ARCHITECTURAL ADDENDUM #3
DATE: July 20, 2017 FROM: Lavin Associates, Architects TO: Plan Holders of Record PROJECT: Maxor Mail Order Pharmacy This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated July 5, 2017. Work not specifically deleted, modified, changed or altered by the Addendum should remain in effect as part of the Contract Documents. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification. IN THE PROJECT MANUAL:
1. Specifications Sections below: Insert revised Table of Contents attached. Insert new Section 01210 Allowances Insert revised Room Finish Schedule attached.
IN THE DRAWINGS:
1. Sheet G1.01 Insert revised sheet attached. 2. Sheet A2.02 Insert revised sheet attached. 3. Sheet A2.03 Insert revised sheet attached. 4. Sheet A3.02 Insert revised sheet attached. 5. Sheet A4.01 Insert revised sheet attached. 6. Sheet A5.03 Insert revised sheet attached. 7. Sheet A5.04 Insert revised sheet attached. 8. Sheet A5.06 Insert revised sheet attached. 9. Sheet A9.01 Insert revised sheet attached. 10. Mechanical Addendum 3 attached. 11. Electrical Addendum 3 attached.
END OF ADDENDUM NO. 3
Maxor Mail Order 2017-02 07/2017
* Issued with Site/Civil Package 6/18/2017 **Issued with Addendum 3 TOC Page 1 of 4
New Building For
Maxor Mail Order
4TH Avenue & Tyler St. Amarillo, Texas
Architectural Package
TABLE OF CONTENTS
(Revised 7/20/2017) DIVISION 0 – BIDDING & CONTRACT REQUIREMENTS ASBESTOS NOTE* SAMPLE FORMS REQUIRED - CO, G702, SC, G706, G706A, G707* INSURANCE REQUIREMENTS* GENERAL CONDITIONS A201-2007* WARRANTY-GENERAL CONTRACTOR* WARRANTY-SUBCONTRACTOR* GEOTECHNICAL REPORT* ROOM FINISH SCHEDULE DIVISION 1 - GENERAL REQUIREMENTS 01100 SUMMARY* 01230 ALTERNATES* 01210 ALLOWANCES** 01250 CONTRACT MODIFICATION PROCEDURES* 01290 PAYMENT PROCEDURES* 01310 PROJECT MANAGEMENT AND COORDINATION* 01320 CONSTRUCTION PROGRESS DOCUMENTATION* 01330 SUBMITTAL PROCEDURES* 01400 QUALITY REQUIREMENTS* 01420 REFERENCES* 01500 TEMPORARY FACILITIES AND CONTROLS* 01600 PRODUCT REQUIREMENTS* 01635 SUBSTITUTION PROCEDURES* 01700 EXECUTION REQUIREMENTS* 01731 CUTTING AND PATCHING* 01732 SELECTIVE DEMOLITION* 01770 CLOSEOUT PROCEDURES* 01781 PROJECT RECORD DOCUMENTS* 01820 DEMONSTRATION AND TRAINING* DIVISION 2 - SITE CONSTRUCTION OJD ENGINEERING SPECIFICATION SECTION (TABLE OF CONTENTS)
Maxor Mail Order 2017-02 07/2017
* Issued with Site/Civil Package 6/18/2017 **Issued with Addendum 3 TOC Page 2 of 4
02080 SITE UTILITIES* 02230 DEMOLITION* 02260 EXCAVATION AND EMBANKMENT* 02270 TRENCH SAFETY SYSTEM* 02741 PLANT MIX BITUMINOUS PAVEMENT* 02763 PAVEMENT MARKINGS* 02361 TERMITE CONTROL* 02821 CANTILEVER GATES 02823 ORNAMENTAL FENCE DIVISION 3 – CONCRETE PHARIS STRUCTURAL ENGINEERS SPECIFICATION SECTION: 03300 CAST-IN-PLACE CONCRETE* OJD ENGINEERING SPECIFICATION SECTION: 03301 STRUCTURAL PORTLAND CEMENT* 03320 CONCRETE CURB AND GUTTER, SIDEWALKS, SLABS* DIVISION 4 – MASONRY 04816 CONCRETE UNIT MASONRY ASSEMBLIES DIVISION 5 – STRUCTURAL STEEL PHARIS STRUCTURAL ENGINEERS SPECIFICATION SECTION: 05120 STRUCTURAL STEEL 05210 STEEL JOISTS 05310 STEEL DECK 05400 COLD FORMED METAL FRAMINGS 05500 METAL FABRICATIONS 05521 PIPE AND TUBE RAILINGS DIVISION 6 – WOOD AND PLASTICS 06105 MISCELLANEOUS CARPENTRY 06402 INTERIOR ARCHITECTURAL WOODWORK 06420 LAMINATE CLAD PANELING DIVISION 7 –THERMAL AND MOISTURE PROTECTION 07131 SELF ADHERING SHEET WATERPROOFING 07190 WATER REPELLENTS 07210 BUILDING INSULATION 07412 METAL WALL PANELS 07421 INSULATED METAL WALL PANELS 07552 (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING 07620 SHEET METAL FLASHING AND TRIM 07920 JOINT SEALANTS DIVISION 8 – DOORS AND WINDOWS 08110 STEEL DOORS AND FRAMES
Maxor Mail Order 2017-02 07/2017
* Issued with Site/Civil Package 6/18/2017 **Issued with Addendum 3 TOC Page 3 of 4
08211 FLUSH WOOD DOORS 08331 OVERHEAD COILING DOORS 08361 SECTIONAL OVERHEAD DOORS 08410 ALUMINUM ENTRANCES AND STOREFRONTS 08450 TRANSLUCENT FIBERGLASS SANDWICH PANEL WALL SYSTEM 08800 GLAZING DIVISION 9 – FINISHES 09111 NON-LOAD-BEARING STEEL FRAMING 09250 GYPSUM BOARD 09310 CERAMIC TILE 09511 ACOUSTICAL CEILING PANELS 09651 RESILIENT TILE FLOORING 09653 RESILIENT WALL BASE AND ACCESSORIES 09654 RESILIENT PLANK FLOORING 09681 CARPET TILE 09912 PAINTING DIVISION 10 – SPECIALTIES 10211 TOILET COMPARTMENTS 10431 SIGNAGE 10505 LOCKERS 10522 FIRE EXTINGUISHER CABINETS 10523 FIRE EXTINGUSHERS 10801 TOILET ACCESSORIES DIVISION 11 – EQUIPMENT 11160 DOCK EQUIPMENT DIVISION 12 – FURNISHINGS 12494 ROLLER SHADES DIVISION 13 – SPECIAL CONSTRUCTION (NOT USED) DIVISION 14 – CONVEYING SYSTEMS (NOT USED) DIVISION 15 -- MECHANICAL BROWN CONSULTING ENGINEERS, INC SPECIFICATION SECTION (TABLE OF CONTENTS) 15000 GENERAL PROVISIONS FOR MECHANICAL*
15060 HANGERS AND SUPPORTS* 15075 MECHANICAL IDENTIFICATION* 15080 MECHANICAL INSULATION* 15410 PLUMBING PIPING* 15430 PLUMBING SPECIALTIES* 15440 PLUMBING FIXTURES* 15450 PLUMBING EQUIPMENT*
15481 COMPRESSED AIR SYSTEM 15535 REFRIGERANT PIPING AND SPECIALTIES*
Maxor Mail Order 2017-02 07/2017
* Issued with Site/Civil Package 6/18/2017 **Issued with Addendum 3 TOC Page 4 of 4
