May 3, 2021 Addendum 1 and 2 Notice to all holders of Bid Documents for Chamberlain St Parking Lot Improvements, Chamberlain St, Augusta, Maine – BGS# 3172 The following changes are to be incorporated into the Contract Documents for Chamberlain Street Parking Lot Improvements, Chamberlain St., Augusta, Maine – BREM# 3172: Addendum 1 1. Revisions have been made and clouded to the electrical drawing 21031-ES-100 Revision 04262021. Addendum 2 2. Revisions have been made to drawings 20031-ES-100 Revision 05032021, 19-33 SITE Rev 04292021, and 19-33 TOPO Rev 04292021. All revisions have been clouded. In summary, the plans show the movement for the location of the two EV dual charging stations including parking stall striping, relocation of one of the blue security boxes, and addition of another security camera in the smaller parking lot. In the larger parking lot, one of the blue security boxes has been deleted (near the crosswalk) and the power supply to one of the light poles added. 3. The Contractor is responsible for installing conduit and power to the blue security boxes, security cameras, and dual charging stations. The Contractor is also responsible for constructing the foundations for the blue security boxes and two dual charging stations. 4. The Hoffman cabinet is to be anchored to a 6” thick by 66” long by 24” wide concrete pad. 5. Testing of project materials (pavement/gravel) and compaction must be performed by certified personnel that may be employed by the Contractor. All test results must be submitted to the Engineer and Owner for verification and records associated with the project. All testing to be at Contractor cost. 6. All utilities and underground features shown on the plans are shown as schematic locations. The Contractor is required to contact DIGSAFE and other utility location companies (such as Greater Augusta Utility District, gas companies, etc.) to identify all underground utilities in the areas of construction work on this project. Any disruption to service must be repaired immediately at the contractors cost. Additional administrative costs for the disruption may be assessed to the Contractor at the Owners direction. 7. Parking lot stall and line work striping shall be 4” wide white paint. Handicap EV stall logo striping to be white paint with blue background. 8. The State of Maine has obtained a building permit, and a street opening permit from the City of Augusta. They have also secured a Stormwater Connection permit from the Greater Augusta Utility District. 9. Bid opening remains Tuesday, May 18, 2021 at 2:00PM. Bid proposals must be emailed prior to that time/date. Please remember to acknowledge this addendum 1 and 2 and date May 3, 2021 in the Contractor Bid form (Section 00 41 13).

May 3, 2021 Addendum 1 and 2 Chamberlain St Parking Lot

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: May 3, 2021 Addendum 1 and 2 Chamberlain St Parking Lot

May 3, 2021 Addendum 1 and 2

Notice to all holders of Bid Documents for Chamberlain St Parking Lot Improvements, Chamberlain St, Augusta, Maine – BGS# 3172 The following changes are to be incorporated into the Contract Documents for Chamberlain Street Parking Lot Improvements, Chamberlain St., Augusta, Maine – BREM# 3172: Addendum 1

1. Revisions have been made and clouded to the electrical drawing 21031-ES-100 Revision 04262021.

Addendum 2 2. Revisions have been made to drawings 20031-ES-100 Revision 05032021, 19-33

SITE Rev 04292021, and 19-33 TOPO Rev 04292021. All revisions have been clouded. In summary, the plans show the movement for the location of the two EV dual charging stations including parking stall striping, relocation of one of the blue security boxes, and addition of another security camera in the smaller parking lot. In the larger parking lot, one of the blue security boxes has been deleted (near the crosswalk) and the power supply to one of the light poles added.

3. The Contractor is responsible for installing conduit and power to the blue security boxes, security cameras, and dual charging stations. The Contractor is also responsible for constructing the foundations for the blue security boxes and two dual charging stations.

4. The Hoffman cabinet is to be anchored to a 6” thick by 66” long by 24” wide concrete pad.

5. Testing of project materials (pavement/gravel) and compaction must be performed by certified personnel that may be employed by the Contractor. All test results must be submitted to the Engineer and Owner for verification and records associated with the project. All testing to be at Contractor cost.

6. All utilities and underground features shown on the plans are shown as schematic locations. The Contractor is required to contact DIGSAFE and other utility location companies (such as Greater Augusta Utility District, gas companies, etc.) to identify all underground utilities in the areas of construction work on this project. Any disruption to service must be repaired immediately at the contractors cost. Additional administrative costs for the disruption may be assessed to the Contractor at the Owners direction.

7. Parking lot stall and line work striping shall be 4” wide white paint. Handicap EV stall logo striping to be white paint with blue background.

8. The State of Maine has obtained a building permit, and a street opening permit from the City of Augusta. They have also secured a Stormwater Connection permit from the Greater Augusta Utility District.

