j MALABAA EARH EMBANKMENT DAM IDENTIFICATION, FEASIBILITY AND DETAILED DESIGN Malabaa Earth embankment Dam is proposed to be a 2.5m high dam, volume 200,000m3 and it is to serve about 114 people located in Darade Sub-location with Lagha Darade as the source, North Horr Constituency

MALABAA EARH EMBANKMENT DAM...Malabaa Earth embankment Dam is proposed to be a 2.5m high dam, volume 200,000m3 and it is to serve about 114 people located in Darade Sub-location with

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

  • j

    MALABAA EARH EMBANKMENT DAM IDENTIFICATION, FEASIBILITY AND DETAILED DESIGN

    Malabaa Earth embankment Dam is proposed to be a 2.5m high dam, volume 200,000m3 and it is to serve about 114 people located in Darade Sub-location with Lagha Darade as the source, North Horr Constituency

  • 1

  • ITEM DESCRIPTION

    DRAWING

    NUMBER NUMBERS

    A. LAYOUTS

    1

    GOOGLE IMAGE OF LAYOUT OF

    MALABAA DAM SITE 1

    2

    LOCATION OF MALABAA DAM ON TOPO MAP 1

    3 PLAN LAYOUT SN/01-01 1

    4

    DIMENSIONS AND DETAILS LAYOUT SN/01-06 1

    B. CROSS SECTIONS

    DRAWING INDEX SHEET

    DESIGN DRAWINGS

    MALABAA EARTH EMBANKMENT DAM

  • ITEM DESCRIPTION

    DRAWING NUMBER NUMBERS

    DRAWING INDEX SHEET

    DESIGN DRAWINGS

    MALABAA EARTH EMBANKMENT DAM

    1

    CROSS SECTION PROFILE@CENTER OF DAM

    SN/01-03 SHEET 3 1

    2

    LONGITUDINAL SECTION @

    CENTER OF DAM

    SN/01-02 SHEET

    002 1

    3

    LONGITUDINAL CROSS SECTION @ CENTRE OF SILT TRAP

    SN/01-05 SHEET 005 1

    4

    CROSS SECTION @CENTER OF

    SPILLWAY

    SN/01-04 SHEET

    04 1

    C. TYPICAL EMBANKMENT

  • ITEM DESCRIPTION

    DRAWING NUMBER NUMBERS

    DRAWING INDEX SHEET

    DESIGN DRAWINGS

    MALABAA EARTH EMBANKMENT DAM

    1

    TYPICAL EMBANKMENT SECTIONS FOR PROPOSED DAM

    SN/01-9 SHEET NO. 9 1

    2

    EMBANKMENT AND RESERVOIR

    LAYOUT PLAN

    SN/01-10 SHEET

    10 1

    3 EMBANKMENT DETAILS SN/01-11 TO 13 3

    D. STANDARD DRAWINGS

    1 WATER PAN SPECIAL SN/01-08 2

    2

    SPILLWAY FOR SMALL EARTH DAMS, TYPE DRAWING (II) M.W.I 2

  • ITEM DESCRIPTION

    DRAWING NUMBER NUMBERS

    DRAWING INDEX SHEET

    DESIGN DRAWINGS

    MALABAA EARTH EMBANKMENT DAM

    3

    INTAKE AND VALVE CHAMBER FOR SMALL DAMS 003-TYPE-014 2

    4 COMMUNAL WATER POINT 018-TYPE-006A 1

    5

    CATTLE TROUGH TYPE DRAWING IV-SHOATS AND CALVES MWI 1

    6 CATTLE TROUGH 018-TYPE-026A 1

    7 EROSION PROTECTION WORKS ML01/DD01 1

    TOTAL 23

  • 457500 457500 457500

    460000 460000 46000021

    7500

    2175

    00

    2200

    0022

    0000

    2225

    0022

    2500

    PROPOSED DAM

    DESIGNED BY: Project Title:Scale:

    Date:

    1:10,000

    SURVEYED BY:

    DRAWN BY:

    CHECKED BY:

    G. N.

    J.MUE

    Drg. No.

