DRAFT

MANUAL ON SOIL CONSERVATION

AND PIPELINE CONSTRUCTION

Based on a Report

Prepared by

TERA ENVIRONMENTAL CONSULTANTS (ALTA.) LTD.

and

PEDOLOGY CONSULTANTS

ENVIRONMENT

F Land Reclamation Division u Regulated Operations Division

.F October, 1995

Page 2: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND
Page 3: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

DRAFT

MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION

Based on a Report

Prepared by

TERA ENVIRONMENTAL CONSUL TANTS (AL TA. ) L TD.

and

PEDOL OGY CONSULTANTS

ENVIRONMENT

Land Reclamation Division

Regulated Operations Branch

Ortober, 1985

Page 4: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

A l b e r t a Environment. Regu la ted Operat ions Branch. Land Reclamat ion D i v i s i o n . Manual on S o i l Conservat ion and P i p e l i n e Cons t ruc t i on . Edmonton. 1985. 82p.

Page 5: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

1 .0 INTRODUCTION

MANUAL ON SOIL CONSERVATION AND

PIPELINE CONSTRUCTION

Page

2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

2.1 S o i l M i x i n g

2.2 S o i l Compaction

2.3 Topso i l Loss

3.0 AGRICULTURAL SOILS

3.1 Parent M a t e r i a l s

3.2 S o i l Zones o f A l b e r t a

3.3 S o i l Orders o f A lbe r ta

4.0 PIPELINE CONSTRUCTION

4.1 P i p e S ize

4.2 R igh t o f Way Width

4.3 Cons t ruc t i on Operat ions

4.31 R igh t o f Way Prepara t ion

4.32 I n s t a l l a t i o n

4.33 Cleanup and Res to ra t i on

4.34 R igh t o f Way T r a f f i c

4.4 Equipment

4.41 Convent ional Equipment

4.42 Spec ia l i zed Equipment

Page 6: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND
Page 7: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

Page

5.0 PLANNING FOR SOIL CONSERVATION

5.1 Calcula t ion of Right of Way Width

5.2 So i l Conservation Procedures

5.21 No Topsoil S t r ipp ing

5.22 Trench Width Topsoil S t r ipp ing

5.23 Blade Width Topsoil S t r ipp ing

5.24 Trench and Spoi l Area Topsoil S t r ipp ing

5.25 Trench, Spoi l and Work Area Topsoil S t r i p p i n g

5.3 Procedures fo r Spec ia l F ie ld S i t u a t i o n s

5.31 Road, Rail and Canal Crossings

5.32 Foreign Line Crossings and Test S i t e s

5.33 Grading

5.4 Extraordinary Conditions

5.41 Wet S o i l Condit ions

5.42 Frozen S o i l Conditions

5.43 I r r i g a t e d Lands

5.44 Three Phase S o i l Handling

Page 8: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND
Page 9: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

TABLES AND FIGURES

TABLES

3.1 Parent Ma te r i a l C h a r a c t e r i s t i c s

Page

8

Cl imat ic Fea tures of t h e S o i l Zones and Their Imp l i ca t ions t o P ipe l ine Construct ion 15

Fea tures of the S o i l Orders of Alberta 16

Associated Impacts t o t h e S o i l Orders of Alberta 17

Ground P res su res For Typical P i p e l i n e Equipment 73

Subsoi l C r i t e r i a 80

FIGURES

3.1 S o i l Zones of Alberta

4.1 P ipe l ine Right of Way

5.1 Typical S t r i p p i n g and Storage Requirements

5.2 No Topsoil S t r i p p i n g

5.3 Trench Width Topsoil S t r i p p i n g

5.4 Blade Width Topsoi l S t r ipp ing

5.5 Trench and Spo i l Area Topsoil S t r i p p i n g

5.6 Trench, Spoi l and Work Area Topsoil S t r i p p i n g

5.7a S o i l Handling a t Road, Rai l and Canal Crossings (Cu l t i va t ed Lands)

5.7b S o i l Handling a t Road, Rai l and Canal Crossings (Pas ture Lands)

5.8 S o i l Handling a t Foreign Line Crossings and Test S i t e s

5.9 Three Phase S o i l Handling 78

Page 10: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND
Page 11: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

PREFACE

This manual d i s c u s s e s t h e impact of p i p e l i n e c o n s t r u c t i o n on a g r i c u l t u r a l

land, i nc lud ing l and with p o t e n t i a l f o r a g r i c u l t u r e . The document

add re s se s reasons why c e r t a i n s o i l s a r e more s e n s i t i v e t o impact than

o the r s and h i g h l i g h t s s p e c i f i c a c t i v i t i e s of p i p e l i n e c o n s t r u c t i o n which

c r e a t e t hose impacts. Based on t h i s d i s cus s ion , f i v e common soil handl ing

procedures f o r conse rva t i on of a g r i c u l t u r a l l ands du r ing p i p e l i n e

c o n s t r u c t i o n a r e d i scussed i n terms of their r e l a t i v e e f f e c t i v e n e s s f o r

d i f f e r e n t s o i l types .

This manual has been designed t o a s s i s t p i p e l i n e p l anne r s i n determining

opt imal soil handl ing procedures based on mi 1 type , seasona l cond i t i ons

and equipment a v a i l a b i l i t y . The manual is n e i t h e r a r e g u l a t i o n , nor a

s t anda rd ; i t s in tended use is a s a r e f e r ence document f o r t hose involved

i n p i p e l i n e planning.

Page 12: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND
Page 13: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

1 -0 INTRODUCTION

A g r i c u l t u r a l s o i l s a r e one of A l b e r t a ' s most v a l u a b l e r e s o u r c e s ; mainten-

ance of s o i l c a p a b i l i t y is e s s e n t i a l t o suppor t t h e a g r i c u l t u r e i n d u s t r y

i n t h e p rov ince . The pet roleum i n d u s t r y is a l s o a major c o n t r i b u t o r t o

t h e p r o v i n c e ls economic h e a l t h through employment, t a x a t i o n , and t h e pur-

c h a s i n g of l o c a l goods and s e r v i c e s . C o n f l i c t s do, however, occur between

t h e s e two i n d u s t r i e s . One of t h e major concerns h a s been t h e impact o f

p i p e l i n e c o n s t r u c t i o n on t h e p r o d u c t i v e c a p a b i l i t y of a g r i c u l t u r a l soils.

The long-term g o a l of m a i n t a i n i n g so i l q u a l i t y can and shou ld c o i n c i d e

wi th t h e more immediate g o a l s of t h e p i p e l i n e owner and c o n t r a c t o r . Th i s

manual has been des igned t o f a c i l i t a t e t h e p i p e l i n e owner i n t h e p l a n n i n g

and c o n s t r u c t i o n of p i p e l i n e s a c r o s s a g r i c u l t u r a l l a n d s wi thou t compromis-

i n g t h e s o i l q u a l i t y r equ i rements of t h e province .

The o b j e c t i v e of t h e s t u d y is t o review c u r r e n t methods of s o i l h a n d l i n g

d u r i n g p i p e l i n e c o n s t r u c t i o n and t o a s s e s s p rocedures most s u i t e d t o

s p e c i f i c s o i l and a g r i c u l t u r a l l and uses . The document is i n t e n d e d f o r

u s e by p i p e l i n e p l a n n e r s i n d e s i g n i n g soil hand l ing p rocedures f o r pipe-

l i n e s which c r o s s a g r i c u l t u r a l l ands . l lAgr icu l t u r a l l ands" means a l l

l a n d s i n t h e p rov ince used, o r capab le of being used, f o r annual f i e l d

c rops , f o r a g e c r o p s o r g raz ing .

The purpose o f t h i s r e p o r t is t o d i s c u s s t h e i n t e r r e l a t i o n s h i p s between

s o i l p r o p e r t i e s , p i p e l i n e c o n s t r u c t i o n p r a c t i c e s and soil impacts ; t o

document c u r r e n t p i p e l i n e s o i l hand l ing p rocedures , and t o de te rmine which

p r o c e d u r e s a r e b e s t s u i t e d t o s p e c i f i c s o i l and l a n d use c o n d i t i o n s .

Three major impac t s t o a g r i c u l t u r a l s o i l from p i p e l i n e c o n s t r u c t i o n a r e :

1. S o i l mixing.

2. Compaction o f t o p s o i l o r s u b s o i l .

3 . Loss of t o p s o i l .

Page 14: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

These impacts may vary i n type and magnitude depending on s o i l type ,

weather, pipe s i z e , equipment a v a i l a b i l i t y , and s o on.

The cons t ruc t ion ope ra t i ons which c o n t r i b u t e most t o s o i l impact include:

1. grading,

2. t renching ,

3. b a c k f i l l i n g ,

4. r i g h t of way t r a f f i c , and

5. clean-up

These ope ra t i ons a r e discussed i n subsequent s e c t i o n s and i n d i c a t e how

they e f f e c t s o i l s and how t h a t e f f e c t can be avoided o r reduced.

There a r e a number of methods used for s o i l handling and reclamation dur-

ing p i p e l i n e cons t ruc t ion . Although s u b t l e v a r i a t i o n s occur , t h e f i v e

common procedures assessed i n t h i s repor t are:

1. No t o p s o i l s t r i p p i n g ,

2. Trench width t o p s o i l s t r i p p i n g ,

3. Blade width t o p s o i l s t r i p p i n g ,

4. Trench and s p o i l a r e a t o p s o i l s t r i p p i n g , and

5. Trench, s p o i l and work a r ea t o p s o i l s t r i p p i n g .

S e l e c t i o n of the most approp r i a t e soil handling method t o s u i t a s p e c i f i c

p ro jec t should be based on s o i l data c o l l e c t e d during p ro j ec t planning,

land uses , farming p r a c t i c e s and o ther f a c t o r s such a s p ro j ec t t iming and

a n t i c i p a t e d weather cond i t i ons . This r epo r t de sc r ibes the r a t i o n a l e f o r

t h e app l i ca t i on of s p e c i f i c s o i l handling procedures t o given f i e l d s i t u a -

t ions. While except i o n s occur , t he most common a p p l i c a t i o n s of each pro-

cedure a r e addressed.

Page 15: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

2.0 IMPACT OF PIPELINE CONSTRUCTION ON AGRICULTURAL LAND

P i p e l i n e cons t ruc t i on equipment opera ted on a g r i c u l t u r a l land can a f f e c t

the p r o p e r t i e s of t h e s o i l . A l t e r a t i o n of s o i l p r o p e r t i e s may change t h e

c a p a b i l i t y of t he s o i l t o s u s t a i n a p a r t i c u l a r land use, thereby, changing

land use c a p a b i l i t y .

Three primary impacts t o a g r i c u l t u r a l s o i l from p i p e l i n e c o n s t r u c t i o n have

been noted. They a r e s o i l mixing, s o i l compaction and s o i l l o s s . No

i n t e n t i o n is made t o q u a n t i f y t h e s e impacts , r a t h e r each is q u a l i t a t i v e l y

d i s cus sed a s a p o t e n t i a l problem.

2.1 SOIL MIXING

The most v i s i b l e impact a s s o c i a t e d with p i p e l i n e cons t ruc t i on on ag r i cu l -

t u r a l l and is the mixing of o rgan ic and n u t r i e n t r i c h t o p s o i l wi th mineral

s u b s o i l which is l e s s f e r t i l e and sometimes t ox i c . Mixing of s o i l s is

u s u a l l y cons idered de t r imen t a l i f t he c a p a b i l i t y of t h e s o i l has been

apprec iab ly lowered.

The d i l u t i o n o r l o s s of o rgan i c s and n u t r i e n t s from t h e roo t zone is a

major e f f e c t of mixing. This d i l u t i o n can a f f e c t p l an t growth t o varying

deg ree s , depending on t h e type of vege ta t ion . Colour comparison of t h e

r ep l aced t o p s o i l with the undis turbed t o p s o i l w i l l g ive a good i n d i c a t i o n

of t h e degree of mixing i n some s o i l s , however, f u r t h e r a n a l y s i s is usua l -

l y r equ i r ed t o s u b s t a n t i a t e t h e problem. For example, while s o i l mixing

might appear t o be ev iden t , t e x t u r e and chemical a n a l y s i s may determine

t h a t l i t t l e or no change i n s o i l c a p a b i l i t y has occurred. Conversely,

some s o i l s e x h i b i t l i t t l e d i f f e r ence i n co lou r between t o p s o i l and sub-

s o i l , l e ad ing one t o conclude t h a t no mixing has occurred. However,

a n a l y s i s may r evea l t h a t , i n f a c t , t h e r e ha s been a chemical change i n

t h e roo t zone m a t e r i a l and a d e f i n i t e reduc t ion i n s o i l c a p a b i l i t y .

Changes i n s o i l chemist ry from mixing poor q u a l i t y s u b s o i l or pa ren t

m a t e r i a l with t o p s o i l , can a l s o nega t i ve ly a l t e r t h e q u a l i t y of t h e r o o t

- 3 -

Page 16: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

zone. The i n c o r p o r a t i o n and p e r s i s t e n c e of t o x i c e lements , such a s sod-

ium, i n t h e t o p s o i l , has been shown t o s e v e r e l y restrict p l a n t growth. A s

well, c e r e a l c rops a r e o f t e n t he most s e n s i t i v e t o changes i n t o p s o i l

chemist ry . This e f f e c t can be measured by comparing crop y i e l d s on and

o f f r i g h t of way. L

A t h i r d e f f e c t of mixing is t e x t u r a l change i n t h e rep laced t o p s o i l . *v.

Changes i n t e x t u r e c r e a t e d i f f i c u l t i e s i n seed es tab l i shment and i n devel-

oping good roo t systems, and may cause problems i n seed bed prepara t ion .

For example, mixing c l a y r i c h s u b s o i l s with loamy t o p s o i l not only a l t e r s - t e x t u r a l composi t ion, but may de s t roy s o i l s t r u c t u r e and make t h e t o p s o i l

more d i f f i c u l t t o "work" because of t h e p resence of hard lumps o r c l ods . F - 7

S o i l mixing g e n e r a l l y occu r s when: L

1. no t o p s o i l is s t r i p p e d p r i o r t o t r ench excava t ion , .r I

2. s t r i p p i n g goes beyond t h e t o p s o i l i n t o t h e s u b s o i l hor izons ,

3. s u b s o i l s t o r e d on c u l t i v a t e d o r r e c e n t l y worked t o p s o i l is rep laced ,

4 . r ep l aced s u b s o i l o v e r f l o b s t h e t r ench onto undis tu rbed t o p s o i l , o r

5 . t h e movement and t u r n i n g of c o n s t r u c t i o n equipment d i s p l a c e s top-

s o i l s , mixing t o p s o i l and s u b s o i l t oge the r .

The e f f e c t of mixing on a p a r t i c u l a r s o i l is dependant upon t h e q u a l i t y

and q u a n t i t y of t h e s o i l involved. For example, deep o rgan i c r i c h

Chernozemic t o p s o i l w i l l not be much a f f e c t e d when mixed wi th a smal l

amount of good q u a l i t y s u b s o i l . However, t h i n n e r , poorer q u a l i t y t o p s o i l s

may be g r e a t l y changed i n n u t r i e n t and o rgan i c con t en t , a s well a s i n tex-

t u r a l and chemical composi t ion, when a s i m i l i a r amount of s u b s o i l is mixed

with i t .

Working with s o i l under wet cond i t i ons can a l s o a l t e r s o i l s t r u c t u r e .

When combined with mixing, t h e a s s o c i a t e d problems a r e u sua l l y even more

severe .

Page 17: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

2.2 SOIL UIMPACTION

Agricul tura l s o i l s have a c a p a b i l i t y t o support plant growth due t o t h e i r

chemical and physical makeup. I f the physical makeup is a l t e r e d , the cap-

a b i l i t y may a l s o change. So i l compaction is evident i n a number of ways,

such a s poor root pene t r a t ion , d i f f i c u l t c u l t i v a t i o n , and r e s t r i c t e d water

movement through the s o i l . Most important ly, compaction a f f e c t s s o i l

a e r a t i o n by decreasing s o i l poros i ty , lowering oxygen l e v e l s and oxygen

renewal and d i f f u s i o n r a t e s . Lower oxygen l e v e l s i n t he s o i l can:

1. r e s t r i c t p l an t root growth,

2. decrease n u t r i e n t uptake by p l an t s ,

3. decrease absorp t ion of water by p l an t s , and

4. encourage formation of compounds t o x i c t o p lan t growth.

Vegetation is a f a c t o r i n determining the r e l a t i v e s e v e r i t y of s o i l com-

pact ion. For example, some p l an t s , such a s grasses , a r e more t o l e r a n t t o

low oxygen d i f f u s i o n r a t e s . than legume crops and a r e t h e r e f o r e more t o l e r -

ant of compaction.

Severe compaction may cause ponding of water and increased eros ion poten-

t i a l by lowering the s o i l ' s i n f i l t r a t i o n capaci ty. Impeded drainage may

lower s o i l temperature enough t o a f f e c t its a b i l i t y t o provide f o r a s u i t -

a b l e b i o t i c h a b i t a t .

S o i l compaction is highly va r i ab l e and depends on moisture content , par-

t i c l e s i z e d i s t r i b u t i o n ( t e x t u r e ) , compactive e f f o r t , and organic matter

content . For a s p e c i f i c s o i l , there is a maximum dry dens i ty which can be

obtained with a given compactive e f f o r t . A t low moisture content , t h e

i nd iv idua l s o i l p a r t i c l e s r e s i s t compaction. Moisture content of 10% t o

20% w i l l genera l ly allow maximum compaction. Water l u b r i c a t e s t he part-

i c l e s and f a c i l i t a t e s re -sor t ing t o a maximum dens i ty by decreasing t h e

shear ing s t r e n g t h of s o i l s . A t higher moisture contents , t h e s o i l w i l l

not compact, but flow away from s t r e s s . When s o i l s become over s a tu ra t ed ,

deep r u t t i n g usua l ly occurs because the s o i l mater ia l flows r a t h e r than

compacts . - 5 -

Page 18: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

Compaction occurs i n both topso i l and subso i l . Topsoil compaction is

e a s i l y remedied through c u l t i v a t i o n . Subsoi l compaction, however, is d i f -

f i c u l t t o overcome, and may p e r s i s t for f i v e o r more years u n t i l the nat-

u ra l f reeze thaw process loosens the s o i l . When subso i l compaction per-

sists or is p a r t i c u l a r i l y severe , deep t i l l a g e may be requi red , however,

success may be l i m i t e d because deep t i l l a g e usual ly br ings some subso i l up

i n t o the topso i l . The most successfu l t reatment of compacted subso i l is

c u l t i v a t i o n before t h e t o p s o i l is replaced.

2.3 TOPSOIL LOSS

The physical l o s s of t o p s o i l w i l l lower the c a p a b i l i t y of the land by

decreasing the amount of a v a i l a b l e n u t r i e n t s and organics i n the root

zone. The severity of the problem is d i r e c t l y r e l a t e d to t h e proport ion

of t opso i l l o s t . I n deep t o p s o i l s of 30 cm, the l o s s of 2 cm is not a

major problem, however, i n t h i n t o p s o i l s o f 6 cm or less, the l o s s of 2 cm

is s i g n i f i c a n t . I n add i t i on , s o i l l o s s may make c u l t i v a t i o n more d i f f i -

c u l t by causing d i f f e r e n t i a l r e s i s t a n c e s i n t h e s o i l t o t he movement o f

farm implements.

~ o ~ s o i l - can be l o s t by wind o r water erosion; subsidence of the t r ench l ine

a f t e r t o p s o i l replacement ; incorpora t ion of undisturbed topso i l i n t o sub-

s o i l mater ia l dur ing b a c k f i l l opera t ions ; and by poor reclamation prac-

t ices .

Construction a c t i v i t i e s causing impeded su r f ace and subsurface dra inage

can acce l e ra t e water e ros ion . The consequence of water e ros ion is s e r i o u s

s ince i t is usua l ly t he f i n e r , more f e r t i l e , s o i l p a r t i c l e s which wash

away f i r s t .

Wind eros ion is a func t ion of wind ve loc i ty , soil c h a r a c t e r i s t i c s , and

s o i l su r f ace condi t ion . So i l handling procedures which r equ i r e excessive

removal of t h e vege ta t ive cover or the e x t r a movement of soil ma te r i a l s

w i l l i nc rease t h e p o t e n t i a l fo r wind eros ion , p a r t i c u l a r i l y i n high wind

a r e a s or with f i n e p a r t i c l e d s o i l s .

Page 19: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

3.0 AGRICULTURAL SOILS

'4

S o i l s capable of support ing a g r i c u l t u r e cover 31% of A lbe r t a ' s land area.

. I The s o i l s vary g r e a t l y i n t h e i r physical , chemical and b io log ica l makeup. A l l s o i l s a r e s u s c e p t i b l e t o impact, t he re fo re , handling procedures t o

ensure minimum dis turbance and maximum conservat ion must be designed i n

accordance with the soil's s e n s i t i v i t y . Fac tors which con t r ibu te t o s o i l

s e n s i t i v i t y during p ipe l ine cons t ruc t ion inc lude parent ma te r i a l s , b io t a ,

c l ima te , topography, and the phys ica l and chemical p r o p e r t i e s of the s o i l

i t s e l f . This s e c t i o n addresses t he inf luences of parent mater ia l and s o i l

p r o p e r t i e s , s ince they determine impact which in tu rn determines appro-

p r i a t e s o i l handling procedures.

3.1 PARENT MATERIALS

Most of A lbe r t a ' s s o i l s have formed on s u r f i c i a l ma te r i a l s deposi ted dur-

i n g the l a s t g l a c i a t i o n . Other s o i l s have formed on reworked g l a c i a l

depos i t s o r d i r e c t l y on bedrock.

Parent mater ia l l a r g e l y determines the physical p rope r t i e s of t h e s o i l

formed and i n some cases , such a s marine bedrock, in f luences chemical pro-

p e r t i e s . C h a r a c t e r i s t i c s such a s t ex tu re , s ton ines s , and s t r a t i f i c a t i o n

a r e a l l dependant on parent mater ia l . These c h a r a c t e r i s t i c s in f luence

s o i l c a p a b i l i t y and r e l a t i v e s u s c e p t i b i l i t y t o impact by p ipe l ine con-

s t r u c t i o n . Table 3.1 summarizes t he main f e a t u r e s of t he parent ma te r i a l s

of a g r i c u l t u r a l l ands i n Alberta.

