Memo Art Repository Theater Tower – 18-1530 pae-engineers.com | 1 Date: June 30, 2021 Project: Art Repository Theater Tower Project Number: 18-1530 To: Jim Smith (AMA) From: Paul Ganz Subject: ART Tower Trash Chute Exhaust Plenum Distribution: Nina Rubenstein, (AMA); PAE File Mechanical Ventilation Separation APPEAL ITEM 1 CODE SECTION 2014 OMSC 603.5.1 REQUIRES 2014 OMSC 603.5.1 states “The use of gypsum boards to form air shafts (ducts) shall be limited to return air systems where the air temperatures do not exceed 125ºF (52ºC) and the gypsum board surface temperature is maintained above the airstream dew-point temperature. Air ducts formed by gypsum boards shall not be incorporated in air-handling systems utilizing evaporative coolers.” PROPOSED DESIGN The proposed exhaust system for the trash rooms on floors L3 through L21 consists of sheet metal sub-ducts extending 22 inches upward into a dedicated, rated gypsum exhaust plenum shaft. A dedicated exhaust fan is located on the top of the shaft and it operates 24/7. The makeup air for the trash room exhaust is transferred from the adjacent corridors that are internal to the building. The air being supplied into the corridors at each level will be fully conditioned by the two Rooftop Units (RTUs) and maintained at all times within a temperature range of 70F- 75F, and maximum 50% relative humidity. The two RTUs do not include evaporative coolers. No plumbing fixtures or any other sources of moisture or heat will be installed in the trash rooms on floors L3 through L21. Therefore, air exhausted from the trash rooms will be identical to the air within corridors, and it will not pose a risk of fire or mold growth inside the gypsum exhaust plenum shaft. Also, the building’s operational plan will include signage and policy to prevent residents from leaving trash, or other items that could add moisture in the trash rooms. To ensure no excessive moisture could be present in the gypsum exhaust plenum, the ground level Trash Chute Termination room is decoupled from the trash room exhaust system serving floors L3-L21. This is the only trash room with direct access to outside and unconditioned air. A sheet metal duct will extend from the two exhaust grilles inside the Trash Chute Termination room to the exterior wall for discharge. A dedicated exhaust fan will be serving this room. Please refer to the attached design schedules, floor plans and riser diagrams showing proposed system design. REASON FOR ALTERNATE As proposed, the exhaust system for the trash rooms on floors L3-L21 will always maintain trash exhaust air temperature below the maximum allowed temperature of 125°F, and the gypsum board surface temperature will always be above the airstream dew-point temperature. The air handling units providing makeup air for the trash rooms do not include evaporative coolers. This design will maintain the same occupant safety level within the building as intended by code. Please refer to included calculations included at the end of the appeal that show the exhaust air will never reach the dewpoint in the shaft.

Mechanical Ventilation Separation

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mechanical Ventilation Separation

Memo

Art Repository Theater Tower – 18-1530 pae-engineers.com | 1

Date: June 30, 2021

Project: Art Repository Theater Tower

Project Number: 18-1530

To: Jim Smith (AMA)

From: Paul Ganz

Subject: ART Tower Trash Chute Exhaust Plenum

Distribution: Nina Rubenstein, (AMA); PAE File

Mechanical Ventilation Separation

APPEAL ITEM 1 CODE SECTION

2014 OMSC 603.5.1

REQUIRES

2014 OMSC 603.5.1 states “The use of gypsum boards to form air shafts (ducts) shall be limited to return air systems where the air temperatures do not exceed 125ºF (52ºC) and the gypsum board surface temperature is maintained above the airstream dew-point temperature. Air ducts formed by gypsum boards shall not be incorporated in air-handling systems utilizing evaporative coolers.”

PROPOSED DESIGN

The proposed exhaust system for the trash rooms on floors L3 through L21 consists of sheet metal sub-ducts extending 22 inches upward into a dedicated, rated gypsum exhaust plenum shaft. A dedicated exhaust fan is

located on the top of the shaft and it operates 24/7. The makeup air for the trash room exhaust is transferred from the adjacent corridors that are internal to the building. The air being supplied into the corridors at each level will be fully conditioned by the two Rooftop Units (RTUs) and maintained at all times within a temperature range of 70F-75F, and maximum 50% relative humidity. The two RTUs do not include evaporative coolers.

No plumbing fixtures or any other sources of moisture or heat will be installed in the trash rooms on floors L3 through L21. Therefore, air exhausted from the trash rooms will be identical to the air within corridors, and it will not pose a risk of fire or mold growth inside the gypsum exhaust plenum shaft. Also, the building’s operational plan will include signage and policy to prevent residents from leaving trash, or other items that could add moisture in the trash rooms. To ensure no excessive moisture could be present in the gypsum exhaust plenum, the ground level Trash Chute

Termination room is decoupled from the trash room exhaust system serving floors L3-L21. This is the only trash room with direct access to outside and unconditioned air. A sheet metal duct will extend from the two exhaust grilles inside the Trash Chute Termination room to the exterior wall for discharge. A dedicated exhaust fan will be serving this room.

Please refer to the attached design schedules, floor plans and riser diagrams showing proposed system design.