9. Bid opening remains Tuesday, May 18, 2021 at 2:00PM. Bid proposals must be emailed prior to that time/date.

Please remember to acknowledge this addendum 1 and 2 and date May 3, 2021 in the Contractor Bid form (Section 00 41 13).

Page 2: May 3, 2021 Addendum 1 and 2 Chamberlain St Parking Lot
Page 3: May 3, 2021 Addendum 1 and 2 Chamberlain St Parking Lot
Page 4: May 3, 2021 Addendum 1 and 2 Chamberlain St Parking Lot

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

A4H

S

A4H

S

A3H

S

A4HS

A4H

S

A3H

S

A4H

S

A4H

S

A1ES-100

C

8

EVSE

HIGGINS STREET

WADE STREET

CH

AMBE

RLA

IN S

TREE

T

HOFFMANN ENCLOSURE (FRONT SIDE)

2

1

4

5 7

6

(E) PADMOUNT TRANSFORMER(APPROX. LOCATION)

PS

C

C

B

D

E

E

C F

E

EE

F

C

A

CF

D

C

C

FC

C

F

F

FC

F

C

FC

BL

C

STAFF HOUSE GARAGE

10

G

D

BL

7 8

D

C

C

6

D

EVSE

E

A4H

S

D

C

D

C

C

C D

SERVICE ENTRANCE (PAD TO PANEL)- (1) 3"C WITH (4)#4/0 + (1)#4G

TELECOMMUNICATIONS- (2) 2"C EMPTY WITH PULLSTRING

SITE LIGHTING- (1) 1"C WITH (2) #10, (1) #10G U.N.O.

SECURITY CAMERA- (2) 1"C EMPTY WITH PULLSTRING

CHARGING STATIONS POWER & DATA- (1) 1"C WITH (4)#6 + (1)#10G FOR POWER- (2) 1"C EMPTY EACH WITH PULLSTRING FOR

DATA (IN CASE CELLULAR CONNECTIONMETHOD IS NOT UTILIZED AND HARD-WIREDCONNECTION IS REQUIRED)

EMERGENCY "BLUE LIGHT" STATIONS- (1) 11

4"C WITH (2)#12 + (1)#12G FOR POWER- (1) 11

4"C EMPTY WITH PULLSTRING FOR DATA

TELECOMMUNICATIONS- (1) 11

4"C EMPTY WITH PULLSTRING

A

B

C

D

E

F

G

POWERCONDUITS

(SEE PLAN FORQUANTITY)

TELE/DATACONDUITS

(SEE PLAN FORQUANTITY)

SPD

3

9

PROVIDE HOFFMAN ENCLOSURE CATALOG NUMBERA62H6018SS6LP3PT & CONDUCTIVE PANEL A60P60G.MOUNT TO CONCRETE PAD (PAD BY DIV 03).

LIGHTINGCONTACTOR

PANEL P1

FINISHEDGRADE

CONCRETE PAD(BY DIV 03)

FROM UTILITY POLE

PHOTOCELL FOR LIGHTING CONTROL

SPACERESERVED

FOR SECURITY,CAMERA, ORTELE/DATAEQUIPMENT

INSTALL GROUND ELECTRODESYSTEM AND PROVIDE BONDINGJUMPER TO ENCLOSURE PER NEC.

GROUND BAR- SEE DETAILON SHEET ES-000

FROM PADMOUNTTRANSFORMER

1

A

B

C

2 3 4 5

F

D

E

G

1 2 3 4 5

6 7 8 9 10

A

B

C

NUM

BER

6 7 8

F

R E

V I

S I O

N S

DATE

BY

D

DESC

RIPT

ION

E

9 10

G

C

160

Ver

anda

Str

eet

Port

land

, Mai

ne 0

4103

T:

F: Web

:

207.

221.

2260

207.

221.

2266

ww

w.a

llied

-eng

.com

Eng

inee

ring

Stru

ctur

al M

echa

nica

l

Alli

ed

Elec

tric

al C

omm

issio

ning

COPYRIGHT 2021 ALLIED ENGINEERING, INC.

ISSU

ED F

OR

CO

NST

RU

CTI

ON

- 04

-09-

2021

ELECTRICAL SITE PLAND1SCALE: 1"=20'

GAR

DN

ERBR

IAN

T.

No.

155

06L

I CE

NS

ED

PROFESSI O

NAL

ENG

INEER

STATE

OF

MA

I N E

0 20' 40'

Scale: 1" = 20'-0"

PROJECT

NORTH

CONDUIT KEYA7SERVICE BOX DIAGRAM/ELEVATIONA1NOT TO SCALE

EXISTING WEATHERPROOF (WP) SINGLE PHASE 208V, 40A PANEL WITHWEATHERPROOF RECEPTACLES FOR BLOCK HEATERS LOCATED INAPPROXIMATELY THIS AREA, TO BE DISCONNECTED AND REMOVED BY THEOWNER PRIOR TO PARKING LOT RECONSTRUCTION.