Aeolian ma te r i a l s have been t ranspor ted and deposi ted by wind

a c t ion. Associated landforms a r e dunes and gent1 y m d u l a t ing p l a ins .

Mater ia l s c o n s i s t of medium t o very f i n e sand and a r e well sor ted and

poorly compacted. Low moisture holding capac i ty , low f e r t i l i t y and wind

eros ion hazard preclude a r a b l e a g r i c u l t u r e and make re-establishment of

n a t i v e vegeta t ion or seeded forages d i f f i c u l t .

Page 20: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

0 . 4 C V )

s C W H

u m H I- n W U m u = l o c n m

c 0

0 f-l

C 0 .I

a E 0 U

u 0 C a I m ~ u 3

0 m ELL

W

L) m C a l m f-l c 2 '+a E X oa l n c

0 L .-I 0 u

-4 a l f n n o 0 U = a 0

D m V) u E (TI f-l - 4 0 U(L- O W O C a m < A

4 u m C .-I a r . k al m a

a m

-

.. D C a l . * k

3 9 Xa, n 10

3 0 1

m C

s 4 o u a l C - n >

d a l CI . - f - l al a u k o

u X U

5 u 3 1 O . * O X

~ C I - + O rn .-I

ax^ k m k ~ a l O a l . I > > D

V) u C 0) (0 a l V) c

o r n ~ ~ U E ~ ca, m o o 0 2 3 C

c - C 0 .rl u 0 m u C

-rt I

I u m 4 3

3 C C -r( m

A 4 rnda a u C C O ,

o m . + I I

c m .-I H 0 al <

L V) 0 c

'4 r+ m al 4 U 0.

9% o

A- n~

3 0 4

c u m m o o u c u m . - I a m % u m > u

' 2 w r n c n o a , O C \ C > o . * c n m a

r. c D o r l C X o m u o

cAzfn.r(u 0 4

*- ' r( u CnaJX-bJ4 C u u k 3

. * r n . ~ a l o n~ U L . ~ o m L O I ~ Z L 4 0 m o . * ' 4 - 4 o 4 - 0

0) al 4 n n rn 0 >5 o m

4 .. o v ) . 4 x

V) 0) a l 4

c d m r4 m.r( elm V) rn m a

f-l al u m 3

z' .4 > o E

0 c ol * C m m . 4 4 a l u o o m U) u m 4 C 0 k 3 . 4 0 k U fU 4 al c9-l L U 3 & I l l

1 (3 -- > 3

9-4

LL

- al nu C c[l .4 k 3 al

D

2 E

6 4

X u .r(

8 7 0 ° u m C u .- -I -0 =I H A 0 O U - 4 L . 4 L a l

40-u k 'rl .r( m alunLI

U L ( al m a l a l c n z ~ n o

> 3 3 ~ ~ ) O O m k D - l E

m D c m m al V) c

o m x u -27" m o o 0- C

TI V) c u .- .4 3 V) 0 X an a l D D

al E Y CU k al 0 L I Z L) m V) ~

m C .4 u m m 4 C 3 *-I u m c 4 3 a I

I 4 C m m .rl .d > w 3 0

rr a LL <

X -4

CI 4 a l m m u . 4 C 0) m o o a l 3 a 4 a

a o XV) C 4 n a l 0 V )

c cn .* t

CI al u Y

C (L4 -4 m a

E C

3 I E! 0 0 € 0 c O C X ( I 1 0 O L l

.4 U k V ) m 0

w m O c a l u ~ ) a , c 4 a 3 . 4 u a l o m a l U 4 k 3 V)

V) m E a, m C 0 0 9-l 4

cn V) X X (0 m m 4 - i5: " " 2 0 X X ~ .Uu X X

ZZ2212 m c n o o ~

k a, u

s' 0 C .4 D C m .U [I)

V) 4

m 9-l C .*

0 .rl c u .u

m r n x 4 - 4 C 4 b)3-4 a, > U m c, al C - m 4 3 ar, I I

a l C I -4 0 f-# h .u u 0) m 3 3- u o 0z m c m d m - l u

cn k al a l a u 0 m H 3 0

X c n o

al u m k al u 0 E

k 0 '7 m E

rn C C '4 0

' r( 0') In D 10 c al m I4 4 a u a, al -0 z

U)

5 m 0 al 4 c

0 m x m u

d U E V )

r n m 4 c

0 C .4

> E

k 3 al 0 u -l m m r

rn 4

m - C 'I -4 c u m m ~ 4 C 4 3 .-4 al 3 m f - l c - m 2 a~ I I

a C

1 .4 4 f-l m u .-I 0 > 3 3 0 4 m LL -2

rn k al al a 0 0

2 G X c n o

a u m k cu r -0 m 0 0 .I E u c

X 4

m k al al a u 0

$2 X C n o

Q) u

0 m .u k

al

ZI-E H E

al (31 m

H '4 r c rn

.r( m al

u f-l C m 73 X

3 o C Y

D 0

E a E

m 2 D L C m u 4 c 4 m a l 3

m s m o E 4 m 0 0 X u 4 u

rn c m x E n m a l C m c r n c o o m o u 4 XUV)

r n 4 cn X X a l X m m k 3 ~ - 4 m . a o u k ~ >

c a r( 0

u m -4 0 m rr m

m c -4 X u Y C m r n 0.4

- c r n o m 3 - 4 4 E L u m - ~ ~ r - C 4 - 4 3al = 'PCEU I I t

h

4 m C .4 m

.-It

z g I- .J

C Q -4 X aJ

U k a , X - 4 a l V ) u 4u .rl .-I m 4 C n 3 m

m k = m a m a m y E W L ) V ) o r , c m ur-,ar,

0 al 0 -

C U m u m a l ~ Q C n n m

X u r n u a l u c V ) .-I C --I a l om+ k r n 4

-r( k u 3L l o m m m m 0 E al OL, V) k

L

rn x m 4 11) 0 n

C m m m c a a l m c

X 0 r n 4 u

u a l m 4~ .-I,, m k c

D al k Y

o z 0 L) k m n 3 n al a l

cn C

.r(

u m c o 4 c x 3.4H

C H . 4 2O.c I I

4 m 3

2 V)

r al

Page 21: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

F l u v i a l m a t e r i a l s have been t ranspor ted and deposi ted by s t reams and

r i v e r s i n recent o r past times. They conta in grave l , sand, silt and a

minor f r a c t i o n of c lay . Moderately t o well so r t ed , s t r a t i f i e d depos i t s

a r e most common but massive, non-sorted d e p o s i t s a l s o occur. F l u v i a l

landforms inc lude f l oodp la in s , t e r r a c e s , upland p l a i n s and occas iona l ro l -

l i n g t e r r a i n . Low moisture holding capac i ty , low f e r t i l i t y and subsur face

g r a v e l s make the sandy or g rave l ly f l u v i a l depos i t s unsu i t ab l e f o r a r a b l e

a g r i c u l t u r e and make vege ta t ion re-est ablishment d i f f i c u l t . However, sil-

t y and very f i ne sandy loam sediments have developed i n t o prime ag r i cu l -

t u r a l l ands t ha t a r e easy t o reclaim. On a c t i v e f loodpla ins , f looding and

water e ros ion can be a problem.

Fluvial-Aeol ian sediments o r i g i n a t e from stream d e p o s i t s which have

been p a r t i a l l y reworked by wind. These depos i t s occur a s gent ly undulat-

ing p l a i n s with s l o p e s i n t h e 2 t o 5% range. Loamy sand t o sandy loam

t e x t u r e s a r e most common, c o n t r i b u t i n g t o droughty cond i t i ons and low f e r -

t i l i t y , but l e s s s eve re ly than i n aeo l i an depos i t s .

Lacus t r i ne m a t e r i a l s have s e t t l e d from suspension i n s t and ing f r e s h

water. They a r e gene ra l l y f i n e t ex tu red , however, s t r a t i f i e d sands, silts

and c l a y s a l s o occur. Topography is usua l ly l e v e l t o m d u l a t i n g . The

f i n e t e x t u r e d s o i l s a r e well s u i t e d t o a r a b l e ag r i cu l tu re . These s o i l s

tend t o be highly s u s c e p t i b l e t o e ros ion from running water and t o compac-

t i on . Care must be taken when d i s tu rb ing and reclaiming these s o i l s .

Another common problem of these soils is t h a t low permeabi l i ty r a t e s l i m i t

i n t e r n a l d ra inage , making s o i l s d i f f i c u l t t o dry and become workable a f t e r

r a in .

F luv i a l -Lacus t r i ne sediments have been deposi ted by slow moving

water. These d e p o s i t s a r e i n t e r g r a d e s between t h e f i n e sandy t o . s i l t y

f l u v i a l depos i t s and clayey l a c u s t r i n e sediments. Slopes less than 5% a r e

most common. S o i l s developed on these m a t e r i a l s a r e among t h e best i n

Alberta f o r a g r i c u l t u r e , although erosion by su r f ace runoff can be a major

problem.

Page 22: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

T i l l (Morainal) d e p o s i t s a r e commonly medium t o f i n e t ex tu red , ston-

ey, n o n - s t r a t i f i e d and well compacted. They were depos i ted by g l a c i e r s

and not modified by water o r wind ac t i on . Topography is usua l ly undulat-

ing t o h i l l y and, i n p l aces , hummocky. Wetlands a r e common i n depres-

s i o n a l a reas . T i l l d e p o s i t s unde r l i e t he l a r g e s t por t ion of the ag r i cu l -

t u r a l a r ea i n t h e province. S ton ines s is a problem, a s well a s s t e e p

s lopes , e ro s ion , and wet lands i n h i l l y and hummocky areas .

Res idua l m a t e r i a l s o r unconsol idated and p a r t i a l l y weathered min-

e r a l s , a r e r a r e l y c u l t i v a t e d . Where they occur they a r e genera l ly covered

with l a c u s t r i n e or t i l l ma te r i a l . Residual m a t e r i a l s a r e predominantly

s i l t y t o c layey and occas iona l ly sandy i n t h e a g r i c u l t u r a l regions. Where

bedrock is of marine o r i g i n , s o d i c i t y , s a l i n i t y or high s a t u r a t i o n percen-

t ages ' a r e t y p i c a l . In most r e s i d u a l m a t e r i a l s permeabi l i ty is r e s t r i c t e d ,

causing shal low l a t e r a l groundwater flow and d i f f i c u l t i e s fo r cons t ruc t ion

and reclamation.

3 -2 SOIL ZONES OF ALBERTA

Albe r t a ' s a g r i c u l t u r a l l ands a r e pr imar i ly d iv ided up i n t o f i v e s o i l

zones, Brown, Dark Brown, Black, Dark Gray and Gray (F igure 3.1 ). Speci-

f i c s o i l o r d e r s predominate i n each zone, fo r example, t h e Chernozems i n

t h e Black s o i l zone. Within each zone, however, l o c a l condi t ions can

cause t he development of s o i l s belonging t o o r d e r s o the r than t h a t of t h e

predominant one. In a d d i t i o n , depending upon paren t mater ia l s , vegeta-

t i o n , c l ima te , and topography, s e v e r a l v a r i a n t s wi th in each order occur

within t h e zonal d i v i s i o n s . The fol lowing s e c t i o n s provide f u r t h e r

d e t a i l s on t he c h a r a c t e r i s t i c s of each zone found i n Alberta and t h e i r

s i g n i f i c a n c e t o p i p e l i n e cons t ruc t ion .

Brown Soil Zone

The Brown S o i l Zone f e a t u r e s a semi-ar id c l ima te and sho r t g rass p r a i r i e

n a t u r a l vege ta t ion . S o i l development is slow with a very t h i n brown s o i l

horizon development o f 5-15 cm t h i c k , con ta in ing l i t t l e organic mat ter

Page 23: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

- BROWN SOILS

n .:.:.:.:.:.: ....... - DARK BROWN SOILS

- BLACK SOILS

- DARK GRAY SOILS

( - GRAY SOILS

UNDIFFERENTIATED - MOUNTAIN COMPLEX

FIGURE 3.1

SOIL ZONES OF ALBERTA

Page 24: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

(2%). Since annual p r e c i p i t a t i o n is about 300 mm, moisture is a l i m i t i n g

f a c t o r t o crop growth and, because of prolonged droughts, only a few s o i l

types a r e considered a r ab l e . There is l i t t l e o r no colour d i f f e r e n c e bet-

ween the A and B horizons, so i d e n t i f i c a t i o n of t o p s o i l depths by analy-

t i c a l means is c r i t i c a l f o r proper t o p s o i l s t r i p p i n g . High winds, coarse

tex tured s o i l s and the presence of so luab le s a l t s f u r t h e r l i m i t t he capa-

b i l i t y fo r c u l t i v a t i o n and c o n t r i b u t e t o the high s u s c e p t i b i l i t y of these

s o i l s t o impact by p i p e l i n e cons t ruc t ion.

Much of the Brown S o i l Zone is used for l i v e s t o c k range on improved o r

n a t i v e rangeland of mixed-grass-prairie dominated by the Bouteloua-Stipa-

Agropyron community. Bout eloua g r a c i l i s (b lue gramma) and Agropyron

s m i t h i i (western wheat g r a s s ) reproduce vege t a t i ve ly h i l e S t ipa comata

(needle and thread) reproduces pr imar i ly from seed. Consequently, d i s t ur-

bance during t h e dormant pe r iods August t o May, w i l l have a minimal e f f e c t

on the vege ta t ion .

Reclamation of n a t i v e pas tu re is more complex where poorer s o i l s a r e

i n t e r s p e r s e d with t he more f e r t i l e s o i l s . F i e l d s under c u l t i v a t i o n w i l l

be dominated by Chernozems while most n a t i v e range w i l l be Solone tz ic .

Topsoil depth on n a t i v e range w i l l g ene ra l l y be l e s s than i n c u l t i v a t e d

a reas . For most n a t i v e range t h e r e w i l l be l i t t l e t o p s o i l development

below t h e sod l aye r .

I r r i g a t i o n , which is employed on the b e t t e r q u a l i t y brown s o i l s i n t he

Taber, Brooks, and Medicine Hat a r ea s , poses s p e c i a l problems fo r p i p e l i n e

cons t ruc t ion . Imp l i ca t i ons of p i p e l i n e cons t ruc t ion on i r r i g a t i o n is

discussed f u r t h e r i n s e c t i o n 5.44.

Dark Brown Soi l Zone

The Dark Brown S o i l Zone is s l i g h t l y less a r i d than the Brown S o i l Zone.

Annual p r e c i p i t a t i o n r a t e s of about 350 mm with wide v a r i a b i l i t y from year

t o year is the main l i m i t a t i o n t o crop production and t o p i p e l i n e reclama-

t i o n . S o i l s of t h i s zone have 10-20 cm of su r f ace horizon t h a t is dark

brown and con ta in s about 4% organic mat ter . A s l i g h t colour d i f f e r e n c e

- 12 -

Page 25: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

can e x i s t between t h e A and B horizons and can be used t o i d e n t i f y top-

s o i l . Where t h i s co lour d i f f e r ence does not e x i s t , i d e n t i f i c a t i o n of top-

s o i l by a n a l y t i c methods may be required.

Black Soil Zone

The Black S o i l Zone occurs i n a r e a s with a dry-subhumid c l ima te ; i n gen-

e r a l the parkland por t ion of t he province. R a i n f a l l v a r i e s from an annual

average o f 380 m along the southeas te rn edge inc reas ing t o 460 mm on t h e

nor thern and western ex t r emi t i e s . A band of Black s o i l s with t h i n (15 cm)

s u r f a c e horizons occur along t h e boundary t o t h e Dark Brown s o i l s . The

- remainder of the zone con ta in s s o i l s t h a t have a deeper black s u r f a c e hor-

i zon (25-30 cm). Organic mat ter content of t h e su r f ace horizons averages

, 4 about 8%. A wide range of c rops can be grown on the Black soils and pro-

duct i v i ty is gene ra l l y high.

I Dark Gray Soil Zone

North and west of the Black S o i l Zone l ies a narrow s t r i p of s o i l s c l a s s i -

f i e d i n t o t he Dark Gray S o i l Zone. Dark Gray S o i l s a l s o predominate t he

Peace River a rea of t he province. These have t h i n , dark gray t o p s o i l s

with a l i g h t g ray ish brown l a y e r below.

Gray Soil Zone

Gray s o i l s which comprise t he rest of t he a g r i c u l t u r a l s o i l s i n t h e pro-

v ince occur i n a r e a s of subhumid c l imate and usua l ly have a continuous

tree cover. Ra in fa l l v a r i e s from 480 t o 560 mm i n t h e southwestern por-

t i o n of the province t o 300 t o 350 mm i n t h e northern por t ion . S o i l s a r e

cha rac t e r i zed by a l e a f mat, a t h i n dark s u r f a c e horizon less than 5 cm i n

t h i cknes s , a l i g h t gray p l a ty s t r u c t u r e d subsur face horizon and a s t r o n g l y

s t r u c t u r e d subso i l . Low i n n a t u r a l f e r t i l i t y , coarse g r a i n s and forages

a r e t he p r i n c i p a l c rops grown on these soils. Careful s o i l management is

requi red t o achieve good product iv i ty .

Page 26: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

h ' Although not s p e c i f i c a l l y addressed i n t h i s document, c l imate p lays a s ig-

n i f i c a n t r o l e i n t h e formation of s o i l s and has d i r e c t imp l i ca t i ons t o

p i p e l i n e cons t ruc t ion . Import ant c l i m a t i c f e a t u r e s of t he s o i l zones and C

t h e i r imp l i ca t i ons t o p i p e l i n e cons t ruc t ion a r e presented i n Table 3.2.

h

3.3 SOIL ORDERS OF ALBERTA

b f

Arable a g r i c u l t u r e i n Alberta i s concent ra ted on a l l t h e g rea t groups o f

t h e Chernozemic and So lone t z i c o rde r s a s well a s on the Gray Luvisol g r ea t

group of t h e Luv i so l i c order . The d i agnos t i c f e a t u r e s and c h a r a c t e r i s t i c s

o f each of t h e s o i l o rde r s and t h e i r imp l i ca t i ons t o p i p e l i n i n g a r e

d i scussed i n t h e fol lowing s e c t i o n s . However, a s d i scussed i n Sec t ion

3.1, the type of , paren t ma te r i a l on which each s o i l o rder is developed

g r e a t l y a f f e c t s t h e s o i l ' s c h a r a c t e r i s t i c s .

Chernozemic S o i l s

Chernozemic s o i l s (Tables 3.3 and 3.4) a r e well t o imper fec t ly drained

s o i l s having s u r f a c e horizons darkened by organic matter from decomposed

g ra s se s and f o r b s r e p r e s e n t a t i v e of g rass land communities o r grassland-

f o r e s t communities with assoc ia ted shrubs and forbs . Their A and B hori-

zons a r e p e r i o d i c a l l y dry each summer. Chernozemic s o i l s have an A hori-

zon i n which organic mat ter has accumulated (Ah, Ahe, Ap), which meets the

requirements of a chernozemic A horizon ( i e . a t l e a s t 10 cm th i ck , con-

t a i n i n g 1 t o 17% o rgan ic carbon e t c . ).

Luviso l ic S o i l s

S o i l s of t h e Luv i so l i c order (Tables 3.3 and 3.4) have l igh t -co loured ,

e l u v i a l hor izons (Ae) and i l l u v i a l B horizons (Bt ) i n which s i l i c a t e c lay

has accumulated. Only t h e Gray Luvisol g r ea t group of t h e Luv i so l i c o rde r

i s recognized i n Alber ta . The Gray Luviso ls usua l ly have s u r f a c e L , F,

and H horizons and may have a degraded Ah o r Ahe horizon t h a t resembles

t h e upper A horizon of Dark Gray Chernozemic s o i l s . The underlying Ae

horizon is well developed, f r i a b l e and p l a t y i n s t r u c t u r e . The Gray

Luviso ls commonly have an AB o r BA horizon below the Ae horizon i n which

- 14 -

Page 27: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

TABLE 3.2

CLIMATIC FEATURES OF THE SOIL ZONES AND THEIR

IMPLICATIONS TO PIPELINE CONSTRUCTION

S o i l Zone Summer Winter

Brown Low r a i n f a l l , very warm Cold temperatures , winds and temperatures , f requent snow storms with apprec iab le high winds. Wind e ros ion snow accumulation a t t imes. hazard; d i f f i c u l t t o Pe r iod i c warm Chinook winds. e s t a b l i s h vegetat ion. Al te rna t ing co ld and warm

temperatures cause wet s l i ppe ry cond i t i ons and v a r i a b l e f r o s t depth. Deep snow hampers a c c e s s i b i l i t y .

Dark Brown - Same a s Brown Zone

Black Ample r a i n f a l l , except i n Cold temperatures, s o i l s Ft. Vermilion a r ea , warm frozen to grea t depth (1 t o t o cool temperatures , 2 m) most winters . occas iona l heavy and pro- Occasional thaws r e s u l t i.n longed r a i n f a l l . s l i p p e r y condi t ions . Deep

snow and pe r iod i c b l i z z a r d s hamper access . "Cloddy" frozen ma te r i a l s make reclamation and clean-up d i f f i c u l t , o f t en r equ i r ing a f i n a l grooming i n spr ing .