REASON FOR ALTERNATE

As proposed, the exhaust system for the trash rooms on floors L3-L21 will always maintain trash exhaust air temperature below the maximum allowed temperature of 125°F, and the gypsum board surface temperature will always be above the airstream dew-point temperature. The air handling units providing makeup air for the trash rooms do not include evaporative coolers. This design will maintain the same occupant safety level within the building as intended by code. Please refer to included calculations included at the end of the appeal that show the exhaust air will never reach the dewpoint in the shaft.

Page 2: Mechanical Ventilation Separation

June 30, 2021

Art Repository Theater Tower – 18-1530 pae-engineers.com | 2

The exhaust plenum approach reduces the operating cost and energy usage of the building as compared to sheet metal duct installed within the same shaft area. Due to the space requirements for construction and support of sheet metal duct, the cross-sectional area of the metal duct would be approximately 45% smaller than the area of the gypsum shaft. This reduction in duct area would increase the static pressure of the system, and it would more then double the operating power of the exhaust fan. This would also increase the carbon footprint of the building.

The project’s exhaust ventilation energy use will be substantially reduced by utilizing the proposed gypsum board shaft in lieu of an 18-story tall sheet metal duct. While NFPA 90A is not officially accepted as code in Portland, this internationally recognized standard does allow gypsum plenums to be used as both return and exhaust ducts. NFPA 90A-2018, Section 4.3.1.3.1 states when using gypsum board air ducts that they “shall be permitted to be used for negative pressure exhaust and return ducts where the temperature of the conveyed air does not exceed 52°C (125°F) in normal service.”

Page 3: Mechanical Ventilation Separation

OREGON

R

EEN

E

NG I

EXPIRES

74533PE

12-31-2021

REGIS

TERED P

ANISS

EFOR

LO

NED

ZI B B I B E

RIC

JA

NUARY 03 , 2

011

P3

S7

TRASH CHUTETERMINATION

ROOM212

AMENITY MUSICLOUNGE

202

ST - 2ST-2 L2

FSAE LOBBY200CORRIDOR

221

FITNESS ROOM204

827 SF

FUTURE T.I.UNDER

SEPARATEPERMIT

250

LOADING210

GALLERY201

RR203

TRASH ROOM211

ST-1ST-1 L2

ST - 3ST-3 L2

CH-201

Z Z

A A

F F

B B

E E

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

C C

D D

10

25018x4 H-3(TYP 12)

FCU-202

FCU-203

300C-1

(TYP 6)

FCU-205

FCU-204 13

30x10 SA

30x1

0 S

A

30x10 SA

30x10 SA

A

A

EF-202

30x10 RA 30x10 RA 30x10 RA

8"ø OSA

8"ø OSA

A

10"ø (TYP 6)

HR-201 A

FCU-201 A

9575H-2

15

EF-201

T

T

CH-205CH-204

3

4

5

6

2

12"ø EXH 8

7

1010

11

12

95036x14 H-2

12

1

800C-2

(TYP 2)

6"ø OSA

8"ø OSA

16x12 OSA

12x6 RA

4"ø OSA

FCU-206

6"ø OSA

12x6 SA12x6 SA DN

16

14

18x10 SA DN

20x8 RA

115036x14 H-2

95036x14 H-2

20x20 EXH

12x12 EXH

12"ø EXH

17

18

12"ø EXH

100C-2

8"ø EXH

BF-201

18x10 SA

10x6 SA

22510x6 H-1(TYP 3)

19

20

3/4" D

10"ø OSA

19 19 19 19 19 19 19 19

191919

19

1919

19

4" D DN TO FS

4" D DN TO L1

2 1/2" D3" D4" D

4" D

2 1/2" D2 1/2" D2 1/2" D2 1/2" D4" D3" D2 1/2" D 2 1/2" D 2 1/2" D

2 1/2" D DN TO P1

2 1/2" D

2 1/2" D

4" D

30x12 OSA

4" D3" D2 1/2" D

2 1/2" D

4" D

3" D

2 1/2" D

22

23

24

CH-202

CH-203

25

10012x4 H-2(TYP 2)

17

PROJECT NUMBER

© ANKROM MOISAN ARCHITECTS, INC.

38 NORTHWEST DAVIS, SUITE 300PORTLAND, OR 97209T 503.245.7100

1505 5TH AVE, SUITE 300SEATTLE, WA 98101T 206.576.1600

1014 HOWARD STREETSAN FRANCISCO, CA 94103T 415.252.7063

DATE

SHEET NUMBERSHEET NUMBER

BIM

36

0:/

/18

-15

30 -

AR

T T

ow

er/

18

-15

30 M

EP

18 C

EN

TR

AL

.rvt

6/1

6/2

021

11:4

8:3

6 A

M

170710

CONSTRUCTIONSET

AR

T T

OW

ER

WO

OD

PA

RT

NE

RS

15

15

SW

MO

RR

ISO

N S

TR

EE

TP

OR

TLA

ND

, O

RE

GO

N 9

72

05

09.18.2019

LEVEL 2 FLOORPLAN

M2.02M2.02

GENERAL NOTES:

PROJECT TRUE

A. PROVIDE VOLUME DAMPER AT EACH BRANCH OUTLET/INLET.

B. RUN DUCTS AND PIPING CONCEALED, UNLESS SPECIFIED OTHERWISE, AND CLEAR OF CEILING INSERTS. ALL DUCTWORK SHALL BE INSTALLED AS CLOSE AS POSSIBLE TO WALL AND UNDERSIDE OF BEAMS, JOISTS, AND SLABS.

C. ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN PIPING AND DUCTS (INCLUDING DIVIDED DUCTS) AND TRANSITIONS AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

D. VERIFY ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS. VERIFY AND PROVIDE DUCT TRANSITIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DIMENSIONS BEFORE FABRICATION.

E. ALL DETAILS APPLY TO THIS SHEET WHETHER TAGGED OR NOT.

F. INSTALL 3 INCH CONDENSATE PIPES BELOW 3RD FLOOR SLAB ALONG THE NORTH AND SOUTH WALLS. CONNECT 1-1/4 INCH CONDENSATE RISERS FROM UPPER FLOORS TO 3 INCH HORIZONTAL MAINS. ROUTE ONE MAIN TO BIKE PARKING P103 AND TERMINATE PIPE ABOVE THE FLOOR SINK. ROUTE SECOND MAIN TO TRASH CHUTE ROOM 212 AND TERMINATE PIPE ABOVE THE FLOOR SINK.

G. COORDINATE LOCATION OF ALL ACCESS PANELS AND CEILING AIR REGISTERS WITH ARCHITECTURAL AND INTERIOR DESIGN REFLECTED CEILING PLANS.

NOTES:

1. 180x170 MAKEUP AIR LOUVER, FOR GARAGE VENTILATION PROVIDE MINIMUM 50% FREE AREA. LOCATE LOUVER 10 FT AWAY FROM THE RELIEF LOUVER SERVING RR 203 ROOM.

2. 72X12 ACTIVE LOUVER AREA FOR OUTSIDE AIR INTAKE. PROVIDE MINIMUM 2FT DEEP PLENUM BEHIND LOUVER. ACTIVE PORTION OF THE LOUVER TO BE LOCATED MINIMUM 10 FT ABOVE SIDE WALK.

3. ANTICIPATED LOCATION OF FUTURE KITCHEN EXHAUST POLLUTION CONTROL (AIR SCRUBBER) SYSTEM. TO BE PROVIDED BY FUTURE TENANT BUILD OUT.

4. APPROXIMATELY 40 SF OF ACTIVE LOUVER LOCATED ABOVE ROLLING DOOR FOR FUTURE CONNECTION TO FUTURE KITCHEN POLLUTION CONTROL UNIT. PROVIDE BLANK OFF FOR LOUVERS AND CODE REQUIRED INSULATION.

5. FUTURE TENANT BUILD OUT GREASE EXHAUST DUCT SHAFT.

6. BLANKED OFF LOUVERS FOR FUTURE TENANT EXHAUST. PROVIDE CODE REQUIRED INSULATION. ACTIVE AREA OF THE LOUVER WILL BE LOCATED MINIMUM 10 FT ABOVE THE SIDE WALK.

7. GARAGE EXHAUST DISCHARGE LOUVER. PROVIDE FULLY DUCTED CONNECTION AND PLENUM BEHIND LOUVER. GENERATOR EXHAUST PENETRATION TO BE SEALED.

8. GENERATOR ENGINE EXHAUST DUCT. ROUTE THROUGH METAL PANEL IN THE GARAGE EXHAUST LOUVER AT 3FT ELEVATION AND EXTEND MINIMUM 3FT BEYOND THE BUILDING FACADE. NO OUTSIDE AIR INTAKES SHALL BE LOCATED WITHIN 25 FT FROM THE TERMINATION OF THE EXHAUST DUCT.

9. NO MECHANICAL EQUIPMENT, DUCTWORK, OR SIMILAR SHALL BE ALLOWED IN THE EMERGENCY EGRESS PATHWAY.

10. CABINET HEATERS TO BE CEILING HUNG WITH DOWNBLAST DISCHARGE. SETPOINT TO BE NON-ADJUSTABLE AT 45F PER OREGON ENERGY CODE UNTIL FUTURE TENANT BUILD OUT.

11. PROVIDE FIRE SEAL AROUND GENERATOR ENGINE EXHAUST VENT.

12. PROVIDE 24x12 LOUVER AT MINIMUM 50% FREE AREA. PROVIDE MINIMUM 18" DEEP SHEET METAL ENCLOSURE AND TRANSITION TO DUCTWORK.

13. RETURN THROUGH LOUVER IN ACCESS PANEL.

14. APPROXIMATELY 60 SF OF LOUVER AREA FOR TI OUTSIDE AIR INTAKE. ROUTE FUTURE DUCT OVER DRIVEWAY, CORRIDOR AND DOWN TO KITCHEN. PROVIDE BLANK OFF FOR LOUVERS AND CODE REQUIRED INSULATION.

15. RA GRILLE LOCATED IN ACCESS PANEL ON FRONT OF FAN COIL CLOSET.

16. ROUTE OSA DUCT THROUGH WALL INTO RETURN AIR PLENUMUNDER FAN COIL.

17. OPEN ENDED DUCT. PROVIDE BIRD SCREEN ON INLET.

18. PROVIDE 1-1/2" UNDERCUT ON DOOR FOR EXHAUST AIR TRANSFER PATH.

19. 2" D UP TO VTAC CONDENSATE STACK ABOVE.

