32
Use of U.S. DoD visual information does not imply or constitute DoD endorsement MAJOR SIMULATOR UPGRADE FOR DUNGENESS B 15 January 2020 2020 Power Plant Simulation Conference (PowerPlantSim’20) Gregory Zakaib, Proposals Manager L3 MAPPS Inc. | Power Systems and Simulation Presented at PowerPlantSim’20

Major Simulator Upgrade for Dungeness BJan 15, 2020  · Dungeness B Power Station Common Control Room (CCR) Simulator • Original simulator and training team based at Oldbury Training

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • Use of U.S. DoD visual information does not imply or constitute DoD endorsement

    MAJOR SIMULATOR UPGRADE FORDUNGENESS B

    15 January 2020 2020 Power Plant Simulation Conference (PowerPlantSim’20)Gregory Zakaib, Proposals Manager

    • L3 MAPPS Inc. | Power Systems and Simulation

    Presented at

    PowerPlantSim’20

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Outline

    • Background• Simulator Upgrade Project

    – Project Overview– Two-phase Deployment– Schedule– Challenges/Strengths/Successes

    • Conclusions

    2

  • source: EDF Energy

    BACKGROUND

    Major Simulator Upgrade for Dungeness B

    3PRESENTATION TITLE (USE INSERT > HEADER & FOOTER TO EDIT FOR ALL SLIDES)

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    EDF Energy’s Current Nuclear Sites

    • L3Harris supported facilities– Stations

    – Dungeness B– Hartlepool– Heysham 1– Hinkley Point B– Sizewell B

    – Other Training Facilities– Campus– Nuclear Power Academy (Barnwood)

    4

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Dungeness B Power Station

    • Dungeness B was first commercial AGR power station to be constructed

    • The £89 million contract was awarded in August 1965 to Atomic Power Constructions (APC), a consortium backed by– Crompton Parkinson– Fairey Engineering– International Combustion and Richardsons– Westgarth and Co

    5

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Dungeness B Power Station

    • Two Advanced Gas-Cooled Reactors (AGRs)– Graphite moderated / CO2 primary coolant – 4 x boiler / gas circulator units – Pre-stressed concrete pressure vessels– Single control room for both reactors

    • Commercial Operation– Unit 1 (R21) 1983– Unit 2 (R22) 1985

    • Current operating lifetime up to 2028

    6

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Dungeness B Power Station Common Control Room (CCR) Simulator

    • Original simulator and training team based at Oldbury Training Centre in Gloucestershire from the mid-1980s

    • Simulator moved into a purpose-built building at Dungeness B site in 1999

    • Unit 1 and Common plant systems simulated• Unit 2 plant systems not simulated• Hardware based on Silicon Graphics (SGI) IRIS

    servers and Hytec Electronics CAMAC I/O– SGI ceased operations in 1989– Hytec ceased operations in 2016

    7

    Legacy SGI Computers Legacy CAMAC I/O System

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Dungeness B Power Station CCR Simulator

    • 10 years Plant Life EXtension (PLEX) approved until 2028

    • EDF Energy recognizes importance of simulator– Reliability– Maintainability– Latest Simulation Technology

    • Simulator Upgrade project funded by PLEX program– Goal: Modernize simulator and ensure it can fulfil its

    mission until plant end of life

    8

  • source: EDF Energy

    SIMULATOR UPGRADE PROJECT

    Major Simulator Upgrade for Dungeness B

    PRESENTATION TITLE (USE INSERT > HEADER & FOOTER TO EDIT FOR ALL SLIDES)

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Simulator Upgrade Contract Award Criteria

    • Commercial– Compliance (conditions of

    contract and tender instructions)– Supplier financial status– Pricing and payment terms– Warranty– After sales service

    10

    • Technical– Competence (capability and

    qualifications)– Previous project experience,

    capability and qualifications– Risk management– Innovation (technical solution and

    project flexibility)

