Art Repository Theater Tower – 18-1530 pae-engineers.com | 1
Date: June 30, 2021
Project: Art Repository Theater Tower
Project Number: 18-1530
To: Jim Smith (AMA)
From: Paul Ganz
Subject: ART Tower Trash Chute Exhaust Plenum
Distribution: Nina Rubenstein, (AMA); PAE File
Mechanical Ventilation Separation
APPEAL ITEM 1 CODE SECTION
2014 OMSC 603.5.1
REQUIRES
2014 OMSC 603.5.1 states “The use of gypsum boards to form air shafts (ducts) shall be limited to return air systems where the air temperatures do not exceed 125ºF (52ºC) and the gypsum board surface temperature is maintained above the airstream dew-point temperature. Air ducts formed by gypsum boards shall not be incorporated in air-handling systems utilizing evaporative coolers.”
PROPOSED DESIGN
The proposed exhaust system for the trash rooms on floors L3 through L21 consists of sheet metal sub-ducts extending 22 inches upward into a dedicated, rated gypsum exhaust plenum shaft. A dedicated exhaust fan is
located on the top of the shaft and it operates 24/7. The makeup air for the trash room exhaust is transferred from the adjacent corridors that are internal to the building. The air being supplied into the corridors at each level will be fully conditioned by the two Rooftop Units (RTUs) and maintained at all times within a temperature range of 70F-75F, and maximum 50% relative humidity. The two RTUs do not include evaporative coolers.
No plumbing fixtures or any other sources of moisture or heat will be installed in the trash rooms on floors L3 through L21. Therefore, air exhausted from the trash rooms will be identical to the air within corridors, and it will not pose a risk of fire or mold growth inside the gypsum exhaust plenum shaft. Also, the building’s operational plan will include signage and policy to prevent residents from leaving trash, or other items that could add moisture in the trash rooms. To ensure no excessive moisture could be present in the gypsum exhaust plenum, the ground level Trash Chute
Termination room is decoupled from the trash room exhaust system serving floors L3-L21. This is the only trash room with direct access to outside and unconditioned air. A sheet metal duct will extend from the two exhaust grilles inside the Trash Chute Termination room to the exterior wall for discharge. A dedicated exhaust fan will be serving this room.
Please refer to the attached design schedules, floor plans and riser diagrams showing proposed system design.
REASON FOR ALTERNATE
As proposed, the exhaust system for the trash rooms on floors L3-L21 will always maintain trash exhaust air temperature below the maximum allowed temperature of 125°F, and the gypsum board surface temperature will always be above the airstream dew-point temperature. The air handling units providing makeup air for the trash rooms do not include evaporative coolers. This design will maintain the same occupant safety level within the building as intended by code. Please refer to included calculations included at the end of the appeal that show the exhaust air will never reach the dewpoint in the shaft.
June 30, 2021
Art Repository Theater Tower – 18-1530 pae-engineers.com | 2
The exhaust plenum approach reduces the operating cost and energy usage of the building as compared to sheet metal duct installed within the same shaft area. Due to the space requirements for construction and support of sheet metal duct, the cross-sectional area of the metal duct would be approximately 45% smaller than the area of the gypsum shaft. This reduction in duct area would increase the static pressure of the system, and it would more then double the operating power of the exhaust fan. This would also increase the carbon footprint of the building.
The project’s exhaust ventilation energy use will be substantially reduced by utilizing the proposed gypsum board shaft in lieu of an 18-story tall sheet metal duct. While NFPA 90A is not officially accepted as code in Portland, this internationally recognized standard does allow gypsum plenums to be used as both return and exhaust ducts. NFPA 90A-2018, Section 4.3.1.3.1 states when using gypsum board air ducts that they “shall be permitted to be used for negative pressure exhaust and return ducts where the temperature of the conveyed air does not exceed 52°C (125°F) in normal service.”