Gray and - Same a s Black Zone Dark Gray

Page 28: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

TABLE 3.3 FEATURES OF THE SOIL ORDERS OF ALBERTA

Horizon Sequence

Average Depth of Topsoi 1

Average Depth From Surface t o Bottom o f B Horizon

Colour o f Topsoi l

Colour o f B hor izon

S a l i n i t y and Sod ic i t y

L UVISOL I C ORDER

L-H, Ah, Ae, AB, Bt, Ck

0- 5 cm i f not c u l t i v a t e d 0-15 cm i f c u l t i v a t e d

70-80 cm

Gray t o Dark Grayish Brown

Brown t o Very Dark Grayish Brown

Low

CHERNOZEMIC ORDER

Ah(p), om, Ck

10-15 cm i n Brown S o i l Zone 15-20 cm i n Dark Brown S o i l Zone 30 cm i n Black S o i l Zone

35-50 cm i n Brown S o i l Zone 50-60 cm i n Dark Brown S o i l Zone 70-100 crn i n Black S o i l Zone

Brown, Dark Brown, Black (depends on s o i l zone)

Brown i n Brown S o i l Zone (no co lou r change Brown t o Dark Brown i n Dark Brown S o i l Zone ( l i t t l e t o no co lou r change) Ye l lowish Brown i n Black S o i l Zone (colour change)

Low t o moderate i n Brown and Dark Brown S o i l Zones Low i n Black S o i l Zone

SOL ONETZ I C ORDER

Ah(p), Bn( t ) , Csk - (Solonetz) Ah, Ae, (Ap), Bn( t ) , Csk - (Solodized Solonetz) Ah, Ae, (Ap), AB, Bn(t) , Csk - (Solod)

0- 5 cm i n Gray S o i l Zone 5-10 cm i n Brown S o i l Zone

15 cm i n Dark Brown S o i l Zone 15-20 cm i n Dark Gray S o i l Zone

20 cm i n Black S o i l Zone

25-40 cm i n Brown S o i l Zone 40-50 cm i n Gray S o i l Zone 40-60 cm i n Dark Brown S o i l Zone 50-60 cm i n Black and Dark Gray S o i l Zones

Brown, Dark Brown, Black, Dark Gray, Gray (depends on s o i l zone)

Brown t o Dark Brown i n Brown S o i l Zone Dark Brown i n Dark Brown S o i l Zone Very Dark Grayish Brown i n Black S o i l Zone Dark Brown t o Very Dark Grayish Brown i n Gray and Dark Gray S o i l Zones

Moderate i n Gray S o i l Zone Moderate t o High i n Dark Gray and Black S o i l Zones High i n Brown and Dark Brown S o i l Zones

Page 29: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

TABLE 3.4 ASSOCIATED IMPACTS TO THE SOIL ORDERS OF ALBERTA

SOLONETZIC ORDER

- d i l u t i o n of organics and n u t r i e n t s where t o p s o i l depths are l e s s than 20 cm. Change i n t e x t u r a l and chemical composi- t i o n o f t opso i l i f mixed w i t h Bnt horizon.

- t e x t u r a l d i f f e rence between A and B horizons makes t o p s o i l suscept ib le t o eros ion by running water. D i f f i c u l t t o rees tab l i sh vegetat ion t o c o n t r o l erosion.

-B hor izon i s subject t o compact i o n when moist.

(1) The 'hard' nature o f the Bnt hor izon can be used t o c o n t r o l the s t r i p p i n g depth when the s o i l i s dry.

( 2 ) High s a l i n i t y and s o d i c i t y values may make vegetat ion establ ishment d i f f i c u l t .

LUVISOLIC ORDER ,

- d i l u t i o n o f organics and n u t r i e n t s , a problem because o f shal low t o p s o i l depths i f Ae hor izon i s incorporated i n t o topso i l . Incorpora t ion o f c lay enr iched B t horizon i n t o t o p s o i l w i l l change t e x t u r a l composit ion o f the topso i l .

- t e x t u r e o f Ae, i f incorporated i n t o topso i l , w i l l r e s u l t i n h igh r i s k o f erosion by wind and water. Textural change between A and B horizons makes d is tu rbed areas suscept ib le t o erosion, p a r t i c u l a r l y by running water.

- B t hor izon i s subject t o compact i o n when m i s t .

(1) Tex tura l change between the Ae and B t horizons can a s s i s t when s t r i p p i n g topso i l .

(2) Low n a t u r a l f e r t i l i t y o f these s o i l s may make vegeta t ion establishment d i f f i c u l t .

S u s c e p t i b i l i t y t o : Mix ing

Loss

Compaction

Imp l i ca t i ons t o P ipe l i ne Construct ion

CHERNOZEMIC ORDER

- d i l u t i o n o f organics and n u t r i e n t s , a problem where t o p s o i l depths are l ess than 20 cm. Lack o f co lour change between A and B horizons may r e s u l t i n poor d e f i n i t i o n o f t o p s o i l dur ing t o p s o i l s t r i p p i n g .

- l o s s o f t o p s o i l i s c r i t i c a l where t o p s o i l depths are l ess than 15 cm.

(1 ) Usua l l y l i t t l e t e x t u r a l change between A and B horizons, therefore, s t r i p p i n g should be based on co lou r change when i t occurs o r by set depth.

(2) Because o f the low s a l i n i t y and s o d i c i t y associated w i t h these s o i l s and the minor t e x t u r a l d i f fe rences between t h e A and B horizons, mix ing of the A and B horizons t o accommodate s o i l handl ing i n adverse cond i t ions w i l l u s u a l l y not r e s u l t i n a major change i n c a p a b i l i t y .

Page 30: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

t h e ped* s u r f a c e s a r e grayer than t h e i r i n t e r i o r . The underlying B t hor i -

zons have moderate t o s t r o n g pr i smat ic or blocky s t r u c t u r e s . The C hor i -

zon is gene ra l l y ca lcareous . The solum* of Gray Luviso ls is gene ra l l y

s l i g h t l y t o moderately ac id but may be s t rong ly a c i d i c . The degree o f

base s a t u r a t i o n is gene ra l l y high.

In the Gray Luviso ls , t he colour change between the Ae and B t is moderate-

l y good and can be used along with s o i l s t r u c t u r e a s a c r i t e r i a fo r top-

s o i l salvage. The ash coloured Ae horizon is a leached horizon, p l a ty i n

s t r u c t u r e , a c i d i c i n na tu re and d e f i c i e n t i n n u t r i e n t s .

- Gray Luviso ls occur t y p i c a l l y under boreal o r mixed f o r e s t vege ta t ion and

i n fores t -grass land t r a n s i t i o n zones i n a wide range of c l i m a t i c a reas .

They a r e l i m i t e d fo r a g r i c u l t u r a l use by a sho r t growing per iod , low na t -

u r a l f e r t i l i t y and organic mat ter conten t , and r equ i r e c a r e f u l management

p rac t i ce s . Supplement a1 f e r t i l i z a t i o n is requi red fo r good y i e ld s . About

10% of the Gray Luvisols a r e p re sen t ly c u l t i v a t e d , however, a s farming

expands i n t h e Peace River District, more of t he se s o i l s may come under

c u l t i v a t i o n .

Solonetzic Soils

S o i l s of t h e So lone t z i c o rde r (Tables 3.3 and 3.4) have B horizons t h a t

a r e very hard when dry and swell t o a s t i c k y mass of low permeabi l i ty when

wet. Typica l ly the s o l o n e t z i c B horizon has p r i sma t i c o r columnar

macros t ruc ture t h a t breaks i n t o hard or extremely hard, blocky peds with

dark coa t ings . They have developed on s a l i n e parent m a t e r i a l s i n some

a r e a s of t he semiar id t o subhumid I n t e r i o r P l a i n s i n a s s o c i a t i o n with

Chernozemic s o i l s , and t o a lesser ex ten t with Luv i so l i c and Gleysol ic

s o i l s .

* peds - t he m i c r o s t r u c t u r a l u n i t s i n t o which a s o i l w i l l e a s i l y break up.

* solum - t h e a c t i v e soil forming s e c t i o n of the upper s o i l p r o f i l e .

Page 31: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

Solonetz ic soils a re thought t o have developed from parent ma te r i a l s t h a t

were more or less uniformly s a l i n i z e d with s a l t s high i n sodium. Leaching

o f s a l t s by water percola t ion r e s u l t s i n de f loccu la t ion of t he sodium-

sa tu ra t ed co l lo ids . The c o l l o i d s a r e c a r r i e d downward and deposi ted i n

t he B horizon. Fur ther leaching deple tes t he a l k a l i c a t i o n s i n t h e A

horizon, which becomes a c i d i c and usual ly develops a p l a t y Ae horizon.

The underlying B horizon normally c o n s i s t s of darkly s t a ined , fused,

i n t a c t columnar peds.

The 'hard ' nature of the so lone tz i c B horizon provides a sharp c o n t r a s t

between t o p s o i l and subso i l even though colour d i f f e r ences may not e x i s t .

When s t r i p p i n g dry t o p s o i l by grader, the blade has a tendency t o r i d e on

t h e top of the s o l o n e t z i c B r e s u l t i n g i n good sepa ra t ion of t opso i l from

subsoi l .

The Solonetzic order inc ludes th ree grea t groups: Solonetz, Solodized

Solonetz , and Solod. They a re separated on the bas i s of the degree of

expression of the Ae horizon and the breakdown of t he upper pa r t of t h e B

horizon :

Solonet z

No continuous Ae horizon. An i n t a c t , columnar Bnt o r Bn horizon.

Solodized Solonetz

An Ae horizon a t l e a s t 2 cm th ick . An i n t a c t , columnar Bnt or Bn

horizon.

Solod

An Ae horizon a t l e a s t 2 cm thick. A d i s t i n c t AB o r BA horizon

( d i s i n t e g r a t i n g Bnt).

Gleysolic Soils

S o i l s of t h e Gleysol ic Order a r e c u l t i v a t e d to some exten t i n t h e c e n t r a l

and northern por t ions of the province. These soils have f e a t u r e s indica-

t i v e of per iodic or prolonged s a t u r a t i o n with water and chemical reducing

- 19 -

Page 32: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

condi t ions . They commonly occur i n a s soc i a t i on with o the r s o i l s i n t h e

landscape. In a r e a s of subhumid c l imate , Gleysol ic s o i l s a r e found i n

shallow depress ions and on l e v e l lowlands s a tu ra t ed with water every

spr ing. Gleyso l ic s o i l s a r e usua l ly a s soc i a t ed with e i t h e r a high ground-

water t a b l e a t some per iod of the year o r temporary s a t u r a t i o n above a

r e l a t i v e l y impermeable layer . Some Gleysol ic s o i l s may be submerged under

shal low water throughout the year.

Gleyso l ic s o i l s a r e divided i n t o t h r ee g rea t groups; Humic Gleysol ,

Gleysol and Luvic Gleysol, which a r e separa ted on the b a s i s of t he devel-

opment of the Ah horizon and the presence o r absence of a B t . horizon:

Humic Gleysol

Ah is a t l e a s t 10 crn th ick : no B t horizon.

Gleysol

No Ah o r Ah is <I0 cm th ick : no B t horizon.

L uvic Gleysol

Btg horizon is presen t , an Ahe o r an Aeg horizon may be presen t .

Since g l e y s o l i c s o i l s a r e wet and poorly drained for a l a r g e par t of t h e

year , p i p e l i n e cons t ruc t ion may c r e a t e major impacts. Some of t he major

imp l i ca t i ons a re :

(1) Standard p i p e l i n i n g machinery cannot be used and a backhoe is o f t e n

used f o r t renching r e s u l t i n g i n l a r g e r volumes of subso i l being

excavated.

(2) Topsoil may be d i f f i c u l t t o s t r i p under wet condi t ions .

(3) Pipe l in ing on wet s o i l s w i l l r e s u l t i n s o i l s t r u c t u r e degrada t ion ,

c lodding of m a t e r i a l s and g r e a t e r compact ion.

( 4 ) F i n a l c l ean up and grooming is d i f f i c u l t due t o clodding and s o i l

s t r u c t u r e degradat ion.

- 20 -

Page 33: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

( 5 ) Water accumulation from heavy r a i n s w i l l cause longer cons t ruc t ion

de lays i n Gleysol ic s o i l a r eas than i n t h e b e t t e r drained adjacent

s o i l s .

( 6 ) These s o i l s f r eeze harder and to g rea t e r depths than ad jacent b e t t e r

drained s o i l s .

(7) Revegetation w i l l r equ i r e wetland t o l e r a n t spec ies .

Page 34: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

4.0 PIPELINE CONSTRUCTION

The movement of ma te r i a l s and equipment required t o cons t ruc t a p ipe l ine

has a d i r e c t a f f e c t on a g r i c u l t u r a l s o i l s . Impacts w i l l vary according t o

type of soil , time of year , type of equipment used and methods of equip-

ment operat ion. The primary impacts t o t h e s o i l from p i p e l i n e construc-

t i o n on a g r i c u l t u r a l lands, a s discussed i n Sec t ion 2, include:

( a ) s o i l mixing,

(b ) s o i l compaction, and

( c ) s o i l l o s s .

Conservation of a g r i c u l t u r a l s o i l s can be achieved by recogni t ion of t h e s e

problems, how they a r e caused by p i p e l i n e cons t ruc t ion , and t h e implemen-

t a t i o n of procedures t o minimize them. The following s e c t i o n s d i scuss t h e

e f f e c t of p i p e l i n e cons t ruc t ion on s o i l conservat ion.

4.1 , PIPE SIZE

One var iab le which determines the impact of p i p e l i n e cons t ruc t ion on s o i l s

is the diameter of t he pipe. Right of way widths, grading requirements,

t rench s i z e and a s soc i a t ed mater ia l s to rage requirements a r e a l l d i c t a t e d

by the s i z e of the pipe. Although most p ipe l ine cons t ruc t ion causes some

a g r i c u l t u r a l impact, the "big inch" p i p e l i n e s of diametres 406.4 mm (16")

o r more genera l ly c r e a t e t h e most su r face dis turbance. They a r e r e l a t i v e -

l y i n f l e x i b l e , r equ i r ing more grading and more su r f ace dis turbance.

Trenches a re wide and n e c e s s i t a t e t h e handling of l a r g e r volumes of sub-

s o i l ma te r i a l s , i nc reas ing the p o s s i b i l i t i e s fo r s o i l mixing and lo s s .

Larger and heavier equipment is requi red i n big inch p i p e l i n e construc-

t i o n , increas ing the poten t i a1 for s o i l compaction. Small inch pipe, l e s s

than 406.4 mm i n diameter, is more f l e x i b l e , r e q u i r e s less grading and can

be placed i n narrower t renches.

Page 35: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

4.2 RIGHT OF WAY WIDTH

For most r i g h t s of way, common p r a c t i c e is t o l o c a t e t he t rench one t h i r d

from the s p o i l s ide , giving t h e cont rac tor two t h i r d s of t h e r i g h t of way

on the work s ide . Storage requirements for small inch l i n e s a r e i n t h e

order of 6.5 m to 9.0 m on the s p o i l s i d e t o accommodate t h e s p o i l and

topso i l p i l e s i n a t y p i c a l s i t u a t i o n (Sec t ion 5.1). This l eaves approxi-

mately 6.0 m - 8.5 m ava i l ab l e t o t h e con t r ac to r for a l l h i s a c t i v i t i e s on

a s t anda rd 15 m r i g h t of way. Most con t r ac to r s f e e l t h a t 10 m is requi red

t o do a proper job a s a narrow, confining work space may inc rease con-

s t r u c t ion c o s t s by reducing cons t ruc t ion e f f i c i ency . F igu re 4.1 o u t l i n e s

t y p i c a l r i g h t of way width cons idera t ions fo r big and small inch s i t u a -

t ions.

The work s i d e of the r i g h t of way c o n s i s t s of t he pipe lay-up a rea , t h e

work a rea , and t r a v e l area. Typical work widths for small inch l i n e s

include:

a. The lay-up area, which provides space fo r welding and coa t ing ,

r e q u i r e s 1.5 m;

b. The work area , where t h e sidebooms and welders opera te ,

r e q u i r e s 4.5 m; and

c. A t r a v e l area of 4 m allows access of s e r v i c e veh ic l e s along

the r i g h t of way.

There has been pressure on and within the indus t ry t o reduce r i g h t of way

widths i n order to minimize land d is turbance and reduce land a c q u i s i t i o n

cos t s . With requirements for t o p s o i l salvage, and sepa ra t ion of t o p s o i l

and s p o i l windrows, t h e work space a v a i l a b l e t o t he c o n t r a c t o r has

decreased. It is usua l ly t he conservat ion of s o i l s and not t he a c t u a l

cons t ruc t ion of the p ipe l ine which is jeopardized when r i g h t of way widths

a r e r e s t r i c t e d .

Although cos t cons idera t ions a r e important, t h e width of t h e r i g h t of way

should be appropr ia te t o the s c a l e of t he p ipe l ine p ro j ec t ; i n s u f f i c i e n t

r i g h t of way can inc rease c o s t s and su r f ace damage. This is p a r t i c u l a r i l y

t r u e where e x t r a grading is required, a t a r eas of wide o r deep t rench ,

- 23 -

Page 36: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

R/W BDY.

I

I S P O I L S I D E WORKING S I D E I - I RIGHT OF WAY I

( S e e N o t e I Re: R/W W i d t h )

PROFILE N.T. S.

1. PRIOR TO CONSTRUCTION, DETERMINE STANDARD RIGHT OF WAY WIDTH AND LOCATIONS REQUIRING A D D I T I O N A L RIGHT OF WAY* MERCHANTABLE TIMBER CAN THEN BE CLEARED AND SALVAGED, AND TOPS0 I L CAN BE STRIPPED AND STOCKPILED SEPARATELY FROM SPOIL .

RIGHT OF WAY WIDTH CONSIDERATIONS I A) NO- OF P I P E L I N E S

- SINGLE - M U L T I P L E

B) P I P E DIAMETER - SMALL INCH - B I G INCH

C ) WORKING SPACE - CROSS 1 NGS - EXPANSION LOOPS - PASSING LANE

L E S S -MORE R / W R / W

F ) GRADING - NONE - EXTENSIVE

G ) TRENCH MATERIAL - CLAY - SAND - R O C K (BLASTING)

H) DEPTH O F COVER - I n - 3 H

D ) SLASH DISPOSAL I) WATER TABLE - BURNING X - LOW - TOTAL ROLLBACK X - H I G H

LESS MORE R / W R / W

E ) TOPSOIL S T R I P P l NG J ) TRENCHING E Q U l PMENT - WIDTH - NONE X ' - WHEEL X - FULL R / W x - HOE x

- DEPTH - 6 CM x - 30 CM x

FIGURE 4.1

PIPELINE RIGHT OF WAY

Page 37: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

f o r e i g n l i n e c r o s s i n g s , road c r o s s i n g s and a t p i p e l i n e t i e - i n s . For exam-

p l e , it is still a predominant p r a c t i c e not t o t a k e e x t r a r i g h t of way a t

road c r o s s i n g s d e s p i t e t h e n e c e s s i t y f o r e x t r a equipment and excess sub-

s o i l excava t ion fo r road bor ing. I n v a r i a b l y , s u b s o i l p i l e s a r e placed t o o

c l o s e o r on top of t o p s o i l p i l e s caus ing mixing o r l o s s of t o p s o i l . Poor

a l l e v i a t i o n of compaction and t r e s p a s s of c o n s t r u c t i o n equipment o f f r i g h t

o f way a r e a l s o common r e s u l t s of i n s u f f i c i e n t r i g h t of way.

Righ t of way and e x t r a work space requirements should be c a l c u l a t e d on a

s i t e s p e c i f i c b a s i s , t a k i n g equipment, procedures and s o i l s i n t o cons ider -

a t i o n . A method f o r c a l c u l a t i n g r i g h t of way width requirements based on

t o p s o i l and s u b s o i l s t o r a g e requ i rements is o u t l i n e d i n t h e fo l lowing

c h a p t e r i n s e c t i o n 5.1.

4.3 CONSTRUCTION OPERATIONS

P i p e l i n e c o n s t r u c t i o n is t y p i c a l l y broken down i n t o a s e r i e s of o p e r a t i o n s

beginning with r i g h t of way p r e p a r a t i o n and ending with f i n a l c l e a n up.

Although each o p e r a t i o n h a s t h e p o t e n t i a l t o impact a g r i c u l t u r a l land, t h e

major s u r f a c e d i s t u r b i n g a c t i v i t i e s a r e g rad ing , t r ench ing , b a c k f i l l i n g ,

r i g h t of way t r a f f i c and c l e a n up.

4.31 Right o f Way Preparat ion

P r e p a r a t i o n of t h e p i p e l i n e r i g h t o f way c o n s i s t s of s e v e r a l a c t i v i t i e s :

f ence opening or b u i l d i n g , c l e a r i n g and g rad ing ( i n c l u d i n g t o p s o i l s t r i p -

p i n g ) , and s t r i n g i n g p i p e j o i n t s . Of t h e s e a c t i v i t i e s , grading is t h e

most important i n terms of p o t e n t i a l s o i l damage.

The g rad ing crew performs two o p e r a t i o n s ; ( 1 ) r i g h t of way grading and

l e v e l l i n g , t o a l low f o r t h e passage of c o n s t r u c t i o n equipment and t o meet

t h e bending l i m i t a t i o n s of t h e p ipe , and (2) t o p s o i l sa lvage .

Topso i l s a l v a g e is normally c a r r i e d out with a motor-grader s i n c e i t can

a c c u r a t e l y s e p a r a t e t o p s o i l from s u b s o i l . This o p e r a t ion may be a s s i s t e d

by dozers when t h e windrows become t o o l a r g e t o be e f f e c t i v e l y handled by

- 25 -

Page 38: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

t h e grader . I t is common p r a c t i c e fo r t h e c o n t r a c t o r t o employ a combina-

t i o n of g r a d e r s and dozers depending on t h e equipment a v a i l a b l e t o him on

t h e s p r e a d , t h e depth of t o p s o i l , and t h e procedure used t o remove t h e

t o p s o i l . Land use may a l s o determine t h e c h o i c e of equipment. For exam-

p l e , s t r i p p i n g t o p s o i l on t r e e d a g r i c u l t u r a l l and might be mare e f f e c t i v e -

l y done by dozer which can more r e a d i l y move r o o t masses.

D e s c r i p t i o n s of equipment used f o r g rad ing and s t r i p p i n g a r e i n c l u d e d i n

S e c t i o n 4.4.

4.32 Installation

While i n s t a l l a t i o n of t h e p i p e l i n e i n v o l v e s a number of s p e c i a l i z e d opera-

t i o n s , i t is t h e excava t ion o f t h e t r e n c h which most a f f e c t s s o i l conser-

va t ion .

Trenching

In good ground c o n d i t i o n s t h e t r e n c h is t y p i c a l l y excavated with a wheel

t r e n c h e r which has a r a t e of excava t ion i n t h e range of 0.1 t o 0.4 kph.

Backhoes a r e used i n main l ine t r e n c h i n g where wheel t r e n c h e r s a r e i n e f f e c -

t i v e , such a s wet ground c o n d i t i o n s and a t t i e - i n s , road c r o s s i n g s , l o c a l

wet a r e a s and f o r e i g n l i n e c r o s s i n g s . The r a t e of p r o g r e s s f o r a backhoe

i n main l ine t r e n c h i n g is approx imate ly 0.1 kph, (one-four th t h e bes t r a t e

o f a t r e n c h e r ) .

