Marina‐Salinas Multimodal Corridor Conceptual Plan
FORA Administrative CommitteeApril, 1 2015
1
Goals• Preserve a corridor
• Plan for regional high quality transit
• Provide a regional bicycle route
• Improve pedestrian safety
• Develop a conceptual corridor design
• Estimate the cost of implementation
2
Partner Agencies
3
Overview
4
Study Area
5
Terrain
Salinas River & Floodplain
Agriculture
Congestion
PM Delays
East Garrison
Education & Employment
Intermodal Transit Center
Bridge Widening
Community Input
6
Preferred Alignment
7
Enhanced Transit
8
Separate BuswayExclusive Bus Lanes
Enhanced Intersections & Stops
9
Queue Jumps
Transit Island Buffer Bicycle Signals
Enhanced Bike
10
Enhanced Bike – Green Treatments
11
Conceptual Design
12
S. Davis Rd
13
Reservation Rd (Davis Rd – Watkins Gate)
14
East Garrison (Transit)
15
Imjin Parkway (Reservation Rd – Imjin Rd)
16
Imjin Parkway (Imjin Rd – 2nd Ave)
17
2nd Avenue (Imjin Pkwy – 9th St)
18
Implementation
19
• Long‐term project
• Phasing
• Federal, State and Local Funds
Next Steps
20
Review Draft Planlines/Plan (Mar/Apr)
Refine Draft Plan (Apr)
Adopt Final Plan
(May/June)