  • *Performance

    DescriptionUnit200520062007Energy PurchaseGWh41,44042,94743,604Energy SaleGWh40,10041,48242,035Maximum Power Demand 30 MinutesMW7,3387,3797,719Energy Loss%3.233.413.60Load Factor%64.4666.4464.48

  • *Performance

    DescriptionUnit200520062007Total Customer at Year EndM Customer2.552.632.71Average LoadkW / CustomerkWh / Customer2.8715,618.792.8015,669.702.8515,451.96Load DensitykW / km2MWh / km22,29912,562.642,31212,995.702,41813,168.99

  • *T&D system

    DescriptionUnit2007Terminal Station Capacity(230/69-115 kV)MVA15,305Substation Capacity(69-115/12-24 kV)MVA15,715Transmission Line (69,115,230 kV)Ckt-km1,476Feeder(12,24 kV)Ckt-km15,048

  • **T&D System Investment of MEA2008 -2011

    DescriptionBudget(Million Baht)PercentageTerminal Station9363Transmission Line4,49817Substation3,72214Feeder7,69029Distribution Transformer6,42924Service3,33213

  • *T&D System Investment of MEA

    Chart1

    3

    17

    14

    29

    24

    13

    T&D system investment 2008 -2011

    Sheet1

    T&D system investment 2008 -2011

    Terminal station3

    Transmission lines17

    Substation14

    Feeder29

    Distribution Trafo24

    service13

    To resize chart data range, drag lower right corner of range.