20. MOTORIZED DAMPER. INTERLOCK DAMPER OPERATION WITH OPERATION OF FCU.

21. NOT USED.

22. TERMINATE TOILET ROOM EXHAUST DUCT AT THE LOUVER.

23. TERMINATE GENERATOR COOLING EXHAUST DUCT AT THE LOUVER.

24. PROVIDE MANUFACTURER SIDE DISCHARGE KIT.

25. LOCATE DUCT SECTION ABOVE THE CEILING CLOUD. ADJUST DIFFUSER THROW TO CLEAR THE CEILING CLOUD.

1/8" = 1'-0"1

LEVEL 2 FLOOR PLAN - MECHANICAL

01/12/2021

REVISION DATE DESCRIPTION

1 04/15/19 PERMIT REVISION 1

2 04/15/19 GMP ADDENDUM 1

3 05/01/19 PERMIT REVISION 1

6 09/18/19 CONSTRUCTION SET

03/xx/20 RFI TBD

17 06/14/21 RFI 806

17

FROM SHEET M0.02

FROM SHEET M0.02

Page 4: Mechanical Ventilation Separation

OREGON

R

EEN

E

NG I

EXPIRES

74533PE

12-31-2021

REGIS

TERED P

ANISS

EFOR

LO

NED

ZI B B I B E

RIC

JA

NUARY 03 , 2

011

ELECT RM351

TRASH350

GAS GAS

CORRIDOR EAST300E

CORRIDOR WEST300W

2B-C

314

1027

UB-A

316

560

1B-D

317

674

1B-D

301

674

UB-A

302

560

1B-C

303

729 2B-C

304

1027

1B-B

305

472

1B-B

313

472

2B-A

312

1117

1B-A

311

UB-B

3103B-A

309

1284

UB-C

308

UB-D

307

2B-A TYPE A

306

1B-C TYPE A

315

FSAE LOBBY300

ST-1ST-1 L3

ST-2

26x60 SA

8x8 EXH

1008x8 H-2

FSD

22512x12 L-2 22x44 SA

13512x12 L-2

1

0C-1

TYP 2

22x6 SA

3

1

10010x6 H-1

Z Z

A A

F F

B B

E E

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

C C

D D

A 2

12x12 RA

14x8 SA

M4.05

1

M4.02

1M4.02

3

M4.02

2

M4.02

2

M4.02

3

M4.02

1

M4.03

2

M4.04

1

M4.01

4

M4.01

3

M4.05

2

M4.01

1

M4.03

1

M4.04

1

M4.03

2

OPP. OPP. OPP. OPP.

OPP.

OPP.

M4.05

1

TT

A

450C-1

2

M4.07

1

M4.07

12x12 RA

12x12 RA 3

A 2

A

FSD

10x6 SA

385C-1

3

5

3 4

4

5

FSD

PROJECT NUMBER

© ANKROM MOISAN ARCHITECTS, INC.

38 NORTHWEST DAVIS, SUITE 300PORTLAND, OR 97209T 503.245.7100

1505 5TH AVE, SUITE 300SEATTLE, WA 98101T 206.576.1600

1014 HOWARD STREETSAN FRANCISCO, CA 94103T 415.252.7063

DATE

SHEET NUMBERSHEET NUMBER

BIM

36

0:/

/18

-15

30 -

AR

T T

ow

er/

18

-15

30 M

EP

18 C

EN

TR

AL

.rvt

6/1

6/2

021

11:4

8:3

9 A

M

170710

CONSTRUCTIONSET

AR

T T

OW

ER

WO

OD

PA

RT

NE

RS

15

15

SW

MO

RR

ISO

N S

TR

EE

TP

OR

TLA

ND

, O

RE

GO

N 9

72

05

09.18.2019

LEVEL 3 FLOORPLAN

M2.03M2.03PROJECT TRUE

H. AT ALL OUTSIDE AIR INTAKES, INSTALL CORROSION RESISTANT SCREENS WITH SCREEN OPENINGS SIZED BETWEEN 1/4 INCH AND 1/2 INCH. WHERE OUTSIDE AIR INTAKES ARE SHOWN ON THE PLANS REMOTELY FORM THE HVAC UNIT, MAINTAIN MINIMUM OF 7'-8" CLEAR BETWEEN OUTSIDE AIR INTAKE AND EXHAUST DUCT TERMINATION.

I. DOMESTIC KITCHEN EXHAUST DUCT SHALL BE INDEPENDENT OF ANY OTHER EXHAUST DUCT, CONSTRUCTED OF GALVANIZED STEEL, HAVE SMOOTH INNER WALLS AND SEALED AIR TIGHT. TERMINATE DUCT AT THE EXTERIOR OF THE BUILDING, AND PROVIDE BACKDRAFT DAMPER AT DUCT TERMINATION.

