CURICULUM VITAE J.M. Janse Van Vuuren Cellophane Number: 076 441 5100 Home Tel number: 016 971 3808 Email: [email protected] PERSONAL DATA Surname: Janse Van Vuuren First Names: Johannes Marthinus (Martin) Date of Birth: 28 April 1966 Language: Afrikaans and English Driver’s License: Code 10 EDUCATION High School Die Bult – George: Matric EMPLOYMENT HISTORY : Contractor: Stefanutti Stocks Duties: Electrical Supervisor for the installation of new Compressor at the Sasol Sasolburg ATR plant. Installed all cable works, earthing, tie-ins to existing MCC.

Martin - CV

Embed Size (px)

Citation preview

Page 1: Martin - CV

CURICULUM VITAE

J.M. Janse Van Vuuren

Cellophane Number: 076 441 5100

Home Tel number: 016 971 3808

Email: [email protected]

PERSONAL DATA

Surname: Janse Van Vuuren

First Names: Johannes Marthinus (Martin)

Date of Birth: 28 April 1966

Language: Afrikaans and English

Driver’s License: Code 10

EDUCATION

High School Die Bult – George: Matric

EMPLOYMENT HISTORY :

Contractor: Stefanutti Stocks

Duties: Electrical Supervisor for the installation of new Compressor at the Sasol Sasolburg ATR plant.

Installed all cable works, earthing, tie-ins to existing MCC.

Year: 08 February 2016 - current (Limited duration Contract).

Contractor: Foster & Wheeler (EPCM)

Page 2: Martin - CV

Duties: Managing the subcontractor for the installation and quality control of the project.

Year: 03/2008 – 15 Dec 2015 (Was given EOC due to no projects available for Foster Wheeler at this stage)

Career Summary: Foster & Wheeler (EPCM)

2014 – 15 Dec 2015:

Managed the LPC & ESE Projects Temane Mozambique

Construction supervisor and QA/QC

Subcontractor : Kentz

Was appointed “Site Manager” while Site Manager was on leave.

Installation of new substation / low pressure compressors

Installation of MV switchgear /LV MCC and switchgear.

Installation of new Super Heater.

Installation of 4th MV Generator.

Changeover of existing Thyristor panels with new panels.

Nitrogen package and instrument air package.

Installation of electrical and instrumentation equipment

For the project.

2013 – 2014 Managed the C3 Stabilization project PP2 (FWSA)

Subcontractor: Stefanutti Stocks

Instrumentation quality control QA/QC

Page 3: Martin - CV

Assisting in getting the project to completion.

Installation of instrumentation for the C3 project

2010 – 2013 Managed the FT WAX (Work Pack 01)(FWSA)

Construction supervisor; QA/QC

Subcontractor: Stefanutti Stocks

Complete installation of WP01

Installation of new substation and rack room.

Installation of all MV switchgear /LV MCC switchgear

Installation of electrical equipment for the project

Installation of 11kV transformers complete with

Feeders and additional switchgear in the feeder substation.

2009 – 2010 Managed the 4t Land Lord project (FWSA)

Construction supervisor

Subcontractor: Kentz

Installation of new rack room and substation (DCS) KK-SS-03

Installation of electrical and instrumentation for the project.

QA/QC for the installation.

2008 – 2009 Managed the Nat Gas 149 Project Komatipoort (FWSA)

Construction supervisor

Subcontractor: Kentz

Installation of new substation and rack room

Installation of LV MCC and switchgear.

Installation of electrical and instrumentation equipment

Page 4: Martin - CV

For the project.

Assisting in completion of the project.

QA/QC for the project.

March 2008 Managed the PPS Project (FWSA)

Construction supervisor

Subcontractor: Energotec.

Installation of additional gas train for NG149

Installation of LV MCC and switchgear.

Installation of new substation and addition of equipment

Installation of electrical and instrumentation equipment

For the project.

QA/QC for the project.

---------------------------------------------------------------------------------------------------------

Contractor: B & W Instrument & Electrical

Project: Veolia

Duties: Construction Supervisor, QA/QC, Installation of extra lights,

Installation of Cables, Cable glanding and termination.