The p o t e n t i a l f o r s u r f a c e d i s t u r b a n c e is d i r e c t l y r e l a t e d t o t h e width of

t h e t r ench . The wider t h e t r e n c h , t h e more r i g h t of way r e q u i r e d f o r t h e

t r e n c h i t s e l f and s t o r a g e of s p o i l genera ted from t h e t r e n c h . The depth

of t r e n c h is governed by t h e diameter of t h e p i p e and t h e minimum cover

over t h e pipe. Energy Resources Conservat ion Board r e g u l a t i o n s s t a t e t h a t

a minimum o f 80 cm of cover is r e q u i r e d over a l l p i p e l i n e s . I n s p e c i f i c

a r e a s t h e p ipe may be b u r i e d even deeper s o a s not t o i n t e r f e r e with irri-

g a t i o n and l and d ra inage systems. Apart from p i p e diameter , t h e width of

t h e t r e n c h is g e n e r a l l y determined by t h e type o f machine used t o excava te

t h e t r ench . - 26 -

Page 39: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

Protec t ion of the pipe wal l s and i n p a r t i c u l a r , t he p r o t e c t i v e pipe coat-

i ng is a major concern when the pipe is lowered i n t o the t rench. I f t h e

t rench wal l s a r e smooth, s o f t , and f r e e of sharp s tones , t he pipe can be

lowered i n t o the t rench with no damage to t h e p r o t e c t i v e coa t ing even i f

t h e pipe contac ts the t rench walls. Some companies be l i eve t h a t for safe-

t y , the trench should be s i zed so t h a t a space equivalent t o t he diameter

o f the pipe is l e f t on each s i d e of the pipe. Others be l i eve t h a t a mini-

mum o f 30 cm should be l e f t on each s i d e of t he pipe r ega rd l e s s of p ipe

s i z e t o minimize the r i s k of damaging the p r o t e c t i v e coa t ing and t o al low

b a c k f i l l mater ia l to flow under t he pipe.

Standard widths of small inch t renchers a r e i n t he order o f 80 cm t o

90 cm. In good s o i l condi t ions pipe diameters up t o 610 mm (24") can

e a s i l y be accommodated. These same t r enche r s a r e commonly used for s t a n -

dard small inch pipe s i z e s of only 60.3 mm or 114.3 mm i n diameter. I n

such cases l e s s than 1/8 of the t rench width is taken up by the pipe.

A l a r g e percentage of the pipe i n s t a l l e d i n a g r i c u l t u r a l a r e a s is

168.3 mm, 114.3 mm, 88.9 mm and 60.3 mm i n diameter. Trenches excavated

any wider than 30 cm, which provides an adequate width fo r these pipes, is

o f no addi t iona l bene f i t . The e x t r a trench width r e q u i r e s more r i g h t of

way to accornodate the t rench i t s e l f and s to rage of t he t rench s p o i l . A

wider t rench and l a r g e r s p o i l s to rage a rea r equ i r e s a wider a rea t o be

s t r i p p e d of t opso i l and more r i g h t of way fo r t opso i l s torage . The con-

s e r v a t i o n of s o i l s can be more r ead i ly achieved i f t h e t rench width and

diameter of pipe t o be i n s t a l l e d a r e more c l o s e l y matched.

Backfillinq

After t h e pipe has been welded, and lowered i n t o t h e t rench , t h e t rench is

b a c k f i l l e d , and the r i g h t of way reclaimed. The replacement of excavated

s p o i l back i n t o the t rench is a c r u c i a l operat ion i n t h e conserva t ion of

a g r i c u l t u r a l s o i l . Proper s t r i p p i n g , s torage , and sepa ra t ion of t he s p o i l

from the topso i l he lps prevent mixing during b a c k f i l l i n g . Separa te s t o r -

age of s p o i l from t o p s o i l f a c i l i t a t e s the ease and e f f i c i e n c y of b a c k f i l l -

ing. I f s p o i l is s to red on t o p s o i l i t w i l l be d i f f i c u l t , i f not

- 27 -

Page 40: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

imposs ib le , t o s e p a r a t e t h e s p o i l wi thout mixing i t and t h e under ly ing

t o p s o i l .

Machinery used f o r b a c k f i l l i n g i n c l u d e s conven t iona l equipment ( d o z e r s and

g r a d e r s ) a s wel l a s power augers , power d o z e r s , mormon boards , and back-

hoes ( S e c t i o n 4.4).

Excavated t rench s p o i l n a t u r a l l y i n c r e a s e s i n volume ( b u l k s ) by approxi-

mately 20% when d i s t u r b e d , and with t h e p ipe i n t h e t r e n c h , r e t u r n e d s p o i l

volumes o f t e n exceed t h e o r i g i n a l t r e n c h volume. The amount of expansion

depends on t h e m a t e r i a l . For example, bedrock c l a y s expand more than

l a c u s t r i n e c l a y s . S tandard p r a c t i c e is t o compact t h e r e t u r n e d t r e n c h

s p o i l wi th g rader tires or a dozer t r e a d . Excess s p o i l is mounded over

t h e t r e n c h l i n e t o a l low f o r subs idence and f e a t h e r e d out over t h e s t r i p p e d

a r e a .

A mound over t h e t r e n c h l i n e can a f f e c t farming a c t i v i t i e s i n a number of

ways; i n t e r f e r e n c e wi th farm equipment o p e r a t i o n s , t h i n n e r t o p s o i l

replacement , and d i s r u p t i o n of s u r f a c e d ra inage . Normal c u l t i v a t i o n w i l l

g r a d u a l l y r e s t o r e t h e f i e l d c o n t o u r s but t h i s u s u a l l y r e s u l t s i n mixing

t h e t h i n n e r t o p s o i l s wi th t h e roached t r e n c h s p o i l . Subsidence of t h e

t r e n c h l i n e may r e q u i r e h a u l i n g i n of s p o i l o r t o p s o i l . Drainage problems

and d i s r u p t i o n t o normal c u l t i v a t i o n p r a c t i c e s can occur i f t h e mound o r

t h e sunken t rench p e r s i s t s over a number of years . In d ry land farming,

t h e consequences o f mounding and subs idence a r e r e l a t i v e l y minor, but t h e y

a r e c r i t i c a l i n i r r i g a t e d a r e a s where s u r f a c e i r r e g u l a r i t i e s may impede

g r a v i t y f lows o r t h e movement of wheel s p r i n k l e r s . I n i t i a l compaction and

mounding o f t h e t r e n c h l i n e is important and whi le s h o r t t e n l o s s e s t o

p r o d u c t i v i t y can r e s u l t , long term s u c c e s s of rec lamat ion is achieved.

4.33 Cleanup and R e s t o r a t i o n

Cleanup i n c l u d e s llmachine" o r "roughll c leanup and f i n a l c leanup. Rough

c leanup is r i g h t of way r e c o n t o u r i n g and t o p s o i l replacement . F i n a l

c leanup i n c l u d e s c u l t i v a t i o n , rock p i c k i n g , fence r e p a i r s and r e s e e d i n g .

Page 41: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

Topsoil replacement is usua l ly done by convent iona l equipment, such a s

dozers a'nd g r ade r s , a s well a s by mormon boards, power dozers and power

augers . Graders , i f a v a i l a b l e , a r e o f t e n used fo r t he f i n a l pa s s s i n c e

they produce t he smoothest and most level s u r f a c e and can r e e s t a b l i s h most

a ccu ra t e1 y t h e o r i g i n a l t o p s o i l depths .

F i n a l c leanup is the l a s t a c t i v i t y of t he p i p e l i n e spread. On c u l t i v a t e d

land, t h e r i g h t of way is c u l t i v a t e d t o r e l i e v e compaction of t o p s o i l and

t o r e s t o r e r i g h t of way appearance. T i l l a g e can be accomplished with con-

vent i o n a l farm implement s, such a s moldboard ploughs, d i s k ploughs and

d i s k harrows. Ch i s e l ploughs may be requ i red t o break up 'severe compac-

t i o n over t h e work and t r a v e l a r ea s . Compacted s u b s o i l should be c u l t i v a -

t ed and l e v e l l e d p r i o r t o t o p s o i l replacement when t h e soil is dry enough

t o s h a t t e r proper ly . "Deep r i pp ing t t may be r equ i r ed fo r compacted s u b s o i l

where t he t o p s o i l is i n place.

4-34 Right o f Way Traff ic

The c o n s t r u c t i o n of a p i p e l i n e i nvo lve s t h e ope ra t i on of much equipment

which must r epea t ed ly t r a v e r s e a narrow path on t h e r i g h t of way. Compac-

t i o n , c r u s t i n g , and r u t t i n g of a g r i c u l t u r a l s o i l s can occur , u sua l l y on

t h e work a r ea and a long the pass ing lane . Turning of c o n s t r u c t i o n vehi-

c l e s on t h e r i g h t of way, p a r t i c u l a r l y a t road c ro s s ings , t i e - i n s and fo r -

e i g n l i n e c r o s s i n g s can a l s o produce mixing of s o i l s .

Rubber t i r e d and t racked veh i c l e s used f o r cons t ruc t i on vary widely i n

t h e i r p o t e n t i a l t o compact a g r i c u l t u r a l s o i l s (Tab le 5.1 ). Ground pres-

s u r e s f o r t racked v e h i c l e s a r e determined by d iv id ing t h e ope ra t i ng weight

by t h e ground con t ac t a rea . Vibra t ion i n c r e a s e s t h e e f f e c t i v e compact i o n

and t h e r e is stress concen t r a t i on around t h e l u g s of t racked veh i c l e s .

Lugged t r a c k s can cause mixing when t u rn ing due t o t h e pene t r a t i on of t h e

l u g s i n t o and, a t times, through t h e t o p s o i l .

Rubber t i r e d v e h i c l e s g e n e r a l l y have g r e a t e r ground p r e s s u r e s than t r a cked

veh i c l e s . Average ground p r e s su re for a t i re is roughly equal t o i n f l a -

t i o n p r e s su re , however because t he load is t r ansmi t t ed through t h e s ide-

- 29 -

Page 42: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

wal l s , t h e edges can e x e r t p r e s su re up t o 5 times t h e average. Table 5.1

g ive s ground p r e s s u r e s f o r t y p i c a l p i p e l i n e equipment.

4.41 Conventional Equipment

Bulldozer - T r a c k - t v ~ e Tractors

Bul ldozers and t h e i r a t t achments a r e used fo r a number of jobs on t h e

p i p e l i n e p r o j e c t , p r i m a r i l y f o r r i .ght of way p r epa ra t i on ' and cleanup.

Bul ldozers equipped with r i p p e r s can r i p and move e a r t h i n r i g h t of way

p r epa ra t i on where e x t e n s i v e earthwork is r equ i r ed . Bul ldozers perform

e f f i c i e n t l y i n moving l a r g e volumes of s o i l s h o r t d i s t ance s . During t h e

f i n a l s t a g e s of p i p e l i n e c o n s t r u c t i o n , they a r e used i n rough cleanup f o r

i n i t i a l r i g h t of way recontour ing and f o r moving l a r g e windrows of s p o i l

and t o p s o i l . Bul ldozers can a l s o be used f o r windrowing m a t e r i a l and

b a c k f i l l i n g i f f i t t e d wi th an ang le blade.

Product ion dozers i n t h e D6 - Dl0 range a r e f i t t e d with e i t h e r a univer-

s a l , a s t r a i g h t o r an angled blade. The un ive r s a l b lade has l a r g e wings

which a r e e f f i c i e n t f o r moving b ig loads . The angled blade is s m a l l e r

than t he u n i v e r s a l , e a s i e r to maneuver and is b e t t e r ab l e t o pene t r a t e .

The angled blade can be ad ju s t ed t o 250 t o e i t h e r s i d e f o r use i n windrow-

ing, s i d e c a s t i n g and b a c k f i l l i n g . Since , b lade s p e c i a l i z a t i o n reduces

v e r s a t i l i t y , most c o n t r a c t o r s employ angled blades .

Graders

The motor grader has a wider blade, o p e r a t e s a t a h igher speed, and is

l e s s expensive t o o p e r a t e than a dozer. The grader is used p r ima r i l y

where t h i n l a y e r s of m a t e r i a l have t o be windrowed o r s i d e c a s t , o r f o r

producing a smooth su r f ace . Unlike t h e dozer , t h e v e r t i c a l movement of

t h e b lade is h y d r a u l i c a l l y c o n t r o l l e d from above, a l lowing more a c c u r a t e

depth c o n t r o l , i n t h e o rde r of +2 cm. This p r e c i s e c o n t r o l makes t he - - 30 -

Page 43: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

motor grader the p re fe r r ed convent ional machine for t o p s o i l s t r i p p i n g and

f i n a l clean-up.

The lower cos t and high production r a t e s make t h e grader t he p re fe r r ed

machine from the c o n t r a c t o r ' s viewpoint. Where l a r g e r volumes of t opso i l

must be moved, however, the dozer is gene ra l l y used t o move t h e bulk o f

t h e t opso i l . The grader is then used t o " f i n i s h off1' t h e t o p s o i l s t r i p -

ping when s t r i p p i n g approaches t he subso i l .

Trenchers

The s tandard machine used for p i p e l i n e t renching is the wheel t rencher .

I t c u t s a s t r a i g h t , smooth walled t rench with a s l i g h t l y curved bottom

which c r a d l e s the lowered-in pipe. The s i z e of t h e wheel and, t h e r e f o r e ,

t h e s i z e of the t rench w i l l vary with t he s i z e of t h e machine. Most

machines can accommodate a number of wheel s i z e s .

Since wheels a r e expensive t o buy and change, most c o n t r a c t o r s have

t r e n c h e r s with wheels t ha t allow work fo r a wide range of p ro j ec t s . Small

inch c o n t r a c t o r s w i l l run 80 cm t o 90 cm wheels which al lcw them t o work

on p i p e l i n e s up t o 406.4 mm. Big inch c o n t r a c t o r s w i l l have a t l e a s t one

l a r g e t rencher . With smaller t r enche r s , s p o i l can be placed on e i t h e r t h e

work or s p o i l s i d e by changing the d i r e c t i o n of the s p o i l conveyor. On

l a r g e r machines, s p o i l can only be placed on t h e s p o i l s i d e .

The wheel t rencher can be used t o s t r i p t o p s o i l and can do an adequate job

given the r i g h t s o i l and land use condi t ions .

A t p resen t the wheel t rencher is the only machine widely a v a i l a b l e fo r

s t r i p p i n g frozen t o p s o i l ; however, t h e r e a r e l i m i t a t i o n s t o its use. Min-

imum depth of excavation is approximately 25 cm. S t r i p p i n g shal lower

depths c r e a t e s excess ive stress on the machine and l o s s of up t o 50% of

t h e t o p s o i l through s i d e s p i l l from the buckets. P r e s e n t l y t h e r e a r e a

few machinery s u p p l i e r s and c o n t r a c t o r s experimenting with modified con-

vent iona l machinery o r developing new machinery t o handle t o p s o i l i n

frozen condi t ions .

- 31 -

Page 44: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

Backhoes

Extensive use of backhoes for t renching through a g r i c u l t u r a l land is not

p re fe r r ed because of increased cos t and increased s u r f a c e dis turbance.

Trench mater ia l excavated by backhoe is usua l ly deposi ted i n l a r g e c lods ,

consequently t h e windrows r equ i r e more s to rage a rea s i n c e the bulking fac-

t o r is g rea t e r . Generally, economics d i c t a t e t h e choice between a backhoe

and a t rencher . Since the t rencher minimizes su r f ace d is turbance and

c o s t s , t he con t r ac to r w i l l use t he t rencher wherever poss ib le .

4.42 Specia l ized Equipment

Power Dozers and Auaer Backf i l l e r s

These machines combine the power of a bul ldozer with t h e a b i l i t y of t h e

motor grader t o s idecas t l a r g e windrows of ma te r i a l i n a s i n g l e pass.

Although o r i g i n a l l y developed for b a c k f i l l i n g and rough cleanup, t h e power

dozer can a l s o be used fo r t o p s o i l s t r i p p i n g . ~ e ~ t h c o n t r o l is s i m i l a r t o

a dozer, t h e r e f o r e its use is bes t s u i t e d t o s t r i p p i n g deep topso i l s .

General ly , these machines a r e more expensive t o ope ra t e than convent ional

equipment.

Stepblades

"Stepblades" have been used for t o p s o i l sa lvage over t h e t r e n c h l i n e i n

pas ture and rangeland.

Typica l ly a narrow one metre wide blade is welded or bo l ted t o t h e bottom

edge of a dozer or grader blade. A narrow width of t o p s o i l is removed and

s i d e cas t by the main blade away from t h e s t r i p p e d area. The add i t i on o f

f l o a t s t o t he ou t s ide of the main b lade allows i t t o be dropped onto t h e

su r f ace without sca lp ing the vegetat ion. A disadvantage of t he s tepblade

is t h e lack of depth cont ro l a s the "step" p ro j ec t ion is assembled t o a

set depth. S e t t i n g d i f f e r e n t depths r equ i r e s reassembling the s t epb lade

onto the main blade. Some prel iminary success has been achieved w i t h t h e

development of an ad jus t ab le s t e p blade t o overcome t h i s problem.

- 32 -

Page 45: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

Varia t ions i n t o p s o i l depths can be accomodated by mounting the s tepblade

t o t he s c a r i f i e r mechanism on graders where the s c a r i f i e r is loca ted i n

f r o n t of the main blade. The s tepblade and main blade can be ad jus ted

independently al lowing va r i ab l e depths t o be s t r i pped . An add i t i ona l

advantage is tha t the operator can r ead i ly see the depth being s t r i p p e d , a

disadvantage of t he s t a t i o n a r y s tepblade.

NOVA'S Winter To~soiler

NOVA, An Alberta Corporation has developed a machine which under winter

cond i t i ons , is ab le t o s t r i p a 1 m width of topsoi l to' a con t ro l l ed

depth. The winter t o p s o i l e r is a hydraul ica l ly driven "Roc-Saw Trencher"

mounted on a D9 t r a c t o r . The c u t t e r has been modified t o make i t wider

and s h o r t e r and more s u i t a b l e for t opso i l s t r i p p i n g . A conveyor system

al lows placement of t opso i l i n a windrow beside the t renchl ine . Cutt ing

depths a r e hydrau l i ca l ly c o n t r o l l e d frun the cab on the i n s t r u c t i o n s of a

swamper and can be quickly adjusted. The c u t t i n g s produced by t h e machine

a r e frozen ch ips which can be moved e a s i l y by a dozer o r grader.

The machine has s t r i p p e d up t o 6 km per day, a r a t e g rea t e r than conven-

t i o n a l t renching. Because of its s i z e , i t must be t ranspor ted t o t he job

s i t e on a modified low boy. A s e rv i ce t ruck and welding r i g a r e main-

t a ined on stand-by t o provide immediate r e p a i r se rv ice . The NOVA winter

t o p s o i l e r s t r i p s t o p s o i l with accura te depth con t ro l , but is repor ted t o

be expensive t o operate .

A l o c a l Edmonton con t r ac to r has developed a machine which e f f e c t i v e l y

s e p a r a t e s t opso i l from subso i l under frozen condit ions. The machine is a

modified Barber Greene TA-77 t rencher . The wheel diameter has been

reduced by 30X, the buckets made wider (1.6 m) and more square, and the

d r ive t r a i n has been modified so t h a t the optimum c u t t i n g depth is 15 cm

t o 20 cm.

Page 46: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

The design of t h e bucke t s and t h e i n c r e a s e d speed of t h e wheel produces

c o a r s e g r a n u l a r ' s t r i p p i n g s which can be n e a t l y and a c c u r a t e l y p i l e d on t h e

r i g h t of way. Guides mounted on t h e wheel e l i m i n a t e s p i l l o v e r of t o p s o i l ,

a common problem when wheel type machines a r e used t o s t r i p t o p s o i l .

S ince t h e bucket assembly is c o n t r o l l e d by two h y d r a u l i c c y l i n d e r s , i t can

be t i l t e d a few degrees t o t h e l e f t o r r i g h t . Th i s f e a t u r e pe rmi t s good

t o p s o i l recovery where m u l t i p l e , ad jacen t st r i p p i n g passes r e q u i r e one

t r a c k t o be on s t r i p p e d ground and the o t h e r on t h e m d i s t u r b e d s u r f a c e ;

i . e . , one t r a c k lower than t h e o t h e r . This shou ld be p a r t i c u l a r i l y u s e f u l

a t road c r o s s i n g s , bends i n t h e p i p e , t i e - i n s , o r f o r l a r g e diameter p ipe

where a wider s t r i p p e d a r e a is requ i red .

Ditch Witch

An R l O O "Ditch Witch1! has been used f o r p i p e l i n e s up t o 168.3 mm. Th i s

machine can excava te a narrow (30.0 cm) t r e n c h t o a dep th of 1.5 m. The

narrow t r e n c h width reduces t h e o v e r a l l d i s t u r b a n c e and s p o i l q u a n t i t y is

r e l a t i v e l y smal l . The D i t c h Witch is t h e r e f o r e p r e f e r r e d from a s o i l con-

s e r v a t i o n po in t of view, f o r l i n e s 168.3 mm o r l e s s .

The Rotor Ripper

The r o t o r r i p p e r can excava te a narrow t r e n c h (30.0 cm) up t o 2.0 m deep.

The excava t ing wheel is f i t t e d with a s e r i e s of c u t t i n g t e e t h which can

c u t through most s o i l t e x t u r e s , both f rozen and dry. A s with a r e g u l a r

bucket wheel t r e n c h e r , i t s use i n wet s o i l s is l i m i t e d .

The machine's t e e t h p u l v e r i z e t h e s o i l and move it on to t h e m d i s t u r b e d

s u r f a c e on each s i d e of t h e t r ench . The width r e q u i r e d f o r t h e s p o i l p i l e

and the t r e n c h is 2.5 m t o 3.0 m. Th i s is a narrower d i s t u r b a n c e than i f

conven t iona l t r e n c h i n g equipment were used. These smal l s p o i l p i l e s

reduce t h e width of r i g h t o f way r e q u i r e d and a l low t h e c o n t r a c t o r t o use

t h e b l a d e width t o p s o i l s t r i p p i n g procedure on a l l l ands , i n c l u d i n g c u l t i -

va ted , f o r a g e and p a s t u r e land. I n a d d i t i o n , t h e s e p a r a t i o n d i s t a n c e

r e q u i r e d between t h e s p o i l and t o p s o i l is reduced because t h e p i l e s a r e

- 34 -

Page 47: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

smaller . This makes b a c k f i l l i n g e a s i e r and minimizes the r i s k of mixing

topsoi l and subsoi l .

