capital projects being addressed at Brooklyn College. There are $42 million worth of projects at Brooklyn College; about $100 million worth of renovation is needed, most of which will be small projects. This is typical of a senior college – it will need significant funding for renovation of older buildings.

She then presented images and information about the status of various construction projects at Brooklyn College, including those at Ingersol Hall, Boylan Hall, Whitehead Hall and Whitman Hall.

Ingersol was part of the original Brooklyn College campus, built in 1939 as a WPA project. The building had an addition constructed in 1961. Renovations to the HVAC system for the laboratories are taking place, approximately 10 different construction projects underway, to bring the labs up to code. It is expected to be completed next year and is going very well, considering how disruptive it is. There are also fire alarm upgrades taking place. At Whitman Hall, exterior conditions have been addressed, particularly entrance ways to performance spaces like the ADA ramp at the entrance to the theater, which is the second-largest theater in Brooklyn; parapets, plazas and roofs. Also, interior work is being done in the black box theater. Boylan Hall is getting a renovated lecture hall, which will be ready in January, and new Ansul System, which is a kitchen monitoring system. Plans are underway for window replacement. Ingersol and Boylan were the original classroom buildings – Ingersol for the sciences, Boylan for administration, English, and other typical curriculum. Whitehead Hall will receive new windows, and a plaza underneath that needs repaving and regrading. And as always, working on a campus while classes are in session is a major disruption.

Mr. Lemieux reported that there are an additional 13 projects in design, waiting to go into construction.

In reply to a question from Acting Chairman Berry about the status of the Performing Arts Center, Mr. Lemieux explained that construction is finished, and they are currently working with the fire department to receive a re-inspection, at which point the DOB will be able to issue a TCO. They expect a grand opening this summer.

The $132 million replacement of Roosevelt Hall is on hold, Ms. Bergtraum stated. The building is on hold now because additional funding is needed. The project has advanced through design development. No construction documents will be issued until the funding is in place. There is $342 million in projects in place at Brooklyn College, $240 million of that is in the new buildings, and $100 million is in renovations; $42 million went to the HVAC project in Ingersol Hall.

Acting Chairman Berry thanked Ms. Bergtraum for her report and presentation. He then called upon Michael Stabulas of the Dormitory Authority.

Report of the Dormitory Authority

Mr. Stabulas said he will bring his reports to the next meeting, with some photographs to illustrate the particulars.

Page 5: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

City University Construction Fund – Minutes of April 25, 2018 Meeting of the Fund, Page 4

Acting Chairman Berry thanked Mr. Stabulas for his report, and thanked everyone for attending the meeting.

On motion duly made and seconded, the meeting of the Board of Trustees was adjourned at 10:04 a.m.

Page 6: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

_____________________________________

Item 2 Resolution #

June 27, 2018

RESOLUTION OF THE CITY UNIVERSITY CONSTRUCTION FUND AUTHORIZING UPGRADES FOR THE HVAC SYSTEM WITHIN THE NORTH ACADEMIC CENTER AT CITY COLLEGE OF NEW YORK

RESOLVED: That, pending a request of the Board of Trustees of The City University of New York, the Board of Trustees of the City University Construction Fund (the “Fund”) authorize The Dormitory Authority of the State of New York to provide funding to The New York Power Authority (NYPA) on behalf of City College of New York (CCNY) to install energy efficient upgrades for the HVAC system within the North Academic Center (NAC) at CCNY. The contract cost shall be chargeable to the State Capital Project, NYPA Project NY. ES-GSN-0590 for an amount not to exceed 20 million dollars ($20,000,000). The contract shall be subject to approval as to form by the Fund’s General Counsel.

EXPLANATION: The New York Power Authority (NYPA) under the NYPA BuildSmart program of Executive Order 88, will implement the installation of energy efficient upgrades for the HVAC system within the North Academic Center (NAC) at CCNY. The upgrades will greatly enhance the University’s ability to reduce energy consumption and greenhouse gas generation at its campus facilities through the implementation of energy efficiency construction projects.

The undersigned hereby certifies that (i) the foregoing is a true and correct copy of the resolution adopted at the regular meeting of the Trustees of the City University Construction Fund held on June 27, 2018; (ii) at such meeting, a quorum of Trustees was present; (iii) the resolution was adopted by the affirmative vote of not less than four Trustees present at such meeting; and (iv) the resolution has not been amended or rescinded since the date of adoption.

June 27, 2018

Judith Bergtraum, Executive Director

Page 7: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

EXHIBIT A

PROJECT SUMMARY

City College of New York North Academic Center HVAC Upgrade

NYPA Project No. ES-GSN-0590

1. Nature of Request for permission to install energy efficient upgrades for the Action HVAC system within the North Academic Center

2. Related Trustee N/A Actions

3. Project History The North Academic Center currently has outdated pneumatic HVAC controls which are barely functional. This leads to overheating and over-cooling in the building and subsequently high energy usage.

4. Project Scope The project will be implemented through the New York Power Authority (NYPA) under the NYPA BuildSmart program of Executive Order 88. The scope includes the upgrade of air handling unit control devices and the rehabilitation of each Air Handling Unit (AHU). The rehabilitation of each AHU will include the replacement of coils, dampers and damper actuators. Also included is the replacement of Variable Frequency Drives (VFD) and the conversion of 100% outside air units to return air systems.

5. Net-to-Gross Not Applicable Efficiency

6. Schedule Design Complete August 2017 Construction Start July 2018 Construction End August 2020

7. Project Funding Source: DASNY Project No. 3423109999 Amounts: Design/Build: $ 20,000,000

8. Cost Estimate N/A

9. Cost Per Square N/A Foot

Page 8: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

Exhibit B - Site Plan

PROJECT SITE

rlev
Line
rlev
Line
Page 9: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

_____________________________

Item 3 Resolution No. 2270

June 27, 2018

RESOLUTION OF THE CITY UNIVERSITY CONSTRUCTION FUND APPROVING THE ANNUAL REPORT ON PROCUREMENT CONTRACTS

AND THE GUIDELINES FOR PROCUREMENT CONTRACTS

RESOLVED: That pursuant to Section 2879 of the New York Public Authorities Law and Section H of the City University Construction Fund ("the Fund") Guidelines for Procurement Contracts ("the Guidelines") as amended through June 23, 2016, the Annual Report on Procurement Contracts of the Fund for the Fiscal Year ending June 30, 2017, attached as Exhibit 1 to this Resolution, be, and hereby is, approved and adopted;

BE IT FURTHER RESOLVED: That the Guidelines as last amended through June 23, 2016, attached as Exhibit 2 to this Resolution, be, and hereby are, approved and adopted.

EXPLANATION: The 2017 Annual Report on Procurement Contracts reflects the procurement activity of the Fund during the prior fiscal year, July 1, 2016 through June 30, 2017. The Guidelines, which have been in effect since September 1991 and were amended as of January 29, 1998, October 14, 2008 and June 10, 2014, and last amended on June 23, 2016, set forth the operative policy and instructions of the Fund regarding the use, awarding, monitoring, and reporting of procurement contracts. They were last reviewed and approved by the Trustees on June 28, 2017 (No. 2248).

The undersigned hereby certifies that (i) the foregoing is a true and correct copy of the resolution adopted at the regular meeting of the Trustees of the City University Construction Fund held on June 27, 2018; (ii) at such meeting, a quorum of Trustees was present; (iii) the resolution was adopted by the affirmative vote of not less than four Trustees present at such meeting; and (iv) the resolution has not been amended or rescinded since the date of adoption.

Date: June 27, 2018

Judith Bergtraum, Executive Director

Page 10: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

City

Uni

vers

ity C

onst

ruct

ion

Fund

6/

25/2

018

FY 2

017

Annu

al R

epor

t on

Proc

urem

ent C

ontr

acts

3:

14 P

M

Cam

pus

Proj

ect N

ame

Vend

or

Sele

ctio

n Pr

oces

s Pr

ojec

t Val

ue

New

Pro

cure

men

t Co

ntra

ct E

nter

ed In

to in

FY

201

7 Pa

ymen

t Am

ount

Ba

ruch

Ad

min

istra

tion

Build

ing

Auto

mat

ion

Syst

em

Tran

e U

S In

c.

NYS

-OGS

$6

44,4

07.6

5 $6

8,73

7.53

Baru

ch

Fiel

d Bu

ildin

g C.

J. Br

own

Ener

gy, P

.C.

Cont

ract

s Pro

cure

d by

Go

vern

men

tal E

ntiti

es-

DASN

Y $2

52,2

95.0

0 $1

9,56

8.66

Ba

ruch

Fi

eld

Build

ing

Davi

s Bro

dy B

ond

LLP

RFP

$12,

369,

764.

00

$588

,619

.03

Baru

ch

Fiel

d Bu

ildin

g Li

Ro P

rogr

am a

nd C

onst

ruct

ion

Man

agem

ent,

P.C.

RF

P $1

66,3

26,0

27.0

0 $5

29,9

67.4

3 Ba

ruch

Fi

eld

Build

ing

Siem

ens I

ndus

try

Inc.

N

YS-O

GS

$980

,423

.69

$142

,601

.64

Baru

ch

IT B

uild

ing

Fire

Ala

rm U

pgra

de

Red

Haw

k Fi

re &

Sec

urity

N

YS-O

GS

$982

,568

.69

$81,

870.

93

Baru

ch

Libr

ary

Mas

ter P

lan

AECO

M

RFP-

Task

Ord

er

$294

,090

.00

$155

,941

.78

Baru

ch

Stud

ent C

ompu

ter L

ab

Dona

ld B

lair

Arch

itect

s RF

P-Ta

sk O

rder

$1

60,3

52.0

0 $3

5,06

8.95

Ba

ruch

St

uden

t Com

pute

r Lab

Q

ualit

y Co

ntro

l Lab

orat

orie

s, L

LC

RFP-

Task

Ord

er

$43,

900.