    SN/01-01

    SHEET 001

    APRILL . 2020

    ENG. B.KASABULI

    EXISTING MURRAM ROAD

    EXISTING BUILDINGS

    LEGEND

    L AGA

    NOTES

    1. All dimensions are in M unless

    otherwise specified

    2. All dimensions to be read off and

    not scaled.

    3. Any discrepancies with dimensions

    to be notified to the Engineer before

    commencement of work.

    CLIENT ENGINEER

    Drg. Title:Plan layout

    DIRECTOR WATER & SEWERAGE

    SERVICES

    MINISTRY OF WATER SANITATION & IRRIGATION

    REPUBLIC OF KENYA

    EWASO NYIRO NORTH

    DEVELOPMENT AUTHORITY

    REPUBLIC OF KENYA

    PROPOSED MALABAA EARTH DAM

    PROJECT

  • 268.0

    126.5 159.5

    301.0

    50.0

    40.0

    32.042.0PAN @ 200,000 M CUBIC

    5.5 M DEEP

    EMBARKMENT TOP

    SIDE SLOPES

    EMBARKMENT SLOPES

    EM

    BARKM

    EN

    T TO

    P

    SID

    E SLO

    PES

    EM

    BARKM

    EN

    T SLO

    PES

    SIDE SLOPES

    EMBARKMENT TOP

    EMBARKMENT SLOPES

    INLET CHANNNEL

    O

    V

    E

    R

    F

    L

    O

    W

    C

    H

    A

    N

    N

    N

    E

    L

    SILT TRAP

    DESIGNED BY: Project Title:Scale:

    Date:

    1:10,000

    SURVEYED BY:

    DRAWN BY:

    CHECKED BY:

    Drg. No.

    SN/01-06

    SHEET 006

    APRILL . 2020

    LEGEND

    NOTES

    1. All dimensions are in M unless

    otherwise specified

    2. All dimensions to be read off and

    not scaled.

    3. Any discrepancies with dimensions

    to be notified to the Engineer before

    commencement of work.

    CLIENT ENGINEER

    G. N.

    J.MUE

    Eng. C.OWITI

    Drg. Title:Plan Dimensions and Details layout

    EXISTING MURRAM ROAD

    EXISTING BUILDINGS

    L AGA

    DIRECTOR WATER & SEWERAGE

    SERVICES

    MINISTRY OF WATER SANITATION & IRRIGATION

    REPUBLIC OF KENYA

    PROPOSED MALABAA EARTH DAM

    PROJECT

    EWASO NYIRO NORTH

    DEVELOPMENT AUTHORITY

    REPUBLIC OF KENYA

  • cross Profile

    STATION

    EXISTING GROUND LEVEL (m)

    EXCAVATED LEVELS

    SOIL TYPE

    O.G.L LEVEL

    EXCAVATION LEVEL

    EMBARKMENT

    EMBARKMENT

    0+

    00

    0

    0+

    05

    0

    0+

    10

    0

    0+

    15

    0

    0+

    20

    0

    0+

    25

    0

    0+

    30

    0

    0+

    35

    0

    0+

    39

    0

    0+250

    0+300

    0+350

    0+400

    CROSS @ CENTER OF A DAM

    LONGTIDUNAL @ CENTER OF A DAM

    LEGEND

    EXISTING MURRAM ROAD

    TRENCH BOTTOM LEVELS

    BUILDINGS

    AIR-STRIP

    HORIZONTAL SCALE-1:2,000

    VERTICAL SCALE-------1:100

    SCALE

    LAGAS

    CLIENT DESIGNED BY:

    Scale:

    Date:

    As shown

    SURVEYED BY:

    DRAWN BY:

    APPROVED BY:

    ENGINEER

    Drg. No.