OREGON
R
EEN
E
NG I
EXPIRES
74533PE
12-31-2021
REGIS
TERED P
ANISS
EFOR
LO
NED
ZI B B I B E
RIC
JA
NUARY 03 , 2
011
P3
S7
TRASH CHUTETERMINATION
ROOM212
AMENITY MUSICLOUNGE
202
ST - 2ST-2 L2
FSAE LOBBY200CORRIDOR
221
FITNESS ROOM204
827 SF
FUTURE T.I.UNDER
SEPARATEPERMIT
250
LOADING210
GALLERY201
RR203
TRASH ROOM211
ST-1ST-1 L2
ST - 3ST-3 L2
CH-201
Z Z
A A
F F
B B
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
C C
D D
10
25018x4 H-3(TYP 12)
FCU-202
FCU-203
300C-1
(TYP 6)
FCU-205
FCU-204 13
30x10 SA
30x1
0 S
A
30x10 SA
30x10 SA
A
A
EF-202
30x10 RA 30x10 RA 30x10 RA
8"ø OSA
8"ø OSA
A
10"ø (TYP 6)
HR-201 A
FCU-201 A
9575H-2
15
EF-201
T
T
CH-205CH-204
3
4
5
6
2
12"ø EXH 8
7
1010
11
12
95036x14 H-2
12
1
800C-2
(TYP 2)
6"ø OSA
8"ø OSA
16x12 OSA
12x6 RA
4"ø OSA
FCU-206
6"ø OSA
12x6 SA12x6 SA DN
16
14
18x10 SA DN
20x8 RA
115036x14 H-2
95036x14 H-2
20x20 EXH
12x12 EXH
12"ø EXH
17
18
12"ø EXH
100C-2
8"ø EXH
BF-201
18x10 SA
10x6 SA
22510x6 H-1(TYP 3)
19
20
3/4" D
10"ø OSA
19 19 19 19 19 19 19 19
191919
19
1919
19
4" D DN TO FS
4" D DN TO L1
2 1/2" D3" D4" D
4" D
2 1/2" D2 1/2" D2 1/2" D2 1/2" D4" D3" D2 1/2" D 2 1/2" D 2 1/2" D
2 1/2" D DN TO P1
2 1/2" D
2 1/2" D
4" D
30x12 OSA
4" D3" D2 1/2" D
2 1/2" D
4" D
3" D
2 1/2" D
22
23
24
CH-202
CH-203
25
10012x4 H-2(TYP 2)
17
PROJECT NUMBER
© ANKROM MOISAN ARCHITECTS, INC.
38 NORTHWEST DAVIS, SUITE 300PORTLAND, OR 97209T 503.245.7100
1505 5TH AVE, SUITE 300SEATTLE, WA 98101T 206.576.1600
1014 HOWARD STREETSAN FRANCISCO, CA 94103T 415.252.7063
DATE
SHEET NUMBERSHEET NUMBER
BIM
36
0:/
/18
-15
30 -
AR
T T
ow
er/
18
-15
30 M
EP
18 C
EN
TR
AL
.rvt
6/1
6/2
021
11:4
8:3
6 A
M
170710
CONSTRUCTIONSET
AR
T T
OW
ER
WO
OD
PA
RT
NE
RS
15
15
SW
MO
RR
ISO
N S
TR
EE
TP
OR
TLA
ND
, O
RE
GO
N 9
72
05
09.18.2019
LEVEL 2 FLOORPLAN
M2.02M2.02
GENERAL NOTES:
PROJECT TRUE
A. PROVIDE VOLUME DAMPER AT EACH BRANCH OUTLET/INLET.
B. RUN DUCTS AND PIPING CONCEALED, UNLESS SPECIFIED OTHERWISE, AND CLEAR OF CEILING INSERTS. ALL DUCTWORK SHALL BE INSTALLED AS CLOSE AS POSSIBLE TO WALL AND UNDERSIDE OF BEAMS, JOISTS, AND SLABS.
C. ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN PIPING AND DUCTS (INCLUDING DIVIDED DUCTS) AND TRANSITIONS AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
D. VERIFY ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS. VERIFY AND PROVIDE DUCT TRANSITIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DIMENSIONS BEFORE FABRICATION.
E. ALL DETAILS APPLY TO THIS SHEET WHETHER TAGGED OR NOT.
F. INSTALL 3 INCH CONDENSATE PIPES BELOW 3RD FLOOR SLAB ALONG THE NORTH AND SOUTH WALLS. CONNECT 1-1/4 INCH CONDENSATE RISERS FROM UPPER FLOORS TO 3 INCH HORIZONTAL MAINS. ROUTE ONE MAIN TO BIKE PARKING P103 AND TERMINATE PIPE ABOVE THE FLOOR SINK. ROUTE SECOND MAIN TO TRASH CHUTE ROOM 212 AND TERMINATE PIPE ABOVE THE FLOOR SINK.