00

* $6

,000

.00

Baru

ch

Stud

ent C

ompu

ter L

ab

Vang

uard

Con

stru

ctio

n &

Dev

elop

men

t Co

Inc.

CS

B $1

,420

,515

.00

* $1

,135

,524

.27

BMCC

AD

A Ba

thro

om 1

99 C

ham

bers

Gi

lban

e Bu

ildin

g Co

mpa

ny

RFP-

Task

Ord

er

$12,

619,

863.

08

* $1

,651

,787

.43

BMCC

AD

A Ba

thro

om 1

99 C

ham

bers

U

rban

Eng

inee

rs o

f New

Yor

k, P

.C.

RFP-

Task

Ord

er

$172

,175

.00

* $7

,342

.50

BMCC

BM

CC A

DA B

athr

oom

Gr

af &

Lew

ent A

rchi

tect

s, L

LP

RFP-

Task

Ord

er

$558

,423

.00

$108

,611

.39

BMCC

Pe

dest

rian

Plaz

a &

Roo

f Rep

lace

men

t Su

pers

truc

ture

s RF

P $3

07,3

79.0

0 $4

9,19

6.87

BM

CC

Phys

ical

Mas

ter P

lan

Cons

ulta

nts

Mitc

hell

Giur

gola

Arc

hite

cts,

LLP

RF

P-Ta

sk O

rder

$2

49,6

84.9

9 $1

1,00

0.00

BM

CC

Roof

Rep

lace

men

t & P

hoto

volta

ic

ABCD

Con

stru

ctio

n Co

rp

CSB

$3,8

64,9

99.0

0 $2

18,7

05.7

7 BM

CC

Roof

Rep

lace

men

t & P

hoto

volta

ic

Supe

rstr

uctu

res

RFP-

Task

Ord

er

$307

,379

.00

$3,6

31.5

3 BM

CC

Emer

genc

y Ge

nera

tor

DASN

Y DA

SNY/

CUN

Y M

OU

( a

) $6

,500

,000

.00

$2,7

48,5

39.0

0 Br

onx

CC

Alum

ni G

ym L

ocke

r Ren

ovat

ion

H2M

Arc

hite

cts &

Eng

inee

rs

RFP-

Task

Ord

er

$66,

244.

00

* $1

2,85

2.00

Br

onx

CC

Bron

x Ex

pres

s/St

uden

t Suc

cess

Cen

ter

Datt

ner A

rchi

tect

s, D

.P.C

. RF

P-Ta

sk O

rder

$9

9,74

6.00

*

$41,

048.

66

Bron

x CC

Bl

iss H

all B

athr

oom

Ren

ovat

ion

H2M

Arc

hite

cts &

Eng

inee

rs

RFP-

Task

Ord

er

$80,

005.

00

* $1

5,78

7.81

Br

onx

CC

Com

mun

ity H

all L

ocal

Law

11

DASN

Y DA

SNY/

CUN

Y M

OU

( a

) $2

50,0

00.0

0 *

$250

,000

.00

Bron

x CC

Do

min

ican

War

Vet

eran

s Mem

oria

l Sa

rato

ga A

ssoc

iate

s RF

P-Ta

sk O

rder

$4

7,99

2.00

*

$8,3

81.5

9 Br

onx

CC

Ohi

o Fi

eld

Trac

k Sa

rato

ga A

ssoc

iate

s RF

P-Ta

sk O

rder

$1

12,7

78.0

0 *

$19,

362.

89

Bron

x CC

Ro

of R

esto

ratio

ns fo

r Gou

ld M

emor

ial L

ibra

ry

Beye

r Blin

der B

elle

Arc

hite

cts &

Pla

nner

s LLP

RF

P-Ta

sk O

rder

$4

13,5

39.0

0 $5

8,75

9.70

Br

onx

CC

Stud

ent C

ente

r Fire

Ala

rm S

yste

m

Red

Haw

k Fi

re &

Sec

urity

N

YS-O

GS

$670

,209

.97

$126

,706

.11

Broo

klyn

AD

A U

pgra

de to

Lec

ture

Hal

l Ep

ic M

anag

emen

t, In

c.

RFP-

Task

Ord

er

$9,1

74,4

85.4

2 $2

9,40

3.56

Br

ookl

yn

Cam

pus W

ide

Secu

rity

& F

ire S

yste

ms

John

son

Cont

rols,

Inc.

N

YS-O

GS

$12,

786,

000.

00

$4,3

09,2

56.0

8 Br

ookl

yn

Geol

ogy

Lab

Reno

vatio

n M

ichi

elli

Wye

tzne

r Arc

hite

cts

RFP-

Task

Ord

er

$145

,000

.00

* $3

8,53

5.31

Br

ookl

yn

Inge

rsol

l Lab

Li

Ro P

rogr

am a

nd C

onst

ruct

ion

Man

agem

ent,

P.C.

RF

P-Ta

sk O

rder

$2

2,72

9,51

6.00

$2

,572

,046

.28

Broo

klyn

In

gers

oll L

ab

Mitc

hell

Giur

gola

Arc

hite

cts,

LLP

RF

P-Ta

sk O

rder

$1

,598

,794

.00

$146

,252

.41

Broo

klyn

In

gers

oll L

ab

Yu &

Ass

ocia

tes

RFP-

Task

Ord

er

$191

,239

.00

* $3

6,83

4.16

Broo

klyn

Pe

rfor

min

g Ar

ts C

ente

r EM

E Co

nsul

ting

Engi

neer

ing

Grou

p, L

LC

Cont

ract

s Pro

cure

d by

Go

vern

men

tal E

ntiti

es-

DASN

Y $1

48,4

74.4

9 $6

9,60

9.41

Br

ookl

yn

Perf

orm

ing

Arts

Cen

ter

Hill

Inte

rnat

iona

l, In

c.

RFP

$69,

086,

736.

00

$16,

898,

528.

46

Broo

klyn

Pe

rfor

min

g Ar

ts C

ente

r Ho

lland

& K

nigh

t LLP

RF

P-Ta

sk O

rder

$1

00,0

00.0

0 $1

17,5

07.5

1 Br

ookl

yn

Perf

orm

ing

Arts

Cen

ter

Mun

icip

al T

estin

g La

b., I

nc.

RFP-

Task

Ord

er

$443

,710

.00

$346

,511

.47

Broo

klyn

St

eine

r Stu

dios

Ad

oram

a RF

Q &

CSB

( b

) $1

0,55

5.93

$1

0,67

4.31

Br

ookl

yn

Stei

ner S

tudi

os

Appl

e, In

c.

NYS

OGS

( b

) $1

2,79

7.60

$1

2,79

7.60

Br

ookl

yn

Stei

ner S

tudi

os

B&H

Phot

o RF

Q &

CSB

( b

) $5

3,07

4.93

$5

3,07

4.93

Br

ookl

yn

Stei

ner S

tudi

os

Beno

it W

irele

ss In

c.

RFQ

$4

,466

.48

* $4

,466

.48

Broo

klyn

St

eine

r Stu

dios

CD

W-G

N

YS-O

GS

$138

,137

.09

$36,

124.

08

Broo

klyn

St

eine

r Stu

dios

Co

rpor

ate

Com

pute

r Sol

utio

ns, I

nc.

RFQ

$7

,365

.00

* $7

,365

.00

Broo

klyn

St

eine

r Stu

dios

Gr

uska

y Co

nnec

tivity

LLC

RF

Q

$1,0

89.3

3 *

$1,0

89.3

3 CC

NY

City

Lab

Ren

ovat

ion

2014

Gr

af &

Lew

ent A

rchi

tect

s, L

LP

RFP-

Task

Ord

er

$262

,179

.44

* $8

8,69

0.96

CC

NY

Ener

gy L

ab

Trito

n Co

nstr

uctio

n Co

mpa

ny, L

LC

RFP-

Task

Ord

er

$7,0

45,5

65.0

0 *

$157

,255

.30

CCN

Y M

arsh

ak H

all

Trito

n Co

nstr

uctio

n Co

mpa

ny, L

LC

RFP-

Task

Ord

er

$7,8

13,1

74.0

0 $1

5,01

7.68

Page 11: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

City

Uni

vers

ity C

onst

ruct

ion

Fund

6/

25/2

018

FY 2

017

Annu

al R

epor

t on

Proc

urem

ent C

ontr

acts

3:

14 P

M

CSI

Build

ing

2M R

enov

atio

n Ph

ase

2 La

ngan

Eng

inee

ring

& E

nviro

nmen

tal S

ervi

ces I

nc.

RFP-

Task

Ord

er

$20,

600.

00

* $1

9,86

8.00

CS

I Bu

ildin

g 2M

Ren

ovat

ion

Phas

e 2

STV

Cons

truc

tion,

Inc.

RF

P-Ta

sk O

rder

$6

,191

,394

.00

$14,

177,

666.

21

CSI

Build

ing

2M R

enov

atio

n Ph

ase

2 Su

pers

truc

ture

s RF

P-Ta

sk O

rder

$9

3,56

4.00

*

$40,

832.

50

CSI

Cam

pus W

ide

Emer

genc

y Ge

nera

tor

O'B

rien

& G

ere

Engi

neer

s, In

c RF

P-Ta

sk O

rder

$1

11,0

92.0

0 $4

2,99

2.70

CS

I Ca

mpu

s Wid

e U

nder

grou

nd U

tility

U

RS C

orpo

ratio

n RF

P-Ta

sk O

rder

$4

92,8

15.0

0 $4

0,09

0.36

CS

I Co

mpu

tatio

nal C

ente

r HD

R, In

c RF

P $7

,750

,000

.00

$191

,000

.00

CSI

Com

puta

tiona

l Cen

ter

O'B

rien

& G

ere

Engi

neer

s, In

c RF

P-Ta

sk O

rder

$5

95,5

93.0

0 $3

49,9

15.5

4 CS

I Se

wer

Pum

p Ho

use

OLA

Con

sulti

ng E

ngin

eers

, PC

RFP-

Task

Ord

er

$315

,060

.00

* $7

,713

.11

CUN

Y La

w

New

Law

Sch

ool B

uild

ing

Cush

man

& W

akef

ield

, Inc

. Si

ngle

Sou

rce

( c )

NA

$10,

777.