    SN/01-03

    SHEET 03

    APRILL. 2020

    NOTES

    1. All dimensions are in mm unless otherwise specified

    2. All dimensions to be read off and not scaled.

    3. Any discrepancies with dimensions to be notified to the Engineer before

    commencement of work.

    4. All water pipes are all uPVC except where it crosses the laga GI is used

    NOTES

    5. A nominal minimum cover for all pipes shall be 0.6m

    6. Marker posts shall be provided along pipelines at every

    200m, except where they follow permanent roads

    PROJECT TITTLE :

    G. N.

    J.MUE

    ENG .B.KASABULI

    DRG. TITLE:CROSS -SECTION PROFILE SECTION @ CENTER OF DAM

    DIRECTOR WATER & SEWERAGE SERVICES

    MINISTRY OF WATER SANITATION &

    IRRIGATION

    REPUBLIC OF KENYA

    EWASO NYIRO NORTH

    DEVELOPMENT AUTHORITY

    REPUBLIC OF KENYA

    PROPOSED MALABAA EARTH DAM

    PROJECT

  • long Profile

    STATION

    EXISTING GROUND LEVEL (m)

    EXCAVATED LEVELS

    SOIL TYPE

    O.G.L LEVEL

    EXCAVATION LEVEL

    EMBARKMENT

    0+100

    0+150

    0+200

    0+250

    0+300

    0+

    00

    0

    0+

    05

    0

    0+

    10

    0

    0+

    15

    0

    0+

    20

    0

    0+

    25

    0

    0+

    30

    0

    0+

    35

    0

    0+

    40

    0

    0+

    45

    0

    0+

    50

    0

    0+

    52

    3

    0+000

    0+050

    0+100

    0+150

    0+200

    0+225

    0+00

    0

    0+05

    0

    0

    +

    1

    0

    0

    0

    +

    1

    5

    0

    CROS

    S @

    CEN

    TER

    OF A

    DAM

    LONGTIDUNAL @ CENTER OF A DAM

    CROS

    S @

    CEN

    TER

    OF

    SLT T

    RAP

    LEGEND

    EXISTING MURRAM ROAD

    TRENCH BOTTOM LEVELS

    BUILDINGS

    AIR-STRIP

    HORIZONTAL SCALE-1:2,000

    VERTICAL SCALE-------1:100

    SCALE

    LAGAS

    CLIENT DESIGNED BY:

    Scale:

    Date:

    As shown

    SURVEYED BY:

    DRAWN BY:

    APPROVED BY:

    ENGINEER

    Drg. No.

    SN/01-02

    SHEET 02

    APRILL. 2020

    NOTES

    1. All dimensions are in mm unless otherwise specified

    2. All dimensions to be read off and not scaled.

    3. Any discrepancies with dimensions to be notified to the Engineer before

    commencement of work.

    4. All water pipes are all uPVC except where it crosses the laga GI is used

    NOTES

    5. A nominal minimum cover for all pipes shall be 0.6m

    6. Marker posts shall be provided along pipelines at every

    200m, except where they follow permanent roads

    PROJECT TITTLE :

    G. N.

    J.MUE

    ENG .B.KASABULI

    DRG. TITLE:LONGTIDUNAL -SECTION PROFILE SECTION @ CENTER OF DAM

    DIRECTOR WATER & SEWERAGE SERVICES

    MINISTRY OF WATER SANITATION &

    IRRIGATION

    REPUBLIC OF KENYA

    EWASO NYIRO NORTH

    DEVELOPMENT AUTHORITY

    REPUBLIC OF KENYA

    PROPOSED MALABAA EARTH DAM

    PROJECT

  • spll Profile

    STATION

    EXISTING GROUND LEVEL (m)

