Upload
muhd-shoffi
View
212
Download
0
Embed Size (px)
DESCRIPTION
HVAC
Citation preview
ME 326
MEC653 HVAC SystemsDesign Project 30% of final grade.
The goal of this design project is to gain HVAC design and analysis experience by working on real HVAC design problem that interests you. Since each group has a different project, there is no single project assignment. Below is a deliverables for each project assignment together with grading criteria. DELIVERABLESTo ensure you are progressing well in the exercise the deliverables are divided into four phases.- Project statement (introduction)2 pagesExplain what are you designing/analyzing and justify the importance/reasons of the project. On the second page clearly identify project outcomes. Use bullets to list the project outcomes.
Due: April 9th 2015.- Building description (geometry)1-3 pages
Schematics that focus on your system(s). Identify all assumptions and simplifications you introduced.Due: April 30th 2015- Methodology
1-3 pages
Describe methodology (equations, schematics, etc.). Provide a list of assumptions used in your methodology.
Due: May 14th 2015- Results
3-5 pagesFormatted results with comments
Tables, Charts, Diagrams, etcAnalysis and Results discussion
- Summary 0.5-1 pageSummary of most important results
Due: June 4th 2015
Grading criteria:
1) Approach and solution quality:
60%- Methodology
20%- Accuracy
20%
- Result analysis
20%
2) Deliverables:
40%- Final report
40%
- clarity, completeness, assumptions and limitations, quality of graphs, tables schematics, etc.