J. REFER TO UNIT PLANS FOR THERMOSTAT LOCATIONS, DUCT SIZES AND REQUIRED AIRFLOWS.

K. EXTEND 2" CONDENSATE RISERS UP TO 20TH FLOOR AND COMBINE THEM INTO FOUR 4" VENT PIPES; 1 PER EACH FLOOR QUADRANT. EXTEND THE VENT PIPES UP TO ROOF AND TERMINATE MINIMUM 10' AWAY FROM OUTSIDE AIR INTAKE. ON PENTHOUSE LEVEL, ROUTE THE VERTICAL VENT PIPE INSIDE THE PARTION WALLS SEPARATING PENTHOUSE APARTMENTS.

L. IN EACH APARTMENT UNIT, ALL DUCTWORK IS LOCATED IN SOFFIT OR DROP CEILING. DUCTWORK DOES NOT PENETRATE ANY RATED ASSEMBLIES. TYPICAL FOR FLOORS 3 THROUGH 21.

M. COORDINATE LOCATION OF ALL ACCESS PANELS AND CEILING AIR REGISTERS WITH ARCHITECTURAL AND INTERIOR DESIGN REFLECTED CEILING PLANS. TYPICAL FOR FLOORS 3 THROUGH 21.

1. INTERNALLY LINED DUCTWORK FOR SUPPLY BRANCH DUCTWORK PER FLOOR. TYPICAL LEVELS 3 THROUGH 21.

2. PROVIDE ACCESS PANEL FOR FSD MAINTENANCE AND TESTING. FSD INSTALLED IN THE SHAFT WALL.

3. SUB-DUCTED RETURN/EXHAUST BOOT. PROVIDE MINIMUM 22" VERTICAL UPTURN IN PLENUM RETURN/EXHAUST SHAFT TO COMPLY WITH OREGON CODE. TYPICAL FLOORS 3 THROUGH 21.

4. DURING THE NORMAL OPERATION SUBDUCT IS USED AS A RETURN AIR PATH FROM THE CORRIDOR. IT ALSO PROVIDES PATH FOR AIR TO BE RELIEVED FROM THE CORRIDOR DURING STAIRWELL PRESSURIZATION MODE. SEE SECTIONS ON M4.07 FOR DUCT REQUIREMENTS; SEE STAIRWELL PRESSURIZATION RISER DIAGRAM ON M6.01 FOR SOO AND RATIONAL ANALYSIS NARRATIVE FOR ADDITIONAL INFORMATION ON SYSTEM OPERATION.

5. 16x16 TYPE L-1 SUPPLY DIFFUSER WITH INTEGRAL OPPOSED BLADE DAMPER INSTALLED IN THE NON-RATED PARTITION WALL. REFER TO STAIRWELL PRESSURIZATION RISER DIAGRAM ON M6.01 FOR THE REQUIRED NUMBER AND LOCATIONS OF THE SUPPLY DIFFUSERS. ARCHITECTURAL ENCLOSURE IS PART OF THE STAIRWELL, AND IT IS USED AS A SUPPLY AIR PATH ALLOWING MULTIPLE POINT OF AIR INJECTION DURING THE STAIRWELL PRESSURIZATION MODE. PARTITION WALL IS NOT REQUIRED TO BE RATED; REFER TO G2.XX SERIES OF DRAWINGS FOR WALL RATINGS.

1/8" = 1'-0"1

LEVEL 3 FLOOR PLAN - MECHANICAL

NOTES:GENERAL NOTES:

A. PROVIDE VOLUME DAMPER AT EACH BRANCH OUTLET/INLET.

B. RUN DUCTS AND PIPING CONCEALED, UNLESS SPECIFIED OTHERWISE, AND CLEAR OF CEILING INSERTS. ALL DUCTWORK SHALL BE INSTALLED AS CLOSE AS POSSIBLE TO WALL AND UNDERSIDE OF BEAMS, JOISTS, AND SLABS.

C. ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN PIPING AND DUCTS (INCLUDING DIVIDED DUCTS) AND TRANSITIONS AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

D. VERIFY ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS. VERIFY AND PROVIDE DUCT TRANSITIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DIMENSIONS BEFORE FABRICATION.

E. ALL DETAILS APPLY TO THIS SHEET WHETHER TAGGED OR NOT.

F. REFER TO THE UNIT PLAN SHEETS FOR ALTERNATE UNIT PLAN LAYOUTS ON THE FOURTH AND TWENTIETH FLOORS: 2/M4.01, 1/M4.02, 3/M4.03, 2/M4.04 AND 1/M4.06.

G. NOT USED.

01/12/2021

REVISION DATE DESCRIPTION

1 04/15/19 PERMIT REVISION 1

2 04/15/19 GMP ADDENDUM 1

3 05/01/19 PERMIT REVISION 1

6 09/18/19 CONSTRUCTION SET

7 08/16/19 PERMIT REVISION 4

01/09/20 RFI 0093

01/13/20 RFI 0094

14 10/19/20 RFI 210.2

Page 5: Mechanical Ventilation Separation

OREGON

R

EEN

E

NG I

EXPIRES

74533PE

12-31-2021

REGIS

TERED P

ANISS

EFOR

LO

NED

ZI B B I B E

RIC

JA

NUARY 03 , 2

011

ROOF

10TH FLOOR

9TH FLOOR

8TH FLOOR

7TH FLOOR

6TH FLOOR

5TH FLOOR

4TH FLOOR

3RD FLOOR

2ND FLOOR

1ST FLOOR

P1 LEVEL

P2 LEVEL

P3 LEVEL

P4 LEVEL

12TH FLOOR

11TH FLOOR

14TH FLOOR

13TH FLOOR

16TH FLOOR

15TH FLOOR

18TH FLOOR

17TH FLOOR

20TH FLOOR

19TH FLOOR

21ST FLOOR ROOM WEST

FSD (TYP 3 THRU 21)

