Linde AG Engineering Division 1 Pipe Stress Analysis of Reformer R-101 By: E. Perez

Maximum Temperatures and Pressures to Run

Embed Size (px)

Citation preview

Page 1: Maximum Temperatures and Pressures to Run

10-12-2011_PCC Pilot PlantLinde AG Engineering Division 1

Pipe Stress Analysis of Reformer R-101

By: E. Perez

Page 2: Maximum Temperatures and Pressures to Run

10-12-2011_PCC Pilot PlantLinde AG Engineering Division

Pipe Stress Analysis of Reformer R-101Maximum Temperatures to Run. Allowable Stresses of Incoloy 800HT at 10,000 hrs.

2 By: E. Perez

1870°F

Page 3: Maximum Temperatures and Pressures to Run

10-12-2011_PCC Pilot PlantLinde AG Engineering Division

Pipe Stress Analysis of Reformer R-101Maximum Pressures to Run. Allowable Stresses of Incoloy 800HT at 10,000 hrs.

3 By: E. Perez

Page 4: Maximum Temperatures and Pressures to Run

10-12-2011_PCC Pilot PlantLinde AG Engineering Division

Pipe Stress Analysis of Reformer R-101Model Nodes

4 By: E. Perez

Page 5: Maximum Temperatures and Pressures to Run

10-12-2011_PCC Pilot PlantLinde AG Engineering Division

Pipe Stress Analysis of Reformer R-101Model Nodes

5 By: E. Perez

Coil ACoil B

Coil A

Page 6: Maximum Temperatures and Pressures to Run

10-12-2011_PCC Pilot PlantLinde AG Engineering Division

Pipe Stress Analysis of Reformer R-101Model Nodes

6 By: E. Perez

Coil A Coil A

Page 7: Maximum Temperatures and Pressures to Run

10-12-2011_PCC Pilot PlantLinde AG Engineering Division

Pipe Stress Analysis of Reformer R-101Model Nodes

7 By: E. Perez

Coil A

Page 8: Maximum Temperatures and Pressures to Run

10-12-2011_PCC Pilot PlantLinde AG Engineering Division

Pipe Stress Analysis of Reformer R-101Model Nodes

8 By: E. Perez

Page 9: Maximum Temperatures and Pressures to Run

10-12-2011_PCC Pilot PlantLinde AG Engineering Division

Pipe Stress Analysis of Reformer R-101Model Nodes

9 By: E. Perez

Coil B Coil B

Page 10: Maximum Temperatures and Pressures to Run

10-12-2011_PCC Pilot PlantLinde AG Engineering Division

Pipe Stress Analysis of Reformer R-101Model Nodes

10 By: E. Perez

Coil B Coil B