Click here to load reader
Upload
ammar-babar
View
214
Download
0
Embed Size (px)
Citation preview
Date of Birth:
14, DECEMBER 1988
Nationality: Pakistani
Marital Status: Single
Passport No:AR3021581
NIC Number:42201-6387158-3
Address:
E-788-A Block D Street 10 Link Road NO-3 Nishat Colony, Lahore Cantt Pakistan
Cell No:
+92322-8056072
E-Mail:
Ammar. b a b a r @ yahoo. c o m Computer Skills:
• MS Office• Microsoft Visual
Studio• Power World
Simulator• AutoCAD• MAT LAB• Microsoft Visio
Internships :
Four weeks Internship inTransformer ProductionDepartment at Pak Elektron Limited(PEL).
[1 month]
MUHAMMAD AMMAR BABURSeeking acceptance into a prestigious Engineering organization where education, professional training & commitment to excellence will be utilized and also I can ideally groom myself in the field of Project Management Engineering and effectively utilize myextensive knowledge.
P r of e ssi o n al E x pe r ience [ 4+ y e ars]
DIN POWER LIMITED (DIN GROUP OF INDUSTRIES)
Electrical Engineer
Sector Type: Power Plant
Hand on experience of the following: Caterpillar Diesel(HFO)Engines(3612)
Caterpillar Diesel (3512, C-32)Caterpillar Gas (3516B, 3520C)
Control System Terberg(Tec,ETec,SBC 7) Waste Heat Recovery Boilers, Multi fuel fired Boiler Dual Fuel Boilers Alfa Laval purifiers, Booster modules, ATS Power plant &its Auxiliary 5MW Load Complete Distribution, handling
Ind u s t r i al P r o j e cts: Wapda& Power Plant Automation Project. Din Poultry Farm 1250 A LT , Complete Distribution &
Caterpillar 165KVA, 365KVA,1105KVA-C32 Diesel Engines, CUMMINS 100KVA,256KVA Diesel Engines Installation& Commissioning.
CAT Gas Engine 3520C (1.75 MW), 3516B (1 MW) Erection &commissioning With Allied (Caterpillar)Engineering and Services.
Renewable Energy projects 10 Ton Boiler Erection Project. Wapda Load Extension @ 4. 9M W Project. 1500KVA,1250KVA, 630KVA Transformer Installation
Testing &Cables Termination. Motor Control Centre, Switch Gear installing, Grounding
Testing, H.T&L.T Cables Testing& Termination.
T e ch n i c al Ex p e r t ise:
Final Year Project at NUST:
Design a Digital Speed Controller ofDC Motor.Interests and Activities:
• Control System Modification
• Relay Based Automation
• Project Studies
References:References will be provided on
Power Plant Routine, Preventive, BreakdownMaintenance.
HT, LT cable kits, Termination. ACBs, VCBs interlocking Designing, Implementation Testing. Power Distribution System Designing. Industrial Automation Designating,Modification,
Testing. Terberg Control System Commissioning Troubleshooting
Ed u c a t i on a nd Q u a l i f icati o n Demand
B.E-Electrical Pakistan Navy Engineering College (NUST)2007-2011 CGPA 2.43/4.0
HSSC 2007 Garrison Degree College, Lahore Cantt2005-2007 803/1100 in Federal Board
SSC 2004 Federal Government School, Lahore Cantt2002-2004 591/850 i n Federal Board
Maj o r C o u rs e s:
AC Machines, DC Machines, Power Transmission, Power Distribution, Power Electronics, Industrial Electronic, Microcontrollers, Microprocessor, Algo& Computing ,Power Systems Analysis, Power system protection, Control Engineering, Electronic Instrumentation,Power Generation.