15580 FUEL FIRED HEATERS* 15775 DX SPLIT SYSTEMS* 15781 PACKAGED ROOF TOP AIR CONDITIONING UNITS* 15810 DUCTS* 15820 DUCT ACCESSORIES* 15830 FANS* 15850 AIR OUTLETS AND INLETS* 15910 DIRECT DIGITAL CONTROLS* 15940 SEQUENCE OF OPERATION* 15950 TESTING, ADJUSTING, AND BALANCING* DIVISION 16 – ELECTRICAL REYNOLDS ENGINEERING ASSOCIATES, INC SPECIFICATION SECTION (TABLE OF CONTENTS) 16050 GENERAL REQUIREMENTS FOR ELECTRICAL WORK 16060 GROUNDING 16111 RACEWAYS 16123 WIRES AND CABLES 600V AND BELOW 16130 BOXES 16140 WIRING DEVICES 16170 MOTOR AND CIRCUIT DISCONNECTS 16210 ELECTRIC UTILITY SERVICE AND METERING 16235 EMERGENCY STANDBY GENERATOR 16413 AUTOMATIC TRANSFER SWITCH 16440 COORDINATION AND ARC-FLASH STUDY 16441 DISTRIBUTION SWITCHBOARD 16442 PANELBOARDS 16491 FUSES 16500 LIGHTING FIXTURES 16505 LIGHT SOURCES 16510 LIGHTING CONTROL 16671 SURGE PROTECTIVE DEVICES 16740 TELEPHONE AND DATA SYSTEMS 16950 TESTING OF ELECTRICAL SYSTEMS END OF TABLE OF CONTENTS
Maxor Mail Order 2017-02 06/2017
ALLOWANCES 01210 - 1
SECTION 01210 - ALLOWANCES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements governing allowances.
B. Types of allowances include the following:
1. Unit-cost allowances.
1.2 SELECTION AND PURCHASE
A. At the earliest practical date after award of the Contract, advise Architect of the date when final selection and purchase of each product or system described by an allowance must be completed to avoid delaying the Work.
B. At Architect's request, obtain proposals for each allowance for use in making final selections. Include recommendations that are relevant to performing the Work.
C. Purchase products and systems selected by Architect from the designated supplier.
1.3 ACTION SUBMITTALS
A. Submit proposals for purchase of products or systems included in allowances, in the form specified for Change Orders.
1.4 INFORMATIONAL SUBMITTALS
A. Submit invoices or delivery slips to show actual quantities of materials delivered to the site for use in fulfillment of each allowance.
B. Submit time sheets and other documentation to show labor time and cost for installation of allowance items that include installation as part of the allowance.
C. Coordinate and process submittals for allowance items in same manner as for other portions of the Work.
1.5 COORDINATION
A. Coordinate allowance items with other portions of the Work. Furnish templates as required to coordinate installation.
Maxor Mail Order 2017-02 06/2017
ALLOWANCES 01210 - 2
1.6 LUMP-SUM ALLOWANCES
A. Allowance shall include cost to Contractor of specific products and materials ordered by Owner or selected by Architect under allowance and shall include taxes and delivery to Project site.
B. Unless otherwise indicated, Contractor's costs for labor, installation, overhead and profit, and similar costs related to products and materials ordered by Owner or selected by Architect under allowance shall be included as part of the Contract Sum and not part of the allowance.
C. Unused Materials: Return unused materials purchased under an allowance to manufacturer or supplier for credit to Owner, after installation has been completed and accepted.
1. If requested by Architect, retain and prepare unused material for storage by Owner. Deliver unused material to Owner's storage space as directed.
1.7 ADJUSTMENT OF ALLOWANCES
A. Allowance Adjustment: To adjust allowance amounts, prepare a Change Order proposal based on the difference between purchase amount and the allowance, multiplied by final measurement of work-in-place where applicable. If applicable, include reasonable allowances for cutting losses, tolerances, mixing wastes, normal product imperfections, and similar margins.
1. Include installation costs in purchase amount only where indicated as part of the allowance.
2. If requested, prepare explanation and documentation to substantiate distribution of overhead costs and other margins claimed.
3. Submit substantiation of a change in scope of work, if any, claimed in Change Orders related to unit-cost allowances.
4. Owner reserves the right to establish the quantity of work-in-place by independent quantity survey, measure, or count.
B. Submit claims for increased costs because of a change in scope or nature of the allowance described in the Contract Documents, whether for the purchase order amount or Contractor's handling, labor, installation, overhead, and profit.
1. Do not include Contractor's or subcontractor's indirect expense in the Change Order cost amount unless it is clearly shown that the nature or extent of work has changed from what could have been foreseen from information in the Contract Documents.
2. No change to Contractor's indirect expense is permitted for selection of higher- or lower-priced materials or systems of the same scope and nature as originally indicated.
Maxor Mail Order 2017-02 06/2017
ALLOWANCES 01210 - 3
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine products covered by an allowance promptly on delivery for damage or defects. Return damaged or defective products to manufacturer for replacement.
3.2 PREPARATION
A. Coordinate materials and their installation for each allowance with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related work.
