PM-DEM-20/01 (04-10) 0.00 0.0 0.00 0.0 0.0 0.00 0.0 SUB T 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 DELIVERABLES AND ESTIMATED MAN-HOURS DISCIPLINE PROJECT TITLE: EXPANSION OF EAST PUMP STATION-MARAFIQ ORIGINATOR IM DATE: 14-Nov-12 Revision PROCESS ENGINEERING PACKAGE REVIEW DISC. SUP. MTQ DATE: 14-Nov-12 A DRAWING CLASSIFICATIONS DELIVERABLES MAN-HOURS No. of Drawings New Eng'g Design CADD Total u NEW EXISTING NEW EXISTING DRAFTED DRAWINGS Per D A B C D E TOTAL A B C D E TOTAL A B C D E TOTAL A B C D E TOTAL TOTAL MAN-HOURS (FROM OTHER SHEETS) 0 0 0 0 # 0.0 0.0 0.0 0.0 0.0 NON-DRAFTED DRAWINGS 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Non-Deliverables 0 0.0 0.0 0.0 Design Basis/Technical Narrative 80 80 PEP method statement 60 60 0.0 0.0 Design Verification plan. 20 20 0.0 100 100 80 80 Equipment (summary) list (Assupmtion-2) 60 60 Process Flow Diagrams (Assupmtion-5) 80 80 System descriptions (Assupmtion-2) 100 100 Utility Flow Diagrams (Assupmtion-6) 50 50 60 60 P&ID Legends and Symbols (1 P&ID) 10 10 Process & Utility Studies (Assupmtion-2) 150 150 100 100 Drainage and Effluent Summary (Assupmtion-2) 60 60 Cause and Effect Matrix (Assupmtion-2) 50 50 Process Control Logic Diagrams (Assupmtion-2) 60 60 Interface Schedule (Assupmtion-2) 30 30 40 40 200 200 Utilities Summary (Assumption-6) 40 40 Pump calculation data sheets (Assupmtion-2) 20 20 60 60 40 40 Analyser data sheets (Residual Chlorine Analyzer) 20 20 Relief valve list/specifications (Assupmtion-11) 20 20 Relief load study (Assupmtion-11) 40 40 Process Sizing Criteria (Assupmtion-2) 30 30 80 80 40 40 Emergency Shutdown Philosophy (Assumption-2) 60 60 Drainage and Effluent Philosophy (Assupmtion-2) 50 50 Sparing Philosophy (Assupmtion-2) 30 30 100 100 Relief valve sizing philosophy(Assupmtion-11) 50 50 60 60 60 60 80 80 50 50 Verification attendance and reports for: 0 Process safety review 30 30 Selected DHSE reviews in DHSE section (HAZOP) 30 30 Plot Plan review 30 30 Final documentation dossier 40 40 FAT visits (02 Visits in Middle East,1 Engineer) 40 40 Visit to site for Kick Off Meeting (02 Visits) 20 20 Assumptions: NON-DRAFTED DRAWINGS Total Hrs :--------------------> 2510.0 0.0 0.0 2510.0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 MAN-HOUR DISTRIBUTION Hrs Yes No # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 MUHAMMAD TARIQ 800 1.All New Dwg. Covered P # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 BASSIM ALHAMOUD 500 2.All Exsisting Dwg. Covered P # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 HUSSAIN ALKHUDAIR 500 3.Field Visit & Dwg. Search P # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 IMTINAN MOHSIN 710 4.Sub Contract P # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.Requisitions P # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.Data Sheets P # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.Calculations P # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.Materials Take Offs P # 0.0 0.0 0.0 0.0 0.0 9.Man-Hour Distribution P # 0.0 0.0 0.0 0.0 0.0 10. Misc.any other Items P # 0.0 0.0 # 0.0 Dwg. Size New Qty Exist Qty New Eq "A" Total Eq "A" # 0.0 SIZE "A" 0.0 0.0 0.00 0.00 0.00 # SIZE "B" 0.0 0.0 0.00 0.00 # SIZE "C" 0.0 0.0 0.00 0.00 0.00 # Cross Check SIZE "D" 0.0 0.0 0.00 0.00 0.00 # 0 OK SIZE "E" 0.0 0.0 0.00 0.00 0.00 # TOTAL 0.0 0.0 0.0 0.0 0.00 Total Man-Hours ( All Sheets) :-------------------> 2510 0 0 2,510.0 TOTAL AV. MHRS/ "A" SIZE DWG.--------------------------> #DIV/0! A B C D E TOTAL A B C D E TOTAL A B C D E TOTAL A B C D E TOTAL 0.0 0.0 0.0 0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 # 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Existi ng "A" siz e "B" siz e "C" siz e "D" size "E" size Review of vendor data and provision of same (Assupmtion-2) Process description and Block flow diagram (Assupmtion- 2) Material selection philosophy/report & material selection diagrams (Assupmtion-2) Process Engineering Flow Sheets (PEFS, P&IDs, UDDs, UEFS) etc (Assupmtion-12) Battery limit conditions summary (Assupmtion-2) Hydraulic Calcs, basic and overcapacity analysis, surge analysis (Assupmtion-2) Appropriate supporting calculations, line size, overpressure etc (Assupmtion-2) Control valve and inline instrument data sheets (IPDS sheets) (Assupmtion-2) Process Control and Instrumented Protection Function (IPF) Philosophy (Assupmtion-2) Tie in' Isolation and Battery Limits Lists and philosophy (Assupmtion-2) Operation Philosophies Start up, Shutdown and Upset philosophy (Assupmtion-2) Maintenance Philosophy, reliability and plant availability (Assupmtion-2) Commissioning Manual input, commissioning systems definition Operating manual with developed vendor data (Assupmtion-2) Performance Test Procedures and acceptance criteria (Assupmtion-2) 1 Only compliance with contract scope and specification/code requirements. 2. The system to be reviewed will only consisted of new pump station ( Phase-I (6+2 pumps) & Phase-II (6+1 pumps) with auxilliaries like chlorine injection points, flow meter & Air Release Valves) 3. Only potable water stream & chlorine feed is considered. 4. Only pumping station will be considered. No evaluation for perfomance of SWRO plant. 5. 4 PFDs are considered (2 for phase-I & 2 for phase- II). 6.Utilities required for new pumping station is considered. 7. Only two reviews ('for comment' and ‘for approval’) are considered. 8. Assume that the submittals received have the supporting information with them in order to undertake the review. 9. Assume that contractor has a basic level of engineering competence and no engineering will be done. 10. Assume that the submittals received have the supporting information with them in order to undertake the review. 11. Thermal/Pressure Relief Valves on the discharge lines of pumps are considrered. Relief valves on the Storage Tanks are not considered. CHECK LIST : Please Check all the following items are taken care Ext .Eq "A"