The Plough

Another technique which is employed for small p i p e l i n e s up t o 114.3 mm i s

"ploughing" in. . There is no open excavat ion, only some v e r t i c a l displace-

ment during pipe i n s t a l l a t i o n . Ploughing-in minimizes mixing and d i s t u r -

bance, p a r t i c u l a r l y i n sandy s o i l s where i t can be operated most e f f i c -

i e n t l y . As with t h e Ditch Witch and Rotor Ripper, ove ra l l d i s turbance is

normally much l e s s than with a conventional wheel t rencher . One lirnita-

t i on t o ploughing i n is tha t i n some in s t ances , undesireable o r t o x i c sub-

s o i l is brought t o t he sur face , thereby degrading the q u a l i t y of the top-

s o i l .

Page 48: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

5.0 PLANNING FOR SOIL CONSERVATION

This chap te r a s s e s s e s soil handl ing p rocedures used i n p i p e l i n e const ruc-

t i o n on a g r i c u l t u r a l l and and e v a l u a t e s t h e i n t e r r e l a t i o n s h i p s of s o i l s

and p i p e l i n e c o n s t r u c t i o n t o determine op t imal s o i l hand l ing p rocedures

f o r s p e c i f i c s o i l c o n d i t i o n s .

Included i n t h i s s e c t i o n is a procedure f o r c a l c u l a t i n g p i p e l i n e r i g h t o f

way width t o a l l o w t h e p roper handl ing and s t o r a g e of s o i l m a t e r i a l s dur-

i n g p i p e l i n e c o n s t r u c t i o n . Many of t h e s o i l problems a s s o c i a t e d wi th

p i p e l i n e c o n s t r u c t i o n , such a s s o i l mixing and l o s s , occur because t h e r e

is i n s u f f i c i e n t r i g h t of way t o p rov ide e f f e c t i v e s t o r a g e and s e p a r a t i o n

o f s o i l m a t e r i a l s .

F i v e major hand l ing p rocedures a r e d i s c u s s e d , a s well a s p rocedures f o r

road and f o r e i g n l i n e c r o s s i n g s , and f o r f r o z e n , wet o r o t h e r s o i l condi-

t i o n s . Although s u b t l e v a r i a t i o n s occur , t h e f i v e p rocedures a r e :

1. No t o p s o i l s t r i p p i n g ,

2 . Trench width t o p s o i l s t r i p p i n g ,

3. Blade width t o p s o i l s t r i p p i n g ,

4. Trench and s p o i l a r e a t o p s o i l s t r i p p i n g , and

5. Trench, s p o i l and work a r e a s t r i p p i n g .

Each of t h e procedures is d i s c u s s e d accord ing t o a p p l i c a t i o n , v a r i a t i o n ,

and implementation. The Appl ica t ion s e c t i o n o u t l i n e s s p e c i f i c p rocedures

based on s o i l q u a l i t y and q u a n t i t y pa ramete rs , l a n d use and weather condi-

t i o n s which shou ld r e s u l t i n t h e l e a s t a g r i c u l t u r a l impact. To dec ide

which procedure w i l l work b e s t , i t is n e c e s s a r y t o c o l l e c t and e v a l u a t e

t h e r e l e v a n t soils, land use and, i f a p p l i c a b l e , c l i m a t i c i n f o r m a t i o n f o r

t h e area .

The V a r i a t i o n s e c t i o n d i s c u s s e s how t h e s t a n d a r d s o i l hand l ing p rocedures

can be modified t o s u i t s p e c i a l s o i l c o n d i t i o n s o r r i g h t of way r e s t r i c -

t i o n s . Topso i l , f o r example, may need t o be s t o r e d i n a s p e c i a l a r e a

because of r i g h t of way r e s t r i c t i o n s o r t o minimize o t h e r impacts.

- 36 -

Page 49: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

The Implementation s e c t i o n addresses the type and use of equipment best

s u i t e d to var ious s o i l , land use and weather condi t ions , and s o i l handl ing

procedures. The success of the procedure o f t en depends on how i t is

executed i n the f i e l d .

5 1 CALCULATION CF RIGHT OF WAY WIDTH

Calcula t ing t o p s o i l s t r i p p i n g widths, and s to rage requirements f o r s t r i p p -

ed topso i l and excavated trench s p o i l on the r i g h t of way is required t o

determine tha t s u f f i c i e n t space is ava i l ab l e for proper ma te r i a l s t o r a g e

and for e f f i c i e n t cons t ruc t ion operat ions.

Ca lcu la t ing the width required for s torage of t rench s p o i l and t o p s o i l

s t r i p p i n g r e q u i r e s knowledge of the dimensions of t h e t rench and t h e

method of excavation. (Figure 5.1 1. Average t rench depths w i l l be i n t h e

order of 1.2 m t o 1.5 m and widths 0.7 m t o 1.0 m for small inch l i n e s .

The bulking f a c t o r s for subsoi l a r e assumed t o be 20% f o r wheel t r enche r s

and 30% fo r backhoes. Frozen s p o i l w i l l bulk more i f excavated by

backhoe. The angle of repose for s p o i l is 300 - 38O o r approximately

1.5:l.

The following s t e p s w i l l provide t h e width of t h e r i g h t of way requi red :

1. Determine width of s p o i l p i l e ,

2. Determine width of t opso i l s t r i p p i n g ,

3. Determine width of t opso i l p i l e , and

4. Add width of work and t r a v e l a reas , t rench , and sepa ra t ion d i s t a n c e s

between s p o i l and topso i l p i l e s and between s p o i l p i l e and t rench.

Width o f S~oil Pile

Assuming a uniform s p o i l p i l e* with 1,5:1 s ides lopes (34O) formed by a

wheel t rencher:

Width of s p o i l p i l e base W = &i-

Page 50: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

Where A = c ros s - sec t iona l area of s p o i l p i l e (x- t ) yob

x = depth of t r ench

t = depth of t o p s o i l

y = width of t r ench

b = bulking f a c t o r (1.2 f o r t renchers ; 1.3 f o r backhoes)

Example using Figure 5.1.

Cross-sect ional area of s p o i l p i l e A = (x- t ) -yob

= (1.2~1-0.2m) l.Omxl.2m

1.2m2

Width of s p o i l p i l e base

Width o f Topsoil Strippinq

To determine t h e width of t o p s o i l t o be s t r i pped , assuming a t rench and

s p o i l a r ea t o p s o i l s t r i p p i n g procedure (Sect ion 5.24) and r e f e r r i n g t o

F igure 5.1.

One ha l f t he width of t h e t rencher on t h e

work s i d e , so the t rencher w i l l sit l e v e l

during excavation (assuming a Barber-Green TA-77) = .5 x 3.5171 = 1.75rn

One ha l f of the t rench width = .5 x 1.0m = 0.5m

Separat ion of t rench from s p o i l p i l e = 0.5m

Width of s p o i l p i l e = 2.7m

Separat ion of s p o i l p i l e from t o p s o i l p i l e = 1.0m

Total width of t o p s o i l t o be s t r i pped .= 6.45m

* I n p ipe l ine cons t ruc t ion , a uniform s p o i l p i l e is formed only when f ine-grained ma te r i a l is deposi ted from a conveyor be l t . I f formed by a backhoe, dozer, or grader , t he p i l e w i l l be approximately 40 percent wider.

Page 51: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

TRACK WIDTH O F

R/w TRENCHER 1 ~ 1 R/W

BDY. BDY.

I I I SPOIL SIDE

'& WORK SlDE I

I I

6.45

- NOTES

1. B A S E D ON TRENCH AND SPOIL AREA T O P S O I L S T R I P P I N G PROCEDURE ( S E C T I O N 5.24.)

2. ASSUMES TOPSOIL I S STRIPPED WITH A BLADE.

5. ASSUMES TRENCH I S EXCAVATED AND S P O I L STORED WITH A WHEEL TRENCHER.

FIGURE 5.1

TYPICAL STRIPPING AND STORAGE REQUIREMENTS

Page 52: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

Width o f Topsoil P i l e

Assuming t h a t t h e width of a t o p s o i l p i l e pushed with a dozer is 1.4 times

t h e width of the same p i l e i f depos i ted by conveyor:

Width of t opso i l p i l e base = W = 1 . 4 p

Where A = c ros s - sec t iona l a rea of t o p s o i l p i l e = z . t c b

z = width s t r i p p e d of t o p s o i l

t = depth of t o p s o i l

b = bulking f a c t o r (1.1 for c u l t i v a t e d land; 1.2 fo r p a s t u r e )

Example us ing F igure 5.1.

Cross-sect ional a r ea of t o p s o i l p i l e A = 2 . t - b

= 6.45m x 0.2m x 1.1

= 1.42m2

Width of t o p s o i l p i l e base.

Total Width o f Riqht o f Way

Using F igure 5.1 again.

Spoi l p i l e width = 2.7m

Topsoil p i l e width = 4.lm

Separat ion between s p o i l p i l e and t r ench = 0.5m

Separa t ion between s p o i l p i l e and t o p s o i l p i l e = 1 .Om

Trench width = 1.0m

Work & t r a v e l space (See Sec t ion 4.2) = 10.0m

Total width of r i g h t of way r equ i r ed = 19.3m

Page 53: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND
Page 54: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

5.2 SOIL UINSERVATION PROCEDURES

5.21 No Topsoi l S t r i p p i n g

No topso i l is s t r i p p e d or salvaged on t h e r i g h t of way p r i o r t o t rench

excavation. (Figure 5.2) . Topsoil and subsoi l a r e excavated toget her a s

a s i n g l e l i f t . The replaced s p o i l ma te r i a l , which w i l l form the roo t zone

w i l l be a mixture of any e x i s t i n g t o p s o i l and subso i l .

No topso i l s t r i p p i n g should be considered where:

a ) The t o p s o i l , inc lud ing the sod l a y e r , is less than 5 cm on pas-

t u r e land t h a t is not used i n a crop r o t a t i o n b a s i s for g r a s se s

and c e r e a l crops.

b ) The t o p s o i l is l e s s than 10 cm and the land has a s t o n i n e s s r a t -

i ng g r e a t e r than or equal t o S3 on pas tu re land.

c ) The s o i l is poorly dra ined , is sub jec t t o prolonged per iods o f

high water t a b l e and has not been r ecen t ly c u l t i v a t e d .

Var ia t ion

Trench s p o i l is usua l ly s t o r e d on t h e s p o i l s i d e of t h e t rench , however,

i n poorly drained a r ea s i t may be advantageous t o s t o r e it on the work

s i d e fo r use dur ing pipe makeup.

Implementation

A wheel t rencher is p r e f e r r e d for excavat ion s i n c e t he pu lver ized s p o i l

can be back f i l l ed without c r e a t i n g an excessive roach. In s tony or poorly

drained a r ea s , a backhoe is usua l ly used. Compaction of t h e b a c k f i l l

ma te r i a l is recommended immedi a t e 1 y following s p o i l replacement t o reduce

t he height of the roach and t o not impede s u r f a c e drainage.

Page 55: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

R/W BOY. SPOIL S l D E

I I EXCAVATED

WORK S l D E R / W BDY.

I I

UNDISTURBED TOPSOIL

PROF1 LE N.T.S.

NOTES

I 1- EXCAVATE T O P S O I L AND S U B S O I L AS A S I N G L E L I F T PLACE TRENCH S P O I L ON S P O I L S I D E ADJACENT TO TRENCH-

I 2 * RETURN TRENCH S P O I L TO TRENCH AND COMPACT* M I N I M I Z E S C A L P I N G OF U N D I S T U R B E D SOD LAYER I N GRASSED L A N D S * L E A V E A ROACH OVER T H E TRENCH TO ALLOW FOR S U B S I D E N C E .

I 3. RESEED W I T H A C O M P A T I B L E SEED M I X AND F E R T I L I Z E *

FIGURE 5.2

NO TOPSOIL STRIPPING

AUG, 1984

Page 56: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

5.22 Trench Width Topso i l S t r i p p i n g

Trench width t o p s o i l s t r i p p i n g i n v o l v e s t h e s t r i p p i n g and s a l v a g e of a 0.8

t o 1.2 m width of t o p s o i l over t h e t r e n c h l i n e ( F i g u r e 5.3). The purpose

of t h i s procedure is t o i n c u r t h e l e a s t d i s t u r b a n c e and c o s t . Compaction

o f t h e s u b s o i l is kept t o a minimum s i n c e t o p s o i l is undis tu rbed on t h e

s p o i l and work s i d e s . S p o i l can be s t o r e d on und is tu rbed t o p s o i l and

r e t u r n e d t o t h e t r e n c h wi thou t i n c o r p o r a t i n g a h igh p e r c e n t a g e of undis-

tu rbed t o p s o i l . I n a t y p i c a l s i t u a t i o n , b a c k f i l l m a t e r i a l w i l l u s u a l l y

no t overf low t h e t r ench . A s u f f i c i e n t volume of t o p s o i l w i l l have been

sa lvaged t o r e p l a c e t h e o r i g i n a l depth o f t o p s o i l s t r i p p e d over t h e

t r e n c h l i n e .

The maximum width s t r i p p e d should not exceed t h e i n s i d e t r e a d t o t r e a d

dimensions of t h e t r e n c h e r . For an average s i z e t r e n c h e r (Barber Greene

TA-65) t h i s dimension is approximately 1.8 m. In s o f t m a t e r i a l s t h e

s t r i p p e d width shou ld be approx imate ly 1.3 rn t o prevent t h e t r a c k s from

c o l l a p s i n g t o p s o i l i n t o t h e excava t ion .

S t r i p p e d t o p s o i l is s t o r e d on t h e work s i d e approx imate ly 1.3 m from t h e

edge of t h e t r e n c h . The t r e n c h is excavated and t h e s p o i l is s t o r e d on

u n d i s t u r b e d t o p s o i l on t h e s p o i l s i d e and a d j a c e n t t o t h e t r ench .

A p p l i c a t i o n

Trench width t o p s o i l s t r i p p i n g i s b e s t s u i t e d where s p o i l can be s t o r e d on

u n d i s t u r b e d t o p s o i l and s e p a r a t e d wi thou t s i g n i f i c a n t mixing, and where

rep laced s p o i l can be c o n f i n e d t o t h e t r e n c h . The s o i l and l and use

s i t u a t i o n s where t h i s procedure is b e s t s u i t e d inc lude :

a ) S o i l s where:

- t o p s o i l d e p t h s exceed 40 cm

- dry c o n d i t i o n s e x i s t f o r most o f t h e year

Page 57: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

i t WIDTH OF TOPSOIL STRIPPING

R/W BOY. SPOIL SlDE

Q TRENCH I I I I

EXCAVATED @nn'L I STRIPPED

WORK SlDE R/ W BOY.

I I I I

EXCAVATED STRIPPED

1 I

NOTES

1- REMOVE T o P s o r L FROM THE TRENCH LINE AND S T O R E ON WORK SIDE ADJACENT TO THE TRENCH S T R I P P E D W I D T H WILL BE A P P R O X I M A T E L Y 0.8-1 - 2 M. S T O R E D T O P S O I L SHOULD BE APPROXIMATELY 1.3 M FROM THE TRENCH TO ALLOW FOR SUBSEQUENT P A S S OF TRENCHER TO E X C A V A T E S U B S O I L M A T E R I A L .

2. E X C A V A T E S U B S O I L AND STORE ON S P O I L S I D E A D J A C E N T TO T H E T R E N C H *

3. RETURN TRENCH SPOIL TO TRENCH AND COMPACT. MINIMIZE SCALPING OF UNDISTURBED SOD L A Y E R ON GRASSED L A N D S -

4. RETURN T O P S O I L E V E N L Y OVER THE TRENCH L I N E .

5. A L L E V I A T E C O M P A C T I O N OF T O P S O I L OVER E N T I R E R I G H T OF WAY ON C U L T I V A T E D L A N D S * R E S E E D W I T H A C O M P A T I B L E S E E D M I X AND F E R T I L I Z E ON G R A S S E D L A N D S -

FIGURE 5.3

TRENCH WIDTH TOPSOIL STRIPPING

AUG. ,1984

Page 58: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

In such cases , replaced s p o i l can be confined t o t he t rench and min-

or amounts of t opso i l can be mixed with s u b s o i l without apprec iab ly

a l t e r i n g topso i l capab i l i t y . S u f f i c i e n t volumes of salvaged t o p s o i l

w i l l be a v a i l a b l e t o r e s t o r e t o p s o i l depth over t he t rench.

b) S o i l s where:

- t o p s o i l depths exceed 30 cm

- subso i l q u a l i t i e s a r e good t o f a i r

- t h e land is i n forage crop

Under these circumstances, replaced s p o i l can usua l ly .be confined t o

t h e t rench and s u f f i c i e n t volumes of t o p s o i l a r e a v a i l a b l e t o

r e s t o r e t opso i l depths over t h e trench. Separa t ion of s p o i l during

replacement is aided by the e s t ab l i shed roo t mat of t he forage crop,

t h e r e f o r e , l i t t l e t o p s o i l w i l l be incorporated w i t h t h e s p o i l and

l o s t i n the t rench.

c ) S o i l s where:

- t o p s o i l depths exceed 20 cm

- subso i l q u a l i t i e s a r e good t o f a i r

- t h e land is i n e s t ab l i shed pas ture

Given t h i s c r i t e r i a , replaced s p o i l w i l l completely f i l l t h e t rench

or over flow it only s l i g h t l y . Adequate volumes of t o p s o i l and sod

should be a v a i l a b l e for reclamation over t h e t rench and because of

the e s t ab l i shed root mat, s p o i l can be e a s i l y separa ted without dis-

tu rb ing the underlying topso i l .

d) S o i l s where:

- t o p s o i l depths exceed 20 cm

- frozen condi t ions p reva i l

- subso i l q u a l i t i e s a r e good t o f a i r

Generally, rep laced s p o i l w i l l completely f i l l t h e t rench o r over-

flow i t s l i g h t l y and topso i l can be adequately separa ted from sub-

s o i l i n t hese circumstances.

- 46 -

Page 59: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

Spo i l can usua l ly be separa ted from the f rozen t o p s o i l su r f ace with-

out d i s t u r b i n g the t o p s o i l , a l s o adequate volumes of t o p s o i l w i l l be

a v a i l a b l e t o r ep l ace t h e o r i g i n a l depth. I f subso i l q u a l i t i e s a r e

poor t o unsu i tab le , t o p s o i l depths should exceed 30 cm so t h a t top-

s o i l can be understr ipped and yet be i n s u f f i c i e n t quan t i t y fo r

replacement

e ) S o i l s where:

- t o p s o i l depths a r e l e s s than 15 cm

- the p r o b a b i l i t y of s o i l e ros ion by wind is high

- t h e land is i n forage , pas ture o r s t u b b l e

S o i l s i n t h i s type of environment a r e u sua l ly coarse tex tured and

dry. Reducing the r i s k of wind e ros ion by minimizing d is turbance t o

t h e vege t a t i ve cover, should be weighed aga ins t the r i s k of mixing.

Variation

Topsoil i.s usua l ly s t r i p p e d t o t he El horizon. In s o i l s with good q u a l i t y

I3 mate r i a l and poor q u a l i t y C ma te r i a l , s t r i p p i n g can inco rpo ra t e some I3

horizon i n t o the organic A mate r i a l t o i nc rease t he volume of t o p s o i l and

t o ensure t h a t t h e r e is room i n t he t rench f o r a l l of the poorer q u a l i t y C

ma te r i a l . This v a r i a t i o n is app l i cab l e t o s o i l s with t o p s o i l depths o f 20

t o 30 cm. In frozen condi t ions t h i s v a r i a t i o n a p p l i e s t o a l l s o i l s with

t o p s o i l depths o f 10 t o 30 cm.

Implementation

Trench width t o p s o i l s t r i p p i n g can be performed with e i t h e r a bucket wheel

t r enche r o r a s t e p blade. A s t e p blade is usua l ly used where t o p s o i l

depths a r e l e s s t han 20 cm. The s t e p blade w i l l s t r i p t he t o p s o i l and

move i t onto t he undis turbed t o p s o i l su r f ace ad jacent t o t he t rench. The

main blade w i l l l a t e r a l l y d i sp l ace t h i s ma te r i a l away from the t rench t o

a l low the t r enche r t o follow. To avoid l o s s of t o p s o i l during l a t e r a l

t r a n s p o r t a t i o n , t h e undis turbed su r f ace should be frozen o r covered with

an e s t a b l i s h e d vege t a t i ve mat.

- 47 -

Page 60: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

The bucket wheel t r e n c h e r is more e f f e c t i v e when s a l v a g i n g t o p s o i l s deeper

than 20 cm. Topso i l w i l l s p i l l o f f t h e bucke t s d u r i n g excava t ion and end

up a s smal l p i l e s on both s i d e s of the t r e n c h . The remainder of t h e top-

s o i l w i l l be c a r r i e d by t h e bucke t s , dumped on t h e conveyor and d e p o s i t e d

away from t h e t r e n c h on t h e work s i d e . With s h a l l o w dep ths , less than

20 cm, t h e sa lvaged volume of t o p s o i l w i l l be s i m i l a r t o t h a t s p i l l e d from

t h e buckets. S p i l l can be reduced o r avoided by mounting a smal l llshoe"

or guide on each s i d e of t h e wheel t o push t h e t o p s o i l back i n t o t h e

t r e n c h f o r e x c a v a t i o n by subsequent buckets .

When r e p l a c i n g s p o i l , c a r e shou ld be taken t o e n s u r e t h e s p d i l is r e t u r n e d

t o t h e t r e n c h and not e x c e s s i v e l y roached over t h e t r e n c h o r al lowed t o

overf low t h e t r e n c h on t o u n d i s t u r b e d t o p s o i l . T h i s is p a r t i c u l a r i l y

important when working with sha l low t o p s o i l s t o avoid gouging and i n c o r -

p o r a t i o n of s p o i l i n t o t o p s o i l dur ing subsequent c u l t i v a t i o n by t h e land-

owner. This can be avoided by s u c c e s s i v e l y "shading inv1 p o r t i o n s of t h e

s p o i l and compacting, r a t h e r than r e t u r n i n g a l l t h e s p o i l i n one p a s s and

then compacting. The compactive e f f o r t of one p a s s o f a dozer o r g r a d e r

is u s u a l l y not enough . to p r o p e r l y compact a metre of s p o i l . However, a

grader t ire does compact b e t t e r than a dozer t r a c k .