Year: 03/2007 – 02/2008

Contractor: B & W Instrument & Electrical

Project: Shutdown Rectisol

Duties: Construction Supervisor, QA/QC

Year: 01/2007 – 02/2007

Page 5: Martin - CV

Contractor: XSTRATA

Project: Vantech Mine

Duties: Electrical Supervisor, QA/QC

Year: 09/2006 – 12/2006

Contractor: B & W Instrument & Electrical

Project: Project Landlord – Veolia Water Systems.

Duties: Electrical Supervisor, Electrical QA/QC, First Aider,

KBC Induction, Legal Liability.

Year: 10/2005 – 08/2006

Contractor: B & W Instrument & Electrical

Project: Waste Recycle Facility Project.

Duties: Electrical Supervisor, Small Power and Lights,

Field Installation of Motors and MCC in Substation,

First Aider, KBC Induction, Legal Liability.

Year: 05/2004 – 10/2005

Other Experience:

2004 – 2008 B & W Instrumentation & Electrical

Construction Supervisor

Various projects ESD replacement at unit 040

ESD replacement at unit 240

Page 6: Martin - CV

UPS installation at unit 244

Lightning and small power installation at control room

Desalination plant

Installation of temporary truck stop

Additional Work:

QC for electrical installation at project Veolia

Additional work at WRF

Construction supervisor for WRF project with FW as client

E&I supervisor for Wade Walker PMR Rustenburg capacity

Increase project

E&I supervisor GLTA

Electrical supervisor Polokwane smelters green fields project

Electrical supervisor BMR Rustenburg Installation of all electrical equipment for the Cool isle project.

Contractor: Electrical Wade Walker

Duties: Electrical Supervisor, Small power and Lights,

First Aider, KBC Induction, Legal Liability.

Year: 07/2003 – 05/2004

Contractor: Grinaker LTA (MEIP)

Page 7: Martin - CV

Electrical and Maintenance

Duties: Foreman Electrical, Small power and Lights,

First Aider, KBC inducted, Legal Liability,

Excavation Inspector, install Construction Power

Up to 550 volt and Removal thereof, Safety Rep.

Year: 11/2001 – 07/2003

Contractor: Grinaker LTA

Electrical and Mechanical

Duties: Install motors, motor termination,

DB and MCC panel Terminations,

Small power and lights.

Year: 11/1998 – 10/2001

Contact Person: Keith Moss / Koos Janse Van Rensburg

Own Business: Breakdown Recovery

Year: 11/1997 – 11/1998

Machine Setter: Nestle Bethal

Duties: Maintenance and Running maintenance.

Removal of intake valves and shafts.

Weld up to size and machine down to size.

Page 8: Martin - CV

Reason for leaving: End of Contract

Year: 1995 – 1997

Millwright: Wepner Engineering

Contractual Basis

Duties: Foreman Pipe Fitter, and Machine Setter

Contact Person Chris Wepner

Year: 1994 – 1995

Self Employed: Bulawayo Zimbabwe

Millwright

1992 – 1994

Counter Sales: Timber City

Kempton Park

1991 – 1992

S.A.N.D.F: National Service

Heidelberg (TVL)

07/1988 – 12/1990

Apprentice: Electrician

Page 9: Martin - CV

C.T.C. Witbank

01/1986 – 06/1988

Apprentice: Instrument Technician

U.S.C.O. Vereeniging

1985

Education, Qualifications and Memberships:

Education:

Metric 1984

Qualifications:

20 years electrical experience.

15 years instrumentation experience.

Competant electrical supervisor.

Memberships:

None

Courses Done:

Venomous Snake Handling Course 2015.

Construction Regulations 2016.

Legal Responsibility and Accountability 2016.

Working at Heights 2016.

HIRA (Hazard Identification and Risk Assesment) 2016.

Radio detection RD8000/Accessories 2011

Page 10: Martin - CV

Fire & Gas Training Sasol 2006

Certificate of competence:

E&I Supervisor

2004

---------------------------------------------------

Summary:

I’m a hard worker and thrive on challenges.

I set myself goals to reach.

Completion of a project is an achievement.

I will be an asset for your company.

I am always willing to learn.

Please see “Letter of Recommendation” below.