G. COORDINATE LOCATION OF ALL ACCESS PANELS AND CEILING AIR REGISTERS WITH ARCHITECTURAL AND INTERIOR DESIGN REFLECTED CEILING PLANS.
NOTES:
1. 180x170 MAKEUP AIR LOUVER, FOR GARAGE VENTILATION PROVIDE MINIMUM 50% FREE AREA. LOCATE LOUVER 10 FT AWAY FROM THE RELIEF LOUVER SERVING RR 203 ROOM.
2. 72X12 ACTIVE LOUVER AREA FOR OUTSIDE AIR INTAKE. PROVIDE MINIMUM 2FT DEEP PLENUM BEHIND LOUVER. ACTIVE PORTION OF THE LOUVER TO BE LOCATED MINIMUM 10 FT ABOVE SIDE WALK.
3. ANTICIPATED LOCATION OF FUTURE KITCHEN EXHAUST POLLUTION CONTROL (AIR SCRUBBER) SYSTEM. TO BE PROVIDED BY FUTURE TENANT BUILD OUT.
4. APPROXIMATELY 40 SF OF ACTIVE LOUVER LOCATED ABOVE ROLLING DOOR FOR FUTURE CONNECTION TO FUTURE KITCHEN POLLUTION CONTROL UNIT. PROVIDE BLANK OFF FOR LOUVERS AND CODE REQUIRED INSULATION.
5. FUTURE TENANT BUILD OUT GREASE EXHAUST DUCT SHAFT.
6. BLANKED OFF LOUVERS FOR FUTURE TENANT EXHAUST. PROVIDE CODE REQUIRED INSULATION. ACTIVE AREA OF THE LOUVER WILL BE LOCATED MINIMUM 10 FT ABOVE THE SIDE WALK.
7. GARAGE EXHAUST DISCHARGE LOUVER. PROVIDE FULLY DUCTED CONNECTION AND PLENUM BEHIND LOUVER. GENERATOR EXHAUST PENETRATION TO BE SEALED.
8. GENERATOR ENGINE EXHAUST DUCT. ROUTE THROUGH METAL PANEL IN THE GARAGE EXHAUST LOUVER AT 3FT ELEVATION AND EXTEND MINIMUM 3FT BEYOND THE BUILDING FACADE. NO OUTSIDE AIR INTAKES SHALL BE LOCATED WITHIN 25 FT FROM THE TERMINATION OF THE EXHAUST DUCT.
9. NO MECHANICAL EQUIPMENT, DUCTWORK, OR SIMILAR SHALL BE ALLOWED IN THE EMERGENCY EGRESS PATHWAY.
10. CABINET HEATERS TO BE CEILING HUNG WITH DOWNBLAST DISCHARGE. SETPOINT TO BE NON-ADJUSTABLE AT 45F PER OREGON ENERGY CODE UNTIL FUTURE TENANT BUILD OUT.
11. PROVIDE FIRE SEAL AROUND GENERATOR ENGINE EXHAUST VENT.
12. PROVIDE 24x12 LOUVER AT MINIMUM 50% FREE AREA. PROVIDE MINIMUM 18" DEEP SHEET METAL ENCLOSURE AND TRANSITION TO DUCTWORK.
13. RETURN THROUGH LOUVER IN ACCESS PANEL.
14. APPROXIMATELY 60 SF OF LOUVER AREA FOR TI OUTSIDE AIR INTAKE. ROUTE FUTURE DUCT OVER DRIVEWAY, CORRIDOR AND DOWN TO KITCHEN. PROVIDE BLANK OFF FOR LOUVERS AND CODE REQUIRED INSULATION.
15. RA GRILLE LOCATED IN ACCESS PANEL ON FRONT OF FAN COIL CLOSET.
16. ROUTE OSA DUCT THROUGH WALL INTO RETURN AIR PLENUMUNDER FAN COIL.
17. OPEN ENDED DUCT. PROVIDE BIRD SCREEN ON INLET.
18. PROVIDE 1-1/2" UNDERCUT ON DOOR FOR EXHAUST AIR TRANSFER PATH.
19. 2" D UP TO VTAC CONDENSATE STACK ABOVE.
