Mass Changing Bills of Material_SPD

Embed Size (px)

Citation preview

  • 8/14/2019 Mass Changing Bills of Material_SPD

    1/17

    System Process DocumentMass Changing Bills of Material

    Department

    Responsibility/Role

    File Name 27762023.docRevision

    Document Generation Date 18/01/2010 09:37:00

    Date Modified 1/18/2010 09:37:00 AM

    Last Changed by

    Status

    Mass Changing Bills of Material

    Trigger:

    Concept

    Use the Mass Change Bills page to mass change your manufacturing or engineering bills of

    material. You can define a mass change to add, delete or replace a component, alter a component

    quantity or yield, or change other component information. You can mass change all using bills of

    material or choose a subset of bills by item range, item category, or item type. You can mass

    change primary and alternate bills of material for each using assembly.

    For engineering bills, you can schedule the mass change for a future effective date. Formanufacturing bills, you can implement the changes immediately. You can also report effective

    changes for all using assemblies or components.

    In this topic, you will mass change bills of material.

    Required Field(s) Comments

    Output - Result(s) Comments

    Additional Information

    Last changed on: 1/18/2010 09:37:00 AM Page 1

  • 8/14/2019 Mass Changing Bills of Material_SPD

    2/17

    System Process DocumentMass Changing Bills of Material

    Procedure

    Step Action

    1. Begin by navigating to the Mass Change Bills page.

    Click the vertical scrollbar.

    Page 2 Last changed on: 1/18/2010 09:37:00 AM

  • 8/14/2019 Mass Changing Bills of Material_SPD

    3/17

    System Process DocumentMass Changing Bills of Material

    Step Action

    2. Click the Manufacturing and Distribution Manager link.

    Last changed on: 1/18/2010 09:37:00 AM Page 3

  • 8/14/2019 Mass Changing Bills of Material_SPD

    4/17

    System Process DocumentMass Changing Bills of Material

    Step Action

    3. Click the vertical scrollbar.

    Step Action

    4. Click the Mass Changes link.

    Page 4 Last changed on: 1/18/2010 09:37:00 AM

  • 8/14/2019 Mass Changing Bills of Material_SPD

    5/17

    System Process DocumentMass Changing Bills of Material

    Step Action

    5. Use the Organizations page to select your organization.

    Last changed on: 1/18/2010 09:37:00 AM Page 5

  • 8/14/2019 Mass Changing Bills of Material_SPD

    6/17

    System Process DocumentMass Changing Bills of Material

    Step Action

    6. Click the M1 Seattle Manufacturing list item.

    Step Action

    7. Click the OKbutton.

    orPress [Alt+O].

    Page 6 Last changed on: 1/18/2010 09:37:00 AM

  • 8/14/2019 Mass Changing Bills of Material_SPD

    7/17

    System Process DocumentMass Changing Bills of Material

    Step Action

    8. Use the Mass Change Bills page to change your manufacturing or engineering bills

    of materials in a mass.

    Last changed on: 1/18/2010 09:37:00 AM Page 7

  • 8/14/2019 Mass Changing Bills of Material_SPD

    8/17

    System Process DocumentMass Changing Bills of Material

    Step Action

    9. Click in the Number field.

    Step Action

    10. Enter the desired information into the Number field. Enter "M1-100".

    Page 8 Last changed on: 1/18/2010 09:37:00 AM

  • 8/14/2019 Mass Changing Bills of Material_SPD

    9/17

    System Process DocumentMass Changing Bills of Material

    Step Action

    11. Click in the Type field.

    Last changed on: 1/18/2010 09:37:00 AM Page 9

  • 8/14/2019 Mass Changing Bills of Material_SPD

    10/17

    System Process DocumentMass Changing Bills of Material

    Step Action

    12. Enter the desired information into the Type field. Enter "MCO".

    Step Action

    13. Click in the Type Description field.

    Page 10 Last changed on: 1/18/2010 09:37:00 AM

  • 8/14/2019 Mass Changing Bills of Material_SPD

    11/17

    System Process DocumentMass Changing Bills of Material

    Step Action

    14. Use the Types page to select the type of change.

    Engineering change order types help classify engineering and mass change order to

    items and bills of material, and determine whether such orders apply to engineering

    in addition to manufacturing.

    Step Action

    15. Click the OKbutton.

    orPress [Alt+O].

    Last changed on: 1/18/2010 09:37:00 AM Page 11

  • 8/14/2019 Mass Changing Bills of Material_SPD

    12/17

    System Process DocumentMass Changing Bills of Material

    Step Action

    16. For engineering bills, enter a future effective date for the change. For

    manufacturing bills, you can implement the changes immediately.

    Click in the Effective Date field.

    Page 12 Last changed on: 1/18/2010 09:37:00 AM

  • 8/14/2019 Mass Changing Bills of Material_SPD

    13/17

    System Process DocumentMass Changing Bills of Material

    Step Action

    17. Click in the Items field.

    Last changed on: 1/18/2010 09:37:00 AM Page 13

  • 8/14/2019 Mass Changing Bills of Material_SPD

    14/17

    System Process DocumentMass Changing Bills of Material

    Step Action

    18. Enter the desired information into the Items field. Enter "RT1000".

    Step Action

    19. You can specify the parent items to change. You can use a category set, a category

    range, or an item range.

    Click in the To Item field.

    Page 14 Last changed on: 1/18/2010 09:37:00 AM

  • 8/14/2019 Mass Changing Bills of Material_SPD

    15/17

    System Process DocumentMass Changing Bills of Material

    Step Action

    20. Enter the desired information into the To Item field. Enter "RT1003".

    Last changed on: 1/18/2010 09:37:00 AM Page 15

  • 8/14/2019 Mass Changing Bills of Material_SPD

    16/17

    System Process DocumentMass Changing Bills of Material

    Step Action

    21. Click in the Item Type field.

    Step Action

    22. Enter the desired information into the Item Type field. Enter "Equipment Item".

    Page 16 Last changed on: 1/18/2010 09:37:00 AM

  • 8/14/2019 Mass Changing Bills of Material_SPD

    17/17

    System Process DocumentMass Changing Bills of Material

    Step Action

    23. Click the Save button.

    Step Action

    24. You have completed the Mass Changing Bills of Materials procedure.End of Procedure.

    Last changed on: 1/18/2010 09:37:00 AM Page 17