MAINTENANCE RATING PROGRAM Allen Mattox
District Five Technical Support Manager
MRP HISTORY
• Legislative Request
• Task Team
• First Survey 1985 / 86
3 SURVEY PERIODS / YEAR
• JULY - OCTOBER
• NOVEMBER - FEBRUARY
• MARCH - JUNE
WHAT IS MRP?
• A visual and mechanical evaluation of routine highway maintenance conditions.
• It is a report card for maintenance
Purpose of MRP
• To provide information that should be used to schedule and prioritize routine maintenance activities.
• To provide uniform maintenance conditions that meet established Departmental objectives.
FACILITY CLASSIFICATIONS
• Rural Limited Access• Rural Arterial• Urban Limited Access• Urban Arterial
• 30 Points are surveyed for each Facility Type.
ELEMENTS
• Roadway
• Roadside
• Traffic Service
• Drainage
• Vegetation/Aesthetics
ROADWAYCharacteristics
• Flexible Pothole• Flexible Edge Raveling• Flexible Shoving• Flexible Depression/Bump• Flexible Paved Shoulder/Turnout• Rigid Pothole• Rigid Depression/Bump• Rigid Joint/Cracking• Rigid Paved Shoulder/Turnout
ROADWAY
Flexible Pothole Flexible Edge Raveling
Flexible Bump / DepressionFlexible ShovingFlexible Paved Shoulder Turnout
ROADWAY
Rigid Joint / Cracking
Rigid Joint / CrackingRigid Depression/Bump
Rigid Turnout
ROADSIDE
• Unpaved shoulder
• Front slope
• Slope pavement
• Sidewalk
• Fence
ROADSIDE
Unpaved Shoulder Front Slope
Slope Pavement Sidewalk
Fence
TRAFFIC SERVICESCharacteristics
• Raised Pavement Markers• Striping• Pavement Symbols• Guardrail• Attenuator• Signs <= 30 sq. ft.• Signs > 30 sq. ft.• Object Markers and Delineators• Lighting
TRAFFIC SERVICESCharacteristics
RPM’S Striping
Pavement Symbol Guardrail
TRAFFIC SERVICESCharacteristics
Signs > 30 SF
Attenuator Signs <= 30 SF
LightingObject Markers & Delineators
DRAINAGE
• Side/cross drain
• Roadside/median ditch
• Inlets
• Miscellaneous drainage structure
• Roadway sweeping
DRAINAGECharacteristics
Side drain
Roadside/Median ditch Outfall ditch
Cross drain
DRAINAGECharacteristics
Misc. Drainage StructureInlet
Roadway sweeping
VEGETATION AND AESTHETICS
• Roadside mowing
• Slope mowing
• Landscaping
• Tree trimming
• Curb/sidewalk edge
• Litter removal
• Turf condition
VEGETATION AND AETHETICS
Slope MowingRoadside Mowing
Tree TrimmingLandscaping
VEGETATION AND AETHETICS
Curb/Sidewalk Edge
Litter RemovalTurf Condition
Curb/Sidewalk Edge
• WHAT DOES THIS MEAN TO ME?
• WHAT IS MY ROLE IN THIS?
• As an inspector, your job is to make sure the contractor follows the plans and specifications.
• MRP criteria is based on the Roadway and Traffic Design Standards. As long as you are following these standards, we will pass MRP.
• Don’t get caught up in things you cannot control, such as plan design. We can get exceptions for these issues and not be scored on them.
• Follow the Standards and Specifications.
Drop Off at Call Box
Debris
SIDEWALK
Pothole/Debris
GUARDRAIL
TURF CONDITION
FENCE
FRONT SLOPE
SIGNS
SIGNS
SIGNS
MISCELLANEOUS
MISCELLANEOUS
• http://www.dot.state.fl.us/statemaintenanceoffice/MaintRatingProgram.shtm
QUESTIONS?