  • May 18, 2017

  • PROJECT TEAM

    • City of Boston• James Gillooly

    Deputy Commissioner

    • William ConroyProject Manager

    • Tetra Tech• Erik Maki, PE, PTOE

    Project Manager

    • Ian McKinnon, PE, PTOEProject Engineer

    2

  • AGENDA

    • GOALS • RECAP: ADJACENT PROJECTS + TRAFFIC VOLUMES• WYNN PROJECT CHANGES - NPC• LOWER MYSTIC REGIONAL WORKING GROUP• TRANSPORTATION ANALYSIS• CONCEPT PLANS• RESILIENCY STUDY• Questions / Comments

    3

  • PROJECT GOALS – 2009 & NOW

    Improve pedestrian connections / safety to MBTA Transit Stations and community

    Decrease traffic congestion Protect Main Street from cut-through traffic

    Create public/open spaceProvide opportunities for appropriate development

    Provide bicycle connectionsIncrease on-street parking 4

  • ADJACENT DEVELOPMENT PROJECTS

    • Casino • 46,333 Daily Person Trips• 17,550 Daily Vehicle Trips• 2914 parking spaces

    • 5 Middlesex (Somerville)• 1.75M SF Mixed Use• 220 Residential Units• 18,500 Daily Trips• 1000 parking spaces

    • Partners Health Care• BHA (One Charlestown)

    • 2,200 Residential Units• 14,300 Daily Trips• 1900 parking spaces

    5

  • 2017 – DAILY CORRIDOR VOLUMES

    6

  • 2017 SULLIVAN SQ DAILY VOLUMES

    RutherfordAve

    ADT: 16,200

    ADT: 11,800

    ADT: 8,800 (WB)

    ADT: 10,200

    ADT: 24,200

    ADT: 21,600

    ADT: 18,900 (EB)

    ADT: 15,400

    ADT: 26,900UNDERPASS

    Total Entering: ~100,800

    Vehicles Per Day

    7

  • SULLIVAN SQ UNDERPASS VOLUMES

    0

    50

    100

    150

    200

    250

    300

    350

    400

    450

    500

    12:0

    0 AM

    12:3

    0 AM

    01:0

    0 AM

    01:3

    0 AM

    02:0

    0 AM

    02:3

    0 AM

    03:0

    0 AM

    03:3

    0 AM

    04:0

    0 AM

    04:3

    0 AM

    05:0

    0 AM

    05:3

    0 AM

    06:0

    0 AM

    06:3

    0 AM

    07:0

    0 AM

    07:3

    0 AM

    08:0

    0 AM

    08:3

    0 AM

    09:0

    0 AM

    09:3

    0 AM

    10:0

    0 AM

    10:3

    0 AM

    11:0

    0 AM

    11:3

    0 AM

    12:0

    0 PM

    12:3

    0 PM

    01:0

    0 PM

    01:3

    0 PM

    02:0

    0 PM

    02:3

    0 PM

    03:0

    0 PM

    03:3

    0 PM

    04:0

    0 PM

    04:3

    0 PM

    05:0

    0 PM

    05:3

    0 PM

    06:0

    0 PM

    06:3

    0 PM

    07:0

    0 PM

    07:3

    0 PM

    08:0

    0 PM

    08:3

    0 PM

    09:0

    0 PM

    09:3

    0 PM

    10:0

    0 PM

    10:3

    0 PM

    11:0

    0 PM

    11:3

    0 PM

    2015

    2008

    VE

    HIC

    LES

    PE

    R 1

    5 M

    in

    TIME OF DAY

    EQUAL MORNING

    PEAK HOUR START

    HIGHER MORNING DEMAND

    EARLIER AND HIGHER AFTERNOON PEAKEXTENDED MORNING PEAK

    8

  • MBTA BUS ROUTES - GROWTH

    86

    CT2

    8990

    101

    92

    95

    104

    105

    109

    9392

    91

    86

    22%

    104

    63%

    105

    49%

    109

    81%91

    59%

    9

  • Source: UIL

    89, 90, 95, 101

    86, 91, CT2

    104, 105, 109

    92, 93

    NEW CIRCULATION*

    *MBTA STILL EVALUATING FUTURE ROUTES AND ACCESS

    MBTA BUSES- CIRCULATION

    10

  • REGIONAL GROWTH

    lowermysticstudy.org 11

  • WYNN PROJECT CHANGE - NPC

    Vehicle Trips to Casino = 17,550/day (Fridays)*EVERETT

    BOSTON

    56%

    63%

    *CASINO TRIPS THROUGH SSQ ~ 10,440 VEHICLES12

  • WYNN PROJECT CHANGE - NPC

    0

    100

    200

    300

    400

    500

    600

    700

    800

    900

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

    CASINO - FRIDAY HOURLY VEHICLE TRIPS THRU SSQ

    ALL TRIPS UNDERPASS

    TOTAL TRIPS THRU SSQ

    TRIPS THAT WOULD USE THE UNDERPASS

    63% EXITING18% SURFACE45% UNDERPASS

    56% ENTERING 42% SURFACE14% UNDERPASS

    3PM

    +500

    11PM

    +800

    7PM

    +600

    11AM

    +30045%

    14%

    5 AM +200

    1 AM +500

    ADDED TRIPS(~10,440 Daily)