3.3 SCHEDULE OF ALLOWANCES
A. Hardware Allowance: Include the sum of: 150,555 Dollars.
1. This allowance includes doors, frames, and aluminum door hardware, FOB jobsite.
END OF SECTION 01210
Room Surface Finish
2017-02 Maxor Mail Order PrescriptionsRoom Finish Schedule
- Finishes Typical Throughout Building
Countertop Solid Surfacing LG Hi-Macs M104 Roma
Cabinet Plastic Laminate Formica Cognac Maple 7738-58
Window Stools Solid Surfacing LG Hi-Macs M104 Roma
Interior Door Prefinished Wood Door VT Industries Cherry Veneer
Alpine Finish AL07
Interior Door Painted Hollow Metal Sherwin Williams SW7075 Cyberspace
Interior Door Frame Painted Hollow Metal Sherwin Williams SW7076 Cyberspace
Toilet Partitions Solid Plastic ASI Accurate Solid Plastic Black 9205
101 Foyer Floor Modular Walk-off Carpet Tandus Assertive Action 04837
Steelwork 26202
Base 4" Rubber Base Flexco 093 Graphite
All Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
Ceiling Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
102 Waiting Floor Modular Carpet 24" X 24" Tandus Squareup 04990 Electricity 71604 Installed Ashlar Running North/South
Base 4" Rubber Base Flexco 093 Graphite
South Wall Painted Gyp. Bd. Sherwin Williams SW9162 African Gray
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
103 Office Floor Modular Carpet 24" X 24" Tandus Squareup 04990 Electricity 71604 Installed Ashlar Running North/South
Base 4" Rubber Base Flexco 093 Graphite
North Wall Painted Gyp. Bd. Sherwin Williams SW9162 African Gray
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
104 Copy Work Room Floor Modular Carpet 24" X 24" Tandus Squareup 04990 Electricity 71604 Installed Ashlar Running North/South
Base 4" Rubber Base Flexco 093 Graphite
All Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
105 Office Floor Modular Carpet 24" X 24" Tandus Squareup 04990 Electricity 71604 Installed Ashlar Running North/South
- 1 - July 17th, 2017
Room Surface Finish
2017-02 Maxor Mail Order PrescriptionsRoom Finish Schedule
Base 4" Rubber Base Flexco 093 Graphite
South Wall Painted Gyp. Bd. Sherwin Williams SW9162 African Gray
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
106 Office Floor Modular Carpet 24" X 24" Tandus Squareup 04990 Electricity 71604 Installed Ashlar Running North/South
Base 4" Rubber Base Flexco 093 Graphite
South Wall Painted Gyp. Bd. Sherwin Williams SW9162 African Gray
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
107 Office Floor Modular Carpet 24" X 24" Tandus Squareup 04990 Electricity 71604 Installed Ashlar Running North/South
Base 4" Rubber Base Flexco 093 Graphite
North Wall Painted Gyp. Bd. Sherwin Williams SW9162 African Gray
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
108 Open Office Floor Modular Carpet 24" X 24" Tandus Squareup 04990 Electricity 71604 Installed Ashlar Running North/South
Base 4" Rubber Base Flexco 093 Graphite
Wainscot On North & West Wall
3'-0" Plastic LaminateSimilar To 5/A6.01
PSI Panel Specialists, Inc. Formica Woodbrush Aged Ash 8844-WR
North Wall Painted Gyp. Bd. Sherwin Williams SW9162 African Gray
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
Column Painted Steel Benjamin Moore 798 Blue Suede Shoes
Furrdown Painted Gyp. Bd. Sherwin Williams SW6438 Dill
Ceiling Painted Exposed Structure
Benjamin Moore 2129-10 Midnight Dream
109 Passage Floor Modular Carpet 24" X 24" Tandus Squareup 04990 Electricity 71604 Installed Ashlar Running North/South
Base 4" Rubber Base Flexco 093 Graphite
Wainscot On West Wall 3'-0" Plastic LaminateSimilar To 5/A6.01
PSI Panel Specialists, Inc. Formica Woodbrush Aged Ash 8844-WR
South Wall Painted Gyp. Bd. Sherwin Williams SW9162 African Gray
- 2 - July 17th, 2017
Room Surface Finish
2017-02 Maxor Mail Order PrescriptionsRoom Finish Schedule
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
Furrdown Painted Gyp. Bd. Sherwin Williams SW6438 Dill
110 Foyer Floor Modular Walk-off Carpet Tandus Assertive Action 04837
Steelwork 26202
Base 4" Rubber Base Flexco 093 Graphite
All Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
Ceiling Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
111 Training Room Floor Modular Carpet 24" X 24" Tandus Syllabus 10965 Power Grid 76504 Installed Ashlar Running East/West
Base 4" Rubber Base Flexco 093 Graphite
Wainscot 3'-0" Plastic LaminateSimilar To 5/A6.01
PSI Panel Specialists, Inc. Formica Woodbrush Aged Ash 8844-WR
North Wall Painted Gyp. Bd. Benjamin Moore 798 Blue Suede Shoes
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
Column Painted Steel Sherwin Williams SW6438 Dill
112 Prefunction Floor Luxury Vinyl Planks Aspecta Five Summer Pine Ash 5382104 W/inset Of Melbourne Elm Pearl 5362107
Base 4" Rubber Base Flexco 093 Graphite
North Wall Painted Gyp. Bd. Benjamin Moore 798 Blue Suede Shoes
South Wall Painted Gyp. Bd. Benjamin Moore 798 Blue Suede Shoes
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
113 Corridor Floor Modular Carpet 24" X 24" Tandus Squareup 04990 Electricity 71604 Installed Ashlar Running North/South
Floor At Drinking Fountain Alcove
Porcelain Tile 24" X 24" Crossville Oceanaire Seamount AV335 W/ Ardex Cast Iron-22 Grout
Base 4" Rubber Base Flexco 093 Graphite
South Wall Painted Gyp. Bd. Sherwin Williams SW6438 Dill
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
Wainscot At Drinking Fountain Alcove
