2012 HYUNDAIEngineering& SteelIndustries
34
2012 HYUNDAIEngineering
& SteelIndustries
We have been accumulating advanced technoloybased on track records we have done before
Major Records
35
Major RecordsPart. I B
usiness AreaPart. II M
ajor Plants / FacilitiesPart. III M
ajor Records
Throughout Korea and around the world, our history is completed bridges, industrialfacilities, marine facilities, and mega-structures. We are proud of these accomplishments and our contribution to building worldwide.
24x460
27x1,420
39x2,457
34x150
39x2,890
Steel Plate Deck(Marine B.) 20x940Steel Plate Deck(Long-Span Bridge)
23x1,390
Stee Bridge forHigh-Speed Railroad
Incl. Cable Installation
Incl. Cable Installation
Arch, SM570
Railroad Bridge
I.L.M. Installation
Truss Bridge for Railroad(Marine B.)
Nielsen Arch Bridge(Marine B.)/Incl. Cable
Truss Bridge for Railroad(The Han River)
Steel Plate Deck Bridge(Marine B.)
Truss Cable StayedBridge (Marine B.)
Three-Span ContinuousHalf-Through Arch Bridge
Arch Bridge/ILM Installed
Cable-Stayed Bridge(Hoof Shaped Opening)
Main span : 1,545m
Nielsen Lohse Arch Bridge
Station, Steel Pier, Steel ArchCable-Stayed Bridge
Nielsen Lohse Arch Bridge
1960MPa, 546
Main span : 1,150m
Name of Construction
The Han River Bridge #1
Seongsan Bridge
Seoul Outer Ring Road Lot#4
Seogang Bridge(Nielsen Arch)
Seoul Outer Ring Road Lot#3
NewGeoje Bridge
Seoul Outer Ring Road Lot#7
Improvement & Widening Project of Hannam Bridge
Widening Project of Mapo Bridge
Seoul-Busan High-Speed Railroad Lot#7-1
Namdo Bridge (Nielsen Arch)
Cable-Stayed Bridge Construction of Jindo Bridge #2
Widening Project of Samrangjin Bridge
Busan Subway Line #2, Yangsan Lot#1
Seoul Outer Ring Road Lot#1(Ilsan~Toegyewon)
Iksan~Jangsu Road Construction Lot#4
Gyeongjeon Line and Railway for Busan New Harbor Lot#1
Gajo land Bridge
Incheon Int'l Airport Railroad Lot#2-4B (Magok Bridge)
Steel Deck of Myeongji Bridge
GeouguemGrand Bridge
Amsa Bridge
Seongnam Pangyo Overpass Bridge
Daegu-si Road Construction Lot#2-44
Seongnam-Janghowon Road Construction Lot#2
Yi Sunsin Suspension Bridge
Improvement of Yangwha Bridge
Lot#4 of Daegu Urban Railroad Line#3
Yangsu Bridge construction
PPWS of Ulsan Suspension Bridge
Ulsan Suspension Bridge
Client
The City of Seoul
The City of Seoul
The Korea Highway
The City of Seoul
The Korea Highway
Busan Regional ConstructionandManagement Administration
The Korea Highway
The City of Seoul
The City of Seoul
Korea Train Express
Jeollanam-do
Iksan Regional ConstructionandManagement Administration
Gyeongsangnam-do
Office of Busan Subway Construction, Busan Urban Transit Authority,
Seoul Beltway Co.,Ltd.
The Korea Highway
Korea Railroad
The City of Geoje
Korail Airport Railroad Co.,Ltd.
Myeongji Bridge Co.,Ltd.
Iksan Regional ConstructionandManagement Administration
The City of Seoul
Korea Land & Housing Corporation
Korea Land & Housing Corporation
Seoul Regional ConstructionManagement Administration
Jeollanam-do
The City of Seoul
Daegumetropolitan UrbanRailroad Construction HQ
Gyeonggi-do
Ulsan Hub Bridge
Ulsan Hub Bridge
RemarksScale(TON)
5,100
18,000
37,681
5,400
33,627
11,000
6,888
17,438
14,048
2,600
1,588
4,025
7,391
9,959
15,630
12,124
14,684
4,959
14,815
18,849
17,768
21,500
2,885
6,977
8,992
11,594
3,034
6,830
4,806
5,439
15,488
Constrction Period
79.03-81.11
79.04-80.06
92.07-95.12
93.04-96.01
94.08-97.12
94.08-97.12
97.07-00.02
97.09-99.06
97.09-99.12
99.12-00.12
01.07-03.06
03.01-05.08
02.09-06.12
03.03-06.03
02.02-06.06
04.09-08.01
05.02-08.12
05.07-08.12
05.09-08.12
06.12-09.06
07.08-09.12
07.08-12.09
07.05-09.01
08.02-09.12
09.11-12.09
10.04-12.05
10.04-12.06
10.07-13.12
10.11-12.07
11.06-12.12
12.02-14.12
●Construction of Steel Bridge
⊖
2012 HYUNDAIEngineering& SteelIndustries
36
2012 HYUNDAIEngineering
& SteelIndustries
37
Major RecordsPart. I B
