Upload
larry-sherrod
View
215
Download
0
Embed Size (px)
Citation preview
8/14/2019 Mass Changing Bills of Material_SPD
1/17
System Process DocumentMass Changing Bills of Material
Department
Responsibility/Role
File Name 27762023.docRevision
Document Generation Date 18/01/2010 09:37:00
Date Modified 1/18/2010 09:37:00 AM
Last Changed by
Status
Mass Changing Bills of Material
Trigger:
Concept
Use the Mass Change Bills page to mass change your manufacturing or engineering bills of
material. You can define a mass change to add, delete or replace a component, alter a component
quantity or yield, or change other component information. You can mass change all using bills of
material or choose a subset of bills by item range, item category, or item type. You can mass
change primary and alternate bills of material for each using assembly.
For engineering bills, you can schedule the mass change for a future effective date. Formanufacturing bills, you can implement the changes immediately. You can also report effective
changes for all using assemblies or components.
In this topic, you will mass change bills of material.
Required Field(s) Comments
Output - Result(s) Comments
Additional Information
Last changed on: 1/18/2010 09:37:00 AM Page 1
8/14/2019 Mass Changing Bills of Material_SPD
2/17
System Process DocumentMass Changing Bills of Material
Procedure
Step Action
1. Begin by navigating to the Mass Change Bills page.
Click the vertical scrollbar.
Page 2 Last changed on: 1/18/2010 09:37:00 AM
8/14/2019 Mass Changing Bills of Material_SPD
3/17
System Process DocumentMass Changing Bills of Material
Step Action
2. Click the Manufacturing and Distribution Manager link.
Last changed on: 1/18/2010 09:37:00 AM Page 3
8/14/2019 Mass Changing Bills of Material_SPD
4/17
System Process DocumentMass Changing Bills of Material
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Mass Changes link.
Page 4 Last changed on: 1/18/2010 09:37:00 AM
8/14/2019 Mass Changing Bills of Material_SPD
5/17
System Process DocumentMass Changing Bills of Material
Step Action
5. Use the Organizations page to select your organization.
Last changed on: 1/18/2010 09:37:00 AM Page 5
8/14/2019 Mass Changing Bills of Material_SPD
6/17
System Process DocumentMass Changing Bills of Material
Step Action
6. Click the M1 Seattle Manufacturing list item.
Step Action
7. Click the OKbutton.
orPress [Alt+O].
Page 6 Last changed on: 1/18/2010 09:37:00 AM
8/14/2019 Mass Changing Bills of Material_SPD
7/17
System Process DocumentMass Changing Bills of Material
Step Action
8. Use the Mass Change Bills page to change your manufacturing or engineering bills
of materials in a mass.
Last changed on: 1/18/2010 09:37:00 AM Page 7
8/14/2019 Mass Changing Bills of Material_SPD
8/17
System Process DocumentMass Changing Bills of Material
Step Action
9. Click in the Number field.
Step Action
10. Enter the desired information into the Number field. Enter "M1-100".
Page 8 Last changed on: 1/18/2010 09:37:00 AM
8/14/2019 Mass Changing Bills of Material_SPD
9/17
System Process DocumentMass Changing Bills of Material
Step Action
11. Click in the Type field.
Last changed on: 1/18/2010 09:37:00 AM Page 9
8/14/2019 Mass Changing Bills of Material_SPD
10/17
System Process DocumentMass Changing Bills of Material
Step Action
12. Enter the desired information into the Type field. Enter "MCO".
Step Action
13. Click in the Type Description field.
Page 10 Last changed on: 1/18/2010 09:37:00 AM
8/14/2019 Mass Changing Bills of Material_SPD
11/17
System Process DocumentMass Changing Bills of Material
Step Action
14. Use the Types page to select the type of change.
Engineering change order types help classify engineering and mass change order to
items and bills of material, and determine whether such orders apply to engineering
in addition to manufacturing.
Step Action
15. Click the OKbutton.
orPress [Alt+O].
Last changed on: 1/18/2010 09:37:00 AM Page 11
8/14/2019 Mass Changing Bills of Material_SPD
12/17
System Process DocumentMass Changing Bills of Material
Step Action
16. For engineering bills, enter a future effective date for the change. For
manufacturing bills, you can implement the changes immediately.
Click in the Effective Date field.
Page 12 Last changed on: 1/18/2010 09:37:00 AM
8/14/2019 Mass Changing Bills of Material_SPD
13/17
System Process DocumentMass Changing Bills of Material
Step Action
17. Click in the Items field.
Last changed on: 1/18/2010 09:37:00 AM Page 13
8/14/2019 Mass Changing Bills of Material_SPD
14/17
System Process DocumentMass Changing Bills of Material
Step Action
18. Enter the desired information into the Items field. Enter "RT1000".
Step Action
19. You can specify the parent items to change. You can use a category set, a category
range, or an item range.
Click in the To Item field.
Page 14 Last changed on: 1/18/2010 09:37:00 AM
8/14/2019 Mass Changing Bills of Material_SPD
15/17
System Process DocumentMass Changing Bills of Material
Step Action
20. Enter the desired information into the To Item field. Enter "RT1003".
Last changed on: 1/18/2010 09:37:00 AM Page 15
8/14/2019 Mass Changing Bills of Material_SPD
16/17
System Process DocumentMass Changing Bills of Material
Step Action
21. Click in the Item Type field.
Step Action
22. Enter the desired information into the Item Type field. Enter "Equipment Item".
Page 16 Last changed on: 1/18/2010 09:37:00 AM
8/14/2019 Mass Changing Bills of Material_SPD
17/17
System Process DocumentMass Changing Bills of Material
Step Action
23. Click the Save button.
Step Action
24. You have completed the Mass Changing Bills of Materials procedure.End of Procedure.
Last changed on: 1/18/2010 09:37:00 AM Page 17