Porcelain Tile Crossville Argent See Interior Elevations
Memphis Blues A1415 W/ Ardex Irish Creme-10 Grout
- 3 - July 17th, 2017
Room Surface Finish
2017-02 Maxor Mail Order PrescriptionsRoom Finish Schedule
114 Family Toilet Floor Porcelain Tile 12" X 24" Crossville Gotham Mainline AV324 W/Ardex Silver Shimmer-19 Grout Laid In Square Grid
Base 6" X 12" Porcelain Cove Base
Crossville Gotham Mainline AV324 W/ Ardex Silver Shimmer-19 Grout
Wainscot 6'-10" Tall Porcelain Tile Crossville Ready To Wear 12" X 24" W/2" X 24" Accents. See Tile Schedule A6.01
Buttoned Up AV311 Field Tile W/ Smarty Pants AV316 Accents. Grout To Be Irish Creme-10
West Wall Painted Gyp. Bd. Sherwin Williams SW6438 Dill
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
Ceiling Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
115 Women Floor Porcelain Tile 12" X 24" Crossville Gotham Mainline AV324 W/Ardex Silver Shimmer-19 Grout Laid In Square Grid
Base 6" X 12" Porcelain Cove Base
Crossville Gotham Mainline AV324 W/ Ardex Silver Shimmer-19 Grout
Wainscot 6'-10" Tall Porcelain Tile Crossville Ready To Wear 12" X 24" W/2" X 24" Accents. See Tile Schedule A6.01
Buttoned Up AV311 Field Tile W/ Smarty Pants AV316 Accents. Grout To Be Irish Creme-10
South Wall Above Toilets Painted Gyp. Bd. Benjamin Moore 798 Blue Suede Shoes
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
Ceiling Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
116 Storage Floor Linoleum Tile Forbo MCT MCT-629 Eiger
Base 4" Rubber Base Flexco 093 Graphite
All Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
117 Janitor Floor Sealed Concrete
Wainscot 7' Tall Porcelain Tile Crossville Ready To Wear 12" X 24" Laid In Horizontal Brick Pattern W/1/3 Offset. See 9/A6.01
Buttoned Up AV311 W/ Ardex Irish Creme-10 Grout
All Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
- 4 - July 17th, 2017
Room Surface Finish
2017-02 Maxor Mail Order PrescriptionsRoom Finish Schedule
118 Men Floor Porcelain Tile 12" X 24" Crossville Gotham Mainline AV324 W/Ardex Silver Shimmer-19 Grout Laid In Square Grid
Base 6" X 12" Porcelain Cove Base
Crossville Gotham Mainline AV324 W/ Ardex Silver Shimmer-19 Grout
Wainscot 6'-10" Tall Porcelain Tile Crossville Ready To Wear 12" X 24" W/2" X 24" Accents. See Tile Schedule A6.01
Buttoned Up AV311 Field Tile W/ Smarty Pants AV316 Accents. Grout To Be Irish Creme-10
North Wall Above Toilets Painted Gyp. Bd. Benjamin Moore 798 Blue Suede Shoes
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
Ceiling Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
119 Break Room Floor Luxury Vinyl Tile Aspecta Five Summer Pine Ash 5382104
Base 4" Rubber Base Flexco 093 Graphite
Wainscot 3'-0" Plastic LaminateSee 5/A6.01
PSI Panel Specialists, Inc. Formica Denim Twill 8814-58See Interior Elevations
North Wall Painted Gyp. Bd. Sherwin Williams SW9162 African Gray
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
120 Compressor Floor Sealed Concrete
Base 4" Rubber Base Flexco 093 Graphite
All Walls Painted CMU Benjamin Moore OC-14 Natural Cream
121 Corridor Floor Modular Carpet 24" X 24" Tandus Squareup 04990 Electricity 71604 Installed Ashlar Running North/South
Base 4" Rubber Base Flexco 093 Graphite
North Wall Painted Gyp. Bd. Benjamin Moore 798 Blue Suede Shoes
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
122 Storage Floor Linoleum Tile Forbo MCT MCT-629 Eiger
Base 4" Rubber Base Flexco 093 Graphite
All Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
123 Small Conference Floor Modular Carpet 24" X 24" Tandus Squareup 04990 Electricity 71604 Installed Ashlar Running North/South
- 5 - July 17th, 2017
Room Surface Finish
2017-02 Maxor Mail Order PrescriptionsRoom Finish Schedule
Base 4" Rubber Base Flexco 093 Graphite
West Wall Painted Gyp. Bd. Sherwin Williams SW9162 African Gray
East Wall Painted Gyp. Bd. Sherwin Williams SW9162 African Gray
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
124 IT Server Floor Linoleum Tile Forbo MCT MCT-629 Eiger
Base 4" Rubber Base Flexco 093 Graphite
All Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
125 Office Floor Modular Carpet 24" X 24" Tandus Squareup 04990 Electricity 71604 Installed Ashlar Running North/South
Base 4" Rubber Base Flexco 093 Graphite
West Wall Painted Gyp. Bd. Sherwin Williams SW9162 African Gray
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
126 Conference Floor Modular Carpet 24" X 24" Tandus Syllabus 10965 Power Grid 76504 Installed Ashlar Running East/West
Base 4" Rubber Base Flexco 093 Graphite
West Wall Painted Gyp. Bd. Benjamin Moore 798 Blue Suede Shoes
East Wall Painted Gyp. Bd. Benjamin Moore 798 Blue Suede Shoes
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
127 Small Conference Floor Modular Carpet 24" X 24" Tandus Squareup 04990 Electricity 71604 Installed Ashlar Running North/South
Base 4" Rubber Base Flexco 093 Graphite
East Wall Painted Gyp. Bd. Sherwin Williams SW6438 Dill
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
128 Fill Floor Floor Sealed Concrete
Base 4" Rubber Base Flexco 093 Graphite
Wainscot 7'-2" Plastic Laminate PSI Panel Specialists, Inc. See Interior Elevations For Laminate Selections
North Wall Painted Gyp. Bd. Sherwin Williams SW9162 African Gray
- 6 - July 17th, 2017
Room Surface Finish
2017-02 Maxor Mail Order PrescriptionsRoom Finish Schedule