(TYP FLOORS 3 THRU 21) (TYP FLOORS 3 THRU 21)

22x4426x60

26x4426x44

26x4026x40

26x3026x30

26x2426x24

16x2416x24

MIN 22" H

-8x8 L-2

-12x12 L-2

CORRELECEASTCORR

PER CODEMIN 22" HPER CODE

RTU-2202RTU-2201

SPRF-2201

AUTOMATIC CONTROL DAMPER

SPRF-2202

FSD (TYP 3 THRU 21)

NOTES:1. MAKEUP AIR FOR TYPICAL TRASH ROOM TRANSFERRED FROM THE WEST CORRIDOR. CORRIDOR SHALL BE MAINTAINED AT AT ALL TIMES AT

TEMPERATURE BETWEEN 70F AND 75F AND RELATIVE HUMIDITY BELOW 50% RH.

1

2

2

2. FAN OPERATES CONTINUOUSLY.

ROOF

10TH FLOOR

9TH FLOOR

8TH FLOOR

7TH FLOOR

6TH FLOOR

5TH FLOOR

4TH FLOOR

3RD FLOOR

2ND FLOOR

1ST FLOOR

P1 LEVEL

P2 LEVEL

P3 LEVEL

P4 LEVEL

12TH FLOOR

11TH FLOOR

14TH FLOOR

13TH FLOOR

16TH FLOOR

15TH FLOOR

18TH FLOOR

17TH FLOOR

20TH FLOOR

19TH FLOOR

21ST FLOOR ROOM

AIR (TYP)

(TYP FLOORS 3 THRU 21)

1008x8 H-2

CORR MAKEUP

TRASHEASTCORR

MIN 22" HPER CODE

RTU-2201 RTU-2202

TRASH CHUTESTACK

TEF-2201

TERMINATION ROOMTRASH CHUTE

EF-201

PROJECT NUMBER

© ANKROM MOISAN ARCHITECTS, INC.