20. MOTORIZED DAMPER. INTERLOCK DAMPER OPERATION WITH OPERATION OF FCU.
21. NOT USED.
22. TERMINATE TOILET ROOM EXHAUST DUCT AT THE LOUVER.
23. TERMINATE GENERATOR COOLING EXHAUST DUCT AT THE LOUVER.
24. PROVIDE MANUFACTURER SIDE DISCHARGE KIT.
25. LOCATE DUCT SECTION ABOVE THE CEILING CLOUD. ADJUST DIFFUSER THROW TO CLEAR THE CEILING CLOUD.
1/8" = 1'-0"1
LEVEL 2 FLOOR PLAN - MECHANICAL
01/12/2021
REVISION DATE DESCRIPTION
1 04/15/19 PERMIT REVISION 1
2 04/15/19 GMP ADDENDUM 1
3 05/01/19 PERMIT REVISION 1
6 09/18/19 CONSTRUCTION SET
03/xx/20 RFI TBD
17 06/14/21 RFI 806
17
FROM SHEET M0.02
FROM SHEET M0.02
OREGON
R
EEN
E
NG I
EXPIRES
74533PE
12-31-2021
REGIS
TERED P
ANISS
EFOR
LO
NED
ZI B B I B E
RIC
JA
NUARY 03 , 2
011
ELECT RM351
TRASH350
GAS GAS
CORRIDOR EAST300E
CORRIDOR WEST300W
2B-C
314
1027
UB-A
316
560
1B-D
317
674
1B-D
301
674
UB-A
302
560
1B-C
303
729 2B-C
304
1027
1B-B
305
472
1B-B
313
472
2B-A
312
1117
1B-A
311
UB-B
3103B-A
309
1284
UB-C
308
UB-D
307
2B-A TYPE A
306
1B-C TYPE A
315
FSAE LOBBY300
ST-1ST-1 L3
ST-2
26x60 SA
8x8 EXH
1008x8 H-2
FSD
22512x12 L-2 22x44 SA
13512x12 L-2
1
0C-1
TYP 2
22x6 SA
3
1
10010x6 H-1
Z Z
A A
F F
B B
E E
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
C C
D D
A 2
12x12 RA
14x8 SA
M4.05
1
M4.02
1M4.02
3
M4.02
2
M4.02
2
M4.02
3
M4.02
1
M4.03
2
M4.04
1
M4.01
4
M4.01
3
M4.05
2
M4.01
1
M4.03
1
M4.04
1
M4.03
2
OPP. OPP. OPP. OPP.
OPP.
OPP.
M4.05
1
TT
A
450C-1
2
M4.07
1
M4.07
12x12 RA
12x12 RA 3
A 2
A
FSD
10x6 SA
385C-1
3
5
3 4
4
5
FSD
PROJECT NUMBER
© ANKROM MOISAN ARCHITECTS, INC.
38 NORTHWEST DAVIS, SUITE 300PORTLAND, OR 97209T 503.245.7100
1505 5TH AVE, SUITE 300SEATTLE, WA 98101T 206.576.1600
1014 HOWARD STREETSAN FRANCISCO, CA 94103T 415.252.7063
DATE
SHEET NUMBERSHEET NUMBER
BIM
36
0:/
/18
-15
30 -
AR
T T
ow
er/
18
-15
30 M
EP
18 C
EN
TR
AL
.rvt
6/1
6/2
021
11:4
8:3
9 A
M
170710
CONSTRUCTIONSET
AR
T T
OW
ER
WO
OD
PA
RT
NE
RS
15
15
SW
MO
RR
ISO
N S
TR
EE
TP
OR
TLA
ND
, O
RE
GO
N 9
72
05
09.18.2019
LEVEL 3 FLOORPLAN
M2.03M2.03PROJECT TRUE
H. AT ALL OUTSIDE AIR INTAKES, INSTALL CORROSION RESISTANT SCREENS WITH SCREEN OPENINGS SIZED BETWEEN 1/4 INCH AND 1/2 INCH. WHERE OUTSIDE AIR INTAKES ARE SHOWN ON THE PLANS REMOTELY FORM THE HVAC UNIT, MAINTAIN MINIMUM OF 7'-8" CLEAR BETWEEN OUTSIDE AIR INTAKE AND EXHAUST DUCT TERMINATION.