South & East Walls Adjacent To Replenishment Room 184
Painted Gyp. Bd. Sherwin Williams SW9162 African Gray
129 Corridor Floor Modular Carpet 24" X 24" Tandus Squareup 04990 Electricity 71604 Installed Ashlar Running North/South
Base 4" Rubber Base Flexco 093 Graphite
South Wall Painted Gyp. Bd. Sherwin Williams SW6438 Dill
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
130 Women Floor Porcelain Tile 12" X 24" Crossville Gotham Mainline AV324 W/Ardex Silver Shimmer-19 Grout Laid In Square Grid
Base 6" X 12" Porcelain Cove Base
Crossville Gotham Mainline AV324 W/ Ardex Silver Shimmer-19 Grout
Wainscot 6'-10" Tall Porcelain Tile Crossville Ready To Wear 12" X 24" W/2" X 24" Accents. See Tile Schedule A6.01
Buttoned Up AV311 Field Tile W/ Smarty Pants AV316 Accents. Grout To Be Irish Creme-10
North Wall Above Toilets And Washfountain
Painted Gyp. Bd. Sherwin Williams SW6438 Dill
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
Ceiling Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
131 Men Floor Porcelain Tile 12" X 24" Crossville Gotham Mainline AV324 W/Ardex Silver Shimmer-19 Grout Laid In Square Grid
Base 6" X 12" Porcelain Cove Base
Crossville Gotham Mainline AV324 W/ Ardex Silver Shimmer-19 Grout
Wainscot 6'-10" Tall Porcelain Tile Crossville Ready To Wear 12" X 24" W/2" X 24" Accents. See Tile Schedule A6.01
Buttoned Up AV311 Field Tile W/ Smarty Pants AV316 Accents. Grout To Be Irish Creme-10
North Wall Above Toilets And Washfountain
Painted Gyp. Bd. Sherwin Williams SW6438 Dill
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
Ceiling Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
132 Lockers Floor Modular Walk-off Carpet Tandus Assertive Action 04837
Steelwork 26202
- 7 - July 17th, 2017
Room Surface Finish
2017-02 Maxor Mail Order PrescriptionsRoom Finish Schedule
Base 4" Rubber Base Flexco 093 Graphite
All Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
Lockers Standard Spray Finish Republic Storage Systems
61 Midnight Blue
Ceiling Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
133 Electrical Floor Sealed Concrete
Base 4" Rubber Base Flexco 093 Graphite
All Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
134 Replenishment Room Floor Sealed Concrete
Base 4" Rubber Base Flexco 093 Graphite
Wainscot 7'-2" Plastic Laminate PSI Panel Specialists, Inc. Similar To 4/A6.01
South Wall Painted Gyp. Bd. Sherwin Williams SW9162 African Gray
Other Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
135 Connector Floor Sealed Concrete
Base 4" Rubber Base Flexco 093 Graphite
Wainscot 4'-0" AC Plywood Clear Varnish
All Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
Ceiling Painted Exposed Structure
Benjamin Moore OC-14 Natural Cream
136 Storage Floor Sealed Concrete
Base 4" Rubber Base Flexco 093 Graphite
Wainscot 4'-0" AC Plywood Clear Varnish
All Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
Ceiling Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
137 Shipping Floor Sealed Concrete
Base 4" Rubber Base Flexco 093 Graphite
- 8 - July 17th, 2017
Room Surface Finish
2017-02 Maxor Mail Order PrescriptionsRoom Finish Schedule
Wainscot 4'-0" AC Plywood Clear Varnish
All Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
Ceiling Painted Exposed Structure
Benjamin Moore OC-14 Natural Cream
138 Receiving Floor Sealed Concrete
Base 4" Rubber Base Flexco 093 Graphite
Wainscot 4'-0" AC Plywood Clear Varnish
All Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
Ceiling Painted Exposed Structure
Benjamin Moore OC-14 Natural Cream
139 Trash Dock Floor Sealed Concrete
Base 4" Rubber Base Flexco 093 Graphite
Wainscot 4'-0" AC Plywood Clear Varnish
All Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
Ceiling Painted Exposed Structure
Benjamin Moore OC-14 Natural Cream
140 Shared Dock Floor Sealed Concrete
Base 4" Rubber Base Flexco 093 Graphite
Wainscot 4'-0" AC Plywood Clear Varnish
All Walls Painted Gyp. Bd. Benjamin Moore OC-14 Natural Cream
Ceiling Painted Exposed Structure
Benjamin Moore OC-14 Natural Cream
141 Covered Dock Floor Sealed Concrete
North Wall Prefinished Metal Panels
West Wall Prefinished Metal Panels
South Wall Painted CMU To Be Selected
Ceiling Prefinished Metal Panels
- 9 - July 17th, 2017
G1.01
Thom
as L
. Lav
inTe
xas
Arc
hite
ct R
egis
trat
ion
No.
655
9D
ate:
____
____
____
_
This
doc
umen
t is
inco
mpl
ete
and
cann
ot b
e us
ed fo
rre
gula
tory
app
rova
l, pe
rmitt
ing,
or
cons
truc
tion.
95%
RE
VIE
WS
ET
Max
or M
ail O
rder
Lavin Architects2810 Duniven Circle, Suite 100
Amarillo, Texas 79109806.358.7069 p806.358.8242 f
www.lavinarchitects.com
Clear Floor Space Lavatory Clearances Accessories
Knee ClearanceSpout Height and Clear Floor Space
at Alcove
(Front and Side Approach)Water ClosetsUrinals
(Front Approach)
Side Wall UrinalBack Wall
G1.1 General Information
Foundation PlanS1.1Level 2 Framing PlanS1.2Level 3 Framing PlanS1.3
Retail Level 2 Framing Plan – Area B & CS2.4S2.5S2.6S3.1S3.2
Overall Site Plan / Site DetailsA1.1A1.2
A2.2
Enlarged Site Plan - Area A
Garage First Floor Plan
A4.1
A5.1
Exterior Elevations
Building SectionsBuilding SectionsBuilding Sections
A5.2A5.3A5.4
Interior ElevationsA6.2
First Floor - Mechanical Floor PlanM1.11
M1.31
P1.51
A5.7
Footing Schedule and Foundation DetailsFoundation Sections and Details
