43
Mechanical Installation Workflow

Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

Mechanical Installation Workflow

Page 2: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

New architecture (reminder)

22017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

• New cabinet C-FRT instead of C1&C2

• New cabinet PDU compatible UL & CE instead of PDB

• New On/Off management

• New UPS 8KVA � choice between 1, 8 or 20KVA

• Digital Video Distribution introduction (19’’ LCD/LDM)

• LD solution integrated in C-Frt

• New Suspension with Dual Arm (DAS)

� New HW platform introduced on monoplane systems only

Page 3: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

32017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

Torque 206 Nm

� Mech install same as DAS Analogic (Addendum DOC1974960 & DOC1957173)

� Installation Time: 2 Hours x 2 FE

� Content / Change overview: • The suspension is pre-mounted and pre-cabled • Lift the system and route the internal cables through the central hole of the substructure• Fix the system to the ceiling substructure

� Maintenance: • Same process as current suspension

DAS digital Installation (IST0542) DAS digital Installation (IST0542)

Page 4: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

42017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

RAD SHIELD & SURGICAL LIGHT SUSPENSIONSRAD SHIELD & SURGICAL LIGHT SUSPENSIONS

Refer to manufacturer installation manual delivered with the 3rd party equipment.

Page 5: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

52017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

Installation of Group 1 � (Technical room to Exam room)

Installation of Group 2 � (Technical room to Control booth)

Installation of Group 4 � (optional monitors)

Installation of Group 3 � (inside the Technical room)

Installation of option like Fast Link, ECG Cable, Diamentor Cable…

(7X) Installation of Group 5 � (Exam room to Technical room)

SYSTEM CABLE ROUTING (IST0532) SYSTEM CABLE ROUTING (IST0532)

Key Point: - Constraint of routing

between PDU to C-FRT = AWG2 (35mm²) Lg 6m

Page 6: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only 62017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

Page 7: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

72017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

Installation of Group 1 � (Technical room to Exam room)

Installation of Group 2 � (Technical room to Control booth)

Installation of Group 4 � (optional monitors)

Installation of Group 3 � (inside the Technical room)

Installation of option like Fast Link, ECG Cable, Diamentor Cable…

(7X) Installation of Group 5 � (Exam room to Technical room)

SYSTEM CABLE ROUTING (IST0532) SYSTEM CABLE ROUTING (IST0532)

Key Point: - Constraint of routing

between PDU to C-FRT = AWG2 (35mm²) Lg 6m

Page 8: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

82017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

CABLE ROUTING (IST0532) CABLE ROUTING (IST0532)

Key Points:

• Mis Map with color by cable groups

• Constraint for routing cable between PDU to C-FRT (Jedi Power MIS 29287A) = AWG2 (35mm²) Lg 6m and specificrouting on the CFRT (see IST0530)

• Only one cables length (24m)

• Additional video cables:- No labels- Equipped with rings to customize on site

WARNING! for config IGS 7OR:• J59 labelled « not use » is for

iPoint 2 ethernet cable

• J5 labelled « Table ITU » isfor iPoint 1 ethernet cable

Page 9: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only 92017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

Page 10: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

102017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

CABLE ROUTING (IST0532) CABLE ROUTING (IST0532)

Key Points:

• Mis Map with color by cable groups

• Constraint for routing cable between PDU to C-FRT (Jedi Power MIS 29287A) = AWG2 (35mm²) Lg 6m and specificrouting on the CFRT (see IST0530)

• Only one cables length (24m)

• Additional video cables:- No labels- Equipped with rings to customize on site

WARNING! for config IGS 7OR:• J59 labelled « not use » is for

iPoint 2 ethernet cable

• J5 labelled « Table ITU » isfor iPoint 1 ethernet cable

Page 11: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only 112017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

Depending the use of the video cable (LIVE or REVIEW or ROADMAP) clip the correct color define by

the table on the 2 sides of video cable (clip are ship with cables)

NOTE : GREEN ring is for lateral

Page 12: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

122017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

CABLE ROUTING (IST0532) CABLE ROUTING (IST0532)

Key Points:

• Mis Map with color by cable groups

• Constraint for routing cable between PDU to C-FRT (Jedi Power MIS 29287A) = AWG2 (35mm²) Lg 6m and specificrouting on the CFRT (see IST0530)

• Only one cables length (24m)

• Additional video cables:- No labels- Equipped with rings to customize on site

WARNING! for config IGS 7OR:• J59 labelled « not use » is for

iPoint 2 ethernet cable

• J5 labelled « Table ITU » isfor iPoint 1 ethernet cable

Page 13: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

132017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

LC Gantry & TableLC Gantry & Table

Page 14: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

142017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

PDU (IST0529) – HandlingPDU (IST0529) – Handling

• PDU has its own wheels and a ramp can be use to transfer cabinet from its pallet.