    EXCAVATED LEVELS

    SOIL TYPE

    O.G.L LEVEL

    EXCAVATION LEVEL

    0

    +

    0

    0

    0

    0

    +

    0

    5

    0

    0

    +

    1

    0

    0

    0

    +

    1

    5

    0

    0

    +

    2

    0

    0

    0

    +

    0

    0

    0

    0

    +

    0

    5

    0

    0

    +

    1

    0

    0

    0

    +

    1

    5

    0

    0

    +

    2

    0

    0

    0

    +

    2

    2

    5

    0

    +

    0

    0

    0

    0

    +

    0

    5

    0

    0

    +

    1

    0

    0

    0

    +

    1

    5

    0

    0

    +

    2

    0

    0

    0

    +

    2

    5

    0

    0

    +

    2

    7

    0

    CROSS @

    CENTER

    OF SLT TRA

    P

    LEGEND

    EXISTING MURRAM ROAD

    TRENCH BOTTOM LEVELS

    BUILDINGS

    AIR-STRIP

    HORIZONTAL SCALE-1:2,000

    VERTICAL SCALE-------1:100

    SCALE

    LAGAS

    CLIENT DESIGNED BY:

    Scale:

    Date:

    As shown

    SURVEYED BY:

    DRAWN BY:

    APPROVED BY:

    ENGINEER

    Drg. No.

    SN/01-05

    SHEET 05

    APRILL. 2020

    NOTES

    1. All dimensions are in mm unless otherwise specified

    2. All dimensions to be read off and not scaled.

    3. Any discrepancies with dimensions to be notified to the Engineer before

    commencement of work.

    4. All water pipes are all uPVC except where it crosses the laga GI is used

    NOTES

    5. A nominal minimum cover for all pipes shall be 0.6m

    6. Marker posts shall be provided along pipelines at every

    200m, except where they follow permanent roads

    PROJECT TITTLE :

    G. N.

    J.MUE

    ENG .B.KASABULI

    DRG. TITLE:LONGTIDUNAL -SECTION PROFILE SECTION @ CENTER OF SPILLWAY

    DIRECTOR WATER & SEWERAGE SERVICES

    MINISTRY OF WATER SANITATION &

    IRRIGATION

    REPUBLIC OF KENYA

    EWASO NYIRO NORTH

    DEVELOPMENT AUTHORITY

    REPUBLIC OF KENYA

    PROPOSED MALABAA EARTH DAM

    PROJECT

  • silt Profile

    STATION

    EXISTING GROUND LEVEL (m)

    EXCAVATED LEVELS

    SOIL TYPE

    O.G.L LEVEL

    EXCAVATION LEVEL

    0+000

    0+050

    0+100

    0+150

    0+

    00

    0

    0+

    05

    0

    0+

    10

    0

    0+

    15

    0

    0+

    20

    0

    0+

    22

    5

    0+

    000

    0+

    050

    0

    +

    1

    0

    0

    0

    +

    1

    5

    0

    0

    +

    2

    0

    0

    0

    +

    2

    5

    0

    0

    +

    2

    7

    0CROSS @ CENTER OF SLT TRAP

    LEGEND

    EXISTING MURRAM ROAD

    TRENCH BOTTOM LEVELS

    BUILDINGS

    AIR-STRIP

    HORIZONTAL SCALE-1:2,000

    VERTICAL SCALE-------1:100

    SCALE

    LAGAS

    CLIENT DESIGNED BY:

    Scale:

    Date:

    As shown

    SURVEYED BY:

    DRAWN BY:

    APPROVED BY:

    ENGINEER

    Drg. No.

    SN/01-04

    SHEET 04

    APRILL. 2020

    NOTES

    1. All dimensions are in mm unless otherwise specified

    2. All dimensions to be read off and not scaled.

    3. Any discrepancies with dimensions to be notified to the Engineer before

    commencement of work.