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Simulator Upgrade Contract

    • EDF Energy awarded contract to L3Harris in December 2016• Contract extended in early 2017 to include replacement of legacy CAMAC I/O system

    – Additional work had impact on original planned project tasks/schedule, however change in scope accommodated without impacting any key delivery dates

    • Project broken down into two distinct phases

    11

    Phase 1• New computer system• Rehost Unit 1 configuration• Unit 1 I/O system replacement• Classroom simulator

    Phase 2• Unit 1 configuration updated with new

    core/RCS/SG models• New Unit 2 configuration• Unit 2 panels and desk

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Phase 1 – New Computer System

    12

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Phase 1 – Rehost

    • New operating systems and third-party software

    • Orchid® simulation environment

    • Rehost legacy simulation software to Orchid®– Source code – GFLOW models converted to Orchid® Modeling

    Environment graphical models– Database– Initial conditions– Training exercises (scenarios)– Triggers (conditions)– Etc.

    • New soft panels

    • Converted tutor diagrams

    • Stimulated/simulated external systems

    • Upgraded A/V system

    13

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Phase 1 – Orchid® Instructor Station

    PRESENTATION TITLE (USE INSERT > HEADER & FOOTER TO EDIT FOR ALL SLIDES) 14

    • Control and monitor all aspects of simulator and trainee performance

    • Fully graphical user interface with standard Windows features e.g. drag and drop, window resizing, zoom, pan, etc.

    • Highly configurable (e.g. toolbars, plant parameters, feature behaviors, etc.)

    • User-defined windows layout

    • Client/server application

    • On-line PDF user manuals

    • Simulation control and maintenance functions (freeze, unfreeze, store, restore, speed-up, slow-down, DORT, etc.)

    • Replay scenarios and operator actions (synchronized with the other systems such as Orchid® Multimedia Manager, etc.)

    • Insertion of plant component and system malfunctions, instrument overrides and local operator actions

    • Direct access to modeling schematics, active schematics and virtual (soft) panels

    • On-the-fly creation of active schematics and virtual panels

    • Multiple operating modes i.e. instructor, operator, engineer and student

    • Built-in exam security

    • Focuses on automation and data collection– Create/edit graphical scenarios– Monitor, record and trend any parameter– Monitor and track operator performance– Scenario-based Testing and Training

    (SBT2) – Generate training performance records

    and reports based on ANSI/ANS-3.5 requirements

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Phase 1 – New Soft Panels

    • Scope– Unit 1 Desk – Unit 1 Panels– Common Panels– Back Panels– Backup/Emergency

    Panels– Sync Trolley

    • Available from Orchid® Instructor Station

    15

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Phase 1 – Tutor Diagrams + External Systems

    • Tutor Diagrams– Legacy tutor diagrams converted to Orchid® Graphic

    Editor displays using L3Harris’ pre-existing conversion tool, with fine adjustments performed as necessary– Identical look-and-feel as legacy tutor diagrams (no tutor

    learning curve)– Available from Orchid® Instructor Station

    16

    • External Systems– ATOS Digital Plant Control System (DPCS)

    – Stimulated (complete) DPCS in full scope simulator– Simulated alarm list with Orchid® Control System in

    classroom– POLARIS Plant Monitoring System (PMS)

    – Partially simulated PMS HMI with Orchid® Control System in full scope simulator and in classroom

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Phase 1 – Upgraded A/V System

    17

    • Hardware– 6 analog cameras and microphones retained– 2 new digital encoders (4 channels each) – New A/V server

    • Software– Orchid® Multimedia Manager

    – A/V recording and playback– Time-synchronized with the simulator for

    synchronized audio-video playbacks– Connectivity with debriefing room– Preview of all cameras in a mosaic display

    for monitoring at all times– Stores files using industry-standard “AVI”

    format

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Phase 1 – Unit 1 I/O System Replacement

