MassDOT’s Transportation Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 Stephanie Pollack, MassDOT Secretary and CEO

MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

MassDOT’s Transportation Investment Gameplan

Remarks to ARTBA Northeastern Regional Meeting

November 9, 2017

Stephanie Pollack, MassDOT Secretary and CEO

Page 2: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

We are busy at MassDOT – In the last two years we have • Spent $2.8 billion on highway construction contracts

• Distributed over $560 million in Chapter 90 payments (out of $700 million authorized) to cities and towns to improve local roads

• Rehabilitated or replaced approximately 80 bridges, including two Accelerated Bridge Program “Mega Projects” ahead of schedule and on-budget

• Paved approximately 2,000 lane miles of roadway paved – equivalent to paving a one lane road across Massachusetts and back over 5 times

• Installed approximately 160 miles of sidewalk

• Removed 24 manual toll plazas (159 toll booths) on I-90 (the Massachusetts Turnpike) and replaced with 16 All Electronic Tolling gantries

• Awarded $12.5 million awarded through the Complete Streets Funding Program for 26 cities and towns to improve and build new infrastructure.

• Awarded $16 million awarded through the Small Municipal Bridge Program for 36 communities to preserve or repair their own small bridges between 10 and 20 feet not eligible for federal aid

• Installed 137 “GoTime” Real Time Traffic Signs on highways throughout Massachusetts

2

Page 3: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Ramping Up Spending: FY07-13 . . . FY07 FY08 FY09 FY10 FY11 FY12 FY13

Central Artery $165 $62 $37 $47 $4 $26 $17

Highway $767 $824 $999 $1,069 $991 $1,027 $785

Highway Payroll Costs ($122) ($136) ($135) ($149) ($164) ($192) ($173)

Net Highway $645 $689 $864 $920 $827 $836 $612

Highway + Central Artery (including payroll) $932 $886 $1,036 $1,116 $995 $1,053 $802

ABP - - 47 191 261 253 340

Chapter 90 111 182 178 157 172 214 188

Toll Capital 39 47 85 107

Total Highway 1,043 1,068 1,261 1,503 1,475 1,606 1,437

Rail 3 3 13 42 1 0 51

Transit/MBTA Bond 18 21 11 9 2 3 6

MBTA REP 0 10 25 32 36 44 51

Other 6 7 9 27 46 51 51

Total $1,070 $1,109 $1,319 $1,613 $1,559 $1,703 $1,596

Page 4: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Versus Spending in FY14 – FY17 FY14 FY15 FY16 FY17 Central Artery $2 $1 $1 $0

Highway $845 $950 $1,044 $1,002 Highway Payroll Costs ($157) ($1) $0 $0 Net Highway $689 $949 $1,044 $1,002

Highway + CA (including payroll) $847 $951 $1,045 $1,002

ABP 486 407 343 206

Chapter 90 197 211 224 230

Toll Capital 148 221 224 252

Total Highway 1,678 1,790 1,834 1,690

Rail 12 91 32 40

Transit/MBTA 139 276 301 245

Other 47 60 43 52 Total $1,876 $2,218 $2,210 $2,027

Total MassDOT

spending on

projects has

grown significantly

over the past

three years.

Page 5: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

FY14 FY15 FY16 FY17 Central Artery $2 $1 $1 $0

Highway $845 $950 $1,044 $1,002 Highway Payroll Costs ($157) ($1) $0 $0 Net Highway $689 $949 $1,044 $1,002

Highway + CA (including payroll) $847 $951 $1,045 $1,002

ABP 486 407 343 206

Chapter 90 197 211 224 230

Toll Capital 148 221 224 252

Total Highway 1,678 1,790 1,834 1,690

Rail 12 91 32 40

Transit/MBTA 139 276 301 245

Other 47 60 43 52 Total $1,876 $2,218 $2,210 $2,027

Accelerated Bridge finishes up but highway ramps up

Even with payroll

costs removed,

MassDOT

Highway spending

on projects is at

record high levels

– currently

exceeding

spending level

seen at the height

of the Accelerated

Bridge Program.

Page 6: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

FY14 FY15 FY16 FY17 Central Artery $2 $1 $1 $0

Highway $845 $950 $1,044 $1,002 Highway Payroll Costs ($157) ($1) $0 $0 Net Highway $689 $949 $1,044 $1,002

Highway + CA (including payroll) $847 $951 $1,045 $1,002

ABP 486 407 343 206

Chapter 90 197 211 224 230

Toll Capital 148 221 224 252

Total Highway 1,678 1,790 1,834 1,690

Rail 12 91 32 40

Transit/MBTA 139 276 301 245

Other 47 60 43 52 Total $1,876 $2,218 $2,210 $2,027

Chapter 90 and MBTA spending is also up

Highway record

high spending

levels on projects

are in addition

to higher spending

levels for

Chapter 90

and higher capital

spending at the

MBTA.