11

CUN

YWID

E CU

NY

Firs

t Sy

scom

Si

ngle

Sou

rce

( d )

$9

28,4

77.0

0 $2

71,9

95.4

8 CU

NYW

IDE

Data

Cen

ter R

eloc

atio

n Ep

ic M

anag

emen

t, In

c.

RFP-

Task

Ord

er

$20,

144,

810.

00

$3,5

74,8

85.6

5 CU

NYW

IDE

Educ

atio

nal T

echn

olog

y El

luci

an C

ompa

ny L

.P.

Sing

le S

ourc

e ( e

) $7

64,4

14.0

0 *

$331

,987

.26

CUN

YWID

E Te

achi

ng L

abs

Epic

Man

agem

ent,

Inc.

RF

P-Ta

sk O

rder

$3

,150

,697

.52

$61,

817.

55

CUN

YWID

E Te

achi

ng L

abs

Gert

ler &

Wen

te A

rchi

tect

s, L

LP

RFP-

Task

Ord

er

$728

,981

.00

* $5

,180

.25

CUN

YWID

E Te

achi

ng L

abs

Graf

& L

ewen

t Arc

hite

cts,

LLP

RF

P-Ta

sk O

rder

$4

,683

.46

* $4

,683

.46

Grad

uate

Cen

ter

9th

Floo

r Con

fere

nce

Room

Do

nald

Bla

ir Ar

chite

cts

RFP-

Task

Ord

er

$567

,395

.40

$30,

706.

11

Hono

rs

Roof

top

HVAC

Rep

lace

men

t Li

Ro P

rogr

am a

nd C

onst

ruct

ion

Man

agem

ent,

P.C.

RF

P-Ta

sk O

rder

$1

,270

,000

.00

$352

,123

.29

Host

os C

C Ai

r Han

dlin

g U

nits

De

wbe

rry

Engi

neer

s Inc

. RF

P-Ta

sk O

rder

$2

39,0

76.0

0 *

$117

,026

.01

Host

os C

C Al

lied

Heal

th a

nd N

atur

al S

cien

ce B

uild

ing

Com

plex

Fl

ad A

rchi

tect

s RF

P $9

,321

,429

.00

$43,

257.

81

Host

os C

C Fi

re A

larm

475

GC

John

son

Cont

rols,

Inc.

N

YS-O

GS

$29,

477.

20

$3,0

65.9

5 Ho

stos

CC

HVAC

Wor

k O

LA C

onsu

lting

Eng

inee

rs, P

C RF

P-Ta

sk O

rder

$2

38,9

30.0

0 *

$89,

013.

26

Host

os C

C Sa

voy

Build

ing

Roof

Rep

lace

men

t Ex

pedi

te C

onst

ruct

ion

Man

agem

ent S

ervi

ces I

nc.

CSB

$1,0

92,0

00.0

0 *

$497

,234

.78

Host

os C

C Sa

voy

Build

ing

Roof

Rep

lace

men

t Su

pers

truc

ture

s RF

P-Ta

sk O

rder

$1

29,8

91.0

0 $7

2,15

5.87

Hu

nter

Ch

iller

Rep

lace

men

t Tr

ane

US

Inc.

N

YS-O

GS

$367

,164

.81

$851

,069

.10

Hunt

er

Hunt

er L

ab R

enov

atio

n 20

14

Graf

& L

ewen

t Arc

hite

cts,

LLP

RF

P-Ta

sk O

rder

$2

62,1

79.4

4 $1

53,2

23.4

7 Hu

nter

Hu

nter

Lab

Ren

ovat

ion

2014

TD

X Co

nstr

uctio

n Co

rpor

atio

n RF

P-Ta

sk O

rder

$4

,934

,976

.00

* $1

13,4

58.2

7 Hu

nter

N

orth

Bui

ldin

g En

ergy

Fea

sibili

ty

Tran

e U

S In

c.

NYS

-OGS

$3

2,30

3.52

$3

02,8

65.5

4 Hu

nter

Pu

rcha

se C

orne

ll Co

ndo

Wei

ll Co

rnel

l Med

ical

Col

lege

Si

ngle

Sou

rce

(f )

$65,

000,

000.

00

$435

,000

.00

Hunt

er

Stud

ent U

nion

Ren

ovat

ion

RCDo

lner

LLC

RF

P-Ta

sk O

rder

$2

,450

,000

.00

$17,

656.

20

Hunt

er

Swin

g Sp

ace

Mitc

hell

Giur

gola

Arc

hite

cts,

LLP

Si

ngle

Sou

rce

( g )

$2,5

26,7

47.0

0 $7

5.00

Ki

ngsb

orou

gh C

C Ki

ngsb

orou

gh C

C Fi

re A

larm

Upg

rade

Si

emen

s Ind

ustr

y In

c.

NYS

-OGS

$4

2,94

9.00

$3

0,00

0.00

Ki

ngsb

orou

gh C

C Pe

rfor

min

g Ar

ts R

enov

atio

n St

ephe

n Ya

blon

Arc

hite

cts P

LLC

RFP-

Task

Ord

er

$547

,565

.50

* $5

9,84

2.42

Ki

ngsb

orou

gh C

C St

uden

t Con

fere

nce

Cent

er

Mic

hiel

li W

yetz

ner A

rchi

tect

s RF

P-Ta

sk O

rder

$1

65,0

00.0

0 *

$19,

460.

48

King

sbor

ough

CC

T2 B

uild

ing

Epic

Man

agem

ent,

Inc.

RF

P-Ta

sk O

rder

$4

,604

,935

.00

$129

,043

.95

King

sbor

ough

CC

T7 P

hase

1 H

VAC

& E

lect

rical

Upg

rade

O

'Brie

n &

Ger

e En

gine

ers,

Inc

RFP-

Task

Ord

er

$238

,810

.00

$85,

727.

16

Lehm

an

Book

stor

e Re

loca

tion

Ikon

5 A

rchi

tect

s, L

LC

RFP-

Task

Ord

er

$350

,000

.00

$45,

127.

92

Lehm

an

Child

Car

e Ce

nter

Ax

is Co

nstr

uctio

n Co

rp.

CSB

$6,0

77,7

00.0

0 $1

96,2

95.0

0 Le

hman

Ch

ild C

are

Cent

er P

layg

roun

d K&

V Co

nstr

uctio

n, In

c.

CSB

$484

,392

.00

$37,

568.

05

Lehm

an

Conc

ert H

all A

dditi

on

Mic

hiel

li W

yetz

ner A

rchi

tect

s RF

P-Ta

sk O

rder

$4

45,0

00.0

0 $5

1,95

3.05

Le

hman

De

part

men

t of S

ocia

l Wor

k St

ephe

n Ya

blon

Arc

hite

cts P

LLC

RFP-

Task

Ord

er

$380

,654

.00

$43,

708.

07

Lehm

an

Labs

Rou

nd II

I Gr

af &

Lew

ent A

rchi

tect

s, L

LP

RFP-

Task

Ord

er

$400

,989

.48

$137

,546

.58

Lehm

an

Labs

Rou

nd II

I Li

Ro P

rogr

am a

nd C

onst

ruct

ion

Man

agem

ent,

P.C.

RF

P-Ta

sk O

rder

$3

,613

,467

.00

$17,

309.

52

Lehm

an

Lehm

an S

ecur

ity S

yste

m U

pgra

de

Siem

ens I

ndus

try

Inc.

N

YS-O

GS

$2,4

56,5

26.5

6 $9

,417

.76

Lehm

an

Lovi

nger

The

ater

ADA

Com

plia

nce

Dona

ld B

lair

Arch

itect

s RF

P-Ta

sk O

rder

$2

55,4

84.8

3 $1

7,40

7.62

Le

hman

N

ursin

g Ed

ucat

ion

Cent

er

Urb

ahn

Arch

itect

s PLL

C RF

P $2

,906

,850

.28

$320

,040

.59

Lehm

an

Spee

ch &

The

ater

Am

phith

eate

r M

ichi

elli

Wye

tzne

r Arc

hite

cts

RFP-

Task

Ord

er

$350

,050

.00

$157

,138

.83

Lehm

an

Stud

ent H

ealth

Ser

vice

s Cen

ter

Graf

& L

ewen

t Arc

hite

cts,

LLP

RF

P-Ta

sk O

rder

$9

2,97

8.00

*

$6,6

50.0

0 Le

hman

Te

achi

ng &

Lea

rnin

g Co

mm

ons

Curt

is +

Gins

berg

Arc

hite

cts L

LP

RFP-

Task

Ord

er

$430

,575

.00

* $3

6,63

1.69

M

edga

r Eve

rs

ADA

Bath

room

& A

thle

tic C

ente

r St

ephe

n Ya

blon

Arc

hite

cts P

LLC

RFP-

Task

Ord

er

$1,0

65,8

46.0

0 $1

68,9

55.2

5 M

edga

r Eve

rs

Bedf

ord

Ave.

Site

Rec

onst

ruct

ion

Thom

as B

alsle

y As

soci

ates

RF

P-Ta

sk O

rder

$4

61,5

80.1

3 $2

36,2

38.8

8 N

YCCT

N

amm

Hal

l Hea

t Exc

hang

ers R

epla

cem

ent

Tran

e U

S In

c.

NYS

-OGS

$4

90,1

05.7

8 *

$92,

471.

26

NYC

CT

New

Aca

dem

ic B

uild

ing

Emte

c Co

nsul

tant

s, P

rofe

ssio

nal E

ngin

eers

, PLL

C RF

P-Ta

sk O

rder

$1

,003

,950

.00

$383

,100

.00

NYC

CT

New

Aca

dem

ic B

uild

ing

F.J.

Scia

me

Cons

truc

tion

Co.,

Inc.