    • Hardware– Legacy CAMAC I/O system replaced with new

    Beckhoff EtherCAT compact I/O system– 1-to-1 I/O points

    • Software– Orchid® Input Output

    – Provides online diagnostics– Hardware and communication failure

    indications sent to Instructor Station (i.e. Simulator Confidence)

    – Conversion from engineering units to electrical units

    – Panel sleep

    18

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Phase 1 – Unit 1 I/O System Replacement

    19

    Before After

    Legacy CAMAC I/O controllers replaced with interface to mate existing

    I/O wiring and connectors to new BeckhoffI/O installed on DIN rails

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Phase 1 – Classroom Simulator

    • 5 Student Workstations (capability to run independent simulations)

    • 1 Standard Orchid® Touch Interface Bay– Utilized for testing at L3Harris– Delivered to Dungeness B during

    Phase 2

    • Mobile Instructor Station with Orchid® Instructor Station

    20

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Phase 2 – Dual-Unit Simulation Strategy

    • Capability to operate Unit 2 stand-alone or in conjunction with Unit 1 to simulate complete power station• Similar strategy implemented by L3Harris at Heysham 1• Benefits of dual-unit simulator

    – Provides very representative and realistic control room environment especially important for plant with common control room

    – Enables training of full shift crews following plant processes and procedures– Enhances shift crew teamwork– Enhances control room communication skills while directing actions to be performed on a specific unit (communication

    more complex than before)– Allows opportunity for control room personnel to prioritize tasks to perform on training scenarios affecting both units

    21

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Phase 2 – New Models

    • Unit 1 Legacy Updated – New Reactor Core Model

    – Comet Plus™ Reactor Core Model / Orchid® Core Builder – New Boiler and Reheater Model

    – ANTHEM™ / Orchid® Modeling Environment– New Gas Circuit Model

    – ANTHEM™ / Orchid® Modeling Environment– Boundary Interfaces

    – Feedwater, startup vessel, main steam– RCS gas bypass circuit

    • New simulator load for Unit 2 created– Unit 1 used as starting point and updated to match R2

    conditions

    22

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Phase 2 – Unit 2 Panels and Desk

    23

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Phase 2 – Unit 2 Panels and Desk

    • Full Hard Panels solution– Replace existing Unit 2 Panel mockup with new structure and new operable instruments– Retain Unit 2 Desk structure / add new operable instruments

    • Best physical fidelity/realism (i.e. look-and-feel)• Enable most effective training

    24

    Existing Unit 2 Panel mockup New Unit 2 Panel Instruments

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Phase 2 – Unit 2 Panels and Desk

    25PRESENTATION TITLE (USE INSERT > HEADER & FOOTER TO EDIT FOR ALL SLIDES)

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    PHASE I (Rehost and I/O Replacement) Rehost Design Rehost Development and Integration Rehost FAT I/O Design I/O Prototype Build and Test At Dungeness I/O Production Build and Factory Test Install at Dungeness

    Phase 1 SAT Support EDF Training (Remotely from L3M)

    Phase 2 (Model Updates + Unit 2 Panel / Desk)Unit 1 Model Development and IntegrationUnit 1 Model FATUnit 1 Model SATUnit 2 Model Development and IntegrationUnit 2 Model FATUnit 2 Panel/Desk DesignUnit 2 Panel/Desk DevelopmentUnit 2 Panel/Desk Integrated FATSite Work: Panel Disassembly / New Panel Install

    Unit 2 Panel/Desk and Model Update

    2017 2018 2019Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q1

    2020Q4 Q1 Q2 Q3 Q4

    • Contract award: December 2016• In Service: November 2019

    Project Timeline

    26

    Ph 1 Unit 1 Training

    Ph2 Takeover

    P2 Unit 1 Training

    BAR Sched Template (QTR)

    2017201820192020

    StartFinishQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1

    PHASE I (Rehost and I/O Replacement)PHASE I (Rehost and I/O Replacement)