Fourth Floor - Mechanical Floor PlanM1.41
Third Floor - Plumbing Floor PlanP1.31
First Floor Lighting PlanE1.1E1.2E1.3
Fourth Floor Lighting PlanE1.4
Parking Garage Streetscape PlanL-1.0
Building Sections
Wall Sections / Details
Millwork SectionsA7.2
Reflected Ceiling Plan - Level 1A8.1
M1.61
E2.1Second Floor Power PlanE2.2Third Floor Power PlanE2.3
E2.4E2.5
Enlarged Power PlansE3.1E3.2E3.3
Panel SchedulesE3.4
A2.3 Garage Second Floor PlanA2.4 Garage Third Floor Plan
A3.1 Door Schedule / Graphic Door Schedule
Interior ElevationsA6.1
Interior ElevationsA6.3Interior ElevationsA6.4Interior ElevationsA6.5Interior ElevationsA6.6Interior ElevationsA6.7Millwork SectionsA7.1
Millwork SectionsA7.3
M1.21
M1.51
First Floor - Waste, Vent, and Storm Drain PlanP1.11P1.12P1.21
P1.41
FP1.31
First Floor - Fire Protection Floor PlanFP1.11Second Floor - Fire Protection Floor PlanFP1.21
Parking Garage Streetscape Site PlanE0.1
E1.5
Parking Garage Streetscape Layout PlanL-1.1
A5.8 Wall Sections / DetailsA5.9 Wall Sections / Details
Mechanical Schedules
S4.1
Steel Framing Sections and Details
Wall Pattern Elevation and Floor Pattern Plan I1.1
A1.3 Enlarged Site Plan - Area B
A2.5 Garage Fourth Floor PlanA2.6 Garage Fifth Floor Plan
A5.10 Wall Sections / DetailsA5.11 Wall Sections / DetailsA5.12 Wall Sections / Details
S4.2S4.3S4.4S5.1S5.2
S6.2 Simple Beam Connection DetailsS6.3 Typical Steel Details
Retail Roof Framing Plan – Area ARetail Roof Framing Plan – Area B & C
Steel Framing Sections and Details
Second Floor - Mechanical Floor PlanThird Floor - Mechanical Floor Plan
Mechanical Roof Plan
Plumbing DetailsP1.61
Fourth Floor - Plumbing Floor Plan
First Floor - Domestic Water and Gas Plan
Plumbing Schedules and Details
Second Floor - Plumbing Floor Plan
FP1.41Fire Protection Roof PlanFP1.51
Third Floor - Fire Protection Floor PlanFourth Floor - Fire Protection Floor Plan
Second Floor Lighting Plan
Roof Lighting Plan
Fourth Floor Power Plan
Light Fixture Schedule And Lighting Details
Third Floor Lighting Plan
First Floor Power Plan
Roof Power Plan
Riser Diagram And Fire Alarm Riser Diagram
C1.1 Existing Site ConditionsC2.1 Site LayoutC3.1 Site Grading Plan Master
C4.2 Storm Sewer Layout
C5.2 Erosion Control PlanC6.1 Details
C4.3 Storm Sewer Plan and Profile
C3.2 Site Grading Plan InsertC3.3 Site Grading Plan InsertC3.4 Site Grading Plan InsertC3.5 Site Grading Plan InsertC3.6 Site Grading Plan Insert
Embassy Suites Streetscape PlanL-1.2Embassy Suites Streetscape Layout PlanL-1.3Streetscape Detail PlanL-2.0Parking Garage Streetscape Irrigation PlanL-3.1Parking Garage Tree Irrigation PlanL-3.2
L-3.3L-3.4
Parking Garage Planting PlanL-4.0L-4.1
Embassy Suites Streetscape Irrigation PlanEmbassy Suites Tree Irrigation Plan
Embassy Suites Planting Plan
A2.7 Retail Area B and C First Floor PlanA2.8 Retail Area A First Floor Plan
A5.20 Elevator and Stair Sections / Details
Level 5 Framing PlanS1.5Enlarged Stair/Elevator Core PlansS1.6Precast Wall Panel ElevationsS1.7
Retail Level 2 Framing Plan – Area AS2.3Retail Foundation Plan – Area B & CS2.2Retail Foundation Plan – Area AS2.1
Precast Concrete Sections & DetailsPrecast Concrete Sections & DetailsPrecast Concrete Sections & DetailsPrecast Concrete Sections & Details
Fire Protection DetailsFP1.61
General NotesS1.0
Level 4 Framing PlanS1.4
Precast Wall Panel ElevationsS1.8
S3.3 Slab-On-Grade & Foundation DetailsS3.4 Foundation Sections and Details
S5.3 Steel Framing Sections and DetailsS6.1 Steel Column And Base Plate Details
S6.4 Wind Brace Elevations & Details
C4.1 Storm Sewer Layout
C4.4 Storm Sewer Plan and ProfileC5.1 Erosion Control Plan
Life Safety Plans and Design CriteriaLS1.1Parking Garage Open Area CalculationsLS2.1
A2.1 Overall First Floor Plan
A2.9 Retail Area B and C Clearstory PlanA2.10 Retail Area A Clearstory Plan
A3.2 Graphic Window ScheduleA3.3 Door and Window Details
A2.11 Garage Equipment Plan
A5.5 Building SectionsA5.6 Building Sections/ Details
A5.13 Wall Sections / DetailsA5.14 Wall Sections / DetailsA5.15 Wall Sections / DetailsA5.16 Wall Sections / DetailsA5.17 Wall Sections / Details
A5.19 Elevator and Stair Sections / Details
Reflected Ceiling Plan - Level 2A8.2Reflected Ceiling Plan - Level 3A8.3Reflected Ceiling Plan - Level 4A8.4Retail Area B and C Roof PlansA9.1Retail Area A Roof Plan / A9.2
A4.2 Cladding Panel ScheduleA4.3 Cladding Panel ScheduleA4.4 Cladding Panel ScheduleA4.5 Cladding Panel ScheduleA4.6 Cast Stone and Metal Grille Schedules
Electrical Courtyard DetailE0.2
A3.4 Door and Window Details
A5.18 Stair Sections / Details
Stair and Elevator Tower Roof Plan
A1.1 Site Demolition Plan
G1.1 General Information
First Floor - Mechanical Floor PlanM1.11
M1.31Fourth Floor - Mechanical Floor PlanM1.41
First Floor Lighting PlanE1.1E1.2E1.3
Fourth Floor Lighting PlanE1.4
Parking Garage Streetscape PlanL-1.0
M1.61
E2.1Second Floor Power PlanE2.2Third Floor Power PlanE2.3
E2.4E2.5
Enlarged Power PlansE3.1E3.2E3.3
Panel SchedulesE3.4
A2.01 Overall Floor Plan
M1.21
FP1.31
First Floor - Fire Protection Floor PlanFP1.11Second Floor - Fire Protection Floor PlanFP1.21
Parking Garage Streetscape Site PlanE0.1
E1.5
Parking Garage Streetscape Layout PlanL-1.1
A5.01 Building Sections
Mechanical Schedules
Second Floor - Mechanical Floor PlanThird Floor - Mechanical Floor Plan
FP1.41Fire Protection Roof PlanFP1.51