usiness AreaPart. II M
ajor Plants / FacilitiesPart. III M
ajor Records
Name of ConstructionDaecheongMultipurpose DamGateChungju Multipurpose DamGateSaemangeumGaryeok Draining GateSaemangeum Shinsi Draining GateAra Waterway Gate / Lot#6,Nakdong River Restoration (Sangju Gate)Nakdong River Restoration (Dalsung Gate)Han River Restoration (Kangcheon Gate)
ClientMinistry of ConstructionMinistry of ConstructionKorea Rural Community CorporationKorea Rural Community CorporationKoreaWater Resources CorporationKoreaWater Resources CorporationKoreaWater Resources CorporationKoreaWater Resources Corporation
RemarksScale(TON)7,300 4,300 1,200 4,2861,929 3,228 2,519 1,550
Constrction Period79.10.-80.1281.12-84.0698.06-99.0202.03-07.1209.09-11.1209.12-12.0410.02-12.0410.02-11.10
200,000 DWT200,000 DWT
325,000 DWT
200,000 DWT
Pipe Rack Module
Pipe Rack Module
Name of ConstructionIncheon Coal Power #3,4Keukdong Oil crude oil storing facilityKeukdong Oil berthing JacketMasan Port PontoonIncheon Steel In-desk(lining board)Pyeongtack Port rebuilding(vessels and bridge road)345KV Yeongheung T/L 1 Section marine Jacket & DeckYeongheung Coal Power #1,2 (Deck Structure)Yeongheung Coal Power #3,4 (Deck Structure)SPP Shipbuilding H1023, Line#4 L,T Shipbuilding BlockGeoje Petroleum Stockpiling ProjectTongyeong LNG Terminal Jacket ProjectGeouguemGrand Bridge Jacket Up BargeTaean Coal Power Unloading Deck Structure2MWOffshore Wind Tower JacketPressure Vessel in Yeosu Oil Tank TerminalModule in Yeosu Oil Tank TerminalEast-sea Ocean Research StationJacket & Module in BTX #2 ProjectDockwise Shipping Block
ClientKorea Electric PowerKeukdong OilKeukdong OilHyundai E&CBusan Transportation CorporationHYUNDAI Motors Co. LtdKorea Electric PowerKorea Electric PowerKorea South-east PowerSPP Heavy IndustriesKorea National Oil CorporationKorea Gas CorporationHyundai Engineering & Construction Co.,Ltd.
KoreaWestern PowerDoosan Heavy Industries & Construction Co.,Ltd.
Oilhub Korea Yeosu Co.Oilhub Korea Yeosu Co.Korea Ocean R&D InstituteHyundai OilbankDockwise Shipping B.V.
RemarksScale(TON)1,600 2,350 6,217 263
8,000 1,600 2,700 3,700 4,408 1,590 14,557 7,305 1,330 7,479 327 16
5,800 2,7545,4149,550
Constrction Period80.04-80.1185.08-86.0488.08-89.1290.11-91.0393.05-94.1299.12-00.0500.03-01.1201.06-02.0606.03-07.0308.12-09.0309.04-12.0209.07-11.0609.07-10.0309.09-11.0610.04-10.0610.10-12.0511.04-12.0711.08-13.1011.07-12.0311.09-12.05
●Construction of Gate
●Offshore andOther Projects
B4/F18B3/F12B3/F20B4/F35B6/F33B2/F14B8/F24B5/F41B4/F4B3/F15
B5/F393-dimention P/Truss
/F46/F69
B5/F34
Pipe Truss I.L.M. Installed
123 Stories
Name of ConstructionInternational Telecommunication CenterHeadquarters Building of HYUNDAI ConstructionHeadquarters Building of Korea Electric PowerIntercontinental HotelJansil � -Tower BuildingAsan Medical CenteMain Office of Korea Commercial BankTechnomart shopping centeConvention Center in ASEM Trade CenteSeoul National University Budang HospitalNew National Museum of KoreaBundang TripolisPipe Roof Truss of Jeju SeogwipoWorld Cup StadiumSeocho Hyundae Supervil APTMokdong Hyundai Hyperion super multistory APT(69 floors)Jamsil Lotte Castlegold APTLG Philips LCD P7 PlantHwanghak-dong Housing Redevelopment APT (1 Section)LG Philips LCD P8 PlantSongdo Convention CenterJinju-si StadiumCheongshim GymnasiumLG Philips LCD P9 PlantYeosu Expo Big-O ProjectJamsil High-Rise Lotteworld Tower
ClientKorea Postal ServiceHYUNDAI Engineering & Construction Co. Ltd
Korea Electric PowerHanmoo DevelopmentSilla Co., LtdAsan FoundationKorea Commercial BankPrime IndustryKorea Trade AssociationSeoul National UniversitySeoul Metropolitan CityKolon E&CJeju CityMilitary Mutual and AssociationHYUNDAI Engineering & Construction Co. Ltd