Shallow t o p s o i l shou ld be r e p l a c e d with a grader because of i ts g r e a t e r

accuracy i n hand l ing smal l volumes of m a t e r i a l s . On p a s t u r e l a n d s where

s c a l p i n g of t h e sod l a y e r must be avoided, t h e g rader h a s t h e p r e c i s i o n t o

do t h e job p roper ly .

I n f rozen c o n d i t i o n s t o p s o i l shou ld not be r e p l a c e d u n t i l t h e t r e n c h s p o i l

has thawed, subs ided and has been mechan ica l ly compacted and con toured .

Page 61: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND
Page 62: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

5.23 Blade Width Topsoil Stripping

Topsoil is s t r i pped and salvaged over a t h ree t o four metre s t r i p cen t r ed

over the t r ench l ine (Figure 5.4). This procedure produces t h e l e a s t mix-

i ng of t o p s o i l and subso i l by accommodating t h e b a c k f i l l and replacement

o f trench s p o i l without a f f e c t i n g adjacent undisturbed t o p s o i l . Trench

s p o i l w i l l bulk when excavated and with the pipe i n place, w i l l occupy a

g rea t e r volume than is ava i l ab l e i n the trench. By removing a blade width

of t opso i l , the excavated s p o i l can be replaced and allowed t o overflow

t h e trench. Overflow s p o i l can be fea thered over t h e blade width, rework-

ed and recontoured without s e r i o u s l y a f f e c t i n g e i t h e r t h e s t r i p p e d o r

undisturbed topso i l . S t r ipped topso i l is then replaced over t h e o r i g i n a l

s t r i pped area.

The width s t r i p p e d w i l l vary according t o the type and angle of t he b lade

used. Both graders and dozers a r e used. The minimum width s t r i pped

should accommodate the ou t s ide t r ead to t r ead dimensions of t h e t rencher .

For an average s i z e t rencher (Barber Greene TA-65) t h i s dimension is 3 m.

An add i t i ona l 0.5 m should be allowed, making t h e s t r i p p e d width. 3.5 m.

Larger t r enche r s w i l l r equ i r e add i t i ona l width.

S t r ipped t o p s o i l is s to red on the work s i d e immediately ad jacent t o t he

s t r i pped area. The t rench is excavated and the s p o i l s t o r e d on t h e s p o i l

s i d e p a r t i a l l y on subso i l and undisturbed topso i l .

Application.

Blade width topso i l s t r i p p i n g is best s u i t e d where t rench s p o i l can be

s to red on and separated from undisturbed t o p s o i l without r i s k of mixing,

and where the replaced t rench s p o i l cannot be completely confined t o t h e

o r i g i n a l t rench and must be l a t e r a l l y fea thered t o avoid high roaching.

The s o i l and land use s i t u a t i o n s where t h i s procedure is bes t s u i t e d

include:

a ) S o i l s where:

- the land is i n e s t ab l i shed forage c rops

- 50 -

Page 63: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

WIDTH OF TOPSOIL STRIPPING k

WORK SIDE R / W BOY.

EXCAVATED I

STRIPPED

NOTES

1. REMOVE T O P S O I L FROM AN AREA CENTRED OVER THE TRENCH L I N E . S T R I P P E D W I D T H W I L L B E A P P R O X I M A T E L Y 3 T O 3.5 M a STORE T O P S O I L ON WORK S I D E A D J A C E N T TO S T R I P P E D AREA. T O P S O I L CAN B E S T O R E D I N A P I L E OR S P R E A D OUT OVER THE WORK S I D E .

2. E X C A V A T E TRENCH S U B S O I L AND STORE ON S P O I L S I D E A D J A C E N T TO T R E N C H *

3 . R E T U R N TRENCH S P O I L TO TRENCH A N D C O M P A C T - F E A T H E R OUT E X C E S S S P O I L OVER S T H I P P E D AREA L E A V I N G A LOW ROACH C E N T N E U O V E N T H E T R E N C H -

4. R E T U R N T O P S O I L E V E N L Y OVEN THE S T R I P P E D A R E A -

5 . A L L E V I A T E C O M P A C T I O N OF T O P S O I L OVER 6 N T I R E R I G H T OF WAY ON C U L T I V A T E D L A N D S * R E S E E D WITH A COMPATIBLE SEED MIX AND FERTILIZE ON GRASSED LANDS.

FIGURE 5.4

BLADE WIDTH TOPSOIL STRIPPING

AUG., 1984

Page 64: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

- t o p s o i l is less than 30 cm

- subso i l q u a l i t i e s a r e good to f a i r

Es tab l i shed vegeta t ion cover allows subso i l t o be p a r t i a l l y placed

on the undisturbed t o p s o i l and e a s i l y separa ted during replacement.

Shallow t o p s o i l depths of l e s s than 30 cm may not allow replacement

o f a l l t he s p o i l i n t h e t rench, t h e r e f o r e , excess s p o i l must be dis-

placed over s u b s o i l t o avoid impacting undisturbed topso i l . Mixing

o f t opso i l and subso i l w i l l occur during post cons t ruc t ion a c t i v i -

ties i f the excess s p o i l is not l a t e r a l l y d isp laced t o reduce t h e

roach he ight .

b) S o i l s where:

- the land is improved pas tu re

- t o p s o i l depth is less than 20 cm

A s with a ) above, s p o i l can be placed p a r t i a l l y on t h e undisturbed

t o p s o i l s u r f a c e because of t he e x i s t i n g vegeta t ion mat. With sha l -

low t o p s o i l depths, replaced s p o i l w i l l overflow t h e t rench and

a f f e c t the undisturbed t o p s o i l , forming a high roach i f not l a t e r -

a l l y d isp laced on the subso i l sur face . Mixing t o p s o i l and subso i l

is a major concern.

c ) S o i l s where:

- a t o p s o i l depth of 30 t o 40 cm e x i s t s

- the land is c u l t i v a t e d

- s u b s o i l q u a l i t i e s a r e good t o f a i r

Trench s p o i l , when rep laced , w i l l l i k e l y exceed t h e o r i g i n a l t rench

volume and must be l a t e r a l l y d isp laced . Because of t he l a r g e vol-

umes of t o p s o i l , ma te r i a l s to rage w i l l be a problem i f t h e s p o i l

s t o r a g e a rea is completely s t r i pped . Replacement of s p o i l dur ing

b a c k f i l l can cause some l o s s of undisturbed t o p s o i l , but its conse-

quences t o s o i l c a p a b i l i t y a r e not major due t o t h e l a r g e amounts o f

a v a i l a b l e t o p s o i l .

Page 65: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

d ) S o i l s h e r e :

- t o p s o i l dep ths a r e between 10 and 20 cm

- f rozen condi t ions exist

- subso i l q u a l i t i e s a r e good t o f a i r

In t h i s i n s t ance , t o p s o i l can be adequately separa ted from s u b s o i l .

However, f rozen s p o i l w i l l be d i f f i c u l t t o handle and may not be

e f f e c t i v e l y rep laced i n t h e t rench u n t i l thawed. Replaced s p o i l

w i l l overflow t h e t rench and should be allowed t o thaw before i t is

reworked with a blade.

e ) S o i l s where:

- t o p s o i l depth is between 10 and 30 cm

- frozen cond i t i ons exist

- s u b s o i l q u a l i t i e s a r e poor t o unsu i t ab l e

The same cond i t i ons i n d) above w i l l apply. Even with 30 cm of top-

s o i l , the rep laced frozen s p o i l w i l l completely f i l l t h e t rench .

Because of t he poor q u a l i t y ' subso i l , s p o i l must be confined t o a

pos i t i on below t h e t o p s o i l t o avoid major impacts t o undis turbed a s

wel l a s replaced t o p s o i l .

This procedure can a l s o be app l i ed where t renching equipment d e p o s i t s

s p o i l on both s i d e s of t h e t r ench ; for example, t h e "Ditch Witch" and some

narrow wheel t renchers . The o u t s i d e dimensions of the s p o i l p i l e s adja-

cent t o t he t rench w i l l be 2.5 m t o 3.0 m. With t he b lade width t o p s o i l

s t r i p p i n g procedure, excavated t rench s p o i l rests on undis turbed subso i l .

This s t r i p p i n g procedure, i n conjunct ion with narrow t renching equipment,

can be used for s o i l s on c u l t i v a t e d , forage and improved pas tu re land. I n

these s i t u a t i o n s , s p o i l is not s t o r e d on t o p s o i l and the r i s k of mixing

during b a c k f i l l i n g is decreased.

Variations

It is p re fe rab l e t o s t o r e t he s t r i p p e d t o p s o i l on t he work s i d e ad jacent

t o t he s t r i p p e d area. (Figure 5.4). Topsoil may be spread out over t he

- 53 -

Page 66: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

work s i d e t o reduce subso i l compaction and r u t t i n g of t h i n t o p s o i l s o r i f

t he t o p s o i l p i l e becomes an o b s t a c l e t o t h e c o n s t r u c t i o n crew.

In some cases , p l ac ing t o p s o i l on t h e s p o i l s i d e between t h e s p o i l p i l e

and the r i g h t of way boundary can be done a s a l a s t r e s o r t . General ly ,

t h i s is not d e s i r e d due t o t o p s o i l l o s s from movement back and f o r t h

ac ros s the vegetat ion mat. In add i t i on , damage t o t h e vege ta t ion mat may

occur during t h e process of recovering t h e t o p s o i l .

Implementation

Topsoil is s t r i p p e d by e i t h e r a dozer o r grader . Due t o t he r i s k of mix-

ing , r ipping i n f rozen condi t ions p r i o r t o s t r i p p i n g is not recommended.

S t r i pp ing should be t o a uniform depth t o ensure t h a t a l l of t he t o p s o i l

is removed p r i o r t o t renching and b a c k f i l l i n g . This a l s o al lows t h e

t rencher t o sit l e v e l t o avoid excessive equipment s t r a i n .

A grader is recommended, because of its b e t t e r depth c o n t r o l , f o r

Solone tz ic soils which exh ib i t poor t o m s u i t a b l e phys ica l and chemical

subso i l q u a l i t i e s and fo r s o i l s with less than 15 cm of t opso i l . Mixing

with subso i l can be a major problem i f t o p s o i l is not a c c u r a t e l y sepa-

r a t ed , p a r t i c u l a r i l y i n Solone tz ic s o i l s . S o i l s with t o p s o i l dep ths

g r e a t e r than 15 cm may be succes s fu l ly s t r i p p e d by dozer.

I f frozen, replaced s p o i l must thaw before f i n a l compaction and d e f i n i t e l y

before t opso i l replacement. Topsoil can be l o s t i f i t is rep laced p r i o r

t o t rench se t t l ement . I f cons t ruc t ing i n w in t e r , t h e t rench should be

llroughed i n " with s p o i l t o pro tec t t he pipe a d t h e t o p s o i l rep laced t h e

following spr ing . Trench mater ia l excavated with a t r enche r p u l v e r i z e s

b e t t e r and can be more e a s i l y compacted than ma te r i a l dug up with a back-

hoe.

Page 67: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND
Page 68: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

5.24 Trench and Spoil Area Topsoil Stripping

This procedure provides a s t r i p p e d width wide enough t o accommodate the

trencher, the s p o i l and a one metre separat ion between the s p o i l p i l e and

topso i l . (F igure 5.5). Mix ing i s avoided s ince t o p s o i l i s s tored on top-

s o i l and s p o i l i s s to red on subsoi l . Movement o f the s p o i l should not

a f f e c t any t o p s o i l . Replaced s p o i l should be compacted i n the trench,

reworked w i th a blade and feathered over the s t r i pped area p r i o r t o top-

s o i l replacement.

Str ipped widths are t y p i c a l l y 6 t o 8 m, depending on the s i z e o f trencher,

the w i d t h o f trench and the amount o f spoi.1 generated. Str ipped t o p s o i l

i s usua l ly s to red on the s p o i l s i d e adjacent to the r i g h t o f way bound-

ary. The t rench s p o i l i s placed on a subso i l sur face near the trench and

one metre from the t o p s o i l p i l e o r one metre from the undisturbed topso i l ,

whichever i s nearer.

Application

Trench and s p o i l area t o p s o i l s t r i p p i n g i s the most widely used proce-

dure f o r p i p e l i n e cons t ruc t i on on a g r i c u l t u r a l lands. I t i s p r a c t i c a l

where t rench s p o i l cannot be s tored on t o p s o i l without mix ing dur ing back-

f i l l operations. The s o i l and land use s i t u a t i o n s where t h i s procedure i s

best s u i t e d inc lude:

a) S o i l s where:

- t o p s o i l depths range from 10 t o 30 cm

- the land i s c u l t i v a t e d

- s u b s o i l q u a l i t i e s are good t o f a i r

Because of the moderate t o p s o i l depths and the "loose" nature o f the

topso i l , s p o i l cannot be s tored on i t wi thout s i g n i f i c a n t mixing.

b) S o i l s where:

- t o p s o i l depths are l ess than 30 cm

- the land i s i n forage crop

- 56 -

Page 69: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

WIDTH OF TOPSOIL STRIPPING G R'W SPOIL SlDE BDY.

I Q TRENCH I

WORK SlDE

I STRIPPED I

PROFILE N.T. S.

NOTES . .

1. REMOVE T O P S O I L FROM OVER THE TRENCH AND UNDER THE S P O I L P I L E - S T R I P P E D W I D T H WILL BE APPROXIMATELY 6-8 M. S T O R E TOPSOIL ON SPOIL SIDE ADJACENT TO STRIPPED AREA.

2. E X C A V A T E TRENCH S U B S O I L AND STORE ON S P O I L S I D E A D J A C E N T TO TRENCH. ALLOW A 1 M S E P A R A T I O N BETWEEN THE T O P S O I L P I L E AND THE TRENCH S P O I L *

3. RETURN TRENCH S P O I L TO TRENCH AND COMPACT- F E A T H E R OUT EXCESS S P O I L OVER S T R I P P E D AREA L E A V I N G A LOW ROACH CENTRED OVER THE T R E N C H - A L L E V I A T E C O M P A C T I O N OF C L A Y R I C H S U B S O I L S OVER THE S T R I P P E D A R E A -

4. RETURN T O P S O I L E V E N L Y OVER THE S T R I P P E D AREA.

5 - A L L E V I A T E C O M P A C T I O N OF T O P S O I L OVER E N T I R E R I G H T OF N A Y -

FIGURE 5.5

TRENCH AND SPOIL AREA TOPSOIL STRIPPING

AUG. , 1 9 8 4

Page 70: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

- s u b s o i l q u a l i t y is poor t o unsu i t ab l e

The poor q u a l i t y s p o i l should not be i n contac t with e i t h e r s t o r e d

o r undis turbed t o p s o i l because of its p o t e n t i a l t o a l t e r t o p s o i l

qua l i t y .

Variation

To prevent mixing, t o p s o i l is usua l ly s t r i p p e d only t o t h e B horizon. For

c u l t i v a t e d f i e l d s with poor or unsu i t ab l e B horizons, t he t o p s o i l should

be understr ipped so t h a t poorer q u a l i t y B mate r i a l is not mixed with t h e

s t r i p p e d t o p s o i l . This is f a i r l y e a s i l y done i f t h e r e is a colour d i f f e r -

ence between the t o p s o i l and B horizons. Where a co lour change is not

ev ident , i t is important t o con t ro l s t r i p p i n g t o a predetermined depth

j u s t above the B horizon.

Where the s u b s o i l is f i n e t ex tu red and the moisture conten t is favourable

f o r compaction, t he s t r i p p e d t o p s o i l may be spread on t h e work s i d e of the

r i g h t of way. The i n c r e a s e i n t he t o p s o i l depth w i l l decrease the compac-

t i o n t o the subso i l . Compacted s u b s o i l i n t h e s t r i p p e d a r e a can be

"worked up" p r i o r t o t o p s o i l replacement.

Implementation

Topsoil can be s t r i p p e d with e i t h e r a dozer o r a grader . The grader is

p re fe r r ed i n a r e a s of t h i n t o p s o i l and on soils with poorer q u a l i t y sub-

s o i l where depth c o n t r o l is c r i t i c a l . With r e l a t i v e l y deep t o p s o i l

(> I5 cm), a dozer can be used t o remove the bulk of t he mater ia l . A

grader should then be used t o s e p a r a t e t he remaining t o p s o i l f r an t h e B

horizon.

A t rencher is p re fe r r ed for t rench excavat ion s i n c e t h e ma te r i a l can be

deposi ted accu ra t e ly on the r i g h t of way, a l lowing cons tan t s epa ra t i on o f

s p o i l and t o p s o i l .

Page 71: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

J I n i t i a l b a c k f i l l i n g can be done by e i t h e r dozer or mormon board, although

the l a t t e r performs t h i s t a sk bes t . F ina l b a c k f i l l i n g is f in i shed o f f

, - with a grader t o r e s t o r e t h e o r i g i n a l s u b s o i l grade. The s p o i l p i l e

t should be shaded i n t o t h e t rench i n por t ions and each por t ion of t he s p o i l

d compacted a s i t is replaced. This w i l l a s s i s t i n r e tu rn ing t h e s p o i l t o the t rench without major overflow.

d

Subsoi l compaction i n t he s t r i p p e d a r ea should be c u l t i v a t e d p r i o r t o top-

s o i l replacement. 4

Page 72: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

5.25 Trench, Spoil and Work Area Topsoil Stripping

The primary purpose of t rench , s p o i l and work a r e a t o p s o i l s t r i p p i n g

(Figure 5.6) is to reduce mixing and compaction of s o i l s . S torage of

s p o i l and movement of equipment occurs on s u b s o i l and away f ran t h e top-

s o i l p i l e s and undis turbed topso i l . Mixing is minimized s i n c e t o p s o i l is

not f u r t h e r d i s t u r b e d during ac tua l p i p e l i n e cons t ruc t ion . While compac-

t i o n may occur on t h e work s i d e and on t h e s p o i l s t o r a g e a r ea , i t w i l l be

confined to t h e s u b s o i l and can be a l l e v i a t e d through c u l t i v a t i o n p r io r t o

t o p s o i l replacement. Rut t ing and mixing of t h i n t o p s o i l s by r i g h t of way

t r a f f i c w i l l not occur s i n c e the t o p s o i l has been removed.

The only par t of t he r i g h t of way not s t r i p p e d is t h a t requi red for top-

s o i l s to rage . S t r i p p e d widths w i l l vary from 12 t o 25 m depending on t h e

depth of t o p s o i l , t he s i z e of t he r i g h t of way and e x t r a working space

required.

S t r i pped t o p s o i l is s t o r e d e i t h e r on one or both s i d e s of t h e r i g h t of

way, Trench s p o i l is s t o r e d on s u b s o i l , s e p a r a t e from the t o p s o i l p i l e .

Construct ion equipment t r a v e l on t h e graded s u b s o i l su r f ace . Care should

be taken not t o d i s t u r b o r compact the s t o r e d t o p s o i l by r i g h t of way

t r a f f i c ; nor should t o p s o i l be used t o l e v e l low o r wet areas .

Application

Trench, s p o i l and work a r ea t o p s o i l s t r i p p i n g is s u i t e d where t h e r e is a

high p o t e n t i a l for t o p s o i l r u t t i n g or compaction of subso i l on t h e work

s i d e , The s o i l and land use where t h i s procedure is app l i cab l e inc ludes :

a ) S o i l s where:

- t o p s o i l depths a r e less than 10 cm

- s u b s o i l q u a l i t i e s a r e good t o f a i r

- t h e land is under c u l t i v a t i o n

- parent m a t e r i a l s a r e f i n e t ex tu red , such a s l a c u s t r i n e c l a y s

Page 73: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

WIDTH OF TOPSOIL STRIPPING - w

R/W BOY. SPOIL SIDE

I TRENCH

I WORK SIDE R/W

BDY. I

I STRIPPED I

TOPSOIL

PROFILE N.T. S.

NOTES

1- REMOVE T O P S O I L FROM THE TRENCH, S P O I L STORAGE AlJD WORK A R E A S . STORE T O P S O I L Old B O T H S I D E S OF THE R I G H T OF WAY A D J A C E N T TO THE S T R I P P E D A R E A .

2. E X C A V A T E TRENCH S U B S O I L AND STORE ON S P O I L S I D E A D J A C E N T TO T t i E TRENCH. A L L O W FOR A 1 M S E P A H A T I O r J B E T N E E N THE T O P S O I L P I L E ANL) THE THENCH S P O I L -

3- R E T U R N TRENCH S P O I L TO TRENCH AND COMPACT. F E A T H E R OUT E X C E S S S P O I L OVER S T R I P P E D AREA L E A V I N G A LOW ROACH C E N T R E D OVER THE TRENCH. A L L E V I A T E C O M P A C T I O N OF C L A Y R I C H S U B S O I L S OVER THE S T R I P P E U A R E A -

4. R E T U R N T O P S O I L E V E N L Y OVER THE S T R I P P E D A R E A -

5. A L L E V I A T E C O M P A C T I O N OF T O P S O I L OVER E N T I R E R I G H T OF WAY-

F I G U R E 5.6

TRENCH , SPOIL , AND WORK AREA TOPSOIL STRIPPING

I AUG., 1984 1

Page 74: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

The r i s k of r u t t i n g t h i n t o p s o i l s is e l imina ted by its removal

from t h e work s i d e . With t h i n t o p s o i l s developed on l a c u s t r i n e

c l a y s , compaction of t h e B horizon would probably occur even i f

t o p s o i l is not s t r i p p e d . Removing t h e t o p s o i l p r i o r t o

cons t ruc t ion permits reworking of t h e s u b s o i l t o a l l e v i a t e

compaction.

b) S o i l s where:

- t h e land is p re sen t ly under c u l t i v a t i o n or i n r e c e n t l y es tab-

l i s h e d forage

- t o p s o i l depth is less than 20 cm

- wet weather may p r e v a i l throughout c o n s t r u c t ion.

Topsoil is removed from t h e work s i d e p r i o r t o cons t ruc t ion t o avoid

r u t t i n g and mixing during wet weather. Rut t ing and subso i l compac-

t i on can be remedied p r i o r t o t o p s o i l replacement.