Page 7: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

But we know that it’s not enough – our assets are not yet in good condition

Page 8: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

So what’s the gameplan? • Prioritize: Focus on fixing what we have, in order to

improve reliability for drivers and transit users alike

• Measure and Track: Document asset condition, set targets and track progress

• Deliver: Deliver projects on time and on budget while minimizing customer disruption wherever possible

• Innovate: Reinvent how we plan, deliver and finance transportation projects

• Plan Ahead: Design/engineer and plan for the next generation of major investments

Page 9: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

PRIORITIZE

Reinventing Capital Budgeting

9

Page 10: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Reinventing Capital Planning

Page 11: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Capital Investment Plan Priorities

1 Reliability

2 Modernization

3 Expansion

Maintain and improve the

condition and reliability

► Necessary routine and

capital maintenance

► State of Good Repair

projects designed

primarily to bring asset

condition up to an

acceptable level

► Asset management and

system preservation

projects

Address safety and

accessibility to

accommodate growth

► Compliance with federal

mandates or other

statutory requirements for

safety and/or accessibility

improvements

► Projects that go beyond

State of Good Repair and

substantially modernize

existing assets

► Projects that provide

expanded capacity to

accommodate current or

anticipated demand on

existing systems

Expand diverse

transportation options

► Projects that expand

highway, transit and rail

networks and/or services

► Projects that expand

bicycle and pedestrian

networks to provide more

transportation options and

address health and

sustainability objectives

11

Page 12: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

64%

21%

14%

Overall program budget by priorities 1, 2 and 3

Investing in Reliability and Modernization

Overall spending by priority

Spending

Priority

% of Total

Spending Aeronautics Highway IT MBTA Rail RMV Transit

1 / Reliability 64% $269.3 $4,657.3 $54.1 $4,437.2 $248.3 $0.9 $128.1

2 / Modernization 21% $25.0 $1,563.6 $43.7 $1,385.3 $57.5 $109.6 $93.9

3 / Expansion 14% $494.4 $1,587.0 $132.0

Planning &

Enterprise

Services

Chapter 90 $1,000.0

Overall spending by priority by Division (in $ millions)

► The 2018-2022 update continues the investment strategy of the

prior CIP

► 64% of funds go toward the reliability of our transportation

system

► Modest investments are made in modernization and expansion

of the system

► CIP is funded from a mix of federal and state sources, each of

which varies with respect to its flexibility in uses for different

elements of the transportation system

12

Page 13: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Reliability Investments by Program

$58.0 $10.0

$10.0

$50.1

$0.9

$138.3

$5.3

$36.5

$15.0

$53.2

$1,285.6

$390.9

$112.6

$400.8

$1,702.7

$544.6

$15.5

$9.6

$19.9

$9.1

$350.0

$235.8

$150.0

$50.0

$4.6

$543.9

$50.0

$281.7

$161.5

$75.0

$660.0

$2,028.2

$66.6

$155.0

$114.3 Aeronautics / Airport pavement management system

Aeronautics / Airport capital improvement

Highway / All-electronic tolling

Highway / Bridge

Highway / Design, environment and right-of-way

Highway / Equipment

Highway / Facilities

Highway / Interstate pavement

Highway / Municipal bridge

Highway / Non-interstate pavement

Highway / Pre-apprenticeship

Highway / Retainage and utility payments

Highway / Roadway improvements

Highway / Safety improvements

Highway / Tunnels

Information Technology / Desktop experience

Information Technology / Digital infrastructure

Information Technology / Cyber/information security

Information Technology / Asset management

MBTA / Bridges and tunnels

MBTA / Revenue vehicles

MBTA / Facilities

MBTA / Stations

MBTA / System upgrades

MBTA / Track, signals, and power

Rail / Bridges

Rail / Facility reliability

Rail / Grade crossings

Rail / Vehicle reliability

Rail / Track and right-of-way reliability

RMV / Operations Management

Transit / Mobility assistance program

Transit / RTA facility and vehicle maintenance

Transit / Technical assistance

Transit / RTA vehicle replacement

Five-year program budget in millions

Aeronautics Highway IT MBTA Rail RMV Transit Total FY18-22

$269.3(millions) $4,657.3 $54.1 $4,437.2 $248.3 $0.9 $128.1 $9,795.2

Page 14: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

MEASURE AND TRACK

Managing Assets and Performance

14

Page 15: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Tracking Performance

Page 16: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

MassDOT Performance Goals Customer Experience: Provide reliable and accessible services to MassDOT and MBTA customers and ensure that they are satisfied with the services provided.

System Condition: Ensure that the transportation system is well maintained and follows best practices for maintaining, preserving, and modernizing assets.