    4. All water pipes are all uPVC except where it crosses the laga GI is used

    NOTES

    5. A nominal minimum cover for all pipes shall be 0.6m

    6. Marker posts shall be provided along pipelines at every

    200m, except where they follow permanent roads

    PROJECT TITTLE :

    G. N.

    J.MUE

    ENG .B.KASABULI

    DRG. TITLE:CROSS-SECTION PROFILE SECTION @ CENTER OF SILT TRAP

    DIRECTOR WATER & SEWERAGE SERVICES

    MINISTRY OF WATER SANITATION &

    IRRIGATION

    REPUBLIC OF KENYA

    EWASO NYIRO NORTH

    DEVELOPMENT AUTHORITY

    REPUBLIC OF KENYA

    PROPOSED MALABAA EARTH DAM

    PROJECT

  • 3.0

    1.0

    3.51

    15mm HDPE

    LINING MATERIAL

    8.50

    Anchor Trench

    Normal Water Level

    Full Reservoir Level

    0.5m Free

    Board

    Anchor Trench

    1.0

    2.5

    DAM EMBANKMENT TYPICAL SECTION FOR ERSE TENO DAM

    (homogeneous embankment with membrane lining)

    Rock or firm ground as

    directed by dam engineer

    6.70

    2.0019

    5.5007

    DESCRIPTION

    REVISIONS

    DATEDESCRIPTION

    DATE

    Scales:

    Designed By: Eng. B.

    Approved By:

    ENGINEERCLIENT

    Sht No:

    DESCRIPTION

    REVISIONS

    DATEDESCRIPTION

    DATE

    Scales:

    Designed By: Eng. B. K

    Surveyed By: G.N.N

    Date:APRILL 2020

    TITTLE:

    Drawn By: J.MUE

    Sht No:

    09

    As Shown

    PROJECT:

    TYPICAL EMBANKMENT CROSS-SECTION

    DRAWING NO:SN/01-9

    FOR PROPOSED DAMS/PANS

    DIRECTOR WATER & SEWERAGE SERVICES

    MINISTRY OF WATER SANITATION & IRRIGATION

    REPUBLIC OF KENYA

    PROPOSED MALABAA EARTH DAM

    PROJECT

    EWASO NYIRO NORTH

    DEVELOPMENT AUTHORITY

    REPUBLIC OF KENYA

    PROPOSED MALABAA EARTH DAM

    PROJECT

    AutoCAD SHX Text----

  • Bottom 2

    B1B4

    B2B3

    B4

    B2

    B3

    B1

    Bottom 3

    Bottom 4 Bottom 1

    INLET

    LAYOUT PLAN

    BYNO. DATE

    SURVEYD BY :DESIGNED

    APPROVEDG.N.N

    DRAWN BY J.MUE

    PROPOSED MALABAA EARTH DAMPROJECT

    DWG No.

    Scale: 1:2500

    DESCRIPTIONREVISIONS

    SHEET 010DATE: APRILL 2020EMBANKMENT AND MAIN RESERVOIR

    LAYOUT PLANENG.B.KASABULI

    DIRECTOR WATER & SEWERAGE SERVICES

    MINISTRY OF WATER SANITATION & IRRIGATION

    REPUBLIC OF KENYA

    ENGINEER

    CLIENT

    Drg .NO.SN/01-13 EWASO NYIRO NORTH

    DEVELOPMENT AUTHORITY

    REPUBLIC OF KENYA

  • DAM SECTION AT Bottom 2

    Slope 1:3

    Slope 1:2.5

    DAM SECTION AT Bottom 3

    Slope 1:3Slop

    e 1:2.5

    DAM SECTION AT Bottom 1

    Slope 1:3

    Slope 1:2.5

    DAM SECTION AT Bottom 4

    Slope 1:3Slop

    e 1:2.5 Free Board

    BYNO. DATE

    SURVEYED BYDESIGNED

    APPROVEDG.N.N

    DRAWN BY J.MUEDWG No.