Lotte Engineering & Construction Co. LtdLG Philips LCDLotte Engineering & Construction Co. LtdLG Philips LCDGale International KoreaThe City of JinjuCheongshim Private InstitueLG DisplayOrganization Committee ofInternationnal Exposition Yeosu KoreaLotte Corporation, Lotte Shopping, Hotel Lotte
RemarksScale(TON)5,300 8,700 5,715 7,619 8,669 7,500 11,520 35,200 20,200 9,250 14,950 18,000 3,000 14,000 30,000 19,268 41,172 19,268 27,856 4,237 4,882 3,250 25,0001,00047,890
Constrction Period81.01-82.1082.09-83.0383.05-84.0686.07-87.0293.08-94.1093.03-93.1295.10-96.0995.10-97.0597.04-98.1097.07-98.0898.04-99.1299.02-00.1000.01-01.1200.06-02.0300.11-03.0303.02-05.0904.05-04.1004.08-07.1005.11-06.1205.12-07.0409.02-10.0509.04-11.1210.06-11.0511.12-12.0411.10-15.10
●Construction of Steel Frame
Pipe Rack Module
Name of ConstructionKwangyangkoro #1,2,4Yeongkwang Nuclear Power #3,4Taean Coal Power #3,4 T/GWolseong Nuclear Power #2Uljin Nuclear Power #3,4Seoincheon Integrated Coal Power #3,4Yeongkwang Nuclear Power #5,6Dangjin Coal Power #7,8 Turbine & Main buildingShingori Nuclear Power Plant #1,2Shingori Nuclear Power Plant #1,2 / Exposed Misc.Incheon Integrated Power #2Yeosu Industrial Complex Phase2 Pipe RackGS Caltex No.3 HOUWoongjin PloysiliconShingori Nuclear Power Plant #3 / ExposedMisc.HDO #2 HOUKwangyang Heat Treating Furnace StructureHyundai Steel Pipe RackHyundai Steel 3rd Stage Still Mill2D-ProjectHyundai Hysco 2 Cold Rolling PlantHyundai Steel 3rd Stage Thick Plate Plant
ClientPOSCOKorea Electric PowerKorea Electric PowerKorea Electric PowerKorea Electric PowerKorea Electric PowerKorea Electric PowerKorea East-West PowerKorea Hydro & Nuclear PowerKorea Hydro & Nuclear PowerKorea Midland PowerKorea industrial Complex Corp.GS CaltexWoongjinKorea Hydro & Nuclear PowerHyundai Oil BankPOSCOHyundai Steel CompanyHyundai Steel CompanyDaesan MMAHyundai HyscoHyundai Steel Company
RemarksScale(TON)20,000 14,400 6,233 13,000 6,960 5,950 16,612 6,793 12,324 4,274 5,022 4,290 5,242 5,020 2,400 8,936 1,630 9,613 29,400 4,308 26,000 15,300
Constrction Period87.03-90.1290.03-93.1192.11-93.0592.05-95.0593.08-96.1095.01-95.1097.12-00.0404.05-05.0705.10-10.0206.10-11.0507.07-09.0608.04-08.1008.10-10.1209.03-10.0609.05-12.0209.06-11.0210.04-10.1211.07-13.1011.07-13.0211.10-12.0611.12-13.0511.12-13.05
●Constructions of Industrial Plants
300,000 DWT
Suspension bridge
3-D Pipe Truss
Name of ConstructionJubayl Industrial Port marine JacketYanbu Oil Port Des-Alination FacilitiesSingapore Changi reclaiming work dredging PipeSan Diego Convention Center / USASouth-Pars Phase #2,3 Pipe Rack & EquipmentAnchorage International Airport Terminal / USASan Diego Ball Park / USATriborough Bridge / USAAir -train Terminal at Jamaica Station / USAPuerto-Rico Convention Center / USAZAWIA PLANT / LibyaC-17 Maintenance Complex, Phase 2 / USAKuwait Shuaiba Power PlantQatar Ras Laffan Power PlantGas Turbine Power Plant in Sarir, LibyaJurong Rock Cavern / SinggaporeBorouge-3 Utility & Offsite / UAEBraka Nuclear Power Plant / UAEOSX Shipyard Structural Steel / Brazil
ClientSaudi-ArabiaParsons Ltd/Saudi-arabiaHYUNDAI Engineering & Construction Co. Ltd
San Diego City / USATotal South-Pats / IranAlaska DOT / USASan Diego City / USANew York city / USAJFK International AirportPuerto-Rico Tourism Co.Libya Electric Power AgencyKiewit Building Group, Inc / USAKuwait Electric Power AgencyRas Girtas Electricity CompanyLibya Electric Power AgencyJTC Co.A.D Polymers CompanyKEPCO / UAEOSX / Brazil
RemarksScale(TON)12,000 4,940 850
14,300 16,000 4,500 9,000 8,500 3,800 9,860 2,574 1,335 6,991 7,057 2,500 6,626 4,195 28,822 14,917
Constrction Period80.02-83.0582.08-83.0693.03-93.0898.11-99.1299.09-00.1200.02-01.0500.04-01.0801.02-02.0901.06-02.1202.03-04.0705.03-05.0606.06-07.0507.12-08.1208.05-09.1108.11-09.1111.05-12.1211.10-12.0511.10-13.0311.10-12.09
●Overseas