RF

P $2

97,4

33,2

31.0

0 $6

9,94

3,23

1.97

Page 12: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

City

Uni

vers

ity C

onst

ruct

ion

Fund

6/

25/2

018

FY 2

017

Annu

al R

epor

t on

Proc

urem

ent C

ontr

acts

3:

14 P

M

NYC

CT

New

Aca

dem

ic B

uild

ing

Gene

sys E

ngin

eerin

g P.

C.

Cont

ract

s Pro

cure

d by

Go

vern

men

tal E

ntiti

es-

DASN

Y $2

99,5

00.0

0 $7

4,99

8.18

N

YCCT

N

ew A

cade

mic

Bui

ldin

g M

unic

ipal

Tes

ting

Lab.

, Inc

. RF

P-Ta

sk O

rder

$8

96,2

75.0

0 $5

41,4

00.0

0 N

YCCT

N

ew A

cade

mic

Bui

ldin

g Pe

rkin

s Eas

tman

Arc

hite

cts,

PC

Sing

le S

ourc

e ( h

) $1

5,30

8,82

5.00

$1

,008

,562

.35

NYC

CT

New

Aca

dem

ic B

uild

ing

Supe

rstr

uctu

res

RFP-

Task

Ord

er

$26,

250.

00

$7,0

69.1

1 Q

ueen

s Ca

mpu

s Wid

e Fi

re A

larm

@ K

lapp

er H

all

Sim

plex

Grin

nell

NYS

-OGS

$1

,156

,513

.00

$196

,686

.53

Que

ens

Fitz

gera

ld G

ym F

loor

En

Tech

Eng

inee

ring,

PC.

RF

P-Ta

sk O

rder

$4

2,66

0.00

$5

8,91

2.18

Q

ueen

s Fi

tzge

rald

Gym

Flo

or

STV

Cons

truc

tion,

Inc.

RF

P-Ta

sk O

rder

$3

,253

,055

.30

$1,0

45,1

94.4

4 Q

ueen

s M

olec

ular

Eco

logy

& R

esea

rch

Scie

nce

Labs

Em

tec

Cons

ulta

nts,

Pro

fess

iona

l Eng

inee

rs, P

LLC

RFP-

Task

Ord

er

$30,

000.

00

* $3

0,00

0.00

Q

ueen

s M

olec

ular

Eco

logy

& R

esea

rch

Scie

nce

Labs

GC

Eng

Eng

inee

ring

Asso

ciat

es

RFP-

Task

Ord

er (W

ASA)

$7

,000

.00

$7,0

00.0

0 Q

ueen

s M

olec

ular

Eco

logy

& R

esea

rch

Scie

nce

Labs

Li

Ro P

rogr

am a

nd C

onst

ruct

ion

Man

agem

ent,

P.C.

RF

P-Ta

sk O

rder

$3

,797

,630

.96

$300

,532

.65

Que

ens

Que

ens A

DA B

athr

oom

Ar

ch B

uild

ers &

Dev

elop

ers I

nc.

CSB

$999

,999

.00

$481

,981

.56

Que

ens

Que

ens A

DA B

athr

oom

Fu

ture

Tec

h Co

nsul

tant

s of N

ew Y

ork,

Inc.

RF

P-Ta

sk O

rder

$1

7,80

0.00

*

$3,3

00.0

0 Q

ueen

s Q

ueen

s ADA

Bat

hroo

m

Mic

hiel

li W

yetz

ner A

rchi

tect

s RF

P-Ta

sk O

rder

$1

64,2

00.0

0 $8

,000

.00

Que

ens

Que

ens A

DA B

athr

oom

Th

e Co

mm

issio

ner o

f Lab

or

Stat

e DO

L Pa

ymen

t-U

nder

paym

ent o

f Fun

ds (

i )

NA

$49,

352.

49

Que

ens

Razr

an H

all L

ab R

enov

atio

n Gr

af &

Lew

ent A

rchi

tect

s, L

LP

RFP-

Task

Ord

er

$485

,585

.36

$175

,120

.81

Que

ens

Rem

sen

Hall

Roof

ing

Diaz

Arc

hite

cts

RFP-

Task

Ord

er

$62,

554.

00

$51,

165.

20

Que

ens

Rem

sen

Hall

Roof

ing

MT

Grou

p, L

LC

RFP-

Task

Ord

er

$9,6

00.0

0 *

$1,8

00.0

0 Q

ueen

s Re

mse

n Ha

ll Ro

ofin

g RJ

Gre

en C

onst

ruct

ion

Corp

. CS

B $1

,530

,500

.00

$779

,946

.66

Que

ens

Rem

sen

& S

B En

viro

nmen

tal L

abs

Perk

ins E

astm

an A

rchi

tect

s, P

C RF

P-Ta

sk O

rder

$2

90,3

85.9

7 *

$8,5

12.0

1 Q

ueen

s St

eam

Pip

e Re

plac

emen

t Sy

ska

Henn

essy

Gro

up

RFP-

Task

Ord

er

$245

,000

.00

* $1

0,82

1.25

Q

ueen

sbor

ough

CC

Libr

ary

ADA

Bath

room

Ik

on 5

Arc

hite

cts,

LLC

RF

P-Ta

sk O

rder

$1

32,0

00.0

0 *

$72,

787.

51

Que

ensb

orou

gh C

C PA

C AD

A Re

cons

truc

tion

Gosh

ow A

rchi

tect

s, L

LP

RFP-

Task

Ord

er

$180

,362

.00

$104

,251

.45

Scho

ol o

f Pub

lic H

ealth

Sc

hool

of P

ublic

Hea

lth

Appl

e, In

c.

NYS

-OGS

(b)

$21,

631.

00

* $2

1,63

1.00

Sc

hool

of P

ublic

Hea

lth

Scho

ol o

f Pub

lic H

ealth

BV

K 55

Wes

t 125

th S

tree

t LLC

Si

ngle

Sou

rce

( j )

NA

$3,8

33,3

34.0

0 Sc

hool

of P

ublic

Hea

lth

Scho

ol o

f Pub

lic H

ealth

De

ll U

SA L

.P.

NYS

-OGS

(b)

$186

,259

.83

* $1

86,2

59.8

3 Yo

rk

Acad

emic

Cor

e HV

AC U

pgra

de

Liza

rdos

Eng

. Ass

oc.,

P.C.

RF

P-Ta

sk O

rder

$6

11,8

73.0

0 $3

1,69

6.48

Yo

rk

Scie

nce

Build

ing

Fire

Ala

rm U

pgra

de

John

son

Cont

rols,

Inc.

N

YS-O

GS

$223

,591

.21

$162

,870

.84

York

Sc

ienc

e Bu

ildin

g Re

tro

Com

miss

ioni

ng

Siem

ens I

ndus

try

Inc.

N

YS-O

GS

$338

,707

.87

$696

,088

.15

Gran

d To

tal

$137

,430

,130

.36

(a) R

elec

ts tr

ansf

er o

f fun

ds p

rovi

ded

from

the

Colle

ge to

DAS

NY

thro

ugh

CUCF

for t

he su

bjec

t pro

ject

. (b

) Inc

lude

s mul

tiple

pur

chas

es.

(c) C

ushm

an a

nd W

akef

ield

man

aged

the

build

ing

cont

aini

ng th

e La

w S

choo

l and

ther

e w

as a

requ

irem

ent b

y th

e co

ndom

iniu

m to

use

them

. (d

)The

CU

NY

Firs

t sys

tem

incl

udes

a n

ew st

uden

t inf

orm

atio

n sy

stem

for p

roce

ssin

g st

uden

t rec

ords

. Stu

dent

reco

rds b

egin

with

pro

cess

ing

of la

rge

num

bers

of a

pplic

atio

n do

cum

ent i

mag

es. T

hese

doc

umen

t im

ages

are

crit

ical

to th

e ap

plic

atio

n/ad

miss

ions

pro

cess

and

ong

oing

stud

ent i

nfor

mat

ion

need

s. T

he c

urre

nt a

pplic

atio

n im

age

proc

essin

g w

orkf

low

s mus

t be

revi

sed

and

mod

ified

to p

rope

rly in

tegr

ate

and

wor

k in

con

junc

tion

with

the

CUN

Y Fi

rst s

yste

m. S

ysco

m is

cur

rent

ly re

spon

sible

for a

dmin

ister

ing

the

exist

ing

syst

em a

nd h

as d

evel

oped

hig

hly

spec

ializ

ed k

now

ledg

e of

the

Uni

vers

ity’s

adm

issio

n pr

oces

s. S

ysco

m’s

und

erst

andi

ng o

f the

exi

stin

g sy

stem

s, e

nviro

nmen

t, an

d w

orkf

low

s mak

es th

em u

niqu

ely

qual

ified

to c

ompl

ete

the

requ

ired

wor

k in

the

mos

t effi

cien

t, co

st e

ffect

ive

man

ner.

(e )

Ellic

ian

Degr

ee W

orks

is th

e U

nive

rsity

Aca

dem

ic A

dvise

men

t Sys

tem

in e

ffect

sinc

e 20

04 to

pro

vide

info

rmat

ion

on d

egre

e re

quire

men

ts, c

ours

e pr

ogre

ssio

n an

d de

gree

com

plet

ion

rate

s to

over

20,

000

stud

ents

with

in th

e CU

NY

syst

em. F

or C

UN

Y to

max

imize

the

bene

fit fr

om th

e ap

plic

atio

n, it

s new

func

tions

, and

be

able

to im

plem

ent f

utur

e re

leas

es,

this

upgr

ade

and

cons

ultin

g se

rvic

es a

re c

ritic

al.

(f) W

eill

Corn

ell M

edic

al C

olle

ge e

nter

ed in

to a

pub

lic-p

rivat

e pa

rtne

rshi

p w

ith C

UCF

to a

cqui

re fo

r CU

NY

on b

ehal

f of H

unte

r Col

lege

a fu

ll re

sear

ch fl

oor a

t the

new

18

stor

y m

edic

al re

sear

ch fa

cilit

y be

ing

cons

truc

ted

by W

eill

Corn

ell M

edic

al C

olle

ge.