    Scale: 1:300

    DESCRIPTIONREVISIONS

    SHEET 011DATE: MARCH 2020EMBANKMENT CROSS SECTIONS AT

    B4-B1 AND B2-B3ENG.B.KASABULI

    DIRECTOR WATER & SEWERAGE SERVICES

    MINISTRY OF WATER SANITATION & IRRIGATION

    REPUBLIC OF KENYA

    ENGINEER

    CLIENT

    Drg .NO.SN/01-11 EWASO NYIRO NORTH

    DEVELOPMENT AUTHORITY

    REPUBLIC OF KENYA

    PROPOSED MALABAA EARTH DAMPROJECT

    AutoCAD SHX TextCrest Level/OGL 514

    AutoCAD SHX TextWater Rest Level 513

    AutoCAD SHX TextKey Trench Level 508.20

    AutoCAD SHX TextBed level 508.50

    AutoCAD SHX TextEmbankment Bed level 508.50

    AutoCAD SHX TextCrest Level/OGL 514

    AutoCAD SHX TextKey Trench Level 508.20

    AutoCAD SHX TextEmbankment Bed level 508.50

    AutoCAD SHX TextOgl 512.70

    AutoCAD SHX TextOgl 512.80

    AutoCAD SHX TextWater Rest Level 513

    AutoCAD SHX TextBed level 283.5

    AutoCAD SHX TextCrest Level 514

    AutoCAD SHX TextKey Trench Level 508.20

    AutoCAD SHX TextEmbankment Bed level 508.50

    AutoCAD SHX TextCrest Level 514

    AutoCAD SHX TextKey Trench Level 508.20

    AutoCAD SHX TextEmbankment Bed level 508.50

    AutoCAD SHX TextHand placed riprap/stone pitching

    AutoCAD SHX TextLIMIT OF EXCAVATION

    AutoCAD SHX TextLIMIT OF EXCAVATION

    AutoCAD SHX TextLIMIT OF EXCAVATION

    AutoCAD SHX TextLIMIT OF EXCAVATION

    AutoCAD SHX TextWater Rest Level 513

    AutoCAD SHX TextWater Rest Level 513

  • DAM SECTION AT Bottom 1Scale 1:250

    Slope 1:3 Slope 1:2.5

    DAM SECTION AT Bottom 4Scale 1:250

    Slope 1:3Slop

    e 1:2.5 Free Board

    Slope 1:2.5

    BYNO. DATE

    SURVEYED BYDESIGNED

    APPROVEDG.N.N

    DRAWN BY J.MUEDWG No.

    Scale: 1:300

    DESCRIPTIONREVISIONS

    SHEET 012DATE: APRILL 2020 EMBANKMENT CROSS SECTION AT

    B4-B1 LINING DETAILSENG.B.KASABULI

    DIRECTOR WATER & SEWERAGE SERVICES

    MINISTRY OF WATER SANITATION & IRRIGATION

    REPUBLIC OF KENYA

    ENGINEER

    CLIENT

    Drg .NO.SN/01-12 EWASO NYIRO NORTH

    DEVELOPMENT AUTHORITY

    REPUBLIC OF KENYA

    PROPOSED MALABAA EARTH DAMPROJECT

    AutoCAD SHX TextOgl 512.20

    AutoCAD SHX TextOgl 512.10

    AutoCAD SHX TextWater Rest Level 513

    AutoCAD SHX TextBed level 508.50

    AutoCAD SHX TextCrest Level 514

    AutoCAD SHX TextKey Trench Level 508.20

    AutoCAD SHX TextEmbankment Bed level where there is lining 508.50

    AutoCAD SHX TextCrest Level 514

    AutoCAD SHX TextBed level where there is dam bottom lining 508.20

    AutoCAD SHX TextEmbankment Bed level where there is lining 508.50

    AutoCAD SHX TextKey Trench Level 508.20

    AutoCAD SHX TextLIMIT OF EXCAVATION WHERE LINING IS REQUIRED AT DAM BOTTOM

    AutoCAD SHX Text300mm Compacted clay lining where directed

    AutoCAD SHX TextLIMIT OF EXCAVATION

  • DAM SECTION AT Bottom 2

    Slope 1:3

    Slope 1:2.5

    DAM SECTION AT Bottom 4

    Slope 1:3

    Free Board

    DAM SECTION AT Bottom 1Scale 1:250

    Slope 1:3

    DAM SECTION AT Bottom 3

    Slope 1:3 Slope 1:2.5

    BYNO. DATE

    SURVEYED BYDESIGNED

    APPROVEDG.N.N

    DRAWN BY J.MUE

    Drg .NO.SN/01-13DWG No.