Variation

Preference is t o s t o r e t he s t r i p p e d t o p s o i l on both s i d e s of t he r i g h t o f

way a s i l l u s t r a t e d i n Figure 5.6. This reduces t h e d i s t a n c e t o p s o i l must

be moved t o and from the s t o r a g e a r ea s . The p i l e s a l s o ac t a s a con-

s t r a i n t t o off r i g h t of way t r a f f i c . I f necessary, t o p s o i l can a l s o be

s t o r e d on only one s i d e of t he r i g h t of way.

With t h i n t o p s o i l s ( l e s s t han 10 cm) or with poor t o unsu i t ab l e s u b s o i l s ,

depth cont ro l is c r i t i c a l ; t h e r e f o r e , a grader is t h e p r e f e r r e d s t r i p p i n g

equipment. Where t he t o p s o i l is g r e a t e r t han 10 cm a dozer can be used t o

remove the bulk of t he t o p s o i l . A g rader should then be used t o s e p a r a t e

t he remaining t o p s o i l from t h e B horizon, e s p e c i a l l y i f t h e s u b s o i l qual-

i t y is poor t o unsu i tab le .

During replacement of t h i n t o p s o i l s , a grader is p re fe r r ed because of i ts

cont ro l i n r e s t o r i n g o r i g i n a l t o p s o i l depths. Larger volumes of t o p s o i l

- 62 -

Page 75: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

can be i n i t i a l l y pushed by dozer back over t h e s t r i p p e d a r e a but a g r a d e r

can do a more e f f i c i e n t job i n f i n i s h i n g o f f and e s t a b l i s h i n g uniform top-

s o i l depths .

C u l t i v a t i o n s h o u l d be done t o a l l e v i a t e compaction over t h e e n t i r e

s t r i p p e d a r e a p r i o r t o t o p s o i l replacement .

Page 76: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

5.3 PROCEDURES FOR SPECIAL FIELD SITUATIONS

The main s p r e a d of a p i p e l i n e p r o j e c t is i n t e r u p t e d by roads , r a i l w a y s ,

i r r i g a t i o n and d r a i n a g e c a n a l s , and f o r e i g n p i p e l i n e s . A t each o f t h e s e

l o c a t i o n s , a c t i v i t i e s a r e c o n c e n t r a t e d and prolonged, c r e a t i n g more d i s -

tu rbance . M o d i f i c a t i o n s must be made t o normal c o n s t r u c t i o n p rocedures t o

accommodate t h e s e c o n s t r u c t i . o n a c t i v i t i e s and t o reduce t h e i r e f f e c t on

t h e s o i l .

The fo l lowing sect i o n s d i s c u s s recommendat i o n s t o reduce s o i l d i s t u r b a n c e

a t each of t h e s e s i t e s .

5.31 Road, Rail and Canal Crossings

Roads, r a i l w a y s and c a n a l s a r e u s u a l l y bored t o avoid damage and i n t e r -

f e r e n c e t o t h e s e f a c i l i t i e s . A s well, t h e p ipe is u s u a l l y bur ied a t

g r e a t e r depth t o p r o t e c t i t from damage.

Because l a r g e , e x c a v a t i o n s a r e r e q u i r e d on both s i d e s of t h e c r o s s i n g t o

p rov ide a c c e s s f o r bor ing and p ipe t i e - i n s , e x t e n s i v e mixing and l o s s of

t o p s o i l can occur . Topso i l should be removed f r a n t h e excava t ion and

s p o i l s t o r a g e a r e a s and, i f used a s a ramp over t h e ba r d i t c h , should be

p roper ly r e p l a c e d . Poor rec lamat ion a t t h e s e c r o s s i n g s may no t be repre -

s e n t a t i v e of r e c l a m a t i o n on t h e r i g h t of way; n e v e r t h e l e s s , they a r e

h i g h l y v i s i b l e .

Road c r o s s i n g s a r e conven ien t a c c e s s p o i n t s t o and f r m t h e r i g h t o f way.

The c o n c e n t r a t e d a c t i v i t y a t t h e s e p o i n t s i n c r e a s e s t h e p o t e n t i a l f o r

impact t o t h e s o i l .

A t c r o s s i n g s on c u l t i v a t e d l a n d s , t o p s o i l should be s a l v a g e d from t h e

t r e n c h , s p o i l s t o r a g e and work a r e a s and back approx imate ly 30 m depending

on t h e extent of t h e b e l l ho le r e q u i r e d . ( F i g u r e 5.7A). Access ramps

a c r o s s t h e bar d i t c h s h o u l d be c o n s t r u c t e d with s u b s o i l graded from a r e a s

where t o p s o i l h a s been s t r i p p e d . Topsoi l can be s t o c k p i l e d on e i t h e r o r

both s i d e s of t h e r i g h t of way. I f s t o c k p i l e d on t h e s p o i l s i d e , t o p s o i l

- 64 -

Page 77: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

I I APPROX. 3 0 m

S P O I L FROM B E L L H O L E

RAMP OVER

. . , . 7 T O P S O l L . . . . (Y.

. - I I PLAN VIEW

N.T.S.

1. REMOVE T O P S O I L FROM THE TRENCH, B E L L HOLE, S P O I L STORAGE AND WORK AREAS ON C U L T I V A T E D L A N D S * STRIPPED T O P S O I L BACK FROM ROAD W I L L BE APPROXIMATELY 30 Me STORE T O P S O I L ON S P O I L OR WORK S I D E S BOTH ADJACENT TO S T R I P P E D AREA* I

1 2. GRADE S T R I P P E D AREA AND USE GRADED M A T E R I A L TO RAMP BAR D I T C H AS R E Q U I R E D * I 3- EXCAVATE TRENCH AND B E L L HOLE AND STORE ON S P O I L S I D E ADJACENT TO THE

E X C A V A T I O N * ALLOW FOR AT L E A S T 1 M SEPARATION BETWEEN THE T O P S O I L BERM AND THE EXCAVATED S P O I L -

I 4- RETURN S P O I L TO EXCAVATION AND COMPACT* L E A V E A ROACH OVER EXCAVATED AREAS TO ALLOW FOR SUBS I DENCE*

5. RETURN S U B S O I L M A T E R I A L FROM BAR D I T C H AND SPREAD EVENLY OVER THE S T R I P P E D AREA TO E S T A B L I S H OR I G I NAL COIVTOUR A L L E V I A T E COMPACT I ON OF CLAY R 1 CH SUBS0 I LS OVER THE S T R I P P E D A R E A * I

I 6. RETUHM T O P S O I L EVENLY OVER THE S T R I P P E D AREA- I 1 7 -

A L L E V I A T E COMPACTION OF T O P S O I L OVER E N T I R E R I G H T OF WAY AND STORAGE AREAS- I

FIGURE 5.7A

1 SOIL HANDLING AT ROAD, R A I L AND I I CANAL CROSSINGS (CULTIVATED LANDS ) I

Page 78: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

should be placed f a r enough from t h e b e l l hole t o accommodate s to rage of

a l l of t he t rench s p o i l with a one metre s epa ra t ion between i t and t h e

s p o i l p i l e . Since r i s k of mixing is minimized by s t o c k p i l i n g t o p s o i l on

the work s ide , t h i s procedure is prefer red .

Acquisit ion of ex t r a working space a t road and o ther c ros s ings is essen-

t i a l t o accomodate e x t r a ma te r i a l s generated and t o proper ly conserve top-

s o i l . I n s u f f i c i e n t working space and r e s u l t i n g overlap of s t o r a g e p i l e s

is still the major cause of poor reclamation a t such loca t ions .

On pasture land t o p s o i l should be salvaged from any excavated or graded

a rea and a t l e a s t 1 m on each s i d e of t h e b e l l hole excavation.

(Figure 5.78). Topsoil should be p i l ed or spread over t h e work s i d e t o

keep it away from the excavated s p o i l . P i l i n g t o p s o i l is p re fe r r ed unless

compaction of t he s u b s o i l is determined t o be a problem, then spreading on

the work s i d e is more appropr ia te .

5.32 Foreign Line Crossings and Test S i t e s

A t foreign p ipe l ine c ros s ings the fore ign l i n e is exposed p r i o r t o main-

l i n e cons t ruc t ion and t h e new pipe i n s t a l l e d underneath t h e e x i s t i n g

foreign l i n e . Excavation of s i t e s for fore ign p i p e l i n e c ross ings and

p i p e l i n e t e s t i n g is i n i t i a l l y done by hand t o l1daylightl1 t he pipe and then

completed with a backhoe. The excavation is usua l ly wider and deeper than

t h e adjacent mainline t rench, genera t ing a l a r g e r s p o i l p i l e and s to rage

area.

On c u l t i v a t e d land, t o p s o i l should be salvaged from the b e l l h o l e and s p o i l

s to rage a reas with allowance for a one metre s epa ra t ion of t h e spo i l and

be l lho le f r m any s t o r e d or undisturbed t o p s o i l (F igure 5.8). Topsoil is

s to red on the work s i d e by c r e a t i n g a ramp over t h e fore ign "hot" pipe-

l i n e to pro tec t it from cons t ruc t ion equipment.

In pas ture land, t o p s o i l salvaged from the be l lho le a r ea and from a t l e a s t

one metre on both s i d e s of t h e excavation w i l l minimize mixing of t o p s o i l

and subso i l during b a c k f i l l and cleanup. As with c u l t i v a t e d lands, top-

- 66 -

Page 79: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

I UNSTRIPPED TOPSOIL I ? t & -SPOIL FROM BELLHOLE

RAMP OV -- , ,

BAR DITCH \TOPSOIL FROM *.

. . &, . . ( SPOIL OVER BELLHOLE ' . ', u. . . . . . .

P L A N V IEW N.T.S.

NOTES

1. REMOVE T O P S O I L FROM THE TRENCH, AND B E L L HOLE AREAS, AND 1 M ON BOTH S I D E S O F E X C A V A T E D A R E A S - STORE T O P S O I L Oti WORK S I D E A D J A C E N T TO S T R I P P E D AREA BY P L A C I A G I N A P I L E , OR S P R E A D I N G OVER THE WORK AREA.

2. E X C A V A T E B E L L HOLE. USE E X C A V A T E D S P O I L TO RAMP BAR D I T C H - STORE R E M A I N I N G E X C A V A T E D S P O I L ON S P O I L S I D E A D J A C E N T TO B E L L HOLE.

3 . R E T U R N S P O I L TO B E L L HOLE AND COMPACT- REMOVE RAMP, RETURN F I A T E R I A L TO B E L L HOLE AREA AN11 COMPACT. FEATHER OUT EXCESS S P O I L OVER S T R I P P E D AREA L E A V I N G A HOACH C E N T R E D OVER THE B E L L HOLE.

4 - R E T U R N T O P S O I L E V E N L Y OVER THE S T R I P P E D AREA.

5 . R E S E E D W I T H A C O M P A T I B L E SEED M I X AND F E R T I L I Z E .

FIGURE 5 . 7 8

S O I L HANDLING AT R O A D , RA IL AND

CANAL CROSSlNGS ( PASTURE LANDS

AUG.. 1 9 8 4

Page 80: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

>

I& FOREIGN

, . . , . .

. :.. . . . . . . . .

UNSTRIPPED T OPSOlL

PLAN VIEW N.T.S.

NOTES

1- REMOVE T O P S O I L FROM OVER THE EXCAVATION AND UNDER THE S P O I L STORAGE AREAS ON C U L T I V A T E D LAND FROM OVER THE EXCAVATION AND 1 M ON BOTH S I D E S OF THE EXCAVATED AREA ON PASTURE L A N D * STORE T O P S O I L AS A RAMP ON THE WORK S I D E ADJACENT TO THE S T R I P P E D AREA*

29 EXCAVATE TRENCH AND STORE M A T E R I A L ON S P O I L S I D E *

3 . RETURN S P O I L TO TRENCH AREA AND COMPACT* L E A V E A ROACH CENTERED OVER THE E X C A V A T I O N TO ALLOW FOR S U B S I D E N C E *

4- RETURN T O P S O I L EVENLY OVER THE S T R I P P E D AREA*

5 - A L L E V I A T E COMPACTION OF T O P S O I L OVER THE E N T I R E R I G H T OF WAY AND GROOM I N ACCORDANCE W I T H THE REST OF THE R I G H T OF WAY ON C U L T I V A T E D L A N D * RESEED W l T H A C O M P A T I B L E SEED M I X AND F E R T I L I Z E I N ACCORDANCE W l T H THE REST OF THE R I G H T OF WAY OH PASTURE L A N D *

FIGURE 5.8

SOIL HANDLING AT FOREIGN LINE

CROSSINGS AND TEST SITES

AUG., 1984

Page 81: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

s o i l is ramped on the work s ide . In pas ture o r forage land, s p o i l can be

s t o r e d on a s t a b l e vege ta t ive mat.

5.33 Grading

Where grading is requi red for r i g h t of way preparat ion or t o accommodate

bending requirements of t he pipe, t o p s o i l should be salvaged from t h e

e n t i r e graded area and the graded and t rench s p o i l s to rage a reas . Extra

working space is usua l ly required t o accommodate both s to rage of t he grade

s p o i l and the e x t r a s t r i p p e d topso i l .

In pas ture , t o p s o i l is only removed f ran the a rea t o be graded. Topsoil

and s p o i l a r e both placed on the undisturbed vegetat ion mat.

On c u l t i v a t e d lands, t o p s o i l is removed from t h e a rea where t h e grade

s p o i l p i l e w i l l be placed. A s with t h e t rench s p o i l p i l e , t h e grade s p o i l

p i l e r equ i r e s a s epa ra t ion of one metre from any topso i l .

The l i m i t a t i o n s of t h i s procedure occur where t o p s o i l is not placed u p h i l l

for easy recovery, on t h i n t o p s o i l s , o r where working space is r e s t r i c t e d

by topography.

Page 82: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

5.4 EXTRAORDINARY CONDITIONS

5.41 Wet Soil Conditions

Working i n wet cond i t i ons when t h e s o i l is near o r beyond s a t u r a t i o n , can

have l a s t i n g negat ive e f f e c t s on s o i l p r o p e r t i e s and capab i l i t y . Wet con-

d i t i o n s usua l ly occur during summer cons t ruc t ion under heavy r a i n f a l l , o r

i n winter during pe r iods of thaw. Wet work may a f f e c t s o i l c a p a b i l i t y

by compaction of c l ay s o i l s , by mixing of t o p s o i l with subsoi l through

r u t t i n g and by s t r u c t u r a l changes t o the t o p s o i l . More clean-up e f f o r t is

of ten requi red t o amend the e f f e c t s of compaction and mixing;

Measures fo r reducing s o i l damage under wet weather cond i t i ons a re :

( a ) Shut-down or Avoidance

( b ) S o i l Handling Procedures

( c ) Construct ion Procedures

( d ) Reclamation Procedures

Shut-down or Avoidance

The simplest approach t o wet weather is t o s t o p cons t ruc t ion when s o i l s

become s u s c e p t i b l e t o deformation or a l t e r a t i o n . I f poss ib le , construc-

t i o n opera t ions should be timed t o co inc ide with dry periods when damage

t o s o i l s t r u c t u r e can be minimized. Since i t is not always p r a c t i c a l to

schedule cons t ruc t ion ope ra t ions fo r dry per iods , cons t ruc t ion and r ec l a -

mation procedures t o reduce and recondi t ion s o i l compaction a re required.

Damage t o s o i l s , p a r t i c u l a r l y during wet cond i t i ons , is very d i f f i c u l t t o

de t ec t during cons t ruc t ion , and usua l ly can only be assessed once con-

s t r u c t i o n is complete. Few c r i t e r i a e x i s t f o r determining when s o i l

damage w i l l occur and when t o shut a p ro j ec t down. One method used by

some companies is t o shut down when r u t t i n g s t a r t s t o br ing up subso i l .

Some c o n t r a c t o r s work a s long a s they can get crew buses onto the r i g h t of

way. Others shut down when cons t ruc t ion p roduc t iv i ty drops. In most

ca ses , t h e ope ra t ions which shut down f i r s t involve earthmoving o r s t r i n g -

- 70 -

Page 83: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

ing. These are a lso the operations which have the greatest impact on the

s o i l . Welding, the prime determinant o f construct ion progress, i s nor-

mal ly shut down l a s t . On a l a rge job wi th automatic welding ca r r ied out

under weatherproof covers, welding can proceed under almost any cond i t ions

prov id ing the crews can gain access t o the r i g h t o f way.

Soil Handlinq Procedures

Topsoi l may be removed from the trench, s p o i l and work areas t o avoid r u t -

t i n g and mixing o f t o p s o i l w i th subsoi l , and to accomodate the c u l t i v a t i o n

o f compacted B horizons. A disadvantage i s ponding o f water on the r i g h t

o f way from disrupted cross drainage and a compacted impermeable c lay r i c h

subso i l a t the surface. D i f f i c u l t i e s i n c u l t i v a t i n g compacted subsoi l may

occur i f the subso i l does not dry enough t o shat ter when cu l t i va ted .

The unstable nature o f wet s o i l may requ i re changes t o t o p s o i l handling

procedures. I f the s o i l i s already saturated and construct ion must

proceed, s t r i p p i n g t o p s o i l w i th a wide blade may r e s u l t i n poor separat ion

o f the topso i l , l o s s of t r a c t i o n and spinning causing mixing, compaction,

and a l t e r a t i o n o f the s t ruc ture o f the I3 horizon. Trench width s t r i p p i n g

wi th a wide pad machine i s requ i red t o prevent compaction adjacent t o the

trench. Trench width s t r i p p i n g i n t h i s s i t u a t i o n i s sometimes best accom-

p l i shed w i t h a backhoe. Using a wheel trencher i s l i k e l y t o c log up the

buckets and a dozer or grader f i t t e d w i th a stepblade w i l l probably sp in

out.

Construction Procedures

Three methods which may reduce s o i l damage dur ing wet s o i l condi t ions are:

a) r e s t r i c t e d t r a f f i c lanes

b) surface p ro tec t i o n

c ) low ground pressure vehic les

The concept o f r e s t r i c t i n g t r a f f i c t o s p e c i f i c paths ar ises from research

on compact i on i n a g r i c u l t u r a l operations. The greatest degree o f compac-

t i o n occurs from the reduct ion o f la rge pore space i n the s o i l on the

- 71 -

Page 84: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

f i r s t pass . Subsequent passes then inc rease compaction t o its maximum fo r

t he weight of t he machinery employed. I f t r a f f i c is r e s t r i c t e d t o spec i -

f i c d r iv ing pa ths , compaction w i l l occur only on those a r ea s and w i l l be

minimal elsewhere.

The t y p i c a l r i g h t of way con f igu ra t i on used i n p i p e l i n e cons t ruc t ion

f a c i l i t a t e s easy implementation of t h i s procedure. A s i n g l e lane t r a c k

could be used on the bypass a r e a with a second t r a c k developed fo r welding

t rucks and t racked veh ic l e s along the work a rea .

Sur face p ro t ec t i on has l im i t ed usefu lness due t o the high cos t . Methods

inc lude swamp mats, g r a v e l l i n g with g e o t e x t i l e underlays, and po r t ab l e

roads. While p o t e n t i a l l y app l i cab l e to a g r i c u l t u r e lands , t h e i r use l i e s

p r imar i ly i n s p e c i a l t y app l i ca t i ons such a s i n muskeg.

Low ground pressure veh ic l e s have been used i n moderately wet cond i t i ons

without s i g n i f i c a n t damage t o t he s o i l . Major r e s t r i c t i o n s on these

vehic les a r e t h e t r a n s p o r t a t i o n c o s t s and t h e i r u n s u i t a b i l i t y on paved

roads. Table 5.1 lists typi.ca1 p ipe l ine equipment and ground pressures .

Reclamation Procedures

Measures used t o remedy s o i l impacts caused by wet weather work inc lude :

a ) t i l l a g e and subso i l i ng t o a l l e v i a t e compaction, and

b) the add i t i on of s o i l amendments t o i nc rease organic mat ter .

Natural forces , such a s freeze-thaw a r e a c t i v e i n t he upper soi.1 l a y e r s

and can slowly a l l e v i a t e some compaction. Usually more a c t i v e measures

a r e requi red t o loosen compacted s o i l s . Conventional t i l l a g e can be used

i f compaction is within 20 cm of the sur face . Chise l ploughs should be

used i f compaction occurs between 20 - 30 cm. When compacted s u b s o i l is

covered with t o p s o i l , deep plowing may be used i n some s i t u a t i o n s without

s i g n i f i c a n t l y mixing the two hor izons ; although, i t is e a s i e r t o remedy

compaction i n s u b s o i l i f the t o p s o i l has been removed. Addit ions of

organic mat ter i n combination with t i l l a g e and f e r t i l i z a t i o n can be bene-

f i c i a l i n a l l e v i a t i n g compaction i n o ther s i t u a t i o n s .

- 72 -

Page 85: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

TABLE 5.1

GROUND PRESSURES FOR T Y P I C A L PIPELINE EQUIPMENT

+

Ground Pressure ( p s i ) Ki lopascals

DOZERS D6 7.1 - 9.4 49-65

D 7 8.6 - 10.3 59-71

D9 13.6 - 17.1 94-1 18

GRADERS 225 4 5 310

BACKHOES 225 7 48

23 5 8 5 5

245 12 83

SIDEBOOMS 561 11 76

(unloaded) 583 12 83

5 91 15 103

(rnax. load) 561 24 165

583 3 2 220

591 4 1 280

STRINGING TRUCKS 70 480

(loaded)

Page 86: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

Where c o n s t r u c t i o n i n wet c o n d i t i o n s causes mixing of s u b s o i l and t o p s o i l ,

o rgan ic amendments, such a s manure, a r e u s e f u l i n i n c r e a s i n g t h e o rgan i c

ma t t e r con ten t o f t h e roo t zone. Also, fo rage c rops and o t h e r s o i l bu i ld -

i n g vege ta t ion can be p l a n t e d t o i n c r e a s e t h e o rgan i c con ten t . F e r t i l i z a -

t i o n can s t i m u l a t e p l a n t growth and he lp t o r e s t o r e l o s t p r o d u c t i v i t y pro-

duced by l o s s o f o rgan i c mat te r .

5.42 Frozen S o i l Conditions

There a r e advantages and d i sadvantages t o i n s t a l l i n g p i p e l i n e s i n f rozen

s o i l . On a g r i c u l t u r a l l a n d , t h e d i sadvantages gene ra l l y - outweigh t h e

advantages.

One advantage is t h a t compaction is g r e a t l y reduced s i n c e t h e ground i s

f rozen . S i m i l a r i l y , weather and s o i l cond i t i ons a r e more p r e d i c t a b l e

throughout t h e c o n s t r u c t i o n per iod.