Third Floor - Fire Protection Floor PlanFourth Floor - Fire Protection Floor Plan
Second Floor Lighting Plan
Roof Lighting Plan
Fourth Floor Power Plan
Light Fixture Schedule And Lighting Details
Third Floor Lighting Plan
First Floor Power Plan
Roof Power Plan
Riser Diagram And Fire Alarm Riser Diagram
C1.1 Existing Site ConditionsC2.1 Site LayoutC3.1 Site Grading Plan Master
C4.2 Storm Sewer Layout
C5.2 Erosion Control PlanC6.1 Details
C4.3 Storm Sewer Plan and Profile
C3.2 Site Grading Plan InsertC3.3 Site Grading Plan InsertC3.4 Site Grading Plan InsertC3.5 Site Grading Plan InsertC3.6 Site Grading Plan Insert
Embassy Suites Streetscape PlanL-1.2Embassy Suites Streetscape Layout PlanL-1.3Streetscape Detail PlanL-2.0Parking Garage Streetscape Irrigation PlanL-3.1Parking Garage Tree Irrigation PlanL-3.2
L-3.3L-3.4
Parking Garage Planting PlanL-4.0L-4.1
Embassy Suites Streetscape Irrigation PlanEmbassy Suites Tree Irrigation Plan
Embassy Suites Planting Plan
A1.01 Site PlanA1.02
Fire Protection DetailsFP1.61
C4.1 Storm Sewer Layout
C4.4 Storm Sewer Plan and ProfileC5.1 Erosion Control Plan
First Floor Life Safety PlanLS.01
Electrical Courtyard DetailE0.2
Site Demolition Plan
C1.1 Existing Site ConditionsC2.1 Site LayoutC3.1 Site Grading MasterC3.2 Site Grading Inset 1C3.3 Site Grading Inset 2C4.1 Site Utility PlanC5.1 Dock Sump Plan
C6.1 Erosion Control PlanC7.1 Paving DetailsC7.2 Utility Details
D2.1 First Floor Demolition Plan
A3.04
A5.1
Door and Window Details
ReservedReservedReserved
A5.2A5.3A5.4
A5.7
Reserved
Reserved
reservedA8.1
D2.2 Second Floor Demolition PlanD2.3 Third Floor Demolition Plan
A2.04 Enlarged Entry Plans
A5.08 Wall Sections / DetailsA5.09 Wall Sections / Details
D2.4 Roof Demolition PlanD4.1 Elevation Demolition
A5.10 Elevator Details - ReservedA5.11 Wall Sections / DetailsA5.12 Cast Stone Details
A1.02 Site Plan - Reference OnlyA2.00 Basement Floor Plan
A5.20 reserved
D2.0 Basement Demolition Plan
A2.01 First Floor PlanA2.02 Second Floor Plan
A3.01 Graphic Door & Window ScheduleA3.02 Door and Window Details
A2.03 Third Floor Plan
A5.5 ReservedA5.6 Reserved
A5.13 reservedA5.14 reservedA5.15 reservedA5.16 reservedA5.17 reserved
A5.19 reserved
reservedA8.2reservedA8.3reservedA8.4Roof Plan and DetailsA9.1
A4.01 Exterior ElevationsA4.02 Reserved
A3.03 Door and Window Details
A5.18 reserved
D1.0 Site Demolition Plan
A5.21 reservedA5.22 reserved
A4.01 Exterior Elevations
Maxor Mail Order4th and TylerAmarillo, Texas 79101
Foundation Plan - Area AS2.1Foundation Plan - Area BS2.2Roof Framing Plan - Area AS2.3Roof Framing Plan - Area BS2.4Canopy Framing Plan - Area AS2.5
Steel Column and Wind Brace Elevations & DetailsS4.2Steel Framing Sections & DetailsS4.1Slab-on-Grade & Foundation DetailsS3.2
General NotesS1.1
S3.1 Footing Schedule & Foundation Details
StructuralCivilOJD Engineering
2420 Lakeview DriveAmarillo, Texas 79109
806.352.7117 p
Pharis Structural Engineers7120 I-40 West Suite 135Amarillo, Texas 79106
806.463.7799 p
Mechanical Brown Consulting Engineers
3505 Olsen Blvd.Amarillo, Texas 79109
806.354.0141 p
ElectricalReynolds Engineering
3505 Olsen Blvd, Suite 222Amarillo, Texas 79109
806.353.2423 p
LandscapeTurner LandArchitecture
724 S Polk Street, Suite 250Amarillo, Texas 79101
806.342.9400 p
Basement Foundation PlanS1.1AFirst Floor Framing PlanS1.2ASecond Floor Framing PlanS1.3A
Plumbing Roof Demolition PlanP1.01P1.02
Basement Floor Finishes and PatternsI-FP00
Plumbing Roof Plan
Roof Framing PlanS1.5AFoundation Sections and DetailsS3.1Slab on Grade DetailsS3.2
Structural Sections & DetailsS3.6Structural Sections & Details3.5Structural Sections & DetailsS3.4
General NotesS1.0A
Third Floor Framing PlanS1.4A
S3.3 Structural Sections & Details
First Floor Finishes and PatternsI-FP01Second Floor Finishes and PatternsI-FP02Third Floor Finishes and PatternsI-FP03
Hardscape PlanL-2.1Hardscape PlanL-2.2Detail PlanL-3.1Irrigation PlanL-4.1Planting PlanL-5.1
E1.1 Electrical Site Plan
M1.1 Area A Mechanical Floor Plan
A2.02 Floor Plan Area AA2.03 Floor Plan Area BA2.04 Equipment PlanA3.01 Schedule of Finish MaterialsA3.02 Door ScheduleA3.03 Door and Window DetailsA3.04 Window Details
A5.02 Wall SectionsA5.03A5.04A5.05A5.06
Wall SectionsWall SectionsWall SectionsSections
A6.01 Interior ElevationsA7.01 MillworkA8.01 Ceiling PlanA9.01 Roof Plan
C5.1 Joint Plan
M1.2 Area B Mechanical Floor PlanM2.1 Mechanical Schedules and Details
P1.1 Area A Waste and Vent Floor PlanP1.2 Area B Waste and Vent Floor PlanP1.2 Area B Waste and Vent Floor PlanP1.3 Area A Domestic Water and Gas Floor PlanP1.4 Area B Domestic Water and Gas Floor Plan
P2.1 Area A Plumbing Roof PlanP2.2 Area B Plumbing Roof PlanP3.1 Plumbing Schedules and Details
E2.1 Area A Lighting Floor PlanE2.2 Area B Lighting Floor PlanE2.3 Area A Power Floor PlanE2.4 Area B Power Floor PlanE2.5 Area A - Mechanical Power Floor Plan
Simple Beam Connection DetailsS4.3Typical Steel DetailsS4.4
P1.5 Compressed Air Floor Plan
E1.2 Electrical Site DetailsE1.3 Electrical Site Plan - Communications
E2.6 Area B - Mechanical Power Floor PlanE3.1 Lighting Fixture ScheduleE3.2 One line DiagramsE3.3 Short Circuit DiagramsE3.4 Panel SchedulesE3.5 Panel Schedules
8
L
K
J
H.6
H
G
L
765432.52.221
K
J
H
G
3.6 4.4 5.6 6.55.2
G.6
H.2
G.4
B
C
D
(ABOVE)
(ABOVE)
(ABOVE)
AL-3
F
A2.02
Catalog No.No.