• 2 persons will be needed to push it in the proper direction and control speed

WARNING! The ramp is included in the packaging

Page 15: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

152017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

PDU (IST0529) – HandlingPDU (IST0529) – Handling

WARNING! Ramp supports are located with the PDU

• Make the ramps supports and position them under the ramp

Page 16: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

162017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

PDU (IST0529) – PDU configurationPDU (IST0529) – PDU configuration

• Based on UPS solution, 3 different terminal blocks are used � TB3 : 20 kVa (only yellow jumpers to remove)� TB4 : 8 kVa (only cables straps to remove)� TB5 : 1 kVa (only cables straps to remove)

1 kVA

8 kVA 20 kVA

WARNING! Keep on safe place all straps or jumpers removed

Page 17: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

172017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

PDU (IST0529) – PDU ConfigurationPDU (IST0529) – PDU Configuration

• Voltage adaptation on primary transformer using red cables (U;V;W)

• Voltage adaptation on secondary transformer (for tube chiller) only using terminal blocks (X4;X5) or (X2;X3)

NOTE : The corresponding cables are labelled with both configurations

� Neutral : X2/X4� Phase : X3/X5

Page 18: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

182017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

PDU (IST0529) – CablingPDU (IST0529) – Cabling

Connection is possible from the bottom or the Top of the PDU (nominal case is from the bottom)

• Connection from the bottom:� Route the main input power cable from MDP (L1;L2;L3 & PE) to TB0

block (L1;L2;L3) and to the horizontal ground bar (PE - separated)� To be routed through the right side of PDU

• Connection from the top:� Drill holes in upper panel (plastic) with appropriate sealing solution� Remove internal cables between terminal block TB0 and S1 switch�Connect main input power cable from MDP (L1;L2;L3 & PE) to S1

switch (L1;L2;L3) and to the horizontal ground bar (PE - separated)

• The PDU ground bar is now the ground reference for the system.

Page 19: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

192017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

The cables have to be routed from the leftaperture of the PDU bottom entrance

X-Ray Light (pins 1 and 2)

Room Light (pins 1 and 2)

System ON Light (pins 1 and 2)

Mains status / UPS switch

PDU Output

EPO Spare

EPO PDU DOOR

EPO UPS

EPO MDP

UPS Output 230 V

MUPS Output 230 V

FUPS Output 230 V EPO Thermal sensor transformer

PDU (IST0529) – Cabling On/OFF boardPDU (IST0529) – Cabling On/OFF board

Page 20: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

202017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

PDU (IST0529) – Mandatory FixationPDU (IST0529) – Mandatory Fixation

Once the cabling has been completed and no access to the rear of the PDU is needed, lower the four adjustable feet until they touch the floor. The cabinet must be stable and not mobile.

Page 21: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

212017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

PDU (IST0529) – Kit seismic (option)PDU (IST0529) – Kit seismic (option)

For installation where an anti-seismic kit is required, reuse

the transportation brackets (1) and the seismic fixation on wall

(2) provided with the PDU

If part lost during delivery, orderFRU 5786251

WARNING : keep the key in the safe place but out of the PDU

1

2

Page 22: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

222017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

C-FRT (IST0527) – HandlingC-FRT (IST0527) – Handling

• Like PDU, C-FRT has its own wheels

• 2 persons will be needed to push it in the proper direction and control speed

WARNING! The ramp is included in the package

Page 23: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

232017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

C-FRT (IST0527) – HandlingC-FRT (IST0527) – Handling

• WARNING! Ramp supports are located with the C-FRT• Use wedge foam supports (2) to reinforce and stabilize the ramp

(1) to transfer cabinet from its pallet.

1

2

Page 24: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

242017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

C-FRT (IST0528) – CablingC-FRT (IST0528) – Cabling

C-FRT Cabinet bulkhead

C-FRT JEDI power cable from PDU AWG2 (MIS 29287A)

Bulkhead(s) System ;

POS/System ; IGS ;

Power Input and Jedi.

Torque 10Nm

Page 25: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

252017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

C-FRT (IST0528) – CablingC-FRT (IST0528) – Cabling

For power cables (A) connect

the shielding clamps to the

bulkhead JEDI

Mandatory cables routing

thru the holes.

Cables must be attached.

Page 26: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

262017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

C-FRT (IST0528) – Cabling video splittersC-FRT (IST0528) – Cabling video splitters

• Live and Review video splitters are delivered by default and pre-mounted in C-FRT Cabinet.

• Ensure the transmitters DVI to RJ45 are connected to:� Live: Output 1 and 2 (for exam and control room)� Review : Output 1 (for exam room)

WARNING! Ensure the EMC foam is inserted on the RJ45 plugs

• Video splitter for roadmap is an option (to be installed on site)

Live (below) and Review (above)video splitters

EMC foam on the RJ45 plug

Page 27: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

272017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

C-FRT (IST0528) – FixationC-FRT (IST0528) – Fixation

Once the cabling has been completed and no access to the rear of the C-FRT is needed, lower the four adjustable feet until they touch the floor. The cabinet must be stable and not mobile.