I. DOMESTIC KITCHEN EXHAUST DUCT SHALL BE INDEPENDENT OF ANY OTHER EXHAUST DUCT, CONSTRUCTED OF GALVANIZED STEEL, HAVE SMOOTH INNER WALLS AND SEALED AIR TIGHT. TERMINATE DUCT AT THE EXTERIOR OF THE BUILDING, AND PROVIDE BACKDRAFT DAMPER AT DUCT TERMINATION.
J. REFER TO UNIT PLANS FOR THERMOSTAT LOCATIONS, DUCT SIZES AND REQUIRED AIRFLOWS.
K. EXTEND 2" CONDENSATE RISERS UP TO 20TH FLOOR AND COMBINE THEM INTO FOUR 4" VENT PIPES; 1 PER EACH FLOOR QUADRANT. EXTEND THE VENT PIPES UP TO ROOF AND TERMINATE MINIMUM 10' AWAY FROM OUTSIDE AIR INTAKE. ON PENTHOUSE LEVEL, ROUTE THE VERTICAL VENT PIPE INSIDE THE PARTION WALLS SEPARATING PENTHOUSE APARTMENTS.
L. IN EACH APARTMENT UNIT, ALL DUCTWORK IS LOCATED IN SOFFIT OR DROP CEILING. DUCTWORK DOES NOT PENETRATE ANY RATED ASSEMBLIES. TYPICAL FOR FLOORS 3 THROUGH 21.
M. COORDINATE LOCATION OF ALL ACCESS PANELS AND CEILING AIR REGISTERS WITH ARCHITECTURAL AND INTERIOR DESIGN REFLECTED CEILING PLANS. TYPICAL FOR FLOORS 3 THROUGH 21.
1. INTERNALLY LINED DUCTWORK FOR SUPPLY BRANCH DUCTWORK PER FLOOR. TYPICAL LEVELS 3 THROUGH 21.
2. PROVIDE ACCESS PANEL FOR FSD MAINTENANCE AND TESTING. FSD INSTALLED IN THE SHAFT WALL.
3. SUB-DUCTED RETURN/EXHAUST BOOT. PROVIDE MINIMUM 22" VERTICAL UPTURN IN PLENUM RETURN/EXHAUST SHAFT TO COMPLY WITH OREGON CODE. TYPICAL FLOORS 3 THROUGH 21.
4. DURING THE NORMAL OPERATION SUBDUCT IS USED AS A RETURN AIR PATH FROM THE CORRIDOR. IT ALSO PROVIDES PATH FOR AIR TO BE RELIEVED FROM THE CORRIDOR DURING STAIRWELL PRESSURIZATION MODE. SEE SECTIONS ON M4.07 FOR DUCT REQUIREMENTS; SEE STAIRWELL PRESSURIZATION RISER DIAGRAM ON M6.01 FOR SOO AND RATIONAL ANALYSIS NARRATIVE FOR ADDITIONAL INFORMATION ON SYSTEM OPERATION.
5. 16x16 TYPE L-1 SUPPLY DIFFUSER WITH INTEGRAL OPPOSED BLADE DAMPER INSTALLED IN THE NON-RATED PARTITION WALL. REFER TO STAIRWELL PRESSURIZATION RISER DIAGRAM ON M6.01 FOR THE REQUIRED NUMBER AND LOCATIONS OF THE SUPPLY DIFFUSERS. ARCHITECTURAL ENCLOSURE IS PART OF THE STAIRWELL, AND IT IS USED AS A SUPPLY AIR PATH ALLOWING MULTIPLE POINT OF AIR INJECTION DURING THE STAIRWELL PRESSURIZATION MODE. PARTITION WALL IS NOT REQUIRED TO BE RATED; REFER TO G2.XX SERIES OF DRAWINGS FOR WALL RATINGS.
1/8" = 1'-0"1
LEVEL 3 FLOOR PLAN - MECHANICAL
NOTES:GENERAL NOTES:
A. PROVIDE VOLUME DAMPER AT EACH BRANCH OUTLET/INLET.
B. RUN DUCTS AND PIPING CONCEALED, UNLESS SPECIFIED OTHERWISE, AND CLEAR OF CEILING INSERTS. ALL DUCTWORK SHALL BE INSTALLED AS CLOSE AS POSSIBLE TO WALL AND UNDERSIDE OF BEAMS, JOISTS, AND SLABS.
C. ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN PIPING AND DUCTS (INCLUDING DIVIDED DUCTS) AND TRANSITIONS AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
D. VERIFY ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS. VERIFY AND PROVIDE DUCT TRANSITIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DIMENSIONS BEFORE FABRICATION.
E. ALL DETAILS APPLY TO THIS SHEET WHETHER TAGGED OR NOT.
F. REFER TO THE UNIT PLAN SHEETS FOR ALTERNATE UNIT PLAN LAYOUTS ON THE FOURTH AND TWENTIETH FLOORS: 2/M4.01, 1/M4.02, 3/M4.03, 2/M4.04 AND 1/M4.06.
G. NOT USED.
01/12/2021
REVISION DATE DESCRIPTION
1 04/15/19 PERMIT REVISION 1
2 04/15/19 GMP ADDENDUM 1
3 05/01/19 PERMIT REVISION 1
6 09/18/19 CONSTRUCTION SET
7 08/16/19 PERMIT REVISION 4
01/09/20 RFI 0093
01/13/20 RFI 0094
14 10/19/20 RFI 210.2
OREGON
R
EEN
E
NG I
EXPIRES
74533PE
12-31-2021
REGIS
TERED P
ANISS
EFOR
LO
NED
ZI B B I B E
RIC
JA
NUARY 03 , 2
011
ROOF
10TH FLOOR
9TH FLOOR
8TH FLOOR
7TH FLOOR
6TH FLOOR
5TH FLOOR
4TH FLOOR
3RD FLOOR
2ND FLOOR
1ST FLOOR
P1 LEVEL
P2 LEVEL
P3 LEVEL
P4 LEVEL
12TH FLOOR
11TH FLOOR
14TH FLOOR
13TH FLOOR
16TH FLOOR
15TH FLOOR
18TH FLOOR
17TH FLOOR
20TH FLOOR
19TH FLOOR
21ST FLOOR ROOM WEST
FSD (TYP 3 THRU 21)
(TYP FLOORS 3 THRU 21) (TYP FLOORS 3 THRU 21)
22x4426x60
26x4426x44
26x4026x40
26x3026x30
26x2426x24
16x2416x24
MIN 22" H
-8x8 L-2
-12x12 L-2
CORRELECEASTCORR
PER CODEMIN 22" HPER CODE
RTU-2202RTU-2201
SPRF-2201
AUTOMATIC CONTROL DAMPER
SPRF-2202
FSD (TYP 3 THRU 21)
NOTES:1. MAKEUP AIR FOR TYPICAL TRASH ROOM TRANSFERRED FROM THE WEST CORRIDOR. CORRIDOR SHALL BE MAINTAINED AT AT ALL TIMES AT
TEMPERATURE BETWEEN 70F AND 75F AND RELATIVE HUMIDITY BELOW 50% RH.
1
2
2
2. FAN OPERATES CONTINUOUSLY.
ROOF
10TH FLOOR
9TH FLOOR
8TH FLOOR
7TH FLOOR
6TH FLOOR
5TH FLOOR
4TH FLOOR
3RD FLOOR
2ND FLOOR
1ST FLOOR
P1 LEVEL
P2 LEVEL
P3 LEVEL
P4 LEVEL
12TH FLOOR
11TH FLOOR
14TH FLOOR
13TH FLOOR
16TH FLOOR
15TH FLOOR
18TH FLOOR
17TH FLOOR
20TH FLOOR
19TH FLOOR
21ST FLOOR ROOM
AIR (TYP)
(TYP FLOORS 3 THRU 21)
1008x8 H-2
CORR MAKEUP
TRASHEASTCORR
MIN 22" HPER CODE
RTU-2201 RTU-2202
TRASH CHUTESTACK
TEF-2201
TERMINATION ROOMTRASH CHUTE
EF-201
PROJECT NUMBER
© ANKROM MOISAN ARCHITECTS, INC.