1
Manufacturer
Toilet Accessories Schedule
B-6806 x 42Bobrick
Bobrick
2 42" Grab Bar
Description
3 Toilet Tissue Dispenser
4
5
B-6806 x 36 36" Grab Bar
6
Paper Towel Dispenser / Disposal
7
9
B-682Bobrick Single Robe Hook
B-223 x 36Bobrick 36" Mop Rack (Typ. at all Janitor Closets)
B-4112 Soap Dispenser
B-165 1836Bobrick 18" x 36" Channel Frame Mirror
8
Bobrick
Ensure all accessories meet all TAS standards for Handicap Accessibility
Provide wood blocking in all walls behind toilet accessories - Typical for all
* All toilet paper, paper towel, and soap dispensers provided by owner - Install atheights and locations to meet all TAS requirements
B-2888
Bobrick
Bobrick
B-43944
10
KB110-SSREKoala Recessed Diaper Station
B-270 Sanitary Napkin DisposalBobrick
11 B-165 2448Bobrick 24" x 48" Channel Frame Mirror
Floor Finish Legend
Thom
as L
. Lav
inTe
xas
Arc
hite
ct R
egis
trat
ion
No.
655
9D
ate:
____
____
____
_
This
doc
umen
t is
inco
mpl
ete
and
cann
ot b
e us
ed fo
rre
gula
tory
app
rova
l, pe
rmitt
ing,
or
cons
truc
tion.
95%
RE
VIE
WS
ET
Max
or M
ail O
rderWall Legend
G
F
E
D
C
B
A
865321
G
F.3
E.3
D
C
B
A
2.6 7
G.4
3.8
A
A
A
A
A
B(ABOVE)
21 2.6
A2.03
Catalog No.No.
1
Manufacturer
Toilet Accessories Schedule
B-6806 x 42Bobrick
Bobrick
2 42" Grab Bar
Description
3 Toilet Tissue Dispenser
4
5
B-6806 x 36 36" Grab Bar
6
Paper Towel Dispenser / Disposal
7
9
B-682Bobrick Single Robe Hook
B-223 x 36Bobrick 36" Mop Rack (Typ. at all Janitor Closets)
B-4112 Soap Dispenser
B-165 1836Bobrick 18" x 36" Channel Frame Mirror
8
Bobrick
Ensure all accessories meet all TAS standards for Handicap Accessibility
Provide wood blocking in all walls behind toilet accessories - Typical for all
* All toilet paper, paper towel, and soap dispensers provided by owner - Install atheights and locations to meet all TAS requirements
B-2888
Bobrick
Bobrick
B-43944
10
KB110-SSREKoala Recessed Diaper Station
B-270 Sanitary Napkin DisposalBobrick
11 B-165 2448Bobrick 24" x 48" Channel Frame Mirror
Thom
as L
. Lav
inTe
xas
Arc
hite
ct R
egis
trat
ion
No.
655
9D
ate:
____
____
____
_
This
doc
umen
t is
inco
mpl
ete
and
cann
ot b
e us
ed fo
rre
gula
tory
app
rova
l, pe
rmitt
ing,
or
cons
truc
tion.
95%
RE
VIE
WS
ET
Max
or M
ail O
rder
Wall Legend
418 S. TYLER
A4.01
Thom
as L
. Lav
inTe
xas
Arc
hite
ct R
egis
trat
ion
No.
655
9D
ate:
____
____
____
_
This
doc
umen
t is
inco
mpl
ete
and
cann
ot b
e us
ed fo
rre
gula
tory
app
rova
l, pe
rmitt
ing,
or
cons
truc
tion.
95%
RE
VIE
WS
ET
Max
or M
ail O
rder
South Elevation
West Elevation
North Elevation
East Elevation
South Elevation
Partial North Elevation ANB Buiding
A5.03
Thom
as L
. Lav
inTe
xas
Arc
hite
ct R
egis
trat
ion
No.
655
9D
ate:
____
____
____
_
This
doc
umen
t is
inco
mpl
ete
and
cann
ot b
e us
ed fo
rre
gula
tory
app
rova
l, pe
rmitt
ing,
or
cons
truc
tion.
95%
RE
VIE
WS
ET
Max
or M
ail O
rder
Wall SectionA5.03
1 Wall SectionA5.02
2 Wall SectionA5.03
3 Wall SectionA5.03
4 Wall SectionA5.03
5
Wall SectionA5.03
6
A5.04
Max
or M
ail O
rder
Wall SectionA5.04
1 Wall SectionA5.04
2 Wall SectionA5.04
3 Wall SectionA5.04
4
Wall SectionA5.04
5
DetailA5.04
6
DetailA5.04
7 DetailA5.04
8
DetailA5.04
9 DetailA5.0410
A5.06
Thom
as L
. Lav
inTe
xas
Arc
hite
ct R
egis
trat
ion
No.
655
9D
ate:
____
____
____
_
This
doc
umen
t is
inco
mpl
ete
and
cann
ot b
e us
ed fo
rre
gula
tory
app
rova
l, pe
rmitt
ing,
or
cons
truc
tion.
95%
RE
VIE
WS
ET
Max
or M
ail O
rder
ElevationA5.06
2
SectionA5.06
3
PlanA5.06
1
SectionA5.06
4 Elevation At Door 141GA5.06
5 Elevation At Door 141GA5.06
6 Elevation At Door 141GA5.06
7 Elevation At Door 141GA5.06
8
A9.01
Thom
as L
. Lav
inTe
xas
Arc
hite
ct R
egis
trat
ion
No.
655
9D
ate:
____
____
____
_
This
doc
umen
t is
inco
mpl
ete
and
cann
ot b
e us
ed fo
rre
gula
tory
app
rova
l, pe
rmitt
ing,
or
cons
truc
tion.
95%
RE
VIE
WS
ET
Max
or M
ail O
rder
Roof Plan
Referenced Roof Plan Notes
SectionA9.01
1
SectionA9.01
2
SectionA9.01
3