(g) M

itche

ll-Gi

urgo

la A

rchi

tect

s (M

GA) p

revi

ously

com

plet

ed a

n in

fras

truc

ture

stud

y, b

uild

ing

conc

ept a

nd p

hasin

g pl

an, a

nd p

re-s

chem

atic

des

ign

for L

aGua

rdia

CC'

s Cen

ter 3

bui

ldin

g,

as w

ell a

s a fu

ll de

sign

of th

e Bu

ildin

g's 8

th fl

oor.

Thi

s bui

ldin

g w

ill b

e us

ed to

tem

pora

rily

hous

e Hu

nter

Bro

okda

le C

ampu

s pro

gram

s unt

il th

e ne

w H

unte

r Col

lege

Sci

ence

Bui

ldin

g is

com

plet

ed.

Util

izing

MGA

to d

esig

n th

e sw

ing

spac

e in

the

Cent

er 3

Bui

ldin

g fo

r the

se p

rogr

ams w

ill a

llow

for s

igni

fican

t cos

t and

tim

e sa

ving

s.

(h) P

erki

ns E

astm

an w

as p

art o

f the

team

of t

he o

rigin

al d

evel

oper

cho

sen

thro

ugh

a co

mpe

titiv

e pr

oces

s for

a p

roje

ct w

hich

initi

ally

incl

uded

an

acad

emic

com

pone

nt a

nd a

Page 13: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

City

Uni

vers

ity C

onst

ruct

ion

Fund

6/

25/2

018

FY 2

017

Annu

al R

epor

t on

Proc

urem

ent C

ontr

acts

3:

14 P

M

resid

entia

l tow

er.

For 2

.5 y

ears

Per

kins

Eas

tman

wor

ked

on th

e de

velo

pmen

t of t

he p

rogr

am a

nd th

e pr

e-sc

hem

atic

and

sche

mat

ic d

esig

n ph

ases

of t

he p

roje

ct.

Whe

n CU

NY

term

inat

ed it

s par

tner

ship

with

the

deve

lope

r and

lim

ited

the

proj

ect t

o on

ly th

e ac

adem

ic c

ompo

nent

, it w

as d

eter

min

ed th

at P

erki

ns E

astm

an's

unde

rsta

ndin

g of

the

prog

ram

and

th

eir i

nvol

vem

ent i

n th

e pr

evio

us d

esig

n m

ade

them

uni

quel

y qu

alifi

ed to

con

tinue

dev

elop

men

t of t

he p

roje

ct in

the

mos

t exp

editi

ous a

nd e

ffici

ent m

anne

r ava

ilabl

e.

(i) F

inal

ized

1/20

17.

Paym

ent m

ade

to D

OL

for A

rche

r und

erpa

ymen

t of w

ages

on

Que

ens A

DA B

athr

oom

Pro

ject

(j)

BVK

55

Wes

t 125

th S

tree

t LLC

hol

ds th

e le

ase

for t

he si

te o

f thi

s pro

gram

.

Page 14: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

Exhibit 2

CITY UNIVERSITY CONSTRUCTION FUND GUIDELINES FOR PROCUREMENT CONTRACTS

(as amended through June 23, 2016)

Section A. Introduction

These Guidelines set forth the operative policy and instructions of the City University Construction Fund (the "Fund") regarding the use, award, monitoring, and reporting of Procurement Contracts in the actual or estimated amount of $5,000 or more.

These Guidelines are intended to satisfy the requirements of Section 2879 of the New York State Public Authorities Law and to provide an internal and administrative policy for the Fund's trustees, officers and employees. These Guidelines do not provide third parties with any rights or remedies.

Section B. Definitions

1. “Construction Management/Build (CM/Build) Contract” means a Procurement Contract pursuant to which the Fund hires a construction management firm to manage the overall construction project and to bid and hold each underlying contract for materials, labor and services related to the construction of the project. The Fund may employ a CM/Build Contract only when the estimated cost of construction is $3 million or more.

2. “Executive Director” means the Executive Director of the CUNY Construction Fund.

3. “Fund” means the CUNY Construction Fund acting through its Board of Trustees or pursuant to a delegation of powers or duties to one or more of its trustees, officers, agents or employees as may be permitted by Section 6274 of the New York State Education Law.

4. “Job Order Contract” (JOC) means a Procurement Contract resulting from a competitive bid process for an indefinite quantity of construction materials and services, which are specified in a Fund-approved catalog by type and unit price, for the Fund to use on specified projects to repair, maintain and upgrade CUNY facilities; the lowest responsible bidder shall bid the lowest ‘adjustment factor’ by which the Fund will multiply the fixed unit prices established by the catalog; the contract amount shall be the product of the ‘adjustment factor’ times the catalog prices for the materials and services that the Fund identifies for use on all of each individual project covered by the contract documents.

5. "Minority Business Enterprise" and a “Women-Owned Business Enterprise” shall have the meanings set forth in Section 2879 of the Public Authorities Law of the State of New York and the regulations promulgated thereunder.

6. Procurement Contract" means any written agreement for the acquisition of goods, services (including but not limited to professional services) or interests in real property of any kind or for construction, or any combination of these. The term does not include any agreement for employment in the civil services or by the Research Foundation of the City

1

Page 15: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

University of New York. “Procurement Contractors” means any counter-party to a Procurement Contract with the Fund.

Section C. Selection of Procurement Contractors and Award and Board Review of Procurement Contracts

1. Selection Policy

Consistent with these Guidelines, the Fund shall select Procurement Contractors in a manner that (a) is fair and efficient, (b) seeks high quality goods, services, and/or construction at reasonable prices, and (c) satisfies state law in providing an opportunity for Minority Business Enterprises and Women-Owned Enterprises to compete for Procurement Contracts so as to facilitate the awarding of a fair share of such contracts to such enterprises.

2. Selection Mechanisms

The Fund shall use the following mechanisms to select Procurement Contractors for specified goods, services, interests in real estate and/or construction:

(a) Competitive Bids. The Fund may solicit fixed-price bids and may award the Procurement Contract to a responsible bidder primarily on the basis of the lowest price.

(b) Request for Proposals. The Fund may solicit specific proposals and award the Procurement Contract on the basis of an evaluation of the characteristics, quality and cost of such proposals, as set forth in the form of solicitation, including, without limitation, proffered security where security is requested or appropriate.

(c) Negotiated Procurement. The Fund may negotiate the terms of a Procurement Contract under the circumstances and subject to the conditions set forth below. Negotiations may be preceded by preliminary discussions to explore the feasibility of the procurement. A Negotiated Procurement may be used in combination with a Request for Proposals.

(i) In the case of a Procurement Contract for goods, services and/or construction, the Fund may negotiate with at least three vendors (or, in compelling circumstances, with fewer vendors) and award a Procurement Contract on terms that serve the best interests of the Fund where it is not practical and/or advantageous to make an award by Competitive Bids or Request for Proposals because (A) the constraints of a time-sensitive require a prompt selection and award, such the need to comply with a court order, to secure funding or avoid the loss of funding or to cure the default or unavailability of an existing contractor; (B) there is a limited number of vendors available and able to perform the work; (C) an existing contract needs to be extended beyond the contractually stipulated term and extensions; and (D) there is a compelling need to use an existing contractor to perform additional work or a later phase of a project.

(ii) In the case of a contract for the acquisition of an interest in or the

2

Page 16: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

development of real property, the Fund may negotiate with one or more vendors and award a Procurement Contract in the best interests of the Fund.

(d) Single Source. When the Executive Director determines that there is only a single responsible source for any goods, services, interests in real estate and/or construction required by the Fund, the Fund may award a Procurement Contract without competitive procedures. A record setting forth the circumstances under which any such contract was let shall be provided in the annual report of the Fund prepared for the year in which the contract is let.

(e) Emergency. In the event of an emergency involving danger to life or property or other unforeseen occurrences requiring immediate action that cannot await the completion of other procurement mechanisms, the Executive Director may award a Procurement Contract without competitive procedures. For any such Procurement Contract involving an actual or estimated expense of $10,000 or more, the Executive Director shall, prior to executing the contract, notify four Trustees of the Fund of the nature and circumstances of the emergency and obtain their approval as to the aware. The Executive Director shall present a report of the award of such an emergency contract as an information item at the next regularly scheduled meeting of the Board of Trustees. A record setting forth the circumstances under which any such emergency contract was awarded shall be provided in the annual report of the Fund prepared for the year in which the contract is awarded.

(f) Contracts Procured by Government Entities. The Fund may award a Procurement Contract through existing contracts awarded by government entities, i.e., the State of New York, including any authority or public benefit corporation of the State of New York , the City of New York, including the Department of Education, or the Federal Government, provided that the Procurement Contract contains material terms, including price, that are substantially the same as or more favorable than the material terms of the contract with the government entity.

(g) Procurement Cards (P-Cards). The Executive Director shall be permitted to utilize Procurement Cards, a flexible, convenient and efficient means of processing payments for one-time and recurring monthly purchases, for payment of reasonable out-of-pocket expenses incurred in the performance of the duties of that office, such as subscriptions, parking lot fees, E-Z Pass tolls and telecommunication charges.

(h) Discretionary Purchasing. In accordance with Section 2879 of the New York State Public Authorities Law, the Fund may use its discretion in the selection of vendors to compete for Procurement Contracts for goods, services, including architectural services and engineering services, and/or construction, as follows:

i. Eligibility to compete for such Procurement Contracts may be limited by the Fund to those vendors Certified as Minority-Owned Business Enterprises or Women-Owned Business Enterprises by Empire State Development’s Division of Minority and Women’s Business Development or Certified as Service-Disabled Veteran-Owned Businesses by the New

3

Page 17: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

York State Office of General Services Division of Service-Disabled Veterans’ Business Development. This is to provide an opportunity for such entities to compete for Procurement Contracts so as to facilitate the awarding by the Fund of a fair share of such Procurement Contracts to such entities, consistent with State law and these Guidelines.

ii. The total value of all such Procurement Contract awards by the Fund to a particular vendor cannot exceed $200,000.

iii. Except as otherwise provided in this Section, all other provisions of these Guidelines remain in effect.