man-hour estimate

Embed Size (px)

DESCRIPTION

man-hour estimate

Citation preview

Page 1: man-hour estimate

PM-DEM-20/01 (04-10)

Page 1 of 1

0.00 0.0 0.00 0.0 ### 0.0 0.00 0.0

SUB TOTAL0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

DELIVERABLES AND ESTIMATED MAN-HOURS DISCIPLINE PROJECT TITLE: EXPANSION OF EAST PUMP STATION-MARAFIQ ORIGINATOR IM DATE: 14-Nov-12 Revision

PROCESS ENGINEERING PACKAGE REVIEW DISC. SUP. MTQ DATE: 14-Nov-12 A

DRAWING CLASSIFICATIONSDELIVERABLES

MAN-HOURS

No. of Drawings

Ne

w

Exi

stin

g Eng'g Design CADD Total Hours NEW EXISTING NEW EXISTING

DRAFTED DRAWINGS Per Dwg.A B C D E TOTAL A B C D E TOTAL A B C D E TOTAL A B C D E TOTAL

TOTAL MAN-HOURS (FROM OTHER SHEETS) 0 0 0 0 ### 0.0 0.0 0.0 0.0 0.0

NON-DRAFTED DRAWINGS 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Non-Deliverables 0 0.0 0.0 0.0

