Matakuliah : D0762 – Ekonomi TeknikTahun : 2009

Benefit Cost RatioCourse Outline 8

Page 2: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

Outline

2

• Definition• Benefit Cost Ratio for Single Project• Alternative Selection• B/C selection from multiple alternatives

Page 3: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

Definition

• Benefit Cost Ratio is a method for selecting alternatives for public works project.

• B/C method of analysis is based on the ratio of the benefits to costs associated with a particular project

• First steps : determine which of the elements are benefits, disbenefits, and costs

3

Page 4: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

What is Public Project?

• Public Sector is owned by the citizens

• Public Sector Projects provide needed services at ‘no profit’

• Facts…

• Generally large investment size

• Long life span (30-50 years)

• Revenues are used to cover future cost

4KGA-Spr09®Reserved

Page 5: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

KGA-Spr09®Reserved

Terminology• Costs: estimated expenditures for operations,

maintenance, and construction -- Government• Benefits: economic advantages experienced by

the owners -- Public• Disbenefits: expected undesirable

consequences to the owners -- Public• Note: defining the benefit and disbenefit are

not as easy as one two three for some public sectors

• Discount rate: interest rate for public sector projects

Page 6: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

KGA-Spr09®Reserved

Be Consistent!

• Select a viewpoint prior determining costs, benefits, and disbenefits and stick with one only!

• The Do-Nothing option!• Several viewpoints:

• Citizen• Economic development• Job creation/retention, etc

Page 7: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

Conventional B/C Ratio - Single Project

• Calculated as follows B/C = =

B/C = = =

• Decision Criteria• If B/C ≥ 1, then … accept the alternative at the discounted

rate• Otherwise, … not acceptable however it can still be funded for

other reasons…NOTE

• In B/C analyses, costs are not preceded by a minus sign• Salvage values are subtracted from costs• Disbenefits are generally subtracted from benefits

7

benefits –disbenefits

Costs

B-DC

PW(B-D)PW(C)

AW(B-D)

AW(C)FW(B-D)FW(C)

Page 8: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

KGA-Spr09®Reserved

Modified B/C For Single Project

• Conventional B/C

• Modified B/C

• Benefit and Cost difference measure of worthB – C, if (B-C) ≥ 0, accept the project and vice versa

benefits - disbenefits B-D/ = =

costs CB C

benefits - disbenefits - M&O costs

initial investment

Page 9: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

KGA-Spr09®Reserved

Alternative Selection: B/C Incremental Analysis

• Given: ≥ 2 mutually exclusive alternatives• Steps…

• Estimate total equivalent costs for all alternatives• Rank the alternatives from low to high based upon total costs

in the denominator of the ratio• Calculate the incremental cost (ΔC) for the larger-cost

alternative• Calculate the total benefits and disbenefits for both

alternatives – incremental benefits (ΔB) for the larger-cost alternative Δ(B-D)

• Calculate ΔB/C ratio

• Accept the higher cost alternative if ΔB/C ≥1

benefits - disbenefits B-D/ = =

costs CB C

Page 10: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

KGA-Spr09®Reserved

B/C Incremental Analysis for Multiple Alternatives

• Given ≥ 3 mutually exclusive alternatives, must select one

• Conduct pairwise ΔB/C• Selection rule: choose the largest-cost alternative

after justfied by incremental B/C ≥1

• Note: any alternatives that have an overall B/C <1.0 can be eliminated immediately and no need not to be considered in the incremental analysis

Page 11: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

KGA-Spr09®Reserved

Independent Projects

• As long as the budget is unlimited, • Compare each alternative with DN• Choose all that have B/C ≥ 1

• If the budget is limited,• Use optimization methodology (capital

budgeting)

Page 12: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

KGA-Spr09®Reserved

Example …(Example 9.1) The Wartol Foundation, a nonprofit educational research organization, is contemplating an investment of $1.5 million in grants to develop new ways to teach people the rudiments of a profession. The grants will extend over a 10-year period and will create an estimated savings of $500,000 per year in faculty salaries, student tuition and fees, and other expenses. The foundation uses a rate of return of 6% per year on all grant awards. Since the new program will be in addition to ongoing activities, an estimated $200,000 per year will be removed from other program funding to support this educational research. To make this program successful, a $50,000-per-year operating expense will be incurred by the foundation from its regular M&O budget. Use the following analysis methods to determine if the program is justified over a 10-year period: (a) conventional B/C, (b) modified B/C, (c) (B-C) Analysis

Page 13: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

KGA-Spr09®Reserved

Example …(Cont’d)• AW, PW, or FW?

Use the one with…

• Conventional B/CB/C = (500k – 200k)/(203,805+50k) = 1.18, thus…

• Modified B/CB/C = (500k – 200k – 50k)/203,805 = 1.23, thus…

• Benefit and Cost DifferenceB-C = (500k – 200k) – (203,805+50k) = $46,195, thus…

Page 14: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

KGA-Spr09®Reserved

Another One…(Example 9.3) Two routes are under consideration for a new interstate highway segment. The northerly route N would be located about 5 km from the central business district and would require longer travel distances by local commuter traffic. The southerly route S would pass directly through the downtown area, and, although its construction cost would be higher, it would reduce the travel time and distance for local commuters. Assume that the costs for the two routes are as follows:

If the roads are assumed to last 30 years with no salvage value, which route should be selected on the basis of B/C analysis using an interest rate of 5%/ year?

Route N Route S

Initial cost, $ 10,000,000 15,000,000

Maintenance cost/year, $ 35,000 55,000

Road-user cost/year, $ 450,000 200,000

Page 15: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

KGA-Spr09®Reserved

Another One…(Cont’d)

• AW, PW, or FW?Use the one with…

• AWN = $685,500 and AWS = $1,030,750

Incremental cost value = $345,250/yearIncremental benefit = $250,000/yearB/C ratio = $250,000/$345,250 = .724thus…

Page 16: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

KGA-Spr09®Reserved

Example(Example 9.4) Consider the four mutually exclusive alternatives, apply incremental B/C analysis to select the best alternative for a MARR = 10% per year. Use a PW analysisLocation A B C D

Building cost, $ -200,000 -275,000 -190,000 -350,000

Annual cash flow, $ 22,000 35,000 19,500 42,000

Life, years 30 30 30 30

Page 17: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

KGA-Spr09®Reserved

Example

• Find the PW of the cash flows …• Eliminate those with B/C <1, why?• Start performing incremental analysis …

• B to AIncremental cost = 75,000Incremental benefit = 122,551 incremental B/C ratio = 1.63Choose?

• D to BIncremental cost = 75,000Incremental benefit = 65,989 incremental B/C ratio = .88Choose?

Page 18: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

KGA-Spr09®Reserved

(Example 9.6)

Six different sites are into consideration as possible location to construct a dam. If MARR of 6% per year is required and dam life is infinite for analysis purposes, select the one best location using the B/C method

Site Construction Cost, $ (millions) Annual Income, $

A 6 350k

B 8 420k

C 3 125k

D 10 400k

E 5 350k

F 11 700k

Choose EChoose E

Page 19: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

Spreadsheet Example

• Alternative routes are being considered by the local highway district for a new bypass. Route A, costing $4000,000 to local business. Route B, costing $6,000000 can provide $1000,000 in annual benefits. The annual cost of maintenance is $200000 for A and $120000 for B. If the life of each road is 20 years and an interest rate of 8% per year is used, which alternative should be selected on the basis of a conventional B/C analysis?

19

Page 20: Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8

Solution

20