    DesignMon 1/16/17Fri 3/10/17 Rehost Design

    Development and IntegrationMon 2/6/17Fri 8/4/17 Rehost Development and Integration

    FAT Mon 6/5/17Fri 8/25/17 Rehost FAT

    DesignMon 4/24/17Tue 8/8/17 I/O Design

    Prototype Build and Test At DungenessWed 8/2/17Tue 10/10/17 I/O Prototype Build and Test At Dungeness

    Production Build and Factory TestWed 10/11/17Wed 1/31/18 I/O Production Build and Factory Test

    Install at DungenessMon 2/5/18Fri 2/23/18 Install at Dungeness

    Phase 1 SATMon 2/26/18Fri 3/23/18Phase 1 SAT

    Support EDF Training (Remotely from L3M)Mon 3/26/18Fri 6/22/18 Support EDF Training (Remotely from L3M)

    EDF Energy Take-Over - Phase 1Thu 8/30/18Thu 8/30/18

    Phase 2 (Model Updates + Unit 2 Desk/Panels) Phase 2 (Model Updates + Unit 2 Panel / Desk)

    Development and Integration1/1/18Fri 8/31/18Unit 1 Model Development and Integration

    FAT10/22/1811/9/18Unit 1 Model FAT

    Unit 1 Model SAT

    1/1/19Unit 2 Model Development and Integration

    Unit 2 Model FAT

    DesignMon 3/26/18Fri 7/13/18Unit 2 Panel/Desk Design

    DevelopmentFri 7/13/18Wed 4/24/19Unit 2 Panel/Desk Development

    FATWed 4/24/19Tue 5/14/19Unit 2 Panel/Desk Integrated FAT

    Old Panel Disassembly / New Panel InstallationMon 6/17/19Fri 6/28/19Site Work: Panel Disassembly / New Panel Install

    SAT Unit 2 Panel and Model UpdateMon 7/1/19Fri 7/12/19 Unit 2 Panel/Desk and Model Update

    Phase 2 - Take Over CertificateFri 10/18/19Fri 10/18/19

    ``

    Sheet1

    Task NameDurationStartFinish

    PHASE I (Rehost and I/O Replacement)

    Rehost

    Design40 daysMon 1/16/17Fri 3/10/17

    Development and Integration130 daysMon 2/6/17Fri 8/4/17

    FAT 60 daysMon 6/5/17Fri 8/25/17

    I/O Replacement

    Design77 daysMon 4/24/17Tue 8/8/17

    Prototype Build and Test At Dungeness50 daysWed 8/2/17Tue 10/10/17

    Production Build and Factory Test81 daysWed 10/11/17Wed 1/31/18

    Site Work

    Install at Dungeness15 daysMon 2/5/18Fri 2/23/18

    Phase 1 SAT4 wksMon 2/26/18Fri 3/23/18

    Support EDF Training (Remotely from L3M)13 wksMon 3/26/18Fri 6/22/18

    EDF Energy Take-Over - Phase 10 wksThu 8/30/18Thu 8/30/18

    Phase 2 (Model Updates + Unit 2 Desk/Panels)

    Model Update

    Design76 daysFri 5/18/18Fri 8/31/18

    Development and Integration126 daysFri 8/31/18Fri 2/22/19

    FAT76 daysFri 1/18/19Fri 5/3/19

    Unit 2 Desk/ Panels

    Design80 daysMon 3/26/18Fri 7/13/18

    Development204 daysFri 7/13/18Wed 4/24/19

    FAT15 daysWed 4/24/19Tue 5/14/19

    Site Work

    Old Panel Disassembly / New Panel Installation10 daysMon 6/17/19Fri 6/28/19

    SAT Unit 2 Panel and Model Update10 DaysMon 7/1/19Fri 7/12/19

    Phase 2 - Take Over Certificate0 daysFri 10/18/19Fri 10/18/19

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Challenges

    • Schedule – New I/O system upgrade scope added, without impacting the final delivery date of