38 NORTHWEST DAVIS, SUITE 300PORTLAND, OR 97209T 503.245.7100

1505 5TH AVE, SUITE 300SEATTLE, WA 98101T 206.576.1600

1014 HOWARD STREETSAN FRANCISCO, CA 94103T 415.252.7063

DATE

SHEET NUMBERSHEET NUMBER

BIM

36

0:/

/18

-15

30 -

AR

T T

ow

er/

18

-15

30 M

EP

18 C

EN

TR

AL

.rvt

6/1

6/2

021

11:4

9:1

6 A

M

170710

CONSTRUCTIONSET

AR

T T

OW

ER

WO

OD

PA

RT

NE

RS

15

15

SW

MO

RR

ISO

N S

TR

EE

TP

OR

TLA

ND

, O

RE

GO

N 9

72

05

09.18.2019

FLOW DIAGRAMS

M6.02M6.02

NONE1

AIR SIDE RISER DIAGRAM

01/12/2021

REVISION DATE DESCRIPTION

NONE2

TRASH EXHAUST RISER DIAGRAM

Page 6: Mechanical Ventilation Separation
paul.ganz
Text Box
EQUIVALENT FREE AREA (PLENUM SHAFT) = 3.57SF
paul.ganz
Rectangle
paul.ganz
Text Box
17"
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Text Box
36"
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Text Box
4"
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Text Box
4"
paul.ganz
Text Box
4"
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Text Box
4"
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Rectangle
paul.ganz
Text Box
28x9 DUCT
paul.ganz
Text Box
8x8
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Arrow
paul.ganz
Text Box
SHEETMETAL SUB-DUCT 22" UPTURNED ELBOW
paul.ganz
Text Box
Fan Affinity Law (New Trash EF Speed): dP1/dP2 = (N1/N2)^2 * (D1/D2)^2 sqrt(dP1/dP2) = N1/N2 N2 = N1/sqrt(dP1/dP2) N2 = 958/sqrt(0.663) N2 = 1,176 RPM (Ducted Shaft)
paul.ganz
Text Box
Fan Affinity Law (New Trash EF Power): P1/P2 = (N1/N2)^3 * (D1/D2)^2 P2 = P1/(N1/N2)^3 P2 = (0.34)/(958/1176)^3 P2 = 0.63BHP (Ducted Shaft)
paul.ganz
Text Box
Where: D1=D2 dP1 = 0.55" TSP (Plenum Shaft) dP2 = 0.83" TSP (Ducted Shaft) N1 = 958 RPM (Plenum Shaft)
paul.ganz
Text Box
Where: D1=D2 P1 = 0.34BHP (Plenum Shaft) N1 = 958RPM (Plenum Shaft) N2 = 1,176RPM (Ducted Shaft)
paul.ganz
Image
paul.ganz
Rectangle
paul.ganz
Text Box
NET FREE AREA (DUCTED SHAFT - SUBDUCT) = 1.75SF-0.66SF = 1.08SF
paul.ganz
Text Box
PLENUM SHAFT USING 3.57SF EFFECTIVE NET AREA: CALCULATED TOTAL STATIC PRESSURE - 0.55"
paul.ganz
Text Box
DUCTED SHAFT USING 1.58SF EFFECTIVE NET AREA: CALCULATED TOTAL STATIC PRESSURE - 0.83"
paul.ganz
Text Box
The gypsum plenum shaft would require 0.34BHP to exhaust the design airflows. A ducted shaft in the same shaft area is approximately 45% of the cross sectional area. This consequently increases the total static pressure by ~0.3" WG and increase the operation fan power to 0.63BHP, which is roughly 83% higher BHP.
paul.ganz
Text Box
SUPPLEMENTAL CALCULATIONS
paul.ganz
Rectangle
paul.ganz
Line
paul.ganz
Line
paul.ganz
Arrow
paul.ganz
Text Box
4"
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Text Box
NOTE: FOR CONSTRUCTABILITY WE NEED 4" INSIDE 28x9 RISER TO ATTACH A SHORT RADIUS ELBOW. ALTERNATIVELY WE CAN PROVIDE A 24x9 DUCT AND SMASH THE SUB-DUCT DIRECTLY INSIDE THE DUCTED RISER, BUT THIS IS A LOWER EFFECTIVE NET AREA (HIGHER TSP & HIGHER BHP).
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Text Box
8"
paul.ganz
Text Box
22"
paul.ganz
Line
paul.ganz
Line
paul.ganz
Text Box
FLOOR TO FLOOR HEIGHT = 9'9"
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Text Box
28x9 DUCT
paul.ganz
PolyLine
PIPE BREAK
paul.ganz
PolyLine
PIPE BREAK
paul.ganz
PolyLine
PIPE BREAK
paul.ganz
PolyLine
PIPE BREAK
paul.ganz
PolyLine
PIPE BREAK
paul.ganz
PolyLine
PIPE BREAK
paul.ganz
PolyLine
PIPE BREAK
paul.ganz
PolyLine
PIPE BREAK
paul.ganz
Text Box
WEIGHTED AVERAGE OF SHAFT NET FREE AREA: SUB-DUCT REDUCES NET FREE AREA OF DUCTED RISER BY 25.6% OF FLOOR TO FLOOR HEIGHT 28x9 DUCT IS CLEAR FOR 74.4% OF FLOOR TO FLOOR HEIGHT (1.75*.744)+(1.08*.256) = ~1.58 SF EFFECTIVE
paul.ganz
Line
paul.ganz
Line
paul.ganz
Arc
paul.ganz
Arc
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
paul.ganz
Line
Page 7: Mechanical Ventilation Separation