(i) Other Mechanisms Approved by the Fund's Board. The Fund may use any other procurement mechanism the Board of Trustees shall deem appropriate.

3. Advertisement Requirements for Competitive Selection Mechanisms

The solicitation of bids, proposals or submissions for a Procurement Contract shall be made by the Fund in a manner determined by the Executive Director to be the most cost-effective for providing reasonable competition for the Fund's procurement contracts. This may include advertisement in appropriate newspapers or trade journals, direct mailings and such other outreach mechanisms as are consistent with the policy of these Guidelines with respect to firms considered by the Executive Director to be qualified, including, without limitation, Minority Business Enterprises and Women-Owned Business Enterprises.

(a) Procurement Opportunities Newsletter. The Executive Director may solicit bids or proposals by placing a listing in the New York State Contract Reporter, or any other official listing of bidding opportunities established under Article 4-C of the Economic Development Law or comparable statutes. Any such listing shall be made in conformity with the rules and requirements established by the responsible agency, such as New York State Department of Economic Development, Division for Small Business, that are in effect at the time the listing is to be made.

(b) General Contents of Solicitations. Except as otherwise required (for example, by the applicable rules of the Department of Economic Development referred to in item (a) above), each solicitation by the Fund shall include: (i) the name of the Fund, (ii) a description of the goods, services, and/or construction sought, the location where goods are to be delivered or services and/or construction are to be provided and the contract term, (iii) the address where bids or proposals are to be submitted, (iv) the date when such bids or proposals are due, (v) a description of any eligibility requirement or preference and (vi) any other information that the Executive Director deems useful.

(c) Antidiscrimination Language in Fund Solicitations. All solicitations of bids or proposals for any procurement contract shall contain or make reference to the following:

(i) The contractor will not discriminate against employees or applicants 4

Page 18: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

for employment because of race, creed, color, national origin, sex, sexual orientation, age, disability, or marital status, and will undertake or continue existing programs of affirmative action to ensure that minority group members (as herein defined), including, without limitation, women, are afforded equal opportunity without discrimination. Such programs shall include, but not be limited to, recruitment, employment, job assignments, promotion, upgrading, demotion, transfer, layoff, termination, rates of pay or other forms of compensation, and selections for training or retaining, including apprenticeship and on-the-job training;

(ii) At the request of the Fund, the contractor shall request each employment agency, labor union, or authorized representative of workers with which it has a collective bargaining or other agreement or understanding and which is involved in the performance of the contract with the authority to furnish a written statement that such employment agency, labor union or representative shall not discriminate because of race, creed, color, national origin, sex, sexual orientation, age, disability or marital status and that such union or representative will cooperate in the implementation of the contractor's obligations hereunder;

(iii) The contractor will state, in all solicitations or advertisements for employees placed by or on behalf of the contractor in the performance of the contract with the Fund, that will qualified applicants will be afforded equal employment opportunity without discrimination because of race, creed, color, national origin, sex, sexual orientation, age, disability or marital status; and

(iv) The contractor will include the provisions of subdivisions (i) through (iii) of this section in every subcontract or purchase order in such a manner that such provisions will be binding upon each subcontractor or vendor as to its work in connection with the contract with the Fund.

(d) Procurement Contracts for $50,000 or More. If the actual or estimated cost of a Procurement Contract is fifty thousand dollars ($50,000) or more, any solicitation shall be published once in the New York State Contract Reporter, published by Empire State Development and at least once in a newspaper of general circulation.

(e) Timing. At least fifteen business days shall elapse between the first solicitation of bids, proposals or submissions or the first publication of any advertisement for bids, proposals or submissions and the due date for the submission of bids, proposals or submissions.

4. Award of Procurement Contracts

(a) Minimum Solicitation. Except as otherwise provided in these Guidelines, the Executive Director shall solicit bids, proposals or submissions from at least three (3) contractors that are qualified to provide the goods, services, interests in real estate and/or construction sought by the Fund and have

5

Page 19: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

agreed to consent to the nondiscrimination and compliance provisions required by Section E of these Guidelines. Subject to subsections (b) and (c) hereof, the Fund shall award the Procurement Contract on the basis of the most favorable combination of criteria applicable respectively to goods, services, interests in real estate or construction, such as quality, ability to deliver or perform in a timely manner, price or fee structure, location, technical qualifications, financial stability, past performance, staff availability and experience.

(b) Contracts for $10,000 or More. No Procurement Contract involving an actual or estimated expense of ten thousand dollars ($10,000) or more shall be awarded by the Fund unless, prior to execution of the contract by the Fund, no fewer than four (4) trustees of the Fund approve the contract.

(c) Contracts for $25,000 or More. Each Procurement Contract for supplies, materials or equipment involving an estimated expense of twenty-five thousand dollars ($25,000) or more shall be awarded to the lowest responsible bidder furnishing required security, if security is to be required, after obtaining competitive bids, proposals or submissions for such contract in the manner prescribed herein; provided that prior to execution of such contract by the Fund, no fewer than four (4) trustees of the Fund approve the contract.

(d) Construction Management/Build (CM/Build) Contracts. The Executive Director is authorized to enter into CM/Build contracts, as defined herein; provided that prior to execution of such contract by the Fund, no fewer than four (4) trustees of the Fund approve the contract. A record setting forth the justification for utilizing a CM/Build contract shall be provided to the Board. Notwithstanding anything herein to the contrary, award shall be made to the highest qualified vendor, after successful negotiation of a fair and reasonable price.

(e) Job Order Contract (JOC). The Executive Director is authorized to enter into JOC contracts, as defined herein.

(f) Alternative Selection Mechanisms. Notwithstanding anything herein to the contrary, the Executive Director may recommend that the Board approve procedures for the use and application of a particular selection mechanism other than those set forth in these Guidelines.

5. Board Review of Procurement Contracts

For each Procurement Contract to which the Fund is a party, the Executive Director will document and describe for the Board the procedure used to select the Procurement Contractor.

Section D. Minority Business Enterprise and Women-Owned Business Enterprise Participation

1. Solicitation

6

Page 20: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

In order to promote the engagement of Minority Business Enterprises and Women-Owned Business Enterprises as Procurement Contractors, the Fund shall solicit offers from Minority Business Enterprises and Women-Owned Business Enterprises known to supply the goods or provide the services, interests in real estate and/or construction sought. If the provision of any goods, services, interests in real estate and/or construction under a prime contract permits or requires the use of a subcontractors, said prime contract shall require the prime contractor to act affirmatively to secure participation by Minority Business Enterprises and Women-Owned Business Enterprises in such subcontract and to report the nature and extent of such efforts to the Fund.

2. Maintenance of List of Procurement Contractors Including Minority Business Enterprises and Women-Owned Business Enterprises

The Executive Director shall prepare and update annually a list of potential sources including Minority Business Enterprises and Women-Owned Business Enterprises of goods, services, interests in real estate and/or construction that are regularly purchased by the Fund or that the Fund expects to purchase in the following year. Executive Director's report to the Board shall include: (a) the list, and (b) the procedures established to identify new sources for the list and to notify such new sources of the opportunity to bid for contracts for the purchase of goods, services, interests in real estate and/or construction. In identifying qualified sources, including Minority Business Enterprises and Women-Owned Business Enterprises, the Executive Director shall seek the assistance of agencies of the State of New York and the City of New York including the Department of Commerce, the Office of General Services, and the Office of Contract Compliance and Minority and Women-Owned Business Enterprises of the State and the Office of Minority Business Development of the City.

3. Qualification as a Minority Business Enterprise or Women-Owned Business Enterprises

The Executive director shall require each contractor seeking to be considered as a Minority Business Enterprise or Women-Owned Business Enterprise by the Fund to submit a written statement describing how it qualifies as a Minority Business Enterprise or Women-Owned Business Enterprise. The Fund shall monitor the entities considered to be Minority Business Enterprises and Women-Owned Business Enterprises to ensure their continued satisfaction of the criteria set forth in these Guidelines.

Section E. Standard Nondiscrimination and Compliance Provisions to be Made a Part of Procurement Contracts

Each Procurement Contract shall include the following nondiscrimination and compliance provisions:

1. The contractor will not discriminate against any employee or applicant for employment because of race, creed, color, national origin, sex, sexual orientation, age, disability, or marital status and will undertake or continue existing programs of affirmative action to ensure that minority group members (as herein defined), including, without limitation, women, are afforded equal opportunity without discrimination. Such programs shall

7

Page 21: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

include, but not be limited to, recruitment, employment, job assignments, promotion, upgrading, demotion, transfer, layoff, termination, rates of pay or other forms of compensation, and selections for training or retraining, including apprenticeship and on-the-job training. The contractor agrees to post, in conspicuous places available to employees and applicants for employment, notices setting forth the substance of this nondiscrimination provision.

2. At the request of the Fund, the contractor shall request each employment agency, labor union, or authorized representative of workers with which it has a collective bargaining or other agreement or understanding and which is involved in the performance of the contract with the authority to furnish a written statement that such employment agency, labor union or representative shall not discriminate because of race, creed, color, national origin, sex, sexual orientation, age, disability or marital status and that such union or representative will cooperate in the implementation of the contractor's obligations hereunder;

3. The contractor will state, in all solicitations or advertisements for employees placed by or on behalf of the contractor in the performance of the contract with the Fund, that all qualified applicants will be afforded equal employment opportunity without discrimination because of race, creed, color, national origin, sex, sexual orientation, age, disability or marital status;

4. The contractor will include the provisions of subdivisions (l) through (3) of this section in every subcontract or purchase order in such a manner that such provisions will be binding upon each subcontractor or vendor as to its work in connection with the contract with the Fund.

5. The contractor will comply with all provisions of this contract and of the rules, regulations, and orders issued by the Fund to implement the same.