A major problem is t h e d i f f i c u l t y of s e p a r a t i n g f rozen t o p s o i l from sub-

s o i l . S t r i p p i n g f rozen t o p s o i l wi th convent iona l equipment u s u a l l y

r e s u l t s i n mixing because o f poor depth c o n t r o l . Ripping t o p s o i l is some-

times done but because of "lumpinessll o f t h e excavated m a t e r i a l and poor

depth c o n t r o l , i t is not recommended. A s t anda rd b l ade on a dozer o r

g r ade r is not e f f e c t i v e i f t he f r o s t has pene t r a t ed i n t o t h e subso i l .

However, i f f r o s t p e n e t r a t i o n is only t o t h e t o p s o i l depth and t h e s u b s o i l

is r e l a t i v e l y dry, a b lade can be very e f f e c t i v e f o r t o p s o i l s t r i p p i n g .

Double o r p i l o t t r ench ing with a wheel t r e n c h e r is t h e most common proce-

dure for main l ine t o p s o i l s a lvage i n f rozen s o i l cond i t i ons . There a r e ,

however, two drawbacks t o t h e use of a wheel t r enche r . F i r s t , i t was not

designed t o s t r i p sha l low l i f t s , consequent ly t h e r e is g r e a t e r s t r a i n on

t h e d r i v e t r a i n . I n a d d i t i o n , t h e r e is a s p i l l o v e r of t o p s o i l from t h e

bucke ts which reduces t h e amount of t o p s o i l sa lvaged. With s u i t a b l e

equipment mod i f i c a t i ons t h e s e problems can be p a r t i a l l y overcome.

The major problem with f rozen s o i l s t r i p p i n g ope ra t i ons is depth con t ro l .

With a convent iona l wheel t r e n c h e r , t h e minimum depth of s t r i p p i n g is i n

- 74 -

Page 87: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

t h e o r d e r of 25 cm, a l though t o produce enough volume t o handle e f f i c i e n t -

l y , a s t r i p p i n g depth o f 30 cm o r more may be r e q u i r e d . This depth w i l l

u s u a l l y c o n t a i n t o p s o i l and s u b s o i l m a t e r i a l .

Sa lvag ing f rozen t o p s o i l a t road c r o s s i n g s , f o r e i g n l i n e c r o s s i n g s , graded

a r e a s and t i e - i n s is a g r e a t e r problem than mainl ine t o p s o i l sa lvage .

These s i t u a t i o n s r e q u i r e t h a t t o p s o i l be removed over widths g r e a t e r than

a s t a n d a r d t r e n c h width. Wheel t r e n c h e r s a r e slow and c o s t l y and, whi le a

b l a d e i n con junc t ion with r i p p i n g performs better, it is still i n e f f e c t i v e

f o r s a l v a g i n g f rozen t o p s o i l .

Another d i sadvan tage of win te r c o n s t r u c t i o n is t h a t f rozen s o i l bu lks more

t h a n dry s o i l , caus ing o v e r f i l l i n g of the t r e n c h and e x t e n s i v e roaching.

The s i z e of t h e roach w i l l vary but i n most c a s e s w i l l u s u a l l y ex tend

beyond t h e t r e n c h a s replacement of s p o i l r e s u l t s i n some of t h e s p o i l

being f e a t h e r e d over a width of up t o 3 m. If t o p s o i l has not been s a l -

vaged over t h i s width , s u b s o i l w i l l be l e f t on t o p of t o p s o i l and w i l l be

mixed when t h e a r e a i s c u l t i v a t e d . To minimize mixing, a b lade width o f

t o p s o i l should be sa lvaged t o accomodate replacement of s p o i l . I f a b lade

width of t o p s o i l cannot be sa lvaged , t h e s p o i l should be p laced and com-

pac ted i n t h e t r e n c h i n m u l t i p l e l i f t s . The c o m p a c t a b i l i t y of t h e s p o i l

w i l l depend on t h e amount of f r o s t and t h e t e x t u r e of t h e s p o i l .

Frozen s p o i l is not e a s i l y compacted and sunken t rench may r e s u l t upon

thawing. If r e p l a c e d p r i o r t o t r ench subs idence , t o p s o i l m a t e r i a l may be

l o s t and a d d i t i o n a l t o p s o i l placement requ i red . I f t o p s o i l h a s not been

r e p l a c e d p r i o r t o subs idence , t h e t r e n c h l i n e can be reworked with s u b s o i l

m a t e r i a l s p r i o r t o t o p s o i l replacement.

If only a t r e n c h width of t o p s o i l has been sa lvaged , r e c o n t o u r i n g t h e

sunken t r e n c h l i n e wi th a b lade may be imposs ib le without a f f e c t i n g t h e

u n d i s t u r b e d t o p s o i l a d j a c e n t t o t h e t r ench . Recontouring with a b l a d e i n

t h i s s i t u a t i o n w i l l i n e v i t a b l y mix und is tu rbed t o p s o i l wi th b a c k f i l l

m a t e r i a l .

Page 88: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

Working with frozen s o i l s can, i n a v a r i e t y of ways, l ead t o poor clean up

and ex tens ive mixing of t o p s o i l and subso i l . F i r s t l y , s o i l ma te r i a l s a r e

very d i f f i c u l t t o properly l eve l and recontour under frozen condit ions,

o f ten n e c e s s i t a t i n g a r e t u r n v i s i t for f i n a l reclamation during t h e

following spr ing . It is during t h i s f i n a l v i s i t , while reworking pre-

viously excavated ma te r i a l s , t h a t compaction and s o i l mixing can become a

major problem. Secondly, t opso i l and subso i l p i l e s a r e of ten covered by

snow, making t h e i r recovery more d i f f i c u l t . Excessive snow mixed with

t o p s o i l and subso i l can a l so inc rease t h e amount of roach over t h e d i t ch

l i n e and the depth of sunken t rench. A t h i r d problem encountered when

working with frozen s o i l s is tha t colour d i f f e r ences between topso i l and

subso i l a r e l e s s de t ec t ab le , making proper s epa ra t ion of s o i l s more

d i f f i c u l t .

F ina l clean-up of a winter p ipe l ine opera t ion should not be done u n t i l

spr ing. Backf i l l i ng i n t h e winter is done t o r e f i l l and compact t h e

t rench , with excess t rench s p o i l mounded over the t renchl ine . In the

spring, s p o i l is f u r t h e r compacted i n t o the t rench and the t rench a r e a

l eve l l ed . Topsoil is then replaced over t h e d is turbed area.

Ear ly consu l t a t i on with the landowner is c r i t i c a l i f clean-up is to be

l e f t u n t i l sp r ing or l a t e r . Often, t he farmer has a very sho r t period i n

sp r ing t o work the land and get h i s crop in . A p a r t i a l l y completed r i g h t

of way can be a hindrance t o h i s opera t ions . In some in s t ances t h e land-

owner w i l l c u l t i v a t e over a p a r t i a l l y reclaimed r i g h t of way and t o p s o i l

w i l l be p a r t i a l l y or completely l o s t . This s i t u a t i o n should be avoided.

5.43 Irrigated Lands

The most common i r r i g a t i o n systems i n Alberta a r e flood and s p r i n k l e r sys-

tems. Flood systems r equ i r e l e v e l f i e l d s while s p r i n k l e r systems a r e

of ten used on the more undulat ing t e r r a i n . During flood i r r i g a t i o n , water

is re leased onto the f i e l d and flows by g r a v i t y t o cover t h e e n t i r e

f i e l d . Any i r r e g u l a r i t y i n t he topography w i l l i n t e r r u p t t h i s flow.

Sp r ink le r systems move on l a r g e wheels across t h e f i e l d and a r e not a s

a f f ec t ed by topographic i r r e g u l a r i t i e s . However, t h e wheels can get s tuck

- 76 -

Page 89: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

on mounds or i n depressions. The p ipe l ine t rench , i f more permeable than

the surrounding s o i l can a l s o ac t a s a condui t fo r drainage, eroding o r

s ink ing and causing damage t o s p r i n k l e r systems.

S o i l handling procedures on i r r i g a t e d lands should ensure t h a t t he trench-

l i n e and r i g h t of way a r e reclaimed t o a s o l i d l e v e l s u r f a c e and should be

. t a i l o r e d t o the a g r i c u l t u r a l p r a c t i c e s used. Compaction of subso i l i n t he

t rench during b a c k f i l l i n g is recommended. Mounding t o a1 1 ow for subse-

quent subsidence of dry s o i l s a f t e r i r r i g a t i o n is important. I f s p r i n k l e r

systems are used, wheel paths across t rench mounds should be provided.

Trench plugs should be considered t o i n h i b i t drainage alorig t h e trench-

l i n e .

Construct ion timing may a l s o be a c r i t i c a l f a c t o r and w i l l r e q u i r e consul-

t a t i o n with the landowner, o r fo r a l a r g e p r o j e c t , the I r r i g a t i o n D i s t r i c t

Manager. I f pos s ib l e , cons t ruc t ion should be scheduled during a dry

period.

Pos t -cons t ruc t ion monitoring i n i r r i g a t i o n a r e a s is required. Despi te a l l

reasonable measures, t h e r e w i l l be a r e a s of excess mounding o r sunken

t rench which w i l l r e q u i r e r epa i r .

5.44 Three Phase Soil Handling

Three phase s o i l handl ing is a procedure i n which ma te r i a l s handling is

done i n t h r e e phases; t o p s o i l s t r i p p i n g , excavat ion of b e t t e r q u a l i t y sub-

s o i l , and f i n a l l y , removal of undes i reab le q u a l i t y s u b s o i l t o t rench

depth. (Figure 5.9). This procedure is used t o prevent lowering of t he

root zone q u a l i t y caused by mixing with poorer q u a l i t y ma te r i a l . Separa te

removal of t h i s undes i reab le mater ia l permits its replacement i n t h e

t r e n d a t depths removed from the roo t zone.

Topsoil is s t r i p p e d over a width adequate t o s t o r e and s e p a r a t e the two

subso i l p i l e s from the t o p s o i l . This width w i l l vary from 7 t o 9 m f o r a

t y p i c a l s i t u a t i o n . Larger t renches w i l l genera te more s p o i l and t h e r e f o r e

more requi red s t o r a g e space.

Page 90: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

R/ W TRENCH R/W BDY. SPOIL S IDE WORK SIDE BDY.

I I

UND TOP

N .T.S.

R/ W SPOIL SIDE TRENCH WORK SIDE R/W BDY. BDY.

UNDISTURB

UNDESIREABLE S

WIDTH OF TOPSOIL STRIPPING - PROFILE 8

N.T.S.

NOTES

1- REMOVE T O P S O I L FROM OVER THE TRENCH AND UNDER T I i E S P O I L P I L E S - S T R I P P E D W I D T H W I L L BE 7 TO 9 11. STURE T O P S O I L ON S P O I L S I D E ADJACENT TO S T R I P P E D A R E A -

2 - E X C A V A T E F I R S T LIFT OF THENCH SUBSOIL AND S T O R E ON SPOIL SIDE EITHER A D J A C E N T 'ro THE TRENCH ( A ) OR BACK FAR ENOUGH TO ACCOMIIODATE STORAGE OF SECOND S U B S O I L L I F ' r ( B ) . ALLOW FOR A 1 M S E P A R A T I O N BETWEEN THE T O P S O I L P I L E AIJD THE TRENCH S P O I L *

3 - E X C A V A T E SECOND L I F T UF TRENCH S U B S O I L AND STORE ADJACENT TO THE TRENCH E I T H E R ON THE WORK S I D E ( A ) OR THE S P O I L S l D E ( B ) . ALLOW FOR A 1 M S E P A R A T I O N BETWEEN T i i E TWU THEl lCH S P O I L P I L E S (B) THE SECOIJD L I F T S P O I L P I L E AND THE U N D I S T U H B E D T O P S O I L ON THE WORK S I DE ( A ) .

4 - RETURN SECOND L l F T TRENCH S P O I L TO THE THENCH AND COMPACT-

5. RETURN F I R S T L l F T THENCH S P O I L TO THE TREIJCH AND COMPACT. FEATHER EXCESS S P O I L OVER THE S T R I P P E D A R E A - A L L E V I A T E COt. lPACTlON OF CLAY R I C H S U B S O I L S OVEH THE S T R I P P E D A R E A *

6 . RETURN T O P S O I L EVErJLY OVER THE S T R I P P E D AREA.

7 . A L L E V I A T E COMPACTIU lJ OF T O P S O I L OVER E N T I R E R I G I i T OF WAY ON C U L T I V A T E D LANDS.

FIGURE 5.9

THREE PHASE SOIL HANDLING

AUG., 1 9 8 4

Page 91: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

Once t o p s o i l has been removed, t he f i r s t l i f t of t he d e s i r a b l e subsoi l is

' excavated, p r e f e r r ab ly with a wheel t rencher . Minimum r a t e d depths for

wheel t r enche r s a r e i n t h e range of .6 m t o 1 m. Due t o excess s t r a i n on

the d r ive t r a i n , modif icat ions t o the t rencher a r e normally required i f

shal lower depths a r e excavated over long d is tances . However, s i nce dual

l i f t s a r e normally only s p e c i f i e d for r e l a t i v e l y sho r t d i s t a n c e s ((1 km)

t h e requirement fo r shallow digging can usua l ly be accommodated without

major equipment modif icat ion. To f a c i l i t a t e handl ing, 30 cm of f i r s t l i f t

ma te r i a l is suggested a s a minimum which the t rencher can handle e f f ec -

t i v e l y .

The f i r s t l i f t of b e t t e r q u a l i t y subso i l is placed e i t h e r adjacent t o t h e

t rench on the s p o i l s i d e ( P r o f i l e A, Figure 5.9) o r next t o t he t o p s o i l

p i l e ( P r o f i l e B, Figure 5.9). The second l i f t of undes i rab le mater ia l is

then excavated and placed adjacent t o t he t rench on e i t h e r t he work or t h e

s p o i l s i d e . The minimum amount of ma te r i a l t h a t can be excavated i n t h e

f i n a l l i f t w i l l depend on ground condi t ions . Since two passes with t he

t rencher a r e requi red , t h e t rench wal ls have to be s t a b l e enough t o

support t h e second pass. In good ground condi t ions , t he minimum second

l i f t would be 40 cm, or from .8 m t o 1.2 m below o r i g i n a l grade for small

inch pipe. In poor condi t ions t h i s may not be poss ib le due t o i n s t a b i l i t y

of t rench wal ls .

On c u l t i v a t e d and forage lands both s u b s o i l p i l e s should be s t o r e d on sub-

s o i l . In pas tu re lands t he f i r s t l i f t can be s to red on t h e sod layer but

the second l i f t of undes i rab le s u b s o i l should be s t o r e d on s u b s o i l .

For big inch p ipe l in ing , both bulking and pipe s i z e w i l l s i g n i f i c a n t l y

a f f e c t t he height of the replaced s p o i l i n t h e trench. In most cases s ig -

n i f i c a n t o v e r f i l l i n g w i l l r e s u l t which w i l l r equ i r e mounding over t h e

t rench and f ea the r ing of ma te r i a l s on t h e r i g h t of way. O v e r f i l l i n g w i l l

r e s u l t i n some mixing of poorer and b e t t e r q u a l i t y subso i l s . However, i t is b e t t e r t o have good q u a l i t y subso i l near the su r f ace r a t h e r than an

ove ra l l mixture of both ma te r i a l s t o t rench depth. Depth and q u a l i t y o f

t he two s u b s o i l ma te r i a l s should be i nves t i ga t ed thoroughly p r io r t o

t renching opera t ions.

- 79 -

Page 92: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

Application

This procedure would on ly be under taken where a t l e a s t 4 0 cm of poor qua l -

i t y s u b s o i l is encoun te red w i t h i n t r e n c h depth and is s e p a r a t e d from t h e

t o p s o i l by a t l e a s t 30 cm of d e s i r a b l e s u b s o i l . P r i o r t o de te rmin ing t h e

p r a c t i c a l i t y o f a t h r e e phase hand l ing o p e r a t i o n , chemical a n a l y s e s a r e

r e q u i r e d t o a s s e s s whether mixing of t h e two s u b s o i l s would s i g n i f i c a n t l y

degrade t h e b e t t e r q u a l i t y s u b s o i l . I f n o t , a t h r e e phase o p e r a t i o n may

not be war ran ted . Chemical a n a l y s e s shou ld i n c l u d e a mass ba lance ca lcu-

l a t i o n of both s u b s o i l s , e v a l u a t i o n of mixed and unmixed c h a r a c t e r i s t i c s

( i e . s a t u r a t i o n p e r c e n t a g e , e l e c t r i c a l c o n d u c t i v i t y o r SAR).

The s o i l and l a n d u s e s i t u a t i o n s where t h i s procedure is b e s t s u i t e d

inc lude :

a ) S o i l s under c u l t i v a t i o n , f o r a g e and p a s t u r e where poor q u a l i t y

m a t e r i a l o c c u r s w i t h i n t h e t r e n c h depth . The fo l lowing c r i t e r i a

shou ld be used t o de te rmine t h e a p p l i c a t i o n of t h i s procedure .

( i ) M a t e r i a l t o be t a k e n a s a f i r s t l i f t is g r e a t e r than

30 cm t h i c k .

( i i ) A t l e a s t 40 cm of u n d e s i r a b l e m a t e r i a l is a v a i l a b l e a s a

second l i f t .

( i i i ) A t l e a s t one of t h e c r i t e r i a i n d i c a t e d i n Table 5.2

shou ld e x i s t .

T a b l e 5.2 S u b s o i l C r i t e r i a

D e s i r a b l e M a t e r i a l Undes i rab le M a t e r i a l ( f i r s t l i f t ) (second l i f t )

E l e c t r i c a l C o n d u c t i v i t y < 5 a t l e a s t 4 u n i t s h i g h e r (EC) 5- 10 a t l e a s t 6 u n i t s h igher

> 70 N.A.

Sodium Absorpt ion Rat io* < 8 a t l e a s t 6 u n i t s h i g h e r (SAR) 8-12 a t l e a s t 8 u n i t s h i g h e r

> 12 N.A.

S a t u r a t i o n Percentage*" - - a t l e a s t 4096 h i g h e r t h a n d e s i r a b l e m a t e r i a l

S tone Content < 3 > 25 (% Val) 3-25 > 50

25-50 N.A. - 80 -

Page 93: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

* SAR c r i t e r i a apply only t o ma te r i a l s t h a t a r e loam t o heavy c lay i n

t ex tu re . C r i t e r i a may be a l t e r e d by the presence of hi* l e v e l s o f

e i t h e r lime (CaC03) or gypsum (CaS04) i n excess of o the r so lub le

s a l t s .

** Sa tu ra t ion percentage c r i t e r i a apply only t o weathered bedrock

mater ia l s .

NA - Not Applicable -- mul t ip l e l i f t of the subso i l is not required.

Variation

The two most common v a r i a t i o n s of t h i s procedure a r e i l l u s t r a t e d i n

Figure 5.9. Both produce s i m i l a r r e s u l t s . I f t o p s o i l s a r e t h in and com-

pact ion of t he B horizon is a problem o r i f r i g h t of way widths a r e

r e s t r i c t e d , i t may be adviseable t o s t o r e and spread the s t r i p p e d t o p s o i l

over the work area . This e f f e c t i v e l y inc reases the organic buffer on

which cons t ruc t ion equipment t r a v e l s and reduces the compaction of t he B

horizon. I f t o p s o i l s to rage on the work s i d e is not a p r a c t i c a l s o l u t i o n

t o compaction, the work s ide should be s t r i p p e d so t h a t any compaction can

be worked up without a f f e c t i n g the t o p s o i l .

In pas ture land a b lade width s t r i p of t o p s o i l should be removed p r io r t o

t rench excavation. Topsoil is s to red on the work s i d e a s i n blade width

t o p s o i l s t r i p p i n g (F igure 5.3). The first l i f t of subso i l is depos i ted on

the s p o i l s i d e on the sod l aye r immediately adjacent t o t h e s t r i p p e d

area . Since t h i s l i f t is of r e l a t i v e l y good q u a l i t y mater ia l , i t can be

s a f e l y s to red on t h e sod layer . The f i n a l l i f t is then excavated and

s to red on subso i l a s c l o s e a s poss ib le t o t h e t rench to avoid contamina-

t i o n of adjacent s o i l s .

Sa l ine seepage a r e a s o f t en have b e t t e r q u a l i t y ma te r i a l s a t depth (higher

EC o r SAR values i n t he upper mater ia l r e l a t i v e t o the lower ma te r i a l ) .

Separa te removal of ma te r i a l s i n such a reas is not recommended.

Page 94: Manual on Soil Conservation and Pipeline Construction Draft · MANUAL ON SOIL CONSERVATION AND PIPELINE CONSTRUCTION Page 2.0 IMPACT OF PIPEL INE CONSTRUCTION ON AGRICULTURAL LAND

Thin t o p s o i l s should be s t r i p p e d with a grader because of t h e g r e a t e r

depth c o n t r o l . Excavat ion of the two s u b s o i l l i f t s should be performed

with a bucket wheel t r enche r r a t h e r than by backhoe s i n c e i t is more

capab le of excava t i ng m a t e r i a l s t o a predetermined depth.

Ma te r i a l excavated and p u l v e r i s e d with a t r enche r can be a c c u r a t e l y placed

i n a uniform p i l e which prov ides b e t t e r s e p a r a t i o n from t o p s o i l dur ing

excava t ion , and a l lows b e t t e r compaction i n t he t rench dur ing b a c k f i l l i n g .

B a c k f i l l i n g of t h e two s u b s o i l p i l e s should be done with a g rader because

of t h e smal l volumes of ma t e r i a1 invo lved and t h e p r e c i s e n e s s r equ i r ed .

The t r ench should be compacted by g r ade r t i r e s a f t e r each of t he s u b s o i l

p i l e s has been rep laced . Th is wi.11 con f ine t h e undes i r ab l e ma t e r i a l t o

t h e t rench a s f a r from t h e t o p s o i l a s pos s ib l e .

The b e t t e r q u a 1 i . t ~ s u b s o i l should then be rep laced i n t h e t rench , com-

pacted and reworked t o r e s t o r e a uniform s u b s o i l s u r f a c e p r i o r t o t o p s o i l

replacement . Topsoi l should be r ep l aced with a g rader t o a uniform depth

over the d i s t u r b e d a rea .