Budget and Capital Performance: Maximize MassDOT capital investment effectively and efficiently by delivering programs and projects that produce the greatest benefits to the Commonwealth, its residents and its visitors.

Safety: Provide and support a multi-modal transportation network that is safe for our workers and all users.

Healthy and Sustainable Transportation: Invest in and support a transportation system that promotes and protects the health of all users and the natural environment.

Page 17: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

17

Implementing Asset Management

Page 18: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Pavement Condition in 2017 Update

• Non-interstate program challenges and strategies • Significant rise in non-

pavement spending within program (analysis detailed in report)

• Bridge, safety, pedestrian accommodations

• Pavement Preservation Policy is under development by task force (Highway, Municipal, Consultants, Contractors)

• Guidance for project development to ensure significant investment to pavements

18

PERFORMANCE

MEASURE

CURRENT

(FY17)

CHANGE

FROM

FY16

2018

TARGET

2020

TARGET

LONG-

TERM

TARGET

PSI:

Interstate

(% good and

excellent

Condition)

87%

(FFY16)

+5%

(FFY15)

85%

88% 90%

PSI:

Non-interstate

(% good and

excellent

condition)

51%

(FFY16)

-2%

(FFY15)

62%

62%

62%

• New Predictive Modeling in 2018 • System condition survey to be completed this fall

Page 19: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

19

Bridge Condition in 2017 Update

• 15% of NHS deck area is poor

• Amongst other cold weather states including Rhode Island, Connecticut, New York, Michigan and Washington, MA is ranked at the bottom of National Standings

• Meeting the 2020 target may be a challenge under current spending • Report details Highway

Analysis of current investment

• Preservation of fair bridges key to long term reduction

We are here :

15% in 2017

2018 Target – 14%

2020 Target – 13%

We want to be here: Long-term target - <10%

MAP-21 Performance Measure:

% of NHS bridge area in poor condition

Page 20: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

DELIVER

Building Projects the Right Way

20

Page 21: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Replacing the Comm. Ave. Bridge

Page 22: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Implementing All-Electronic Tolling . . .

Page 23: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

. . . And reconstructing the Turnpike

Page 24: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Finishing the Bridge Mega-Projects: 3 Done

24

Page 25: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Finishing the Bridge Mega-Projects: 2 to go

25

Page 26: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Increasing MBTA Capital Spending

26

Page 27: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Draft for Discussion & Policy Purposes Only

Accelerating MBTA Spending on

State of Good Repair

Page 28: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

INNOVATE

Reinventing Project Development, Delivery and Financing

28

Page 29: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

MBTA has been reinventing capital delivery

The MBTA has shortened the construction procurement from 7-9 months to no more than 3 months since the beginning of FY17 with the following improvements:

Eliminated duplicative processes

Held to stated bid periods

Reduced time for routine tasks

Reviewed bid timelines with construction industry groups

The MBTA is currently focused on reducing design procurement to no more than 6 months.

Concept Planning

(Variable Timeframe)

Design Procurement

(11 - 12 Month Process*)

Design

(Variable Timeframe)

Construction Procurement

(3 Month Process)

Construction

(Variable Timeframe)

Page 30: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Now it’s time to do the same process reinvention at MassDOT Highway

11/13/2017 30

Page 31: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Public Private Partnerships: MBTA Automated Fare Collection 2.0

31

Page 32: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

PLAN AHEAD

Planning the Next Generation of Investments

32

Page 33: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Draft for Discussion & Policy Purposes Only

MBTA and MassDOT both need to create a

more robust project pipeline

Contract

Description

Contract

Value ($M)

Parking and

Paving On-Call $22M

Gloucester

Drawbridge

Replacement

$57M

Red Line Test

Track $21M

TOTAL $100M

Note: Contract awards data as of 10/30/17.

Page 34: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

More and better highway projects on the way

34

Page 35: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Green Line Extension

11/13/2017 35

Page 36: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Allston Interchange and Intermodal Project

36

• 3K-Refined – November 30, 2017 DEIR

– Including “throat” variants: Highway Viaduct (HV), Amateur Planner (AMP), & A Better City (ABC)

Page 37: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

- Capital Investments - Policy and Operational Strategies

Bicycle plan

Focus40 (MBTA)

Freight plan

Pedestrian plan

Rail plan

Water plan

Implementation:

Implementation:

Implementation:

Implementation:

Implementation:

Highway Division

Rail & Transit Division

MBTA

Municipal partners

Implementation:

Multiple Plans Underway

Page 38: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

Using new scenario planning tools

Page 39: MassDOT’s Transportation Investment Gameplan · Investment Gameplan Remarks to ARTBA Northeastern Regional Meeting November 9, 2017 ... Rail 3 3 13 42 1 0 51 Transit/MBTA Bond 18

One Scenario from the Freight Plan