6. The contractor will furnish all information and reports required by the Fund and by any applicable rules, regulations, and any orders issued pursuant thereto, and will permit access to its books, records and accounts by the Fund for purposes of investigation to ascertain compliance with this contract and such rules, regulations and order.

7. If the contractor does not comply with the nondiscrimination provisions of this contract or with any such rules, regulations or orders, this contract may be cancelled, terminated or suspended in whole or in part and the contractor may be declared ineligible for further contracts involving projects under the auspices of the Fund and such other sanctions may be imposed and remedies invoked as are provided by rule, regulations or order issued by the Fund, or as otherwise provided by law.

8. The contractor will include the foregoing provisions in every subcontract or purchase order issued in connection with the performance of the prime procurements contract as well as in any agreement with architects, engineers, accountants and legal counsel for professional services, by incorporating the text or by reference thereto, so that such provisions will be binding upon each subcontractor, professional firm or vendor. The contractor will take such action with respect to any subcontract or purchase order as the Fund may direct as a means of enforcing such provisions, including sanctions for noncompliance.

9. The provisions of this section shall be deemed supplementary to, and not in lieu of or in substitution for the provisions of the New York State Labor Law relating to

8

Page 22: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

nondiscrimination, and other applicable Federal, State or City law, ordinance, rule and regulation.

10. Each contractor having a contract containing these provisions shall file, and shall cause each of his subcontractors to file, compliance reports with the Fund. Compliance reports shall be filed within such time and shall contain such information as to the practices, policies, programs, employment policies, and employment statistics of the contractors and each subcontractor, and shall be in such form as the Fund may prescribe.

11. Whenever the contractor or subcontractor has a collective bargaining agreement or other contract or understanding with a labor union or an agency referring workers or providing or supervising apprenticeships or training for such workers, the compliance report shall include such information as to such labor union's or agency's practices and policies affecting compliance as the Fund may prescribe; provided that to the extent such information is within the exclusive possession of a labor union or an agency referring workers or providing or supervising apprenticeship or training, and such labor union or agency shall refuse to furnish such information to the contractor, the contractor shall so certify to the Fund as part of his compliance report, and shall set forth what efforts he has made to obtain such information.

12. The Fund may direct that any bidder or prospective contractor or subcontractor shall submit, as part of his compliance report, a statement in writing, signed by an authorized officer or agent on behalf of any labor union or any agency referring workers or providing or supervising apprenticeship or other training, with which the bidder or prospective contractor deals, with supporting information, to the effect that the signer's practice and policies do not discriminate on the ground of race, creed, color, national origin, sex, sexual orientation, age, disability or marital status, and that the signer either will affirmatively cooperate in the implementation of the policy and provisions of this contract or that it consents and agrees that recruitment, employment, and the terms and conditions of employment under the proposed contract shall be in accordance with the purposes and provisions of this contract. In the event that the union or the agency shall refuse to execute such a statement, the compliance report shall so certify and set forth what efforts have been made to secure such a statement, and such additional factual material as the Fund may require.

Section F. Dispute Resolution Process

All Procurement Contracts for an amount equal to or in excess of $25,000 shall include a provision for resolving disputes with the Fund, including but not limited to such matters as the scope of work required by the contract, the interpretation of the contract and the amount to be paid for extra work. Such a provision shall delineate a process that allows disputes to be resolved directly and efficiently between the Fund, or its designee, and the contractor. At a minimum, it shall (1) define when a dispute arises for resolution by the process; (2) set forth any limitations and exclusions affecting the subject matter of a dispute; (3) designate the Fund’s officers to whom the dispute must be directed; (4) specify the form and content of notices and other documents to be submitted and the deadlines by which they must be submitted; and (5) provide for any meetings to be convened as part of the dispute resolution process. In addition, in the event that the dispute is not resolved directly between the parties, the dispute resolution provision shall

9

Page 23: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

provide for a third party mediator to further review and resolve the dispute, with the parties to share equally in the expense of such mediation.

Section G. Procurement Contracts with Former Trustees, Officers or Employees of the Fund

The Fund may not enter into any Procurement Contract with a former trustee, officer or employee of the Fund, unless that action complies with (1) the Code of Conduct for the Trustees of the Fund and (2) all applicable laws and regulations, including, without limitation, the New York Public Officers Law.

Section H. Preparation of Annual Report on Procurement Contracts

1. The Fund shall annually prepare and approve a report on summarizing the procurement activity of the Fund for the reporting period and the Procurement Contracts entered into by the Fund during the reporting period or otherwise performed by the Fund during the reporting period. The Fund's annual procurement contract report shall include:

(a) the Guidelines;

(b) an explanation of the Guidelines and any amendments thereto made since the last annual report;

(c) a list of all Procurement Contracts entered into since the last annual report;

(d) a list of the Procurement Contractors performing services since the last annual report;

(e) the selection process used in connection with each Procurement Contract;

(f) a list of contract prices, fees, commissions or other charges paid to each Procurement Contractor; and

(g) any statements required by law relating to the Fund’s Guidelines or Procurement Contracts.

2. The Fund's annual report on Procurement Contracts may be made a part of any other annual report.

Section I. Distribution of Annual Report on Procurement Contracts

1. The Fund shall submit its annual report on Procurement Contracts to the Division of the Budget.

2. The Fund shall supply copies of its annual report on procurement contracts of the following:

(a) Department of Audit and Control of the State of New York,

10

Page 24: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

(b) New York State Senate Finance committee, and

(c) (c) New York State Assembly Ways and Means Committee.

3. The Fund shall make copies of its annual report on Procurement Contracts available to the public upon reasonable request therefore.

Section J. Amendment of These Guidelines

The Fund shall have the power from time to time to amend these Guidelines by vote of a majority of the Board.

Section K. Effect of Noncompliance with Guidelines

Failure by the Fund to comply with the provisions of these Guidelines shall not alter, affect the validity of, modify the terms of or impair any contract or agreement for goods, services, interests in real estate and/or construction to which the Fund is a party.

Section L. Prompt Payment

1. Authorization - This Statement of Prompt Payment Policy is adopted by the Members of the Board of the CUCF pursuant to the provisions of Section 2880 of the Public Authorities Law.

2. Purpose - It is the purpose of this Statement of Prompt Payment Policy of the CUCF to set forth the standards for the payment of bills within specific periods and to prescribe interest charges in situations where payments do not conform to these standards, as provided by section 2880 of the Public Authorities Law.

3. Prompt Payment Policy - It shall be the policy of the CUCF to process contract payments efficiently and expeditiously so as to assure payment in a timely manner to firms and organizations which do business with the CUCF and to avoid, to the greatest extent practicable, the payment of interest in cases where prompt payment does not occur as provided herein.

4. Rules and Regulations – Pursuant to Section 2880 of the Public Authorities Law, the CUCF promulgated Prompt Payment Guidelines, effective July 1, 2014. The Guidelines may be amended from time to time as needed to comply with the Public Authorities Law.

5. Definitions - The following terms shall have the following meanings unless the context shall indicate another of different meaning or intent:

(a) “CUCF” means the City University Construction Fund. (b) “Designated Payment Office” means the office designated by the CUCF to which a

proper invoice is to be submitted by a contractor. (c) “Prompt Payment” means payment of a debt due and owing by the CUCF before

11

Page 25: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

interest accrues thereon pursuant to this Statement of Prompt Payment Policy. (d) “Proper Invoice” means a written request for a contract payment that is submitted

by a contractor setting forth the description, price and quantity of goods, property, or services delivered or rendered, in such form and supported by such other substantiating documentation as the CUCF may reasonably require.

(e) “Receipt of an Invoice” means (i) the date on which a Proper Invoice is actually received in the Designated Payment Office, or (ii) the date on which the CUCF, or other entity on whose behalf the CUCF is acting, received the purchased goods, property, or services covered by the Proper Invoice, whichever is later.

(f) “Set-off” means the reduction by the CUCF of a payment due to a contractor by an amount equal to the amount of an unpaid legally enforceable debt owed by the contractor to the CUCF.

6. Scope - This Statement of Prompt Payment Policy shall be applicable to all contract payments. A contract payment is a payment to a contractor pursuant to a written contract, or an amendment thereto, signed by an Authorized Officer of the CUCF and of the contractor, a fully executed change order or an executed purchase order. A contractor is a person, partnership, private corporation, limited liability company, or association:

(a) selling materials, equipment or supplies or leasing property or equipment to the CUCF; (b) constructing, reconstructing, rehabilitating or repairing facilities or other improvements

for or on behalf of the CUCF; or (c) rendering or providing services to the CUCF pursuant to a contract.

7. Prompt Payment Procedure - Each contractor requesting payment shall submit a Proper Invoice and adequate documentation to support the work, services or goods provided to the Designated Payment Office.

(a) In the case of invoices submitted by architects, engineers, contractors and other consultants pursuant to contracts awarded by the CUCF for the construction, reconstruction, rehabilitation or other improvements or facilities comprising all or part of a project, the vendor payment unit is the Designated Payment Office. Proper Invoices submitted to the vendor payment unit will be transmitted to the CUCF project manager assigned to the project for approval. Following the return of the approved proper invoice to the vendor payment unit, a payment will be processed. Payment will be made no later than 30 days, except under the circumstances specified in subdivision (d) of this section, after receipt of such proper invoice at the designated payment office.

(b) For all other invoices for contract payments not covered by paragraph (a), the Finance Office of the CUCF in New York, New York is the Designated Payment Office. Proper Invoices submitted by the tenth of the month will be paid by the last day of the month, but in any event payment will be made no later than 30 days after receipt of such Proper Invoice.

(c) If a proper invoice is not paid within the periods described in (a) or (b) above, such payment will be subject to interest at the overpayment rate set by the N.Y.C. Comptroller, as agent for CUCF, and the N.Y.C. Office of Management and Budget (OMB).