    Scale: As shown

    DESCRIPTIONREVISIONS

    SHEET 014DATE: APRILL 2020EMBANKMENT LONGITUDINAL SECTION

    B1-B2 AND 4-3ENG.B.KASABULI

    DIRECTOR WATER & SEWERAGE SERVICES

    MINISTRY OF WATER SANITATION & IRRIGATION

    REPUBLIC OF KENYA

    ENGINEER

    CLIENT

    EWASO NYIRO NORTH

    DEVELOPMENT AUTHORITY

    REPUBLIC OF KENYA

    PROPOSED MALABAA EARTH DAMPROJECT

    AutoCAD SHX TextOgl 511.50

    AutoCAD SHX TextCrest Level 514

    AutoCAD SHX TextKey Trench Level 508.20

    AutoCAD SHX TextEmbankment Bed level 508.50

    AutoCAD SHX TextWater Rest Level 513

    AutoCAD SHX TextBed level 892.5

    AutoCAD SHX TextCrest Level/OGL 514

    AutoCAD SHX TextKey Trench Level 508.20

    AutoCAD SHX TextEmbankment Bed level 508.50

    AutoCAD SHX TextCrest Level/OGL 514

    AutoCAD SHX TextKey Trench Level 508.20

    AutoCAD SHX TextEmbankment Bed level 508.50

    AutoCAD SHX TextCrest Level 514

    AutoCAD SHX TextOgl 512

    AutoCAD SHX TextKey Trench Level 508.20

    AutoCAD SHX TextEmbankment Bed level 508.50

    AutoCAD SHX TextLIMIT OF EXCAVATION

    AutoCAD SHX TextLIMIT OF EXCAVATION

    AutoCAD SHX TextLIMIT OF EXCAVATION

    AutoCAD SHX TextLIMIT OF EXCAVATION

    AutoCAD SHX TextWater Rest Level 513

    AutoCAD SHX TextWater Rest Level 513

    AutoCAD SHX TextWater Rest Level 513

    COVER MALABAA.DAMx.pdf (p.1-2)drawings-INDEX Malabaa Damx.pdf (p.3-6)LAYOUT COMBINED.pdf (p.7-11)LAYOUT SEPARATION PAGE.pdf (p.1)LOCATION OF mALABAA DAM-PG 1.pdf (p.2)DERATI-14.-With Maraba Dam-PG2.pdf (p.3)LAYOUT-PLAN.-PG 3.pdf (p.4)PLAN

    DIM-PLAN-PG 4.pdf (p.5)PLAN

    CROSS SECTIONS COMBINED.pdf (p.12-16)CROSS SECTIONS SEPARATION PAGE.pdf (p.1)CROSS-SECTION-cross-PG1.pdf (p.2)cross

    CROSS-SECTION-long-PG2.pdf (p.3)long

    CROSS-SECTION-overflow-PG3.pdf (p.4)overflow

    CROSS-SECTION-silt.-PG4.pdf (p.5)silt

    EMBANKMENT COMBINED.pdf (p.17-22)TYPICAL DAM SEPARATION PAGE.pdf (p.1)BIG Typical Dam Embankment X-section-Sheet - (1).pdf (p.2)Sheet - (1)

    Dam Embankment details-LAYOUT LAYOUT PLAN.pdf (p.3)LAYOUT LAYOUT PLAN

    Dam Embankment details-Dam Embankment SECTIONSB3B1 LINING.pdf (p.4)Dam Embankment SECTIONSB3B1 LINING

    Dam Embankment details-Dam Embankment SECTIONSB4B1.pdf (p.5)Dam Embankment SECTIONSB4B1

    Dam Embankment details-LONG SECTIONSB1B2B4B3.pdf (p.6)LONG SECTIONSB1B2B4B3