38 NORTHWEST DAVIS, SUITE 300PORTLAND, OR 97209T 503.245.7100
1505 5TH AVE, SUITE 300SEATTLE, WA 98101T 206.576.1600
1014 HOWARD STREETSAN FRANCISCO, CA 94103T 415.252.7063
DATE
SHEET NUMBERSHEET NUMBER
BIM
36
0:/
/18
-15
30 -
AR
T T
ow
er/
18
-15
30 M
EP
18 C
EN
TR
AL
.rvt
6/1
6/2
021
11:4
9:1
6 A
M
170710
CONSTRUCTIONSET
AR
T T
OW
ER
WO
OD
PA
RT
NE
RS
15
15
SW
MO
RR
ISO
N S
TR
EE
TP
OR
TLA
ND
, O
RE
GO
N 9
72
05
09.18.2019
FLOW DIAGRAMS
M6.02M6.02
NONE1
AIR SIDE RISER DIAGRAM
01/12/2021
REVISION DATE DESCRIPTION
NONE2
TRASH EXHAUST RISER DIAGRAM
-10 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130
DRY BULB TEMPERATURE - °F
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
180
190
200
210
10 15 20 25 30
35
40
45
50
55
55
60
60
65
70
EN
TH
AL
PY
- B
TU
PE
R P
OU
ND
OF
DR
Y A
IR
0
5
10
15
20
25
30
35
40
45
50
EN
TH
ALP
Y - B
TU
PE
R P
OU
ND
OF D
RY
AIR
SA
TU
RA
TIO
N T
EM
PE
RA
TU
RE
- °
F
-50
05
510
1015
1520
2025
2530
3035
3540
4045
45 50
50 55
55 60
6065
65
70
70
75
75
80
80
85 WET BULB TEM
PERATURE - °F
85
90
15%
25%
2 %
4 %
6 %
8 %
1 0 % R E L A T I V E H U M I D I T Y
2 0 %
3 0 %
4 0 %
5 0 %
60%
70%
80%
90%
12.0
12.5
13.0
13.5
14.0
SP
EC
IFIC
VO
LU
ME
ft³/lb O
F D
RY
AIR
14.5
15.0
15.5
HU
MID
ITY
RA
TIO
- G
RA
INS
OF
MO
IST
UR
E P
ER
PO
UN
D O
F D
RY
AIR
PSYCHROMETRIC CHARTBAROMETRIC PRESSURE 29.921 inches of Mercury
Linric Company Psychrometric Chart, www.linric.com
.1
.2
.3
.4
.5
.6
.7
.8
.9
1
1.1
1.2
1.3
VA
PO
R P
RE
SS
UR
E -
IN
CH
ES
OF
ME
RC
UR
Y
-20
0
10
20
25
30
35
40
45
50
55
60
65
70
75
80
85
DE
W P
OIN
T -
°F
-10 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130
DRY BULB TEMPERATURE - °F
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
180
190
200
210
10 15 20 25 30
35
40
45
50
55
55
60
60
65
70
EN
TH
AL
PY
- B
TU
PE
R P
OU
ND
OF
DR
Y A
IR
0
5
10
15
20
25
30
35
40
45
50
EN
TH
ALP
Y - B
TU
PE
R P
OU
ND
OF D
RY
AIR
SA
TU
RA
TIO
N T
EM
PE
RA
TU
RE
- °
F
-50
05
510
1015
1520
2025
2530
3035
3540
4045
45 50
50 55
55 60
6065
65
70
70
75
75
80
80
85 WET BULB TEM
PERATURE - °F
85
90
15%
25%
2 %
4 %
6 %
8 %
1 0 % R E L A T I V E H U M I D I T Y
2 0 %
3 0 %
4 0 %
5 0 %
60%
70%
80%
90%
12.0
12.5
13.0
13.5
14.0
SP
EC
IFIC
VO
LU
ME
ft³/lb O
F D
RY
AIR
14.5
15.0
15.5
HU
MID
ITY
RA
TIO
- G
RA
INS
OF
MO
IST
UR
E P
ER
PO
UN
D O
F D
RY
AIR
PSYCHROMETRIC CHARTBAROMETRIC PRESSURE 29.921 inches of Mercury
Linric Company Psychrometric Chart, www.linric.com
.1
.2
.3
.4
.5
.6
.7
.8
.9
1
1.1
1.2
1.3
VA
PO
R P
RE
SS
UR
E -
IN
CH
ES
OF
ME
RC
UR
Y
-20
0
10
20
25
30
35
40
45
50
55
60
65
70
75
80
85
DE
W P
OIN
T -
°F