(d) In accordance with subparagraph (v) of paragraph (A) of subdivision 3 of Section 2880 of the Public Authorities Law, when the following facts and circumstances exist, the CUCF may, to the extent necessary, extend the payment date of a proper invoice to 45

12

Page 26: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

days after receipt. The facts and circumstances may include, but shall not be limited to: (1) a contract for which a prior overpayment has been made; (2) a contract which is subject to a mechanics’ lien; (3) a contract which is subject to a notice of prevailing wage withholding; (4) when the CUCF has been notified that an entity contracting with the CUCF or the

principals thereof are the subject of criminal investigation or indictment relating to the business activities of the entity;

(5) those instances when the CUCF has reason to believe that the entity contracting with the CUCF has provided a false statement or material misstatement in connection with the contract.

(6) when the CUCF must rely on tests by a third party reported directly to the CUCF as a prerequisite for payment.

(7) the goods and services were not rendered in the manner detailed in the contract requirements.

8. Sources of Funds Available for Payment of Interest - The CUCF holds or has control of moneys which represent the proceeds of the issuance of its obligations or are on deposit in operating funds of the CUCF derived primarily from its fees and charges, from which it may pay interest on Proper Invoices with respect to which Prompt Payment is not made.

9. Extension of Prompt Payment Date - The date by which a contract payment may be made without the payment of interest may be extended when any of the following facts or conditions exists: (a) in accordance with specific statutory or contractual provision, payment must be

preceded by an inspection period, the receipt of a signed receiving report in the case of the purchase of goods for an entity other than the CUCF itself, or by an audit to determine the resources applied or used by a contractor in fulfilling the terms of the contract;

(b) the necessary state government appropriation required to authorize payment has yet to be enacted;

(c) a Proper Invoice must be examined by the federal government or other governmental entities prior to payment; and,

(d) such date by which contract payment must be made is modified in accordance with section 11 below.

10. Interest Eligibility and Computation - In order for the CUCF not to be liable for the payment of interest, contract payment must be made within the periods described in section 7 after the receipt of an invoice for the amount of the contract payment due; except when the contract payment is of the type where the facts and conditions are as defined pursuant to section 9 above. Any time taken to satisfy or rectify any of the facts or conditions described in section 9 above shall extend the date by which contract payment must be made in order for the CUCF not to become liable for interest payments by an equal period of time. The CUCF shall not be liable for the payment of interest when such interest is less than ten dollars. Notification of Defects - The CUCF shall have 15 calendar days after receipt of an invoice by the Designated Payment Office to notify the contractor of (a) defects in the delivered goods, property, or services, (b) defects in the invoice, or (c) suspected improprieties of any kind; and the existence of such defects or improprieties shall prevent the commencement of the time

13

Page 27: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

period specified in section 7 of this Statement. When the CUCF fails to notify a contractor of such defects or suspected improprieties within 15 calendar days of receiving the invoice, the number of days allowed for payment of the corrected proper invoice will be reduced by the number of days between the fifteenth day and the day that notification was transmitted to the contractor. If the CUCF, in such situations, fails to provide reasonable grounds for its contention that a defect or impropriety exists, the date by which contract payment must be made in order for the CUCF not to become liable for interest payments shall be calculated from the date of receipt of an invoice.

11. Predetermined Interval Payments - A Proper Invoice submitted by the contractor shall be required to initiate any payment, except where the contract provides that the contractor will be paid at predetermined intervals without having to submit an invoice for each such scheduled payment and, for the purposes of determining eligibility for payment of interest and subject to the exception and time-to-rectify provisions of sections 9 and 10 above, the date by which contract payment must be made in order for the CUCF not to become liable for interest payments shall be the payment due date specified in accordance with the contract.

12. Inapplicability of Statement - The provisions of this Statement shall not apply to payments due and owing by the CUCF:

(a) under the eminent domain procedure law; (b) as interest allowed on judgments rendered by a court pursuant to any provision of law

other than Section 2880 of the Public Authorities Law; (c) to the federal government; to any state agency or its instrumentalities; to any duly

constituted unit of local government including, but not limited to, counties, cities, towns, villages, school districts, special districts, or any of their related instrumentalists; to any other public CUCF or public benefit corporation; or to its employees when acting in, or incidental to, their public employment capacity;

(d) in a situation where the CUCF exercises a Set-off against all or part of the paymentdue the contractor; or,

(e) for reasonable cause, determines not to release or reduce retainage upon completion or substantial completion of a construction contract.

13. Statement Filing - The CUCF shall, within 30 days after the adoption of this statement, file a copy of such statement, and amendments thereto, with the State Comptroller, the State Director of the Budget, the Chairman of the Senate Finance Committee, and the Chairman of the Assembly Ways and Means Committee.

14. Contract Incorporation - The statement in effect at the time of creation of a contract is hereby deemed to be incorporated into and made a part of that contract.

15. Prompt Payment Report – The N.Y.C. Comptroller, as agent for the CUCF, shall through the N.Y.C. Procurement Policy Board, include CUCF in the prompt payment report generated for the City of New York as a whole. Such report is made available as a matter of public record.

16. Public Access - The City of New York shall make such report available as a matter of public record.

17. Effective Date - This Statement of Prompt Payment Policy shall take effect on July 1, 2014 and shall apply to contracts or purchase orders initially entered into on and after such date.

14

Page 28: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

____________________________________

Item 4 Resolution 2271 June 27, 2018

RESOLUTION OF THE CITY UNIVERSITY CONSTRUCTION FUND AUTHORIZING THE ARCHITECT OF RECORD FOR CONSTRUCTION ADMINISTRATION SERVICES FOR THE STUDENT UNION AT THOMAS HUNTER HALL,

HUNTER COLLEGE

RESOLVED: That the Board of Trustees of The City University Construction Fund (“the Fund”) authorize the Executive Director to execute a Construction Administration Services contract with the firm of Calvert Wright Architecture, for construction administration services, as required for the Thomas Hunter Hall 2nd Floor Student Union project at Hunter College, CUNY Project No. CITYW-CUCF-04-14-07. Calvert Wright Architecture was retained for design services by Hunter College. The contract cost shall be chargeable to the private funds from the Hunter Foundation which have been transferred to the Fund for an amount not to exceed $250,000 for construction administration services. The contract shall be subject to approval as to form by the Fund’s General Counsel.

EXPLANATION: The Fund on behalf of the City University of New York intends to build out 11,000 sf of the 2nd Floor Student Union for Thomas Hunter Hall. The floor is occupied by a variety of student organizations in Student Publications, Accessibility Office and Student Government that provide valuable and essential services to Hunter College students. The work includes general construction for the student government offices, game room, conference rooms, ADA lift, new finishes and structural work related to lowering of the elevator.

The procurement for the construction administration services contract is being awarded as a single source. As the Architect of Record, Calvert Wright Architecture has the most knowledge of the project, and needs to be retained for the construction administration services portion of the project. Selecting another firm to take over the project at this stage will delay the construction

The undersigned hereby certifies that (i) the foregoing is a true and correct copy of the resolution adopted at the regular meeting of the Trustees of the City University Construction Fund held on June 27, 2018; (ii) at such meeting, a quorum of Trustees was present; (iii) the resolution was adopted by the affirmative vote of not less than four Trustees present at such meeting; and (iv) the resolution has not been amended or rescinded since the date of adoption.

Date: June 27, 2018

Judith Bergtraum, Executive Director

Page 29: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East
PWalker
Text Box
Work to be performed in this building
PWalker
Line
PWalker
Line
pwalker
Text Box
EXHIBIT B Student Union
Page 30: Meeting of the Trustees of the City University Construction Fund … · 2018. 6. 26. · June 27, 2018 . Meeting of the Trustees of the City University Construction Fund . 205 East

_____________________________________

Item 5 Resolution No. 2272

June 27, 2018

RESOLUTION OF THE CITY UNIVERSITY CONSTRUCTION FUND APPOINTING LISA BOVA-HIATT AS GENERAL COUNSEL OF THE FUND

RESOLVED: That the Board of Trustees of The City University Construction Fund (“CUCF”) approve the appointment of Lisa Bova-Hiatt as General Counsel of CUCF effective June 27, 2018.

EXPLANATION: Lisa Bova-Hiatt joins us from the private sector, where she was a disaster recovery consultant, working primarily in the USVI, and Texas on rebuilding, construction, infrastructure and policy. Until November of 2017, Ms. Bova-Hiatt served as the Executive Director of the Governor’s Office of Storm Recovery (GOSR), which was created by Governor Cuomo in August 2013 to oversee New York State’s recovery from Superstorm Sandy, Hurricane Irene and Tropical Storm Lee. The Office of Storm Recovery managed New York State’s $4.4 billion grant made available through the U.S. Department of Housing & Urban Development’s (HUD) Community Development Block Grant – Disaster Recovery (CDBG-DR) Program to better prepare New York for future extreme weather. Ms. Bova-Hiatt also served as GOSR’s General Counsel and Acting Chief Operating Officer playing an integral role in helping the agency carry out the reconstruction of over 12,000 homes and hundreds of infrastructure projects. Prior to GOSR, Ms. Bova-Hiatt, spent 19 years at the New York City Law Department. Serving as the Deputy Chief of the Tax and Bankruptcy Litigation Division, she specialized in the acquisition of property by eminent domain, in rem tax foreclosures and real estate titles. She also served in the Bloomberg Administration as a Legislative Representative in the Office of City Legislative Affairs, and on the leadership team assembled by Mayor Bloomberg to address emergency and long term needs on Staten Island in the aftermath of Superstorm Sandy. Lisa Bova-Hiatt will replace the Fund’s former Interim General Counsel, Jane Sovern.

The undersigned hereby certifies that (i) the foregoing is a true and correct copy of the resolution adopted at the regular meeting of the Trustees of the City University Construction Fund held on June 27, 2018; (ii) at such meeting, a quorum of Trustees was present; (iii) the resolution was adopted by the affirmative vote of not less than four Trustees present at such meeting; and (v) the resolution has not been amended or rescinded since the date of adoption.

June 27, 2018

Judy Bergtraum, Executive Director