-10 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130

DRY BULB TEMPERATURE - °F

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

180

190

200

210

10 15 20 25 30

35

40

45

50

55

55

60

60

65

70

EN

TH

AL

PY

- B

TU

PE

R P

OU

ND

OF

DR

Y A

IR

0

5

10

15

20

25

30

35

40

45

50

EN

TH

ALP

Y - B

TU

PE

R P

OU

ND

OF D

RY

AIR

SA

TU

RA

TIO

N T

EM

PE

RA

TU

RE

- °

F

-50

05

510

1015

1520

2025

2530

3035

3540

4045

45 50

50 55

55 60

6065

65

70

70

75

75

80

80

85 WET BULB TEM

PERATURE - °F

85

90

15%

25%

2 %

4 %

6 %

8 %

1 0 % R E L A T I V E H U M I D I T Y

2 0 %

3 0 %

4 0 %

5 0 %

60%

70%

80%

90%

12.0

12.5

13.0

13.5

14.0

SP

EC

IFIC

VO

LU

ME

ft³/lb O

F D

RY

AIR

14.5

15.0

15.5

HU

MID

ITY

RA

TIO

- G

RA

INS

OF

MO

IST

UR

E P

ER

PO

UN

D O

F D

RY

AIR

PSYCHROMETRIC CHARTBAROMETRIC PRESSURE 29.921 inches of Mercury

Linric Company Psychrometric Chart, www.linric.com

.1

.2

.3

.4

.5

.6

.7

.8

.9

1

1.1

1.2

1.3

VA

PO

R P

RE

SS

UR

E -

IN

CH

ES

OF

ME

RC

UR

Y

-20

0

10

20

25

30

35

40

45

50

55

60

65

70

75

80

85

DE

W P

OIN

T -

°F

paul.ganz
Ellipse
paul.ganz
Ellipse
paul.ganz
Text Box
PDX DESIGN DAY (91.4FDB / 67.3F MCWB) *LOWER MOISTURE CONTENT THAN DESIGN SETPOINT
paul.ganz
Arrow
paul.ganz
Ellipse
paul.ganz
Ellipse
paul.ganz
Text Box
PDX DEHUMIDIFCATION DESIGN DAY (63.2DP / 75.2F MCDB)
paul.ganz
Arrow
paul.ganz
Ellipse
paul.ganz
Ellipse
paul.ganz
Text Box
CORRIDOR MAX SUMMER DESIGN CONDITION (75F, 50%)
paul.ganz
Arrow
paul.ganz
Ellipse
paul.ganz
Ellipse
paul.ganz
Text Box
RTU LEAVING COIL TEMP - 52.1WB
paul.ganz
Arrow
paul.ganz
Arrow
paul.ganz
Arrow
paul.ganz
Ellipse
paul.ganz
Ellipse
paul.ganz
Line
paul.ganz
Ellipse
paul.ganz
Ellipse
paul.ganz
Text Box
RTU MIXED AIR TEMP
paul.ganz
Text Box
TRASH ROOM DESIGN SCENARIO (SUMMER)
paul.ganz
Text Box
*ONLY TRANSIENT OCCUPANTS ANTICIPATED IN CORRIDORS OR TRASH ROOM. WILL NOT NOTICEABLY INCREASE TRASH ROOM RH%
paul.ganz
Text Box
SETPOINT - 75F DURING NORMAL OPERATION, THE CORRIDOR WILL ALWAYS BE MAINTAINED AT OR BELOW THE DESIGN SETPOINT. THIS IS WELL ABOVE THE DEWPOINT AND THE SHAFT IS INTERIOR TO THE BUILDING, WHICH MEANS THE SHAFT WALLS ARE APPROXIMATELY THE SAME TEMPERATURE AS THE CORRIDOR AND WILL NOT CAUSE CONDENSATION.
paul.ganz
Arrow
paul.ganz
Arrow
Page 8: Mechanical Ventilation Separation

-10 -5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130

DRY BULB TEMPERATURE - °F

10

20

30

40

50

60

70

80

90

100

110

120

130

140

150

160

170

180

190

200

210

10 15 20 25 30

35

40

45

50

55

55

60

60

65

70

EN

TH

AL

PY

- B

TU

PE

R P

OU

ND

OF

DR

Y A

IR

0

5

10

15

20

25

30

35

40

45

50

EN

TH

ALP

Y - B

TU

PE

R P

OU

ND

OF D

RY

AIR

SA

TU

RA

TIO

N T

EM

PE

RA

TU

RE

- °

F

-50

05

510

1015

1520

2025

2530

3035

3540

4045

45 50

50 55

55 60

6065

65

70

70

75

75

80

80

85 WET BULB TEM

PERATURE - °F

85

90

15%

25%

2 %

4 %

6 %

8 %

1 0 % R E L A T I V E H U M I D I T Y

2 0 %

3 0 %

4 0 %

5 0 %

60%

70%

80%

90%

12.0

12.5

13.0

13.5

14.0

SP

EC

IFIC

VO

LU

ME

ft³/lb O

F D

RY

AIR

14.5

15.0

15.5

HU

MID

ITY

RA

TIO

- G

RA

INS

OF

MO

IST

UR

E P

ER

PO

UN

D O

F D

RY

AIR

PSYCHROMETRIC CHARTBAROMETRIC PRESSURE 29.921 inches of Mercury

Linric Company Psychrometric Chart, www.linric.com

.1

.2

.3

.4

.5

.6

.7

.8

.9

1

1.1

1.2

1.3

VA

PO

R P

RE

SS

UR

E -

IN

CH

ES

OF

ME

RC

UR

Y

-20

0

10

20

25

30

35

40

45

50

55

60

65

70

75

80

85

DE

W P

OIN

T -

°F

paul.ganz
Text Box
TRASH ROOM DESIGN SCENARIO (WINTER)
paul.ganz
Text Box
CORRIDOR MAX WINTER DESIGN CONDITION (70F, 50%)
paul.ganz
Text Box
RTU LEAVING COIL TEMP - 90F DB
paul.ganz
Text Box
RTU MIXED AIR TEMP
paul.ganz
Text Box
*ONLY TRANSIENT OCCUPANTS ANTICIPATED IN CORRIDORS OR TRASH ROOM. WILL NOT NOTICEABLY INCREASE TRASH ROOM RH%
paul.ganz
Ellipse
paul.ganz
Ellipse
paul.ganz
Text Box
PDX DESIGN DAY (25.0F) *LOWER MOISTURE CONTENT THAN DESIGN SETPOINT
paul.ganz
Ellipse
paul.ganz
Ellipse
paul.ganz
Line
paul.ganz
Ellipse
paul.ganz
Ellipse
paul.ganz
Arrow
paul.ganz
Ellipse
paul.ganz
Ellipse
paul.ganz
Ellipse
paul.ganz
Ellipse
paul.ganz
Arrow
paul.ganz
Arrow
paul.ganz
Text Box
SETPOINT - 70F DURING NORMAL OPERATION, THE CORRIDOR WILL ALWAYS BE MAINTAINED AT OR ABOVE THE DESIGN HEATING SETPOINT. THIS IS WELL ABOVE THE DEWPOINT AND THE SHAFT IS INTERIOR TO THE BUILDING, WHICH MEANS THE SHAFT WALLS ARE APPROXIMATELY THE SAME TEMPERATURE AS THE CORRIDOR AND WILL NOT CAUSE CONDENSATION.