May 2013 Internship Instruction

Embed Size (px)

Citation preview

  • 7/28/2019 May 2013 Internship Instruction

    1/2

    No. Task Responsibilities Deadline

    1. Start of IBB/ICB3036-Industrial Training Student 13 May 2013

    2. Report Duty Confirmation (Template will be made available in e-learning in the 1st

    week of internship training)

    Student 13 - 24 May 2013 (week 1 to 2)

    3. Submission of Student Industrial Training Report (SIT) to HC SV & UTP SV (softcopy

    version).

    -Hardcopy version is to be submitted together with Industrial Project Report upon

    returning to UTP.

    -HC SV to submit all IBB/ICB3036 assessment forms for to UTP SV during the assessment

    visit

    Student

    HC SV

    UTP SV

    22-26 July 2013 (week 11)

    4. Assessment visit (no visit for oversea student)

    i) Students Performance & Competency

    ii)Oral Presentationiii)HC SV to submit SIT Reports assessment form to UTP SV

    iv)Intern to submit A COPY of the Summary of the Logbook weekly report scores to

    UTP SV (as of the visit date)

    -Evaluation for oversea student will be done through tele-conference/ skype/recorded

    presentation (to sent through email), etc

    -Submission of Summary of week Logbook scores for oversea students to be submitted in

    softcopy to CSIMAL

    Student

    HC SV

    UTP SV

    29 Jul 16 Aug 2013

    (week 12 to 14)

    5. Submission of Summary of the Logbook weekly report scores to CSIMAL (from week 1-

    14 : softcopy)

    - Ensure it is duly filled, signed and stamped by Host Company

    Student

    HC SV

    UTP SV

    12 16 August 2013 (Week 14)

    6. Continuation of internship during this period shall be subjected to the discretion of the

    Host Company. Intern is to adhere to company decision.

    HC SV 19 Aug 13 Sept 2013

    7. Mark submission & result consolidation process UTP SV

    CSIMAL

    REU/UEC

    19 Aug 13 Sept

    8. Submission of Proposed Project Topic to CSIMAL (softcopy) Student 19 -30 Aug 2013

    9. Project Topic Review Internship

    Coordinator

    2-13 Sept 2013

    IMPORTANT DATES R MAY 2013 SEMESTER

    FOR IBB/ICB3036 INDUSTRIAL TRAINING

  • 7/28/2019 May 2013 Internship Instruction

    2/2

    No. Task Responsibilities Deadline

    1. Start of IBB/ICB3046 Industrial Project Student 16 Sept 2013

    3. Submission of Student Industrial Project (SIP) Report to UTP SV

    (softcopy version)

    Student 9 13 Dec 2013 (week 13)

    4. Assessment visit

    i)Oral Presentation

    ii)Intern to submit A COPY of the Summary of the Logbook weekly

    report scores to UTP SV (as of the visit date)

    Student

    HC SV

    UTP SV

    2 -20 Dec 2013 (week 12 to 14)

    5. Submission of Summary of the Logbook weekly report scores to

    CSIMAL (from week 1-14 : softcopy)

    - Ensure it is duly filled, signed and stamped by Host Company

    Student

    HC SV

    UTP SV

    16 to 20 Dec 2013 (Week 14)

    6. Mark submission & result consolidation process UTP SV

    CSIMAL

    REU/UEC

    23 Dec 2013 to 3 Jan 2014

    7. Submission of Logbook, hardbound Industrial Training Report &

    Industrial Project Report to CSIMAL

    Student

    CSIMAL

    Upon returning to UTP (1st week of new

    semester)

    IMPORTANT DATES FOR MAY 2013 SEMESTER

    FOR IBB/ICB3046 INDUSTRIAL PROJECT