EXISTING UNUSED CUSTOMER-OWNED 75KVA PADMOUNTED TRANSFORMERSHALL BE UTILIZED FOR NEW PARKING LOT POWER PANEL SERVICE.COORDINATE EXACT LOCATION IN FIELD.

PROVIDE (8) CHANNEL LIGHTING CONTACTOR PANEL WITH HAND/OFF/AUTOSELECTOR SWITCH ON ENCLOSURE COVER (FOR BYPASS OF PHOTOCELL).

LEVEL 2 NETWORKED ELECTRIC VEHICLE CHARGING STATIONS; CHARGEPOINTMODEL NO. CT4000 (2 CHARGING PORTS PER POST). COORDINATE WITHOWNER FOR DIVISION OF SCOPE WITH REGARD TO THE OWNER'S MASTERAGREEMENT CONTRACT WITH CHARGEPOINT. CONTRACTOR SHALL MAKE THEREQUIRED CONDUIT AND POWER PROVISIONS TO FACILITATE THE EQUIPMENTPROVISION AND INSTALLATION BY THE OWNER'S VENDOR.

CONDUIT STUB-UP AT UNIT SHALL BE 24" MAX AFG.

POLE MOUNTED CAMERA EQUIPMENT, INSTALLATION, AND WIRING SHALL BEPROVIDED BY OTHERS. COORDINATE WITH OWNER FOR DIVISION OF SCOPE.CONTRACTOR SHALL MAKE THE REQUIRED CONDUIT AND POWER PROVISIONSTO FACILITATE THE EQUIPMENT PROVISION AND INSTALLATION.

ECS (BLUE LIGHT) EQUIPMENT, INSTALLATION, AND WIRING SHALL BEPROVIDED BY OTHERS. COORDINATE WITH OWNER FOR DIVISION OF SCOPE.CONTRACTOR SHALL MAKE THE REQUIRED CONDUIT AND POWER PROVISIONSTO FACILITATE THE EQUIPMENT PROVISION AND INSTALLATION.

CONDUIT STUB-UP AT UNIT SHALL BE 12" MAX ABOVE CONCRETE BASE.

NEW SECONDARY FROM EXISTING UNUSED CUSTOMER-OWNED PADMOUNTEDTRANSFORMER LOCATED APPROXIMATELY 150 FEET FROM FENCE AT THESOUTHWEST CORNER. TRANSFORMER IS A WESTINGHOUSE, 75 KVA, 3 PHASE,12.57 KV PRIMARY TO 120/208 VOLT SECONDARY. COORDINATE PRIMARY SHUTDOWN TO TRANSFORMER WITH STATE FACILITY ELECTRICIAN. EXCAVATEUNDER EXISTING TRANSFORMER TO ROUTE NEW SECONDARY CONDUIT FROMSECONDARY WINDOW IN CONCRETE BASE TO PROPOSED CONTROL/POWERCABINET.

STUB CONDUIT UP INTO THE INSIDE OF THE EXISTING STAFF HOUSE GARAGE(WEST MOST BAY NEAR THE EXISTING SECURITY PANELS). EXTEND CONDUITTO A MINIMUM OF 36" AFF (GARAGE SLAB). COORDINATE WITH OWNER'SREPRESENTATIVE IN THE FIELD FOR THE EXACT LOCATION OF THE STUB UP.

1

KEYNOTESA9

2

3

4

5

6

7

8

9

10

ADD

END

UM

1G

MC

4/26

/202

11

ADD

END

UM

2G

MC

5/3/

2021

2

AutoCAD SHX Text
UU
AutoCAD SHX Text
UU
AutoCAD SHX Text
UU
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
?
AutoCAD SHX Text
?
AutoCAD SHX Text
S
AutoCAD SHX Text
NEW LOAM, SEED & MULCH
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text
SJR ENGINEERING, INC.
AutoCAD SHX Text
(207) 242-6248 tel
AutoCAD SHX Text
AutoCAD SHX Text
16 THURSTON DRIVE
AutoCAD SHX Text
MONMOUTH, MAINE 04259
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AS NOTED
AutoCAD SHX Text
GMC
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
PREPARED FOR
AutoCAD SHX Text
CHAMBERLAIN STREET
AutoCAD SHX Text
STATE OF MAINE
AutoCAD SHX Text
PARKING LOT IMPROVEMENTS
AutoCAD SHX Text
BUREAU OF REAL ESTATE MANAGEMENT
AutoCAD SHX Text
2019-39
AutoCAD SHX Text
2021-04-09
Page 5: May 3, 2021 Addendum 1 and 2 Chamberlain St Parking Lot
Page 6: May 3, 2021 Addendum 1 and 2 Chamberlain St Parking Lot
Page 7: May 3, 2021 Addendum 1 and 2 Chamberlain St Parking Lot