Design Basis/Technical Narrative 80 80

PEP method statement 60 600.0 0.0

Design Verification plan. 20 200.0

Review of vendor data and provision of same (Assupmtion-2) 100 100

Process description and Block flow diagram (Assupmtion-2) 80 80

Equipment (summary) list (Assupmtion-2) 60 60

Process Flow Diagrams (Assupmtion-5) 80 80

System descriptions (Assupmtion-2) 100 100

Utility Flow Diagrams (Assupmtion-6) 50 50

60 60

P&ID Legends and Symbols (1 P&ID) 10 10

Process & Utility Studies (Assupmtion-2) 150 150

100 100

Drainage and Effluent Summary (Assupmtion-2) 60 60

Cause and Effect Matrix (Assupmtion-2) 50 50

Process Control Logic Diagrams (Assupmtion-2) 60 60

Interface Schedule (Assupmtion-2) 30 30

Battery limit conditions summary (Assupmtion-2) 40 40

200 200

Utilities Summary (Assumption-6) 40 40

Pump calculation data sheets (Assupmtion-2) 20 20

60 60

40 40

Analyser data sheets (Residual Chlorine Analyzer) 20 20

Relief valve list/specifications (Assupmtion-11) 20 20

Relief load study (Assupmtion-11) 40 40

Process Sizing Criteria (Assupmtion-2) 30 30

80 80

40 40

Emergency Shutdown Philosophy (Assumption-2) 60 60

Drainage and Effluent Philosophy (Assupmtion-2) 50 50

Sparing Philosophy (Assupmtion-2) 30 30

100 100

Relief valve sizing philosophy(Assupmtion-11) 50 50

60 60

Commissioning Manual input, commissioning systems definition 60 60

Operating manual with developed vendor data (Assupmtion-2) 80 80

50 50

Verification attendance and reports for: 0

Process safety review 30 30

Selected DHSE reviews in DHSE section (HAZOP) 30 30

Plot Plan review 30 30

Final documentation dossier 40 40

FAT visits (02 Visits in Middle East,1 Engineer) 40 40

Visit to site for Kick Off Meeting (02 Visits) 20 20

Assumptions:

3. Only potable water stream & chlorine feed is considered.

5. 4 PFDs are considered (2 for phase-I & 2 for phase-II).

6.Utilities required for new pumping station is considered.

NON-DRAFTED DRAWINGS Total Hrs :--------------------> 2510.0 0.0 0.0 2510.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

MAN-HOUR DISTRIBUTION Hrs Yes No ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

MUHAMMAD TARIQ 800 1.All New Dwg. Covered P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

BASSIM ALHAMOUD 500 2.All Exsisting Dwg. Covered P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

HUSSAIN ALKHUDAIR 500 3.Field Visit & Dwg. Search P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

IMTINAN MOHSIN 710 4.Sub Contract P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

5.Requisitions P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

6.Data Sheets P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

7.Calculations P ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

8.Materials Take Offs P ### 0.0 0.0 0.0 0.0 0.0

9.Man-Hour Distribution P ### 0.0 0.0 0.0 0.0 0.0

10. Misc.any other Items P ### 0.0 0.0

### 0.0

Dwg. Size New Qty Exist Qty New Eq "A" Ext .Eq "A" Total Eq "A" ### 0.0

SIZE "A" 0.0 0.0 0.00 0.00 0.00 ###

SIZE "B" 0.0 0.0 0.00 0.00 ###

SIZE "C" 0.0 0.0 0.00 0.00 0.00 ###

Cross Check SIZE "D" 0.0 0.0 0.00 0.00 0.00 ###

0 OK SIZE "E" 0.0 0.0 0.00 0.00 0.00 ###

TOTAL 0.0 0.0 0.0 0.0 0.00

Total Man-Hours ( All Sheets) :-------------------> 2510 0 0 2,510.0

TOTAL AV. MHRS/ "A" SIZE DWG.--------------------------> #DIV/0! A B C D E TOTAL A B C D E TOTAL A B C D E TOTAL A B C D E TOTAL

0.0 0.0 0.0 0

### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0

### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0 0.0 0.0 0.0 0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ### 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

"A" size

"B" size

"C" size

"D" size

"E" size

Material selection philosophy/report & material selection diagrams (Assupmtion-2)

Process Engineering Flow Sheets (PEFS, P&IDs, UDDs, UEFS) etc (Assupmtion-12)

Hydraulic Calcs, basic and overcapacity analysis, surge analysis (Assupmtion-2)

Appropriate supporting calculations, line size, overpressure etc (Assupmtion-2)

Control valve and inline instrument data sheets (IPDS sheets) (Assupmtion-2)

Process Control and Instrumented Protection Function (IPF) Philosophy (Assupmtion-2)

Tie in' Isolation and Battery Limits Lists and philosophy (Assupmtion-2)

Operation Philosophies Start up, Shutdown and Upset philosophy (Assupmtion-2)

Maintenance Philosophy, reliability and plant availability (Assupmtion-2)

Performance Test Procedures and acceptance criteria (Assupmtion-2)

1 Only compliance with contract scope and specification/code requirements.

2. The system to be reviewed will only consisted of new pump station ( Phase-I (6+2 pumps) & Phase-II (6+1 pumps) with auxilliaries like chlorine injection points, flow meter & Air Release Valves)

4. Only pumping station will be considered. No evaluation for perfomance of SWRO plant.

7. Only two reviews ('for comment' and ‘for approval’) are considered.

8. Assume that the submittals received have the supporting information with them in order to undertake the review.

9. Assume that contractor has a basic level of engineering competence and no engineering will be done.

10. Assume that the submittals received have the supporting information with them in order to undertake the review.

11. Thermal/Pressure Relief Valves on the discharge lines of pumps are considrered. Relief valves on the Storage Tanks are not considered.

CHECK LIST: Please Check all the following items are taken care or not.