    Phase 1

    • Behavior of retained legacy models and higher fidelity Orchid® replacement models– Increased the need for discussions and workshops with plant experts

    • Maintenance of multiple configurations – Synchronizing field updates from Phase 1 (rehost) training into Phase 2 during

    model development– Synchronizing changes between Unit 1 and Unit 2 configurations during the

    deployment lifecycle

    • EDF Energy support stretched between testing in Montreal and supporting training at Site– Overcome by deferring non-critical items to later phases– Provision of training load at EDF for remote support– Use of automated testing features of Orchid® Instructor Station to reduce face-to-

    face testing time*

    • Obsolescence of panel instruments– 3D printed many devices to replicate look-and-feel of originals

    27

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    *Automated Testing

    28

    Recorded Data

    Alarm Logs

    Simulator Actions

    Operator Actions

    Scenarios

    SBT2 • Collated & organized• Saved in 1 folder• Can be zipped

    and/or protected• Saved in common

    formats (.doc, .xls, .pdf).

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Project Strengths/Successes Expressed by EDF Energy

    • Performance– EDF Energy pleased with project progress – L3Harris’ processes, policies and procedures in all areas of operation (Project

    Management, Contract Management, Quality Assurance, Engineering) are professional

    • Cooperation & Communication– Cooperation and communication between L3Harris and EDF Energy on highest

    standard and allowed project to progress to meet customer requirements

    • Flexibility– L3Harris’ flexibility in scope change management and commercial

    arrangements allowed EDF Energy to focus on project with responsive L3Harris team

    29

  • source: EDF Energy

    CONCLUSIONS

    Major Simulator Upgrade for Dungeness B

    PRESENTATION TITLE (USE INSERT > HEADER & FOOTER TO EDIT FOR ALL SLIDES)

  • L3HARRIS | L3 MAPPS INC. © 2020 L3 MAPPS Inc. All rights reserved.

    Conclusions

    • Project completed successfully to EDF Energy’s satisfaction• Dungeness B Simulator now on modern and easy-to-use/maintain

    platform: Orchid®– New high-fidelity models provide most realistic responses and easier to

    maintain using L3Harris’ state-of-the-art graphical modeling tools– Orchid® Core Builder– Orchid® Modeling Environment

    • Obsolete computers and I/O system no longer threat to training program • Enhanced training capabilities with classroom simulator• Upgraded simulator sustainable until the end of power station life• New Unit 2 simulation, desk and panels integrated with Unit 1 simulator

    provides most representative and realistic control room environment– Allows training on dual-unit scenarios – not possible before

    31

  • L3Harris.com/MAPPS

    L3 MAPPS Inc.T +1 514 787 4999F +1 514 788 1442

    [email protected]: L3 MAPPSYouTube: L3 MAPPS

    Major Simulator Upgrade for�Dungeness BOutlineBackgroundEDF Energy’s Current Nuclear SitesDungeness B Power StationDungeness B Power StationDungeness B Power Station Common Control Room (CCR) SimulatorDungeness B Power Station CCR SimulatorSimulator Upgrade ProjectSimulator Upgrade Contract Award CriteriaSimulator Upgrade ContractPhase 1 – New Computer SystemPhase 1 – RehostPhase 1 – Orchid® Instructor StationPhase 1 – New Soft PanelsPhase 1 – Tutor Diagrams + External SystemsPhase 1 – Upgraded A/V SystemPhase 1 – Unit 1 I/O System ReplacementPhase 1 – Unit 1 I/O System ReplacementPhase 1 – Classroom SimulatorPhase 2 – Dual-Unit Simulation StrategyPhase 2 – New ModelsPhase 2 – Unit 2 Panels and DeskPhase 2 – Unit 2 Panels and DeskPhase 2 – Unit 2 Panels and DeskProject TimelineChallenges*Automated TestingProject Strengths/Successes Expressed by EDF EnergyConclusionsConclusionsSlide Number 32