24
MAP D-PHASE • Forecast Demonstration Project • Instrument of WWRP • Last phase of MAP Mathias Rotach, MeteoSwiss

MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

Embed Size (px)

Citation preview

Page 1: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

MAP D-PHASE

• Forecast Demonstration Project• Instrument of WWRP • Last phase of MAP

Mathias Rotach, MeteoSwiss

Page 2: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

What is an FDP?

WWRP instrument> Forecast of weather of international relevance

high-impact weather

> Clear evaluation protocols

> Expectation of success

> Clear advance in operational forecast. Proposal to WWRP

Page 3: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

Components of MAP FDP

Forecast heavy precipitation events in the alps Include assimilation schemes (e.g., for radar

data) Coupling hydro/meteo models End-user specific products

develop and verify on MAP cases experience with operational MC-2 (3km resolution during MAP SOP)

Forecast Demonstration period

Page 4: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

General Goals

Demonstrate ability for improved forecast of heavy precipitation in the alps

High-resolution atmospheric modelling ensemble forecast technique

Radar data (assimilation)

Hydrological modeling End users involved (end user needs, e.g.

probabilistic forecasts) Evaluation protocols (yet to be determined)

Page 5: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

D-PHASE….

Demonstration of Probabilistic Hydrological and Atmospheric

Simulation of Flooding Events in the Alps

Page 6: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

D-PHASE essentials

Forecast (warning) chain for heavy precipitation events in the alps

Test in pre-defined ‘Forecast Period’ MAP season (Sept to November): 2006 (7?) extension to COPS (DFG field program on QNV in summer 07)?

Joint Target area: Lago Maggiore – various sub-areas

Page 7: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

Strategy for D-PHASE

Atmosphere - Multi-component approach:

1. Local EPS systems (COSMO-LEPS, LAMEPS, PEPS,..) 3-5 days probabilistic forecast likelihood of ‘event’

Page 8: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

Probability maps for 24 h precipitation

André Walser & COSMO-LEPS

Page 9: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

Strategy for D-PHASE

Atmosphere - Multi-component approach:

1. Local EPS systems (COSMO-LEPS, LAMEPS, PEPS,..) 3-5 days probabilistic forecast likelihood of ‘event’

2. ‘standard’ deterministic models at high resolution (1-3km) short-range, targeted coupled hydrological models latest radar information assimilated

3. A possible ‘micro-LEPS’ made up as a poor man’s EPS from the above probabilistic information on hydrol. patterns.

Page 10: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

Strategy for D-PHASE

Hydrosphere:

1. Hydrological models distributed coupled

2. Assimilation of latest information radar composites rain gauges

3. Probabilistic forcing from atmospheric models from radar (obs) uncertainty

Page 11: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

Using COSMO-LEPS for hydrological forecasting

COSMO-LEPS Setup:

quasi-operational since November 2002

initial and boundary cond. from ECMWF EPS

Integration period: 120 h

Model: Lokal Modell (LM)

Grid-spacing: 10 km, 32 levels

Hydrological Model Setup:

Rhine upstream of Rheinfelden (34550 km2)

Model: PREVAH (Gurtz et al. 1999)

Driven by LM / COSMO-LEPS

A few test cases with 51 EPS members

AARE(Thun) ILL

(Gisingen)

Mark Verbunt, Christoph Schär ETH Zürich & COSMO-LEPS crew

Page 12: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

Deterministic Runoff Forecast

observedrunoff

Ru

no

ff [

mm

/h]

Aare - Thun (2490 km2)

1970:~400 m3/s

1999:~570 m3/s

initialization

deterministic forecast

hydrological model driven bysurface observations

surface observations

simulated runoff

Mark Verbunt, Christoph Schär ETH Zürich & COSMO-LEPS crew

Page 13: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

Deterministic versus Probabilistic Forecast

Ru

no

ff [

mm

/h]

AARE - Thun (2490 km2)

51 member LEPS forecast

hydrological model driven bysurface observations

surface observations

no precip

initialization

(Mark Verbunt, ETH Zürich)Mark Verbunt, Christoph Schär ETH Zürich & COSMO-LEPS crew

Page 14: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

Deterministic versus Probabilistic Forecast

Ru

no

ff [

mm

/h]

ILL – Gisingen

51 member LEPS forecast

hydrological model driven bysurface observations

surface observations

initialization

Mark Verbunt, Christoph Schär ETH Zürich & COSMO-LEPS crew

Page 15: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

Representative membersR

un

off

[m

m/h

]

5 EPS members (COSMO-LEPS clustering)

10 EPS members (COSMO-LEPS clustering)

51 EPS members

Ru

no

ff [

mm

/h]

Ru

no

ff [

mm

/h]

(Mark Verbunt, ETH Zürich)

ILL – Gisingen

Mark Verbunt, Christoph Schär ETH Zürich & COSMO-LEPS crew

Page 16: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

Strategy for D-PHASE

End users:

1. Authorities civil protection river/lake management

2. THEIR needs thresholds cost/loss

--> end-to-end flood forecasting system

Page 17: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

Event?Where?

yes

HI-ressimulation

Alert

Day -4

ECMWF EPS

LAMEPS

Day 0Latest obs.

Nowcasting

Latest obs.Latest obs.

Action

Tim

e

regionalLEPS(COSMO) LEPS

Days -3, -2, -1Sub-domain X

no

no

HI-ressimulationHI-res

simulationHI-res

simulationHI-res

simulation

Confir-mation

ECMWF EPS

LAMEPSregionalLEPS(COSMO) LEPS

HI-resLEPS

Hydrol. simulation

Page 18: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

Contributions

Many (more than one..) LEPS SYSTEMS Many high-res (1-4km) deterministic models

--> most covering ‚the alps‘

Page 19: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss
Page 20: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

Contributions

Many (more than one..) LEPS SYSTEMS Many high-res (1-4km) deterministic models

--> most covering ‚the alps‘ Many hydrol. Models

--> each for one (more) catchment

Page 21: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss
Page 22: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

Contributions

Many (more than one..) LEPS SYSTEMS Many high-res (1-4km) deterministic models

--> most covering ‚the alps‘ Quite a few hydrol. Models

--> each for one (more) catchments End users: to be determined & involved

Page 23: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

Time table

Evaluation etc. 2007 Demonstration period: Aug to Nov 2006 (Jun/Jul

desirable) Test chain ready summer 2006 High res. models tested: end 2005 Hydrol. Models tested: end 2005 Test cases defined: May 2005 Definition of user needs: May 2005 Set up of organisation end 2005 (done) Financial resources:

Start summer 2005application asap (dependent on

what/where/etc)

Proposal WWRP: spring 2005 Start: May 2004

Time

June to Nov 2007 ??

Page 24: MAP D-PHASE Forecast Demonstration Project Instrument of WWRP Last phase of MAP Mathias Rotach, MeteoSwiss

Thank you for your attention