Page 28: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

282017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

C-FRT (IST0527) – Kit seismic (option)C-FRT (IST0527) – Kit seismic (option)

• For installation where an anti-seismic kit is required, reuse the two L shape brackets (1) and install the wall seismic bracket (2) on the top of C-FRT in the correct orientation as described in the following picture (3)

• If parts lost during delivery (1) : FRU � 5786263

1

3

2

Page 29: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

292017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

UPS 8KVA (IST0526) - HandlingUPS 8KVA (IST0526) - Handling

WARNING! The modules are heavy (80kg).2 persons are needed to lift and carry the equipment with the delivered straps (pre-mounted on the UPS)

• The battery module (1) must be at the right side of the power module (2)

• Install the bracket and the support to secure the two modules

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

bracket support

Page 30: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

302017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

UPS 8KVA (IST0526) - Configuration UPS 8KVA (IST0526) - Configuration

• Ensure the circuit breaker (A) is OFF

• Make sure the jumper is connected (5) (input source config for our use)

• Check the SNMP board is correctly fixed at the back of the power module

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

Page 31: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

312017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

UPS 8KVA (IST0526) - CablingUPS 8KVA (IST0526) - Cabling

Battery Module

• Power battery cable (6)• Battery detection cable (7)

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

Power Module

• Power battery cable (6) • Battery detection cable (7)• Connect Ethernet from C-FRT on SNMP board (8)• EPO UPS (9) from on/off board (J40)

Page 32: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

322017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

UPS 8KVA (IST0526) - Kit seismicUPS 8KVA (IST0526) - Kit seismic

• Secure the UPS by using the 2 brackets provided in the seismic kit:� 2 straps� 4 brackets to fix on the floor� 1 additional bracket to fix modules on the top

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

Page 33: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

332017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

20KVA (IST0538 or IST0540) - Configuration20KVA (IST0538 or IST0540) - Configuration

Key Points:• The 2 straps on Terminal X1 to be installed on site • EPO jumper (JP3) to remove

UL VersionCE Version

2 strapsJP3 jumper

2 straps(4) & (5)

JP3 jumper (3)

WARNING! Requires also parametersconfiguration (item30=1 / item318=10) during Power on (refer to commissioning JC)

Page 34: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

342017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

Video Splitter Roadmap (IST0535) (option)

• Install the video splitter Roadmap with brackets and screws delivered withunmouted parts in C-FRT, above Video Splitters Live and Review already installed

• Cables connection (ref below picture):� Front panel : CAT Video cables and DVI transmitters (2)� Front panel : Alim DC Cable (3) (already routed from SDB board)� Rear : DVI Input cable (4)

WARNING! Swap Review and Roadmap (bizlink DP cables) on the viper2 outputs

Front Rear Side DL Rear Side

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter, LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

ReviewRoadmapLive

Page 35: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

352017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter, LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

Optical Video (IST0576) (option)Optical Video (IST0576) (option)

• You can also broadcast the system video to external monitors or other 3rd party devices (video recorders, multiplexers, broadcasting device…) with kit optical (30m).

• Connect the optical DVI transmitter (Tx) to a free DVI output of the splitter and connect the second transmitter (Rx) to the external device.

Page 36: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

362017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter, LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

Cable routing suspensionCable routing suspension

C-FRT

Interco

suspension

Page 37: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

372017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

LD option installation (IST0546)LD option installation (IST0546)

List of components for LDM option:

• LMM two models- LMM56800 (27 inputs)- LMM0802 (10 inputs)

• Power strip (provides 230 VAC and 5 VDC)• Kit LDM Mechanical parts • LDM Cables Set • Dual link DVI Transmitters• HD Output Set option (splitter scaler)• Modalities linksets (option)

Key Point: There is no more locking screw on the HDMI cable

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter, LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

Page 38: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

382017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

LD option installation (IST0546)LD option installation (IST0546)1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter, LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

Key Point: The upper shelf is available in the LDM Mechanical parts kit coming with the option

Page 39: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

392017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

LD option installation (IST0546)LD option installation (IST0546)1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter, LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

Page 40: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

402017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

CABLESCABLES

Page 41: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

412017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW

HARDWARE

10. OPTION

11. FINALIZATION

CONTROL ROOM (IST0537)CONTROL ROOM (IST0537)

• New KVM with USB connection for mouse and Keyboard

� WARNING! Power connection of the KVM is on the Live Monitor

Page 42: Mechanical Installation Workflow - GE Healthcare · GE proprietary and confidential –Limited diffusion -Internal use only Mechanical Installation Workflow 5 Cerber B : Service TTT

GE proprietary and confidential – Limited diffusion - Internal use only

Mechanical Installation Workflow

422017’Oct 16th to 20thCerber B : Service TTT | DOC2027274 |

1. SUSPENSION SINGLE OR DAS

2. RAD SHIELD & SURGICAL LIGHT

SUSPENSIONS

3. CABLE ROUTING

4. LC GANTRY

5. INNOVA IQ TABLE AND

INNOVA IQ OR TABLE

6. CABINETS

• PDU

• CFRT

• UPS

• Video Distibution (Splitter,

LMM,Optical video…)

7. CABLES

8. CONTROL ROOM

9. MONITORS and AW HARDWARE

10.OPTION

11.FINALIZATION

MONITORS and AW HARDWARE ; OPTION ; FINALIZATIONMONITORS and AW HARDWARE ; OPTION ; FINALIZATION