    UNDERPASS(~5,200 Daily)

    13

  • 0

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    1800

    2000

    1 2 : 0 0 A M

    0 1 : 0 0 A M

    0 2 : 0 0 A M

    0 3 : 0 0 A M

    0 4 : 0 0 A M

    0 5 : 0 0 A M

    0 6 : 0 0 A M

    0 7 : 0 0 A M

    0 8 : 0 0 A M

    0 9 : 0 0 A M

    1 0 : 0 0 A M

    1 1 : 0 0 A M

    1 2 : 0 0 P M

    0 1 : 0 0 P M

    0 2 : 0 0 P M

    0 3 : 0 0 P M

    0 4 : 0 0 P M

    0 5 : 0 0 P M

    0 6 : 0 0 P M

    0 7 : 0 0 P M

    0 8 : 0 0 P M

    0 9 : 0 0 P M

    1 0 : 0 0 P M

    1 1 : 0 0 P M

    SULLIVAN SQ UNDERPASS VOLUMESV

    EH

    ICLE

    S P

    ER

    HO

    UR

    TIME OF DAY

    ADDED CASINO TRIPS(+5200 Daily)

    EXISTING UNDERPASS(26,900 Daily)

    CASINO ADDED TRAFFIC

    14

  • TRAFFIC ANALYSIS RESULTS

    • Traffic Models• Lower Mystic Regional Working Group• Tt

    • Synchro is a macroscopic analysis and optimization software program for signalized intersections, unsignalized intersections and roundabouts. Allows modeling of individual intersections, corridors or grid networks.

    • SimTraffic is a microscopic model where each vehicle in the traffic network is individually tracked through the model and comprehensive operational measures of effectiveness (MOEs) are collected on every vehicle during each 0.1-second of the simulation.

    15

  • LOWER MYSTIC WORKING GROUP

    CTPS Model Output - January 23, 2017 - Surface vs. UnderpassRegional Location AM Peak Hour Delay (Seconds) PM Peak Hour Delay (Seconds)

    INT # Intersection City2040

    Surface2040

    UnderpassMore

    Favorable2040

    Surface2040

    UnderpassMore

    Favorable

    32 Sullivan Square (Route 99 @ Mystic/Main/Cambridge) Charlestown 106 65 Underpass 52 33 Underpass31 Rutherford Ave @ Austin St/Gilmore Bridge Charlestown 95 38 Underpass 115 67 Underpass30 Rutherford Ave @ Rt 1 Ramps Charlestown 75 31 Underpass 42 23 Underpass29 City Square (Chelsea St @ Rutherford/No. Washington) Charlestown 73 41 Underpass 92 51 Underpass56 Main @ Austin St Charlestown 36 18 Underpass 82 46 Underpass

    Source: Lower Mystic Regional Working Group Final Presenation 1-23-2017

    SYNCHRO Performance Measures

    16

  • TRAFFIC ANALYSIS RESULTS – AM Peak - Tt

    AT-GRADE CONCEPT UNDERPASS CONCEPTSYNCHRO Performance Measures

    DRAFT

    17

  • TRAFFIC ANALYSIS RESULTS – PM Peak - Tt

    AT-GRADE CONCEPT UNDERPASS CONCEPTSYNCHRO Performance Measures

    DRAFT

    18

  • TRAFFIC ANALYSIS RESULTS- SIMULATION

    2040 Future Build Rutherford Avenue Reconstruction – SIMTRAFFIC Performance Measures

    AM PM

    At Grade Underpass At Grade Underpass

    Total Delay(hr) 1072 764.2 1277 964.5

    Total Del/Veh (s) 720 175.6 615.2 202.7

    Stop Delay (hr) 1048 649.4 1237.2 827.7

    Stop Del/Veh (s) 703.8 149.2 596 173.9

    Travel Dist (mi) 2681.6 9314.5 4420.5 9616.3

    Travel Time (hr) 5285.7 2564.2 5484.7 3202.6

    Avg Speed (mph) 2 8 3 7

    Fuel Eff. (mpg) 2.1 11.1 3.2 9.7 19

  • TRAFFIC ANALYSIS RESULTS

    • PEDESTRIAN & BICYCLES• Both Alternatives would have safe facilities

    • Underpass Alternative has shorter Intersection Cycle Lengths• Pedestrian crossing at Underpass ramps is limited• Several New Crossing Points added

    • Signals will have LPI (advanced walk)• Countdown pedestrian heads, APS pushbuttons (Advanced ADA)

    • Separated Bike Lanes – both sides of corridor• Bike signal indications and Bike LBI

    20

  • PEDESTRIAN CROSSING SIGNALS

    DRAFT

    1150’ 800’ 1350’160’

    950’

    1050’

    Rutherford Avenue

    Essex StAustin St

    City SqArlington

    Mishawum

    New Crossing Signal

    Community College

    21

  • An UNDERPASS CONCEPT

    FAMILY OF UNDERPASS ALTERNATIVES• Urban Street Grid

    • Ped + Bike Facilities• Open Space and Parks• TOD Parcels

    • Maffa Way / Mystic Ave• Square Blocks or Crossover

    • Arlington Street / MBTA driveway• Traffic Signal• Harbor Path Crossing• Bus access to Underpass

    • Development Parcels

    • Ryan Playground• Mid-Corridor

    • Community College • Industrial Park• Underpass Transitions

    • Austin Street• BPDA

    • Revisit Urban Design• Cecil Group• Public Involvement

    22

  • UNDERPASS REDUCTION

    EXISTING CONCEPT PROPOSED

    GRADE 4% 6%

    LENGTH 3400’ 1900’

    AUSTIN STREET SULLIVAN SQUAREEXISTING CONCEPT PROPOSED

    GRADE 4% 6%

    LENGTH 1800’ 1100’

    AFTER

    BEFORE

    AFTER

    BEFORE

    UNDERPASS TYPICAL ROADWAY PROFILE (EXAGGERATED)

    REDUCED UNDERPASS REDUCED UNDERPASS

    23

  • An UNDERPASS CONCEPT

    • URBAN STREET GRID• Simplify Major Movements• Ped & Bike Facilities• TOD Parcels• Ryan Playground • Arlington Street Parcels• Underpass Transitions

    DRAFT

    T

    Ryan Playground

    24

  • An UNDERPASS CONCEPT

    T

    • Maffa Way at Mystic Ave• Crossover Alternative - revised• One direction - to Mystic Ave• Traffic Signal• Ped crossing to Assembly Sq• Dedicated lane for MBTA

    buses

    25

  • An UNDERPASS CONCEPT

    T

    • Maffa Way at Mystic Ave• Crossover Removed• Square Blocks

    • Short spacing• Traffic queues

    • Parcel Shape

    26

  • An UNDERPASS CONCEPT

    T

    • Pedestrian & Bicycles• Separated bike lanes• Access to:

    • MBTA station• Assembly Sq• Ryan Playground• Neighborhood• Multi-use Path

    27

  • An UNDERPASS CONCEPT

    • Arlington St/MBTA Yard• New Signals• MBTA Bus Yard

    Access/Egress• 35 Acre Parcel

    • Future development• Pedestrian Path Crossing• Bus access to Underpass

    • Bypass Sullivan Square

    DRAFT

    Ryan Playground

    Harbor walk

    28

  • An UNDERPASS CONCEPT

    • Arlington St/MBTA Yard• New Signal• MBTA Bus Yard

    Access/Egress• Pedestrian Path Crossing

    • Hybrid Signal• Parcel access to Underpass

    • Bypass Sullivan Square

    DRAFT

    Ryan Playground

    Harbor walk

    29

  • An UNDERPASS CONCEPT

    • Ryan Playground• Local road access/egress• Expanded Open Space• Expanded parking• Portal Entrance

    DRAFT

    Ramp Roadway

    Covered Deck or Air Rights Development

    Bike/Multi-use Path

    Park/Landscaping

    Ryan Playground

    30

  • MULTI-USE PATH & OPEN SPACE

    DRAFT

    Ramp Roadway

    Covered Deck or Air Rights Development

    Linear Park

    Bike/Multi-use Path

    +50’ Linear Park

    31

  • MULTI-USE PATH & OPEN SPACE

    DRAFT

    +50’ Linear Park

    Linear Park

    Bike/Multi-use Path

    32

  • MULTI-USE PATH & OPEN SPACE

    DRAFT

    +50’ Linear Park

    Linear Park

    Bike/Multi-use Path

    Ramp Roadway

    33

  • SHARED-USE PATH at AUSTIN STREET

    DRAFT

    PEDESTRIAN BRIDGE

    COMMUNITY COLLEGELinear Park

    Bike/Multi-use Path

    Ramp Roadway

    34

  • SHARED-USE PATH at RTE 1 RAMPS

    DRAFT

    Linear Park

    Bike/Multi-use Path

    35

  • SHARED-USE PATH at CITY SQUARE

    DRAFT

    Linear Park

    Bike/Multi-use Path

    Dedicated Bus Lane

    Area comparison from City Sq. to MishawumExisting pavement area = 745,800 sf (17.1 ac)Proposed pavement area= 577,650 sf (13.3 ac.)22% Reduction in pavementOpen Space Gained= 168,150 sf (3.86 ac) 36

  • CROSS SECTION VIEW

    EXISTING at ESSEX STREET: 143’ Pavement

    PROPOSED: 86’ Pavement, +50’ LINEAR PARK

    37

  • RAISED CROSSINGS

    • Typical Minor Street Crossings from Neighborhood

    • Baldwin Street• Essex Street• West School Street

    • Raised Crossing to prioritize pedestrians and bikes

    • Source: Google Maps: Pond St, Brookline 38

  • SUPPORTING THE VISION

    2013 BPDA Community Study• Better access to MBTA• New open spaces• Mixed-use Transit oriented development• Pedestrian friendly streetscape• Neighborhood connections• Accommodating bus operations

    39

  • An UNDERPASS CONCEPT

    DRAFT

    • Underpass - Family of Alternatives

    • TOD PARCELS• Parcel Layout• Air Rights• Decking• Open Space

    • Subconsultants• Cecil Group• Brown Richardson

    & Rowe

    45

    3

    7

    62

    1

    40

  • RESILIENCY STUDY - UPDATE

    DRAFT

    Source: Kleinfelder

    Learn More and Get Updateswww. boston.gov/climate-ready

    DESIGN GOALS:?✓ Protect the Community

    from Coastal Flooding✓ Make Infrastructure

    Resilient✓ Enhance Waterfront

    Access✓ Expand Open Space

    41

    http://www.imagine.boston.gov/

  • RESILIENCY STUDY - UPDATE

    Schrafft’s

    FLOOD ELEVATION

    1. PROPOSED BERM/WALL

    DRAFT

    To Main St

    Mystic River

    Source: Kleinfelder

    2. RAISED ROADWAY

    42

  • NORTH WASHINGTON ST BRIDGE

    BUS LANE

    SEPARATED BIKE LANES

    Source: HSH/ULI

    DRAFT

    43

  • Thank you for your continued involvement

    FOR MORE INFO: https://www.cityofboston.gov/transportation/rutherford/

    QUESTIONS?

    NEXT MEETINGS – TBD

    Austin, TXLance Armstrong path Photo credit: Adam Coppola Photography

    44

    https://www.cityofboston.gov/transportation/rutherford/

    Slide Number 1PROJECT TEAMAGENDAPROJECT GOALS – 2009 & NOWADJACENT DEVELOPMENT PROJECTS2017 – DAILY CORRIDOR VOLUMES2017 SULLIVAN SQ DAILY VOLUMESSULLIVAN SQ UNDERPASS VOLUMESMBTA BUS ROUTES - GROWTHMBTA BUSES- CIRCULATIONREGIONAL GROWTHWYNN PROJECT CHANGE - NPCWYNN PROJECT CHANGE - NPCSULLIVAN SQ UNDERPASS VOLUMESTRAFFIC ANALYSIS RESULTSLOWER MYSTIC WORKING GROUPTRAFFIC ANALYSIS RESULTS – AM Peak - TtTRAFFIC ANALYSIS RESULTS – PM Peak - TtTRAFFIC ANALYSIS RESULTS- SIMULATIONTRAFFIC ANALYSIS RESULTSPEDESTRIAN CROSSING SIGNALSAn UNDERPASS CONCEPTUNDERPASS REDUCTIONAn UNDERPASS CONCEPTAn UNDERPASS CONCEPTAn UNDERPASS CONCEPTAn UNDERPASS CONCEPTAn UNDERPASS CONCEPTAn UNDERPASS CONCEPTAn UNDERPASS CONCEPTMULTI-USE PATH & OPEN SPACEMULTI-USE PATH & OPEN SPACEMULTI-USE PATH & OPEN SPACESHARED-USE PATH at AUSTIN STREETSHARED-USE PATH at RTE 1 RAMPSSHARED-USE PATH at CITY SQUARECROSS SECTION VIEWRAISED CROSSINGSSUPPORTING THE VISIONAn UNDERPASS CONCEPTRESILIENCY STUDY - UPDATERESILIENCY STUDY - UPDATENORTH WASHINGTON